Review the Legal Side and Reform the Institutional Framework of Water Sector in Palestine

Total Page:16

File Type:pdf, Size:1020Kb

Review the Legal Side and Reform the Institutional Framework of Water Sector in Palestine MEDRC Series of R&D Reports MEDRC Project: 12-AS-009 Review the Legal Side and Reform the Institutional Framework of Water Sector in Palestine M. Sc. Thesis Submitted By Eng. Mahmoud R. Sulyman Principal Investigator Dr. Said Ghabayen Assistant Professor, Islamic University of Gaza Faculty of Engineering – Environmental Department. Middle East Desalination Research Center Muscat, Sultanate of Oman June 2013 Islamic University, Gaza. Postgraduate Studies Deanery, Faculty of Engineering, Department of Civil Water Resources Engineering, Review the Legal Side and Reform the Institutional Framework of Water Sector in Palestine M. Sc. Thesis Submitted By Eng. Mahmoud R. Sulyman Supervised By Dr. Said Ghabayen Assistant Professor, Islamic University of Gaza Faculty of Engineering – Environmental Department. A Thesis Submitted in Partial fulfillment of the Requirement for the Degree of Master in Science in Civil / Water Resources Engineering. June, 2013– Shaban, 1434. Abstract The main objective of water resources management is to secure adequate quantity of good quality water in equitable manner. This could be achieved through a proper institutional management and participation of all stakeholders. The water management process in Palestine started since 1995-1996 by establishing Palestine Water authority (PWA) as water sector regulator and still ongoing up to date. In this study, various regional and international institutional configurations were reviewed and how those entities managed the sector. The state of problem in this thesis divided into two main parts the legal part and the institutional framework of the sector. Adaptive methodology was used through reviewing and comparing the four main laws (Water Law, Environmental Law, Agricultural Law and Public Health Law) together, and the institutional framework was restructured based on duties of each competent agency stated in laws, the principles of the Integrated Water Resources Management (IWRM) and the concepts of the Management and Transnet Framework (MTF). And to enhance the proposed ideas, interviews with the main stakeholders were done with filling a questioner contains direct questions about the legal and institutional framework of the sector. This study was based on presumption that PWA, Environment Quality Authority (EQA), Ministry of Agriculture (MoA) and Ministry of Health (MoH) are the main competent agencies for regulating and monitoring of water and waste-water sector at the legal level and there are no discrepancies of stating their responsibilities in laws and these agencies shall cooperate and coordinate in between to achieve purposes of these laws as clear in laws. However it was found that there is no practical willingness for cooperation and information sharing among these agencies. In addition, the study identified that the NWC is currently the link between the regulator (PWA) and the decision makers at the political level represented by PLC and the Council of Ministers. But its current structure is the main reason for its malfunctioning to serve water sector. So that, two main solutions were proposed either by reform the current structure or resolving the NWC then PWA has a direct contact with the political level. This study found that, the current legal references of water management represented, by the national four laws: Water Law, the Environmental Law, the Agricultural Law and the Public Health Law. These laws shared the same concept about violations and sanctions regarding any actions against water sources. The integration among these laws represented by practical coordination mechanisms between these agencies as referred in laws. But the coordination mechanisms were not clarified well in articles of laws. The direct and indirect responsibilities and duties of these agencies were identified in the above mentioned laws and summarized in this study. In addition to clearance of duties, all laws insured that the provisions of each law shall be applied without any contradictories with other articles in the same law or other relevant laws. In addition, it was found that the multi-level regime was used since the beginning of the first attempts of water sector institutional reform process in Palestine. The current I institutional framework composed of three levels. In this study two options were proposed to reform the institutional framework. The first one representing a modification of the current institutional framework with filling the gaps and the other one is a new proposed framework with new proposing agencies aimed to decrease the discrepancies between these agencies. Each level occupied by various agencies based on their duties stated in laws or basic laws. The first option has four levels. At the political level, three current institutions were found: PLC is the legislative authority and these laws shall be executed through the Council of Minister which is the executive authority and the NWC is the direct link between the council of Ministers and the regulator of water sector and recommend for the council any regulations suitable for enforcement water law. The legal level was occupied by the ministries and authorities. At the operation level, a new utility was proposed only for managing the non-conventional water sources. At the service level, there are three current service providers: the 25 municipalities, CMWU as CCS for these municipalities and UNRW also considered as service provider for service in eight refugee camps in Gaza Strip. The second option has fewer institutes for more clearance of duties and less practical discrepancies. The policy and regulation level which occupied by the policymaking institute the Council of Ministers the executive authority, a new proposed ministry called Ministry of Nature & Environment (MoNE) which is a combination between three existing institutes (PWA, MoA & EQA/PEnA) which is the regulator of water and waste-water sub- sector in addition to other sub-sectors. This ministry has three main directorates (Water sources Directorate, Agriculture and Irrigation Directorate & Environment Directorate). In addition to other three main competent agencies which are MoH, MoLG & MoF. At the Operational, Supply & Service Provider Level, the bulk water utility was proposed as the national utility to operate sector assets and supply bulk water to the regional entities; CMWU is the main service provider which shall be re-established as regional utility instead of its current shape as CCS according to the provisions of water law. The 25 municipality in Gaza Strip and UNRWA as service provider in the eight refugee camps shall be represented through the five regional office of CMWU. The second option is more preferable for better management. For more comprehensive institutional framework, Private Sector Participation (PSP) was considered during the restructuring procedures. Different types of Public Private Partnership (PPP) contracts were recommended since the private sector was proposed to be part of the lowest two levels. At the operational and supply level, the delegation PSP type was chosen and the BOT contract was proposed for water treatment, and the concession contract for waste-water treatment. At the same level, the delegation and corporate PSP types and the concession & management contracts were selected for the operation of domestic facilities & supply to municipalities. But at the service level, the management and service contracts were proposed under the corporate & administrative contracts type for service providing to consumers. The legal side of PSP in sector management was guaranteed by the national laws mainly water law, Basic Laws and its amendments and the Local Organizations Law No. 1/1997 supporting the PSP in the management process of the sector. II ا إن ا# ف ا! إدارة در ا ه ھ ت ه دة ة )'و, وھ*ا ( 1 0 /.ل , + 2' )9 78 8ر 7 أ15ب اار. أ ت ?< إدارة =ع ا ه ; ا!را: اA<' ا1)< * ?م D 1996 -1995 إ8Cء < ا ه اA<' ,+ ع ا ه و') ?< , + إدارة =ع ا ه H(I اGن. E>F ھ *ه ا را ا D A>(J ? ا), ت ا2' اK=< وا و Kدارة =ع ا ه و L ھ*ه ا), ت =ع ا ه. إن ا8(< ا) و)# ھ*ه ا را '+ إH =' وھ ا'+ اC C واKطر ا), Kدارة اع. I M + ا)J ام آ E>F , M1 ا D ا اC ا! ا!رD وھ (=C ن ا ه و =C ن ا P و =C ن اOرا? و=C ن ا1 اD) ورTD #(C# اSD, و+ إ?دة ء اKطر ا), ء ?<H #م I '2 7'9 CE ?< 0 ا اC و ء ?<H دئ إدارة در ا ه ا8) و?<H أV اKطر اKداري واCK). و)OOD ا!;(ر اوI ; ا را ; + ?7 .ت Y أ15ب اار I E>F M ا.ت PD ا) ن 1) ي ?<H اI >P ل اKطر اC C وا2' <ع. إ?) ت ھ*ه ا را ?<H أن < ا ه اA<' و < دة ا P و وزارة اOرا? ووزارة ا1 D)وا ا2'ت ذات اD.= وا!=ب ), + وا= =ع ا ه واف اH>? 1 ا') ي ا), وا0C ] /.;ت ; 5 I.5 ^ ه ھ*ه ا2'ت ; ا اC , وأ 0C H>? ھ*ه ا2'ت ا)Dون وا)' [ ; #+ )1 [ ا# ف ھ*ه ا اC ھ وا:` و ص ?< 0 ; ھ*ه ا اC . و( و أ0C ] ا)D اد ?< <)' [ وا)Dون ; # 8ر اD< ت ; #+. وو:E1 ھ*ه ا را ?<H أن <V ا ه اA<' ھ ااb < ا ه اA<' وDC5 اار ?<H ا') ى ا' وھ+ ا<V ا)D8 اA<' و<V ا زراء اA<' . و( ا)( ا1 V> ا ه اA<' ھ ا'9 اc 'D م = 0 #0 ; / =ع ا ه واف ا .1*e + ا=)اح إ إ?دة ا), + ا# (< )( ا<V او 7I ا<V و*e ` < ا ه ا'>A H>? اY F 75 ا') ى ا' . أو ت ھ*ه ا را أن اا Y اC C Kدارة =ع ا ه (D H> ? أرD = اC رc ' وھ =C ن ا ه و=C ن ا P و=C ن اOرا? و=C ن ا1 اI ,D M 8رE ھ*ه ا اC ا!رVAC D اA# م ; اJAت واD ت.
Recommended publications
  • GAZA INTER-AGENCY CONTINGENCY PLAN September 2020 TABLE of CONTENTS
    IACP GAZA INTER-AGENCY CONTINGENCY PLAN September 2020 TABLE OF CONTENTS Summary of scenarios .......................................................................3 Planning assumptions .......................................................................5 Scope of interventions .......................................................................6 Emergency coordination structure .....................................................8 Annexes ...........................................................................................13 Annex 1: Gaza Joint Coordination Management Team ToR................14 Annex 2: Gaza Emergency Coordination Centre - Staff Listing ..........15 Annex 3: Emergency Coordination Centre ToR ..................................16 Annex 4: Joint Liaison Team ToR ......................................................17 Annex 5: Standard JCMT/ECC agenda – reporting format .................20 Annex 6: Summary cluster/sector SOPs ...........................................21 Annex 7: IDP coordination structure .................................................34 Annex 8: Shelter Management structure ...........................................35 Annex 9: IDP registration form ..........................................................36 Annex 10: Assessment, Monitoring and Reporting Forms .................39 Annex 11: Coordination template – infrastructure (ICRC) ..................40 Annex 12: Emergency stockpiles ......................................................41 Annex 13: Communications in Crisis ................................................42
    [Show full text]
  • National Report, State of Palestine United Nations
    National Report, State of Palestine United Nations Conference on Human Settlements (Habitat III) 2014 Ministry of Public Works and Housing National Report, State of Palestine, UN-Habitat 1 Photo: Jersualem, Old City Photo for Jerusalem, old city Table of Contents FORWARD 5 I. INTRODUCTION 7 II. URBAN AGENDA SECTORS 12 1. Urban Demographic 12 1.1 Current Status 12 1.2 Achievements 18 1.3 Challenges 20 1.4 Future Priorities 21 2. Land and Urban Planning 22 2. 1 Current Status 22 2.2 Achievements 22 2.3 Challenges 26 2.4 Future Priorities 28 3. Environment and Urbanization 28 3. 1 Current Status 28 3.2 Achievements 30 3.3 Challenges 31 3.4 Future Priorities 32 4. Urban Governance and Legislation 33 4. 1 Current Status 33 4.2 Achievements 34 4.3 Challenges 35 4.4 Future Priorities 36 5. Urban Economy 36 5. 1 Current Status 36 5.2 Achievements 38 5.3 Challenges 38 5.4 Future Priorities 39 6. Housing and Basic Services 40 6. 1 Current Status 40 6.2 Achievements 43 6.3 Challenges 46 6.4 Future Priorities 49 III. MAIN INDICATORS 51 Refrences 52 Committee Members 54 2 Lists of Figures Figure 1: Percent of Palestinian Population by Locality Type in Palestine 12 Figure 2: Palestinian Population by Governorate in the Gaza Strip (1997, 2007, 2014) 13 Figure 3: Palestinian Population by Governorate in the West Bank (1997, 2007, 2014) 13 Figure 4: Palestinian Population Density of Built-up Area (Person Per km²), 2007 15 Figure 5: Percent of Change in Palestinian Population by Locality Type West Bank (1997, 2014) 15 Figure 6: Population Distribution
    [Show full text]
  • Palestinian Central Bureau of Statistics (PCBS) Reviews the Status
    State of Palestine Issued in 13/03/2017 Palestinian Central Bureau of Statistics Palestinian Central Bureau of Statistics Bethlehem Governorate with about 117 thousand (PCBS) participants. In Khan Yunis Governorate, there were only about 6 thousand participants. In 2015, about 405 reviews the status of cultural institutions in thousand people participated in cultural activities. Palestine on the occasion of Palestinian About 206 thousand visitors to museums in 2016 National Culture Day There were 31 museums operating in Palestine in 2016: 26 museums in the West Bank and 5 museums To mark Palestinian National Culture Day on 13 in Gaza Strip. Two of the museums West Bank did March, PCBS has reviewed the status of cultural not respond. There were about 206 thousand museum institutions in Palestine in 2016. A cultural institution visitors to the museums, which provided data: 77.3% is defined as an institution that includes items (tools were Palestinians and 22.7% from other nationalities. and equipment) used for arts, crafts, recreational and The results showed that the largest number of visitors sports activities that work for the promotion and was about 24 thousand in April and the lowest preservation of culture and facilitate the practice of number was in June with about 7 thousand visitors. In cultural activities in a broad sense. 2015, the number of visitors to museums totaled about 185 thousand. 612 cultural centers operating in Palestine in 2016 There were 612 cultural centers operating in Palestine 47.0% of theatre plays were for children in 2016 in 2016 (598 provided data and 14 did not respond); There were 14 in operation theaters in Palestine: 11 in 531 cultural centers in the West Bank (519 provided the West Bank and 3 in Gaza Strip.
    [Show full text]
  • Summary of Consultation on Effects of the COVID-19 on Women in Palestine
    Palestinian Central Bureau of Statistics A Summary of Statistical Indicators on Women in Palestine during the Covid19 Crises Most Vulnerable Women Segments Around 10,745 women Health care health system workers and a total of 31,873 workers men and women 900 women working in workers in Palestine Women working in Israel Israel and settlements and settelements mostly in agriculture 175891 total females with chronic Women with Chronic disease 69,112 women suffer from at least one Chronic Disease (60+) Disease The percentage of poverty Female Childen with disease 9,596 female among households headed children with chronic by women in 2017 was 19% in the WB and 54% in Poor women Gaza Strip Elderly women In 2020 there are 140 287 60+ women 92,584 women heading households (61241 WB, Women Heading households 31343 Gaza Strip – 41,017 of highest in Jericho women have Women with disabilities at least one type of disability 1 Social Characteristics 1. The elderly (the most vulnerable group) • The number of elderly people (60+ years) in the middle of 2020 is around 269,346, (5.3% women, 140,287, and 129,059 men) • The percentage of elderly in Palestine was 5.0% of the total population in 2017 (5.4% for the elderly females, 4.6% for the elderly males), and in the West Bank it is higher than in the Gaza Strip (5.4 % In the West Bank and 4.3% in the Gaza Strip). • At the governorate level, the highest percentage of elderly people was in the governorates of Tulkarm, Ramallah, Al-Bireh, Bethlehem, and Jerusalem (6.5%, 6.0%, 6.0%, and 5.9%, respectively).
    [Show full text]
  • Study Vaw Gaza
    VIOLENCE AGAINST VIOLENCEWOMEN AGAINST IN THE WOMEN GAZA STRIP IN THE GAZA STRIP AFTER THE ISRAELI MILITARY AFTER THE ISRAELI MILITARY OPERATION PROTECTIVE EDGE OPERATION PROTECTIVE EDGE 2014 2014 Prepared by Catherine Müller and Laila Barhoum Commisionned by Alianza por la Solidaridad (ApS) and ActionAid (AA) October, 2015 Acknowledgements 5 Acronyms and abbreviations 6 Executive summary 7 1. Introduction 10 2. Methodology 13 2.1 Qualitative instruments and implementation 13 2.2 Quantitative instrument and implementation 16 2.3 Limitations of the research 17 CONTENTS 3. Background 18 3.1 Existing knowledge on VAW in Gaza 18 3.2 Political violence, conflict and VAWG in Gaza in the past 20 3.3 Operation Protective Edge 22 4. Study Findings 25 4.1 Types and forms of violence commonly experienced by women in public and private spaces 25 4.1.1 Political violence 25 4.1.2 Violence against women 26 4.2 Incidence and prevalence of VAW in public and private spheres 30 4.2.1 Prevalence of violence against women in public and private spaces 30 4.2.2 Prevalence of domestic violence 33 4.2.3 Incidents (frequency) of VAW in public and private spaces 37 4.3 Existing avenues of support 38 4.4 Women and men’s perceptions and acceptance of VAW 43 4.4.1 Causes and triggering factors 43 4.4.1.1 Economic situation 44 4.4.1.2 Gender roles within households 45 4.4.2 Link to acceptance 47 4.4.3 Consequences 49 4.5 The link between military violence and VAW 49 4.6 Better services to protect and support 53 5.
    [Show full text]
  • Monthly Violations Report September 2020 the Israeli Systematic Attacks
    Monthly Violations Report September 2020 The Israeli systematic attacks on the Palestinian agricultural sector in the West Bank and Gaza Strip UAWC’s Agricultural Committees all over the west bank and Gaza strip monitored the attacks of the Israeli occupation forces and settlers against the Palestinian agricultural sector in the West Bank during the month of September. This report documents Israeli bulldozers demolishing Palestinian agricultural facilities, in addition uprooting over 600 trees. This report documents demolition operations and military notices for more than 13 agricultural facilities, the demolition of two wells for water collection, the uprooting of more than 1400 trees, and the razing and seizing of more than 130 dunums, in a continuous escalation of land seizing and settlement expansion. Demolishing Agricultural Facilities Occupation forces demolishing houses in Yarza/ Jordan Valley • On September 02, 2020, the occupation forces demolished a 300-square-meter barracks in the area of Jebna in Masafer Yatta, Hebron. • On September 02, 2020, the occupation forces demolished a 50-cubic-meter water well in the village of Birin, west of Bani Naim town, to the east of Hebron. • On September 07, 2020, the Israeli occupation authorities delivered military demolition notices for against two barracks for livestock in the village of Kisan, east of Bethlehem. It is noteworthy that the 1 village of Kisan undergoes a fierce settlement attack, and is witnessing the largest settlement project in Bethlehem, which threatens to seize about 3,500 dunums. • On September 14, 2020, a military demolition notice was delivered for an 80-square-meter sheep pen, built of tin, in the village of Twana, to the east of Yatta, south of Hebron governorate.
    [Show full text]
  • Demographic Change: Opportunities for Development
    Palestine 2030 Demographic Change: Opportunities for Development Full Report December 2016 Copy rights Prime Minister’s Office – State of Palestine United Nations Population Fund, UNFPA Research and Writing Team Dr. Youssef Courbage, Lead Consultant, Institut National d’Etudes Démographiques, Paris Dr. Bassam Abu Hamad, Consultant, Al-Quds University Dr. Adel Zagha, Non-resident Research Fellow, Palestine Economic Policy research Institute –MAS. Professor of Economics, Birzeit University Reviewed by Palestinian Central Bureau of Statistics Dr. Majdi Malki, Dean of Faculty of Arts and Professor of Sociology at Birzeit University Dr. Michael Hermann, Senior Adviser on Economics and Demography, UNFPA, NY Edited by Ms. Charmaine Seitz Translation into Arabic Dr. Malek Qutteina Design and Printing TURBO Design Photo credit Chapter 1, page 22: © SHAREK Youth Forum Chapter 2, page 54: © UNESCO Chapter 3, page 90: © UNFPA Chapter 4, page 112: © Dana Al Bouz courtesy of ESNCM Chapter 5, page 124: © UNRWA Chapter 6, page 178: © UNFPA Chapter 7, page 194: © UNESCO Chapter 8, page 222: © courtesy of the Lutheran World Federation Chapter 9, page 240: © UNFPA Annexes, page 258: © UNFPA Cover Photo: The UNRWA Community Mental Health Programme (CMHP) team has been working with Palestine refugees in Gaza since 2002. © 2014 UNRWA Gaza. Photo by Fadi Thabet. Disclaimer: The analysis, recommendations and representation of material in this publication do not necessarily reflect the views and opinions whatsoever on the part of the Prime Minister’s Office, the National Population Committee and United Nations Population Fund UNFPA or any other contributing agencies. Foreword I would like to express my sincere gratitude to UNFPA and the UN more broadly as well as the National Population Committee for this important study.
    [Show full text]
  • West Bank and Gaza Civic Engagement Program Quarterly Report Vii & Viii 1 April – 30 September 2010
    WEST BANK AND GAZA CIVIC ENGAGEMENT PROGRAM QUARTERLY REPORT VII & VIII 1 APRIL – 30 SEPTEMBER 2010 SEPTEMBER 2010 This publication was produced for review by the United States Agency for International Development by Tetra Tech ARD. Prepared for the United States Agency for International Development, USAID Contract Number DFD-I-04-05-00218-04 Implemented by: Tetra Tech ARD P.O. Box 1397 Burlington, VT 05402 WEST BANK AND GAZA CIVIC ENGAGEMENT PROGRAM QUARTERLY REPORT VII & VIII 1 APRIL - 30 SEPTEMBER 2010 OCTOBER 2010 DISCLAIMER The author’s views expressed in this publication do not necessarily reflect the views of the United States Agency for International Development or the United States Government. CONTENTS ACRONYMS AND ABBREVIATIONS .............................................................................iii 1.0 PROGRAM OVERVIEW .............................................................................................. 1 2.0 OPERATIONAL CONTEXT ....................................................................................... 1 POLITICAL DEVELOPMENTS ............................................................................................ 1 PRIMARY ECONOMIC AND SOCIAL DEVELOPMENTS ........................................................ 2 OVERCOMING CHALLENGES AND SETBACKS .................................................................. 5 3.0 PROGRAM ACHIEVEMENTS ..................................................................................... 7 3.1 ACCOMPLISHMENTS OF GRANT ACTIVITIES COMPLETED UNDER OBJECTIVE
    [Show full text]
  • Thirteen Killed by the IOF and Thousands Injured in the OPT in December 2017
    Thirteen Killed by the IOF and Thousands Injured in the OPT in December 2017 Al-Haq – 5 January 2018 Escalations have continued across the Occupied Palestinian Territory (OPT) since 6 December 2017, in the wake of United States (US) President Trump’s decision to recognise Jerusalem as the capital of Israel and to relocate the US Embassy to Jerusalem, in contravention of international law and long-standing international consensus on the status of Jerusalem.1 Throughout the month of December 2017, 13 Palestinians were killed by the Israeli Occupying Forces (IOF) in the OPT, while 4,690 injuries were recorded in the same period by the Palestinian Red Crescent Society (PRCS).2 The aforementioned casualties are a result of the IOF’s excessive use of force, including the launching of airstrikes on the Gaza Strip, the use of live fire to suppress protests, the shooting of rubber- coated metal bullets at crowds, the firing of tear gas canisters at protesters, and the beating of protesters by members of the IOF.3 1. Thirteen Palestinians Killed by the IOF in December 2017 Al-Haq documented the killing of thirteen Palestinians by the IOF in December 2017. Nine Palestinians were killed by the IOF during protests across the OPT. These are: Mahmoud Abd Al-Majid Al-Masri, 29, from Khan Younis, Gaza; Basel Mustafa Ibrahim, 29, from ‘Anata in Jerusalem; Yasser Naji Sukkar, 23, from Al-Shuja’iyah, Gaza; Ibrahim Nayef Abu Thuraya, 29, a resident of Deir Al-Balah, Gaza; Zakaria Adham Al-Kafarna, 20, from beit Hanoun, Gaza; Muhammad Nabil Muheisen, 29, a resident of Al-Shuja’iyah, Gaza; Sharif Al-Abed Shalash, 28, a resident of Jabaliya M.
    [Show full text]
  • Poverty Map for the Palestinian Territories
    Poverty map for the Palestinian Territories "PECS and Census 2017" Technical report1 June 2019 1 This technical report is written by Aziz Atamanov and Nethra Palaniswamy from the Poverty and Equity Global Practice at the World Bank in close collaboration with Jawad Al-Saleh and Fida Twam (Palestinian Central Bureau of Statistics). The team is thankful for collaboration and constant support provided by Ola Awad (President) and Haleema Saeed (Director General) of the Palestinian Central Bureau of Statistics and Benu Bidani (Manager, World Bank). We are particularly thankful to Paul Corral (peer reviewer), Ken Simler, Minh Cong Nguyen and Xiayun Tan for very useful suggestions and help. 2 Table of Contents 1. Introduction .......................................................................................................................................... 5 2. Methodology ......................................................................................................................................... 6 Methodological approach ......................................................................................................................... 7 Practical implementation .......................................................................................................................... 8 2. Data ....................................................................................................................................................... 9 PECS and Census ......................................................................................................................................
    [Show full text]
  • VILLAGE SERVICES PROGRAM Award No
    VILLAGE SERVICES PROGRAM Award No. 294-A-00-00-00069-00 FINAL REPORT SEPTEMBER 2000 – JUNE 2004 September, 2004 Country Representative Office CHF International / West Bank and Gaza TABLE OF CONTENTS 1. EXECUTIVE SUMMARY......................................................................................................................... 1 1.1 CONTRACT AND MODIFICATIONS ........................................................................................................ 1 1.2 VSP DATA SUMMARY ......................................................................................................................... 2 2. PROGRAM OVERVIEW.......................................................................................................................... 2 2.1. PROGRAM ENVIRONMENT AND PROBLEM PRESENTATION ................................................................... 2 2.1.1 UNDER-DEVELOPED MUNICIPAL SERVICES AND INADEQUATE INFRASTRUCTURE................................ 2 2.1.2 HIGH UNEMPLOYMENT AND POVERTY................................................................................................. 3 2.1.3 IN-SUFFICIENT COMMUNITY SERVICES PROVIDED BY THE NON-GOVERNMENTAL AND PRIVATE SECTORS…......................................................................................................................................................... 3 2.1.4 DETERIORATION OF POLITICAL, ECONOMIC AND SOCIAL CIRCUMSTANCES AFTER THE OUTBREAK OF THE INTIFADAH..................................................................................................................................................
    [Show full text]
  • Part Two Water Supply to Gaza Strip
    1 © Palestinian Water Authority West Bank Al-Baloua, Baghdad St. P.O. Box 2174. Al-Bireh Tel: +972 2 242 90 22 Fax: +972 2 242 93 41 Gaza Al-Rimal, Al-wehdeh St. P.O. Box 1438. Al-Rimal Tel: +972 8 283 36 09 Fax: +972 8 282 66 30 www.pwa.ps 2 Table of Contents Foreword . 6 Introduction . .8 1.1 Contextual Background and Current Situation. .9 1.2 Palestinian Water Authority’s Role in Water Supply . .11 1.3 Report Aim, Structure and Content . .10 1.4 Executive Summary. 12 Part One Water Supply to the West Bank . 15 1.1 Water Resources . .15 1.1.1 Local Resources. 19 I. Municipal Wells . .23 II. Ein Samia (JWU) wells. 24 III. PWA Wells. 26 IV. Agricultural Wells . .27 V. Springs. 28 1.1.2 Purchased Resources. 31 1.2 Water Production vs. Water Consumption. 33 1.2.1 Average Water Supply Rate . .33 1.2.2 Supply and Demand Gap . .35 1.2.3 Water Consumption Rate- Individual Analysis. 38 1.2.4 Water Network Coverage . .44 1.2.5 Water Supply for Agricultural Purposes. 52 Part Two Water Supply to Gaza Strip. 55 2.1 Municipal Water Demand. 56 2.1.1Governorate Analysis . .59 I. Northern Governorate . .59 II. Gaza Governorate. .60 III. Middle governorate . .60 IV. Khan Younis Governorate. 61 V. Rafah Governorate. 62 2.1.2UNRWA Wells. 63 3 2.1.3Purchased Resources . .64 2.2.1 Crop Water Requirements and Vulnerable Climate Change in the Region 69 2.2.2Livestock Water Demand.
    [Show full text]