NOTEWORTHY PROJECTS FROM CONCEPT TO COMPLETION 1 2

NOTEWORTHY PROJECTS EXPERIENCE & QUALITY CRAFTSMANSHIP AT WORK

Richard and Gina Santori Aurora Public Library Municipal Construction ...... 5

RiverEdge Park Music Garden Recreational Construction ...... 7

Aurora Police Department Training & Support Building & Parking Garage Police Department Construction ...... 9

Oswego Central Fire Station #1 Fire Station Construction ...... 11

Vaughan Athletic Center Park District Construction ...... 13

Mooseheart Child City and School Gymnasium Educational Construction ...... 15

Aurora Fire Station #8 Fire Station Construction ...... 17

Blackberry Farm Adventureland Playground Park District Construction ...... 19

First Secure Community Bank Financial Construction ...... 21

Hollywood Casino & Parking Garage Entertainment Construction...... 23

Naperville Fire Station #10 Fire Station Construction...... 25

Fox Metro Water Reclamation District P-3 Laboratory Water Reclamation Construction ...... 27

Stuart Sports Complex Park District Construction ...... 29

Aurora Central Catholic High School Educational and Religious Construction ...... 31

Splash Country Aquatic Center Aquatic & Park District Construction ...... 33

Paramount Theatre Entertainment and Historic Construction...... 35 3 4

COMPANY OVERIEW WHAT WE ARE ABOUT

Founded by Robert Carl Wegman in Aurora in 1955, R.C. Wegman is a full service commercial and industrial construction company with over 62 years of success. The company continues to be operated by the family under the same principles on which it was founded. We have a personal commitment to complete every project on-time, with the highest quality craftsmanship and cost controls to maintain budget requirements. We honor this commitment regardless of the value and the complexity of the project.

With a concentration in Construction Management projects, R.C. Wegman has completed some of the most noteworthy structures within Aurora and the surrounding areas. We have been performing Construction Management services since 1991 for projects with values ranging from 2 million to 78 million dollars, demonstrating that we can take on any project, no matter what the size.

R.C. Wegman Construction Company is unique and unparalleled in its ability to understand the constructability of different types of planned facilities and structures. Over the years we have successfully completed a variety of municipal and educational facilities, as well as extremely diverse and complex structures. We have a unique ability and experience to construct any facility with any technological specifications or requirements even if the concept has never been done before. 5 6 RICHARD & GINA SANTORI PUBLIC LIBRARY OF AURORA MUNICIPAL CONSTRUCTION CORDOGAN CLARK & ASSOCIATES Final Cost: $28 Million

THE SANTORI PUBLIC LIBRARY OF AURORA is a new and public areas. There are quiet reading rooms, local history rooms and three story library building in the heart of downtown Aurora that provides other areas that provide solitude for study and reflection. The building some unique features to the Aurora Public Library system. Some unique has been designed and constructed to be a LEED Certified building state of the art features are seen in the expanded areas for children and which features state of the art and environmentally friendly materials, teens, computer and internet areas, dedicated study rooms, community construction assemblies and design. gathering areas, conference rooms and interactive elements at the atrium 7 8

RIVEREDGE PARK MUSIC GARDEN MULLER & MULLER

RIVEREDGE PARK is a stunningly, beautiful entertainment recreational destination with natural elements occupying both sides of the Fox River in downtown Aurora, IL. The outdoor performance venue is a functional element of the park. It acts as a platform from which visitors can experience cultural events within a natural setting and will hold 9,500 people. It supports a state of the art sophisticated sound system, mix tower and concessions building. The site includes 1,700 feet of multi use recreational trail, a 40,510 square feet permeable paver plaza, 81,810 square feet of concrete plaza, walks and native landscaping.

RECREATIONAL CONSTRUCTION Final Cost: $13.2 Million 9 10

AURORA POLICE DEPARTMENT TRAINING & SUPPORT BUILDING & PARKING GARAGE McCLAREN, WILSON & LAWRIE

Forensic Lab

THE AURORA POLICE STATION TRAINING & SUPPORT BUILDING has a LEED Gold rating and is the first LEED public project in Aurora.

The Staff Parking Deck is a 203,069 square foot, two level structure that is pre-cast concrete construction with 557 parking spaces. The Training and Support Building is a 41,000 square foot building constructed with structural pre-cast concrete wall panels at the exterior walls. The building contains a state of the art forensic department that has multiple labs such as a latents lab, digital lab, alternative light source lab, computer forensics lab and a vehicle exam area all of which can process evidence such as DNA, fingerprints, computer and other evidence with the efficiency of a state certified lab. The TAS Building also houses a state of the art firing range. The firing range is a ten lane range that can also be utilized as a free roaming range, which allows training of various tactical maneuvers. Each lane has a firing length of 75 linear feet with stationary targets that swivel 360 degrees. These targets are connected to a computerized system that allows the range master to input training sequences for a multitude of training needs.

POLICE DEPARTMENT CONSTRUCTION 10 Lane Firing Range Final Cost: $16.7 Million 11 12

OSWEGO CENTRAL FIRE STATION #1 FGM ARCHITECTS

THE 44,000 SQUARE FEET CENTRAL FIRE STATION in Oswego, IL includes 15 bunks, 8 apparatus bays, 1 maintenance bay and 6 small vehicle bays. The building meets the needs of Oswego’s growing Fire Protection District. Aesthetically, the Village of Oswego incorporated elements of an old fire house into the new station. The old Chicago style architecture, included in the design, is complete with a bell tower and traditional red overhead doors. Traditional design was incorportated into the interior as well with the Fire Commander’s platform and sliding pole.

FIRE STATION CONSTRUCTION Final Cost: $10.8 Million 13 14

VAUGHAN ATHLETIC CENTER CORDOGAN CLARK & ASSOCIATES

THE VAUGHAN ATHLETIC CENTER in Aurora, is a 40,000 sq. ft . field house with 4 basketball courts, volleyball courts, batting cages, 200 meter 4 lane track, complete with long jump and pole vault pits. The natatorium features 3 meter 4 lane therapy pool with a zero depth ramp, 8 lane competition pool, plunging pool with 2 body slides, zero depth leisure pool with built-in play features and water playground. Also, there is a 10,000 sq. ft. fitness center; 1/6 mile elevated 3 lane running track; aerobic, spinning, and multipurpose rooms; indoor children’s playground; washrooms and locker rooms complete with steam rooms and saunas; and office space.

Midwest Construction Best of 2006 Best of 2006 Award of Merit for Sports and Entertainment, the award winning Vaughan Athletic Center was a ground breaking achievement. Jury comments on the job, “This was a huge endeavor for a park district. It’s all encompassing.”

“R.C. Wegman’s expertise in coordinating and delivering a quality project on schedule and on budget is second to none. Their involvement in countless construction projects in the community leads to a significant number of the subcontractors being local businesses which provides for a great sharing in pride in the project from the craftsman to the small business owners.” Robert Vaughn, Past Fox Valley Park District, Director

PARK DISTRICT CONSTRUCTION Final Cost: $25 Million 15 16

MOOSEHEART CHILD CITY SCHOOL & GYMNASIUM JOEL HESTRUP

MOOSEHEART CHILD CITY in Batavia, Illinois, hired R.C. Wegman Construction for their school addition and new gymnasium project. The Mooseheart project included a new entrance, school offices, a new gymnasium and locker rooms, an air rifle range for the school’s Naval Junior Reserve Officer’s Training Corps (NJROTC) students, and practice rooms for the school’s band. The new gym has seating for 400 and anticipates uses to include NJROTC functions, concerts, and athletic practices and games.

EDUCATIONAL CONSTRUCTION Final Cost: $3.9 Million 17 18

AURORA FIRE STATION #8 DEWBERRY ARCHITECTS

AURORA FIRE STATION #8 & COMMUNITY CENTER is the proud recipient of the “Award of Merit” for the 2007 ALA Design Award. Totaling nearly 20,000 square feet, this unique structure houses both Fire Station #8 and the City of Aurora’s Service Call Center. The high bay opaque glass provides energy-saving natural light to the apparatus bay.

This facility will become one of the main communication hubs for Aurora. From a call center stand point, it gives the city a far east location for the local residents to communicate with the city without having to drive downtown. As one of the industry leaders in fire station construction and CM work, we understand the special construction elements associated with vehicle exhaust systems, apparatus floor application, and the special technical and communication needs associated with fire stations.

FIRE STATION CONSTRUCTION Final Cost: $6.7 Million 19 20 BLACKBERRY FARM ADVENTURELAND PLAYGROUND DANIELS WOODLAND

THIS UNIQUE ADVENTURE STRUCTURE consists of five custom designed wooden structures connected via an extensive network of multi- level climbing decks, ropes and a catwalk-style bridge that connects play-houses. Net climbers, slides, a themed zip line, rock climb, log crawl and other activities are spread around and inside the playground. Interactive elements and games are inside the large barn structure and historical images and fun facts/quotes are placed all around. This innovative playground is fully compliant with IPEMA, ASTM and CPCS standards.

PARK DISTRICT CONSTRUCTION Final Cost: $800,000 21 22

FIRST SECURE COMMUNITY BANK STUDIO GC

FIRST SECURE BANK is a 2-story, 15,000 SF colonial style banking facility. The building has a classical feel inside and out, from the columns on the exterior, to the wood-trimmed coffered ceilings and marble flooring inside, the bank is top of the line. A very unique part of the bank is the 100 year old Antique Vault Door located in the lobby. The Herring Hall Marvin vault door was completely restored. The vault door weighed 10,000 lbs and took a well-executed plan to install.

FINANCIAL CONSTRUCTION Final Cost: $4.4 Million 23 24 HOLLYWOOD CASINO AND PARKING GARAGE CORDOGAN CLARK & ASSOCIATES

HOLLYWOOD CASINO DOCKSIDE GAMING FACILITY in Aurora, Illinois gave R.C. Wegman the opportunity to build the impossible, an 180,000 square foot floating radius casino to encapsulate and join to the existing stationary pavilion. Nothing like it had ever been designed before. This one of a kind structure had to be completed within the constraints of the United States Coast Guard maritime ABS (American Bureau of Shipping) codes and City of the Aurora BOCA (Building Officials and Code Administrators) codes. Simultaneous to the construction, launch, and securing of the floating casino, RCW also com- pleted a major renovation to the pavilion, constructed two surface parking lots, and added another enclosed pedestrian bridge and entry building. A Certificate of Occupancy was issued by the City of Aurora on June 16, 2002. All of these projects, totaling 220,000 square feet and $56 Million, were completed in 16 months.

PARKING GARAGE This 5-story 800 vehicle parking structure in Aurora, Illinois also has the operational office of the casino and the city of Aurora Chamber of Commerce at ground level. Special water proofing, insulation and structural isolation methods were used within the parking facility. A skylight dome and six story high glass curtain wall and landscaped plaza next to the Fox River canoe chute cap off this beautiful structure.

ENTERTAINMENT CONSTRUCTION Final Cost: $56 Million 25 26

NAPERVILLE FIRE STATION #10 CHARLES VINCENT GEORGE

THIS 10,000 SQUARE FOOT SATELLITE FACILITY serves the needs of the Naperville Fire Department. Fire Station 10 will enhance response times within the southwestern section of Naperville. The design includes three drive through apparatus bays, sleeping quarters, fitness room, kitchen/eating area and living area for up to (10) personnel. Also featured is a decontamination room, turnout gear room and lockers for 30 personnel. Both the structure and site have been designed to include unique features which optimize environmental and energy conservation.This facility is a great example of traditional design enhanced with today’s technology.

FIRE STATION CONSTRUCTION Final Cost: $2.2 Million 27 28

FOX METRO WATER RECLAMATION P-3 LAB WALTER E. DEUCHLER ASSOCIATES, ENGINEER LCM ARCHITECTS

THE FOX METRO WATER RECLAMATION P-3 LAB at Fox Metro is an environmental laboratory that runs various analyses to ensure that the treatment plant is operating effectively. The laboratory also provides data for the industrial pretreatment department, the EPA, the Fox River study group, engineering firms and other smaller laboratories in the watershed.

WATER RECLAMATION CONSTRUCTION Final Cost: $4.9 Million 29 30

STUART SPORTS COMPLEX SMITHGROUP JJR

STUART SPORTS COMPLEX - 135 acre expansion consisted of site development; including a new bio-detention pond, wetland mitigation and extensive landscaping. The complex also includes 4 new lighted baseball fields, 11 new soccer fields, with 5 designed as “Flex” fields for a variety of activities. The park also includes a 15 acre dog park and 630 parking spaces making Stuart Sports complex a champion athletic facility and a regional destination.

PARK DISTRICT CONSTRUCTION Final Cost: $9.35 Million 31 32

AURORA CENTRAL CATHOLIC HIGH SCHOOL PRISCO, SERENA, STURM

AURORA CENTRAL CATHOLIC HIGH SCHOOL is a 130,000 Sq. Ft. complete high school campus including: gymnasium, cafeteria, classrooms, football fields, running track and parking lot built for the Diocese of Rockford.

EDUCATIONAL AND RELIGIOUS CONSTRUCTION Final Cost: $10 Million 33 34 SPLASH COUNTRY

AQUATIC CENTER AQUATIC CONSTRUCTION CORDOGAN CLARK & ASSOCIATES Final Cost: $6 Million

SPLASH COUNTRY WATER PARK in Aurora, Illinois has one of the largest lazy rivers in Illinois and also features a beautifully laid out double water slide, zero entry pool, water features, bathhouse and concession stand. All designed with timbers and farm style structures.

Splash Country Water Park in Aurora, Illinois is a family-friendly aquatic center that features:

• Six-lane zero-depth pool with children’s play features • Enclosed kid-friendly area with spray guns, waterfall and • Second-largest lazy river in Illinois, with 1,100 feet winding other interactive features for kids under 48 inches tall through dumping buckets, sprayers, jets and a bubbling rapids • Full concession stand with umbrella tables • One winding, enclosed tube/flume slide • Sand play area with seating and shade • One winding, open tube/flume slide • Lap-lane swimming at designated times • Two regulation sand volleyball courts • Bathhouses

All features of the park were designed with timbers and farm style structures. Splash Country Aquatic Center is a great destination for families of all ages. 35 36

PARAMOUNT THEATRE CORDOGAN CLARK & ASSOCIATES

THE PARAMOUNT THEATRE in Aurora, Illinois was originally built in 1931, and offered movies, concerts, circus performances all inside the first air conditioned building outside of Chicago. Acoustics and sight lines had been so well designed that there was not one bad seat in the house. The luxurious theatre gave its patrons a brief respite from the troubles of the Great Depression.

After 40 years of serving Aurora and the surrounding communities, age began to take its toll. Dirt and grime covered the walls, and beautiful murals, upholstery and curtains had become tattered and torn. In 1965, the Aurora Civic Center Authority and the Aurora Redevelopment Commission (ACCA/ARC) were established, heralding the beginning of downtown redevelopment in Aurora.

The eight hand-painted murals were in such poor shape that they had to be replaced. Each mural was traced and repainted on flame retardant, silk-like fabric and returned to its original position. The warm burgundy, coral, and peach colors of the panels were used as the primary color scheme for the renovations, including the reupholstered original seats. Old veneer and wallpaper were removed and replaced; broken plaster areas were repaired and repainted. The fluted columns that separate the murals were made from plaster, as were most of the surfaces under the decorative work, and were originally clad in German gold leaf. This covering, too expensive to duplicate, was replaced with foil that approximated the original look.

This renovation was a historically significant for R.C. Wegman Construction. Since the renovation completion, it is the “jewel” of the performing arts in the western suburbs, and named one of the Top Ten Theaters in Chicago.

ENTERTAINMENT AND HISTORIC CONSTRUCTION Final Cost: $1.5 Million MARKETS SERVED 38 FEATURED FACILITIES

AQUATIC FACILITIES Herget Middle School Marywood Fire Station #2 Bowman Corporate Center FVPD - New Haven Park RETAIL DuPage Swimming Center Holy Angels School Montgomery Central Station Castrol North America FVPD - Simmons Park Ace Hardware - Aurora & Batavia Marmion Military Academy Illinois Math & Science Academy Naperville Fire Station #3 Cellular One Communications FVPD - Spring Lake Park AT & T Splash Country Water Park Indian Prairie CUSD #204 Naperville Fire Station #10 Coilplus Illinois FVPD - Stuart Sports Complex Aurora Antenna Vaughan Athletic Center Kaneland CUSD #302 North Aurora Fire Station #2 DACO Incorporated Bellweather Automotive Matea Valley High School Oswego Central Station Furnas Electric PARKING STRUCTURES Chicago Premium Outlet Mall - Retail Buildout BANKS Millbrook High School Oswego Fire Station #3 GenOn Energy Aurora Police Parking Garage Douglas Floor Covering Aurora Federal Savings Mooseheart Child City / School & Gym Oswego Fire Station #4 GM Electro Motive Aurora Stolp Avenue Parking Deck Eagle Food Store Aurora National Bank University HQC Incorporated Hollywood Casino / Galena Deck Farm and Fleet Broadview Bank Rachel’s Learning Center HEALTHCARE / DENTAL IBEW Local #461 Hollywood Casino / Valet Parking Deck GTE Airfone Benchmark Bank - Aurora Rosary High School Castle Orthopedics Martner Products Hollywood Casino / Porte Co-chere Globe Wholesale Benchmark Bank - St. Charles St. Francis High School Countryside Nursing Center Masco / CJ Insulation Rush Copley Medical Center Parking Garage Addition Industrial Supply Continental Bank - Aurora St. Joseph Parish Center Dohan Dental Painters District Council #30 J. A. Henckles First Secure Community Bank - Sugar Grove Waubonsee Community College DuPage Health Center Pepsi-Cola America POLICE STATION FACILITIES Janco Chemical Naperville Savings and Loan YWCA of Aurora Fairview Dental Clinic Sikich Corp. Technical Center Aurora Police Headquarters KVR Square Oak Brook Bank - 8 Locations Fox Valley Dialysis Center Weldstar Company Kane County Correctional Center Michaels Brothers Grocery Old Second National Bank ENTERTAINMENT Heartland Blood Center Wrigley Manufacturing Joliet Correctional Center SONY Retail Regency Federal Savings Aurora Millennium Plaza Kelly Orthodontics Naperville Police Station - Tactical Training Add. The Village Green Aurora Fox Riverwalks Lehman & Menis Dental LEED CONSTRUCTION North Aurora Police Headquarters Vastu Commons BRIDGES (PEDESTRIAN) Hollywood Casino - Aurora Lehman and Menis Oral Surgery Aurora Public Library Sheridan Correctional Center WM.F. Meyer Company Hollywood Casino Maywood Park Racetrack Manor Health Care Aurora Police Headquarters St. Charles Police Station Indian Trail Road Paramount Art Center - Aurora Ogden Professional Building Naperville Fire Station #10 SPORTS COMPLEXES Molitor Road Phillips Park Mountain Lion Exhibit Orchard Valley Dental P. C. RECREATION FVPD - Stuart Sports Complex Virgil Gilman Phillips Park Visitor Center - Aurora Prairie Dental Clinic MUNICIPAL Aurora’s RiverEdge Park FVPD - Vaughan Athletic Center RiverEdge Park Randall 10 Theater - Batavia Rush / Copley Hospital Aurora Communication Tower Fox River Canoe Chute River Edge Park Music Garden Tillers Nursing / Rehabilitation Aurora Public Library FVPD - Blackberry Farm STATE COMMERCIAL / CORPORATE Sci-Tech Hands On Children’s Museum Weglarz & Parkhurst Dental Aurora Chamber of Commerce FVPD - Cool Acres Illinois Department of Public Aid Alarm Detection Systems Swimming Stones Sculpture - Aurora Aurora City Hall FVPD - Eola Community Center Illinois Youth Center - St. Charles Auto Network Building Tivoli Fountain Plaza - Avenue HISTORIC FACILITIES Aurora Community Center FVPD - Prisco Community Center Daleiden Funeral Home First Presbyterian Church - Aurora Aurora Economic Development FVPD - Vaughan Athletic Center WATER / WASTEWATER 1st Centennial Mortgage FEDERAL George Elmslie Building - Aurora Aurora Transportation Center Rush / Copley Tennis Courts TREATMENT FACILITIES Hair Professionals Argonne Department of Energy Old Second National Bank - Aurora Batavia Library Remodel Elburn WWTF Insurance Auto Auction Argonne National Laboratory Paramount Arts Center - Aurora DuPage County, Illinois RELIGIOUS STRUCTURES Fox Metro WRD Kodiak Building Fermilab Department of Energy Sci-Tech Hands on Museum - Aurora Hinckley Public Works Alpha Christian Registry Fox Metro P-3 Laboratory Orchard Valley Office Condos Fermilab C0 Detector Hall Upgrade Kane County, Illinois Church of the Holy Ghost Fox Metro Building - Water Systems Improvements R. J. O’Neil Plumbing Fermilab Kress Creek HOSPITALITY Emmanuel Lutheran State Farm Service Center Fermilab MI 52 Aurora Turners Club NON-FOR-PROFIT AGENCIES First Presbyterian Church WIND ENERGY Steiner Electric Supply Fermilab Wilson Hall - 13th Floor Remodel Cantina del Rio Aurora Area Interfaith Food Pantry Harkness Family Center Aurora Township Highway Department Wall Street Journal Harner’s Restaurant Family Counseling Services Immaculate Conception Metamora Elementary School Westbank Office Building FOREST PRESERVE DISTRICTS Hollywood Casino Restaurants Fox Valley United Way Resurrection Lutheran Whitt Law Offices DuPage County Lincoln Inn Hesed House - Aurora Saint Anne Church Remodel Kendall County Orchard Valley Restaurant Lifespring Center - Aurora Saint David Episcopal Essex EDUCATION Sepulveda Restaurant Marie Wilkinson Food Pantry Saint George Grundfos Office All Saints Catholic Academy FIRE SERVICE The Phoenix Club Mutual Ground - Aurora Saint Richards Parish Hengli Office Aurora Central High School Aurora Fire Station #7 Tiger Athletic Club Wayside Cross Ministry - Aurora Saint Rita of Cascia Mercy Housing Aurora Education Center Aurora Fire Station #8 Saint Therese Northbrook Public Works Office Aurora Fire Station #10 INDUSTRIAL / OFFICE PARKS Seegers Lutheran Local 265 Sheet Metal Union Aurora East CUSD #131 Aurora Fire Station #12 ABF Freight Systems Aurora’s RiverEdge Music Park Temple B’Nai Israel Aurora West CUSD #129 Elburn Fire Station #1 Alcan-Toyo America FVPD - Greene Field Park Greenman Elementary School Elburn Fire Station #2 Aurora Air Products FVPD - Lippold Park 750 Morton Avenue | Aurora, Illinois 60506 | Ph: (630) 844-3000 | Fx: (630) 844-3003 | www.rcwegman.com