13-6609-6610 Ground Test Tool Boeing 787 Ram Air Turbine

Total Page:16

File Type:pdf, Size:1020Kb

13-6609-6610 Ground Test Tool Boeing 787 Ram Air Turbine Operation & Service Manual Model: 13-6609-6610 Ground Test Tool Boeing 787 Ram Air Turbine 10/2009 − Rev. 01 Includes Illustrated Parts Lists DEVELOPED IN CONJUNCTION WITH HAMILTON-SUNDSTRAND 1740 Eber Rd Tronair, Inc. Phone: (419) 866-6301 Holland, OH 43528-9794 www.tronair.com 800-426-6301 USA Email: [email protected] Fax: (419) 867-0634 REVISION DATE TEXT AFFECTED 01 10/2009 Original Release Model: 13-6609-6610 Ground Test Tool - Boeing 787 Ram Air Turbine TABLE OF CONTENTS PAGE 1.0 PRODUCT INFORMATION ........................................................................................................................................... 1 1.1 FUNCTION ................................................................................................................................................................. 1 1.2 LIST OF DRAWINGS ................................................................................................................................................. 1 1.3 RELEVANT STANDARDS ......................................................................................................................................... 1 1.3.1 The GTT has been designed to comply with the following directives ......................................................................... 1 1.4 OVERVIEW ................................................................................................................................................................ 1 1.5 MATING COUPLINGS AND PLUGS .......................................................................................................................... 1 2.0 SAFETY INFORMATION............................................................................................................................................... 1 2.1 ALARM AND WARNING SYSTEMS .......................................................................................................................... 1 2.2 EXPLANATION OF WARNING AND DANGER SIGNS ............................................................................................. 1 2.3 COMPONENT SAFETY FEATURES ......................................................................................................................... 1 2.4 FUNCTIONAL SAFETY FEATURES ......................................................................................................................... 2 2.5 FEATURES FOR OPERATOR SAFETY .................................................................................................................... 2 2.6 PERSONAL PROTECTIVE EQUIPMENT .................................................................................................................. 2 2.7 SAFETY GUIDELINES ............................................................................................................................................... 2 2.8 CONDITIONS FOR SAFE USE ................................................................................................................................. 2 2.9 TECHNICAL EXPERTISE .......................................................................................................................................... 2 2.9.1 For Installation ............................................................................................................................................................ 2 2.9.2 For Operation ............................................................................................................................................................. 2 2.9.3 For Maintenance ........................................................................................................................................................ 2 2.10 Additional Safety Information ..................................................................................................................................... 2 3.0 PACKAGING AND STORAGE ...................................................................................................................................... 2 3.1 PACKAGING REQUIREMENTS ................................................................................................................................ 2 3.2 METHODS OF HANDLING ........................................................................................................................................ 2 3.3 STORAGE .................................................................................................................................................................. 2 3.4 STORAGE SPACE AND HANDLING FACILITIES..................................................................................................... 2 4.0 TRANSPORTATION ..................................................................................................................................................... 2 4.1 HANDLING POINTS .................................................................................................................................................. 2 4.2 WEIGHT ..................................................................................................................................................................... 2 5.0 ASSEMBLY ................................................................................................................................................................... 3 6.0 INSTALLATION ............................................................................................................................................................. 3 6.1 INSTALLATION REQUIREMENTS ............................................................................................................................ 3 6.2 PERSONNEL REQUIREMENTS (TECHNICAL EXPERTISE) FOR INSTALLATION ................................................ 3 6.3 SPECIFICATIONS AND STANDARDS ...................................................................................................................... 3 6.4 REQUIRED MATERIALS FOR INSTALLATION ........................................................................................................ 3 6.5 REQUIRED INSTALLATION TOOLS ......................................................................................................................... 3 6.6 INSTALLATION PROCEDURE .................................................................................................................................. 3 6.7 INSPECTION AND TESTING PROCEDURE UPON INSTALLATION ....................................................................... 3 7.0 OPERATION .................................................................................................................................................................. 3 7.1 OPERATING PARAMETERS .................................................................................................................................... 3 7.2 NUMERICAL VALUES AND LIMITS .......................................................................................................................... 3 7.2.1 General ...................................................................................................................................................................... 3 7.2.2 Dimensions ................................................................................................................................................................ 4 7.3 FEATURES ................................................................................................................................................................ 4 7.4 LOCATION AND LAYOUT OF CONTROLS .............................................................................................................. 4 7.5 PREPARATION PRIOR TO FIRST USE .................................................................................................................... 4 7.6 PERSONAL PROTECTIVE EQUIPMENT .................................................................................................................. 4 7.7 CHECKS PRIOR TO START UP ............................................................................................................................... 4 7.8 START UP PROCEDURE .......................................................................................................................................... 4 7.9 OPERATING PROCEDURES .................................................................................................................................... 4 7.9.1 Basic Operation .......................................................................................................................................................... 4 7.10 STOPPING PROCEDURES ...................................................................................................................................... 4 7.11 EMERGENCY STOPPING PROCEDURES .............................................................................................................. 4 8.0 TRAINING...................................................................................................................................................................... 4 8.1 TRAINING REQUIREMENTS .................................................................................................................................... 4 8.2 TRAINING PROGRAMS, MANUALS, METHODS, SUPERVISORS, AND OPERATORS ........................................ 4 9.0 MAINTENANCE ...........................................................................................................................................................
Recommended publications
  • Cranfield University Xue Longxian Actuation
    CRANFIELD UNIVERSITY XUE LONGXIAN ACTUATION TECHNOLOGY FOR FLIGHT CONTROL SYSTEM ON CIVIL AIRCRAFT SCHOOL OF ENGINEERING MSc by Research THESIS CRANFIELD UNIVERSITY SCHOOL OF ENGINEERING MSc by Research THESIS Academic Year 2008-2009 XUE LONGXIAN Actuation Technology for Flight Control System on Civil Aircraft Supervisor: Dr. C. P. Lawson Prof. J. P. Fielding January 2009 This thesis is submitted in fulfilment of the requirements for the degree of Master of Science © Cranfield University 2009. All rights reserved. No part of this publication may be reproduced without the written permission of the copyright owner. ABSTRACT This report addresses the author’s Group Design Project (GDP) and Individual Research Project (IRP). The IRP is discussed primarily herein, presenting the actuation technology for the Flight Control System (FCS) on civil aircraft. Actuation technology is one of the key technologies for next generation More Electric Aircraft (MEA) and All Electric Aircraft (AEA); it is also an important input for the preliminary design of the Flying Crane, the aircraft designed in the author’s GDP. Information regarding actuation technologies is investigated firstly. After initial comparison and engineering consideration, Electrohydrostatic Actuation (EHA) and variable area actuation are selected for further research. The tail unit of the Flying Crane is selected as the case study flight control surfaces and is analysed for the requirements. Based on these requirements, an EHA system and a variable area actuation system powered by localised hydraulic systems are designed and sized in terms of power, mass and Thermal Management System (TMS), and thereafter the reliability of each system is estimated and the safety is analysed.
    [Show full text]
  • Electrical Power Codde 1 Page 1 / 6 General Dgt97831 Issue 2
    FALCON 7X 02-24-05 ATA 24 – ELECTRICAL POWER CODDE 1 PAGE 1 / 6 GENERAL DGT97831 ISSUE 2 ACRONYMS AC Alternative Current APU Auxiliary Power Unit BC Battery Contactor BIT Built In Test BTC Bus Tie Contactor CAS Crew Alerting System CB Circuit Breaker CLSC Cabin Load Shed Contactor CMC Central Maintenance Computer DC Direct Current ECU Electronic Control Unit EEC Engine Electronic Controller FADEC Full Authority Digital Electronic Control FBW Fly By Wire GCU Generator Control Unit GLC Generator Line Contactor GLSC Galley Load Shed Contactor GPC Ground Power Contactor GPU Ground Power Unit GSB Ground Service Bus LFSPDB Left Front Secondary Power Distribution Box LH Left Hand LPPDB Left Primary Power Distribution Box LRSPDB Left Rear Secondary Power Distribution Box LS Load shed MAU Modular Avionic Unit MDU Multi function Display Unit MMEL Master Minimum Equipment List O/C OverCurrent OP Overhead Panel OVHT OVerHeaT PDCU Power Distribution Control Unit PFCS Primary Flight Control System PMA Permanent Magnet Alternator PPDB Primary Power Distribution Box RAT Ram Air Turbine RATC Ram Air Turbine Contactor DASSAULT AVIATION Proprietary Data 02-24-05 FALCON 7X ATA 24 – ELECTRICAL POWER PAGE 2 / 6 CODDE 1 GENERAL ISSUE 2 DGT97831 RFSPDB Right Front Secondary Power Distribution Box RH Right Hand RPPDB Right Primary Power Distribution Box RRSPDB Right Rear Secondary Power Distribution Box S/G Starter Generator SOV Shut Off Valve SPDB Secondary Power Distribution Box SSPC Solid State Power Controller TRU Transformer Rectifier Unit VDC Volt Direct Courant DASSAULT AVIATION Proprietary Data FALCON 7X 02-24-05 ATA 24 – ELECTRICAL POWER CODDE 1 PAGE 3 / 6 GENERAL DGT97831 ISSUE 2 INTRODUCTION The Falcon 7X uses 28 Volts DC power for operation of the various systems installed in the airplane.
    [Show full text]
  • Sl Premium Universal Tractor Hydraulic Fluid
    UNIVERSAL TRACTOR HYDRAULIC FLUID Sinclair Universal Tractor Fluid is a premium quality universal tractor hydraulic fluid formulated with high quality base oils and anti-wear and extreme pressure (EP) additives providing excellent load carrying capacity and wear protection for a wide temperature range and long-term service under severe conditions. It is designed for equipment using a common sump or requiring a single fluid for hydraulic systems, transmission, differential, wet brakes/wet clutches, power take off (PTO) units and final drive. Sinclair Universal Tractor Fluid protects against foam and corrosion and resists the negative effects of water contamination and is highly resistant to oxidation. APPLICATIONS Sinclair Universal Tractor Fluid meets or exceeds most tractor manufacturers’ specifications and can be used where any of the following are specified: • AGCO, Allis Chalmers & Deutz-Allis: 821XL • Massey Ferguson: Permatran III, M-1141 • John Deere: J20C, J20A, J14B, J21A, • Ford M2C134C/D, FNHA-2-C-200.00, M2C86-B, M2C41-B Hygard, 303 Fluid • White: Q1826, Q1705, Q1766, Q1802 • Case International Harvester: MS 1209 (Hy-Tran ULTRA), MS 1207 • Caterpillar: TO-2 (Hy-Tran Plus), MS 1210 (TCH Fluid), MS-1206, MS1230, JIC-144, JIC-143 • Allison: C-4 Fluid • Oliver: Type 55, Universal HTF, Q1766 • Renk 873 and 874 A/B Transmissions • International Harvester: B-6 • Kubota: UDT • Minneapolis-Moline Fluids UNIVERSAL TRACTOR HYDRAULIC FLUID TYPICAL PHYSICAL PROPERTIES METHOD TYPICAL RESULTS Viscosity Grade Universal Tractor Hydraulic Fluid Gravity, °API ASTM D287 30.99 Specific Gravity @ 60°F (15.6°C) ASTM D4052 0.8708 Viscosity @ 40°C cSt ASTM D445 59.34 Viscosity @ 100°C cSt ASTM D445 9.34 Viscosity Index ASTM D2270 138 Pour Point °C (°F) ASTM D5950 -42C (-44 F) Brookfield Viscosity at -35°C, cP ASTM D2983 37,292 Brookfield Viscosity at -20°C, cP ASTM D2983 3,819 Color ASTM D1500 2 Zinc, wt.
    [Show full text]
  • Hydraulic Fluids 1
    HYDRAULIC FLUIDS 1 1. PUBLIC HEALTH STATEMENT This public health statement tells you about hydraulic fluids and the effects of exposure. The Environmental Protection Agency (EPA) identifies the most serious hazardous waste sites in the nation. These sites make up the National Priorities List (NPL) and are the sites targeted for long-term federal cleanup. Hydraulic fluids have been found in at least 10 of the 1,428 current or former NPL sites. However, it’s unknown how many NPL sites have been evaluated for these substances. As more sites are evaluated, the sites with hydraulic fluids may increase. This is important because exposure to these substances may harm you and because these sites may be sources of exposure. When a substance is released from a large area, such as an industrial plant, or from a container, such as a drum or bottle, it enters the environment. This release does not always lead to exposure. You are exposed to a substance only when you come in contact with it. You may be exposed by breathing, eating, or drinking the substance or by skin contact. If you are exposed to hydraulic fluids, many factors determine whether you’ll be harmed. These factors include the dose (how much), the duration (how long), and how you come in contact with it. You must also consider the other chemicals you’re exposed to and your age, sex, diet, family traits, lifestyle, and state of health. 1 .1 WHAT ARE HYDRAULIC FLUIDS? Hydraulic fluids are a very large class of materials that are used in machines and equipment to.
    [Show full text]
  • Mk 7 Aircraft Recovery Equipment
    CHAPTER 3 MK 7 AIRCRAFT RECOVERY EQUIPMENT Present-day aircraft normally require the use of then opened, allowing fluid to be forced from the runways that are 5,000 to 8,000 feet long in order to accumulator back into the engine cylinder, forcing the land ashore. On an aircraft carrier, these same aircraft ram out. As the ram moves out of the cylinder, the are stopped within 350 feet after contacting the deck. crosshead is forced away from the fixed sheave This feat is accomplished through the use of aircraft assembly, pulling the purchase cables back onto the recovery equipment, including an emergency barricade engine until the crosshead is returned to its BATTERY that brings a landing aircraft to a controlled stop by position and the crossdeck pendant is in its normal absorbing and dispelling the energy developed by the position on the flight deck. landing aircraft. This recovery equipment is commonly called arresting gear. PRERECOVERY PREPARATIONS The sole purpose of an aircraft carrier is to provide Prior to recovery of aircraft, all recovery equipment a means of launching a strike against an enemy and landing area must be made ready and all personnel anywhere in the world. After the aircraft complete their properly positioned. The following is a general listing mission, the carrier must provide a means of safely of the events that must be accomplished prior to the recovering them. The Mk 7 arresting gear provides this recovery of aircraft: means. • All operational retractable sheaves raised to the full up position AIRCRAFT RECOVERY • LEARNING OBJECTIVE: Describe aircraft All aft deckedge antennas positioned, as arrestments aboard aircraft carriers.
    [Show full text]
  • Aircraft Collection
    A, AIR & SPA ID SE CE MU REP SEU INT M AIRCRAFT COLLECTION From the Avenger torpedo bomber, a stalwart from Intrepid’s World War II service, to the A-12, the spy plane from the Cold War, this collection reflects some of the GREATEST ACHIEVEMENTS IN MILITARY AVIATION. Photo: Liam Marshall TABLE OF CONTENTS Bombers / Attack Fighters Multirole Helicopters Reconnaissance / Surveillance Trainers OV-101 Enterprise Concorde Aircraft Restoration Hangar Photo: Liam Marshall BOMBERS/ATTACK The basic mission of the aircraft carrier is to project the U.S. Navy’s military strength far beyond our shores. These warships are primarily deployed to deter aggression and protect American strategic interests. Should deterrence fail, the carrier’s bombers and attack aircraft engage in vital operations to support other forces. The collection includes the 1940-designed Grumman TBM Avenger of World War II. Also on display is the Douglas A-1 Skyraider, a true workhorse of the 1950s and ‘60s, as well as the Douglas A-4 Skyhawk and Grumman A-6 Intruder, stalwarts of the Vietnam War. Photo: Collection of the Intrepid Sea, Air & Space Museum GRUMMAN / EASTERNGRUMMAN AIRCRAFT AVENGER TBM-3E GRUMMAN/EASTERN AIRCRAFT TBM-3E AVENGER TORPEDO BOMBER First flown in 1941 and introduced operationally in June 1942, the Avenger became the U.S. Navy’s standard torpedo bomber throughout World War II, with more than 9,836 constructed. Originally built as the TBF by Grumman Aircraft Engineering Corporation, they were affectionately nicknamed “Turkeys” for their somewhat ungainly appearance. Bomber Torpedo In 1943 Grumman was tasked to build the F6F Hellcat fighter for the Navy.
    [Show full text]
  • NOTICE FEDERAL AVIATION ADMINISTRATION Effective Date: National Policy 8/3/16 Cancellation Date: 8/3/17
    U.S. DEPARTMENT OF TRANSPORTATION N 8900.374 NOTICE FEDERAL AVIATION ADMINISTRATION Effective Date: National Policy 8/3/16 Cancellation Date: 8/3/17 SUBJ: Revised FAA-Approved Deicing Program Updates, Winter 2016-2017 1. Purpose of This Notice. This notice provides inspectors with information on holdover times (HOT) and recommendations on various other ground deicing/anti-icing issues. 2. Audience. The primary audience for this notice is Flight Standards District Office (FSDO) principal operations inspectors (POI) responsible for approving an air carrier’s deicing program. The secondary audience includes Flight Standards Service (AFS) personnel in FSDOs, branches, and divisions in the regions and at headquarters (HQ). 3. Where You Can Find This Notice. You can find this notice on the MyFAA employee Web site at https://employees.faa.gov/tools_resources/orders_notices. Inspectors can access this notice through the Flight Standards Information Management System (FSIMS) at http://fsims.avs.faa.gov. Operators can find this notice on the Federal Aviation Administration’s (FAA) Web site at http://fsims.faa.gov. This notice is available to the public at http://www.faa.gov/regulations_policies/orders_notices. Note: The FAA Holdover Time Guidelines for 2016-2017 and related tables referenced in this document can be found on the Air Transportation Division’s (AFS-200) Aircraft Ground Deicing Web site at http://www.faa.gov/other_visit/ aviation_industry/airline_operators/airline_safety/deicing. 4. Cancellation. Notice N 8900.335, Revised FAA-Approved Deicing Program Updates, Winter 2015-2016, dated November 18, 2015, is canceled. 5. Background. Title 14 of the Code of Federal Regulations (14 CFR) part 121, § 121.629(c) requires that part 121 certificate holders have an approved ground deicing/anti-icing program.
    [Show full text]
  • AP3456 the Central Flying School (CFS) Manual of Flying: Volume 4 Aircraft Systems
    AP3456 – 4-1- Hydraulic Systems CHAPTER 1 - HYDRAULIC SYSTEMS Introduction 1. Hydraulic power has unique characteristics which influence its selection to power aircraft systems instead of electrics and pneumatics, the other available secondary power systems. The advantages of hydraulic power are that: a. It is capable of transmitting very high forces. b. It has rapid and precise response to input signals. c. It has good power to weight ratio. d. It is simple and reliable. e. It is not affected by electro-magnetic interference. Although it is less versatile than present generation electric/electronic systems, hydraulic power is the normal secondary power source used in aircraft for operation of those aircraft systems which require large power inputs and precise and rapid movement. These include flying controls, flaps, retractable undercarriages and wheel brakes. Principles 2. Basic Power Transmission. A simple practical application of hydraulic power is shown in Fig 1 which depicts a closed system typical of that used to operate light aircraft wheel brakes. When the force on the master cylinder piston is increased slightly by light operation of the brake pedals, the slave piston will extend until the brake shoe contacts the brake drum. This restriction will prevent further movement of the slave and the master cylinder. However, any increase in force on the master cylinder will increase pressure in the fluid, and it will therefore increase the braking force acting on the shoes. When braking is complete, removal of the load from the master cylinder will reduce hydraulic pressure, and the brake shoe will retract under spring tension.
    [Show full text]
  • Hydraulic Fluid Quick Reference Hägglunds Products
    RE 15414/08.2019 Replaces: 01.2015 Hydraulic fluid quick reference Hägglunds products Contents 1 Hydraulic fluid quick reference 2 1.1 Applicable fluids 2 1.2 Viscosity Limits 3 1.3 Down-rating 3 1.4 Seal and primer compatibility 3 1.5 Additional demands 4 RE 15414/08.2019, Bosch Rexroth AB 2/4 Hägglunds products | Hydraulic fluid quick reference 1 Hydraulic fluid quick reference 1.1 Applicable fluids Only hydraulic fluids by the standards given in Table 1 are Bosch Rexroth’s Hägglunds radial piston hydraulic motors suggested. Fluids complying to other standards only, are are primarily designed to operate on conventional petro- not approved. leum based hydraulic fluids. Table 1: Standards for detailed requirements of respective fluid group. To get a well working drive system it is very important to ISO 11158 ISO 15380 ISO 12922 follow the recommendations given in this instruction. Mineral oil based and Environmentally Fire resistant Improper hydraulic fluid might cause a shorter service life mineral oil related acceptable hydraulic hydraulic fluids or in worst case lead to instant failure. hydraulic fluids fluids Within these standards, not all fluid classes are allowed, and only some are recommended (see Table 2). NOTICE Wrong hydraulic fluid for Hägglunds motors Table 2: Applicable fluids by designation according to ISO 6743-4. Risk of damage to equipment and impact on service Recommended Allowed Not allowed life for Hägglunds motors HM HV [mineral] 1) HH ▶ Fluids HFDU other than polyol esters are not allowed HV no VI improver HEPR HL [e.g. PAO] HEES [saturated] HETG HR Wrong hydraulic fluid for Hägglunds accessories HEES [un-saturated] HG Risk of damage to equipment and impact on service life HFB 2) 3) HFA for accessories Hägglunds MDA brakes (HFAE and HFAS) ▶ Fluids HFB, HFC and HFD are not allowed HFC 2) 3) HEPG HFDU 2) 3) 5) HFDU [Non-polyol ester] HFDR 2) 3) 4) Wrong hydraulic fluid for CBm motors Risk of damage to equipment and impact on service life 1) Recommended to be without VI improver.
    [Show full text]
  • Calculated Drag of an Aerial Refueling Assembly Through Airplane Performance Analysis
    NASA/TM-2004-212043 Calculated Drag of an Aerial Refueling Assembly Through Airplane Performance Analysis Michael Jacob Vachon and Ronald J. Ray NASA Dryden Flight Research Center Edwards, California Carl Calianno NAVAIR Patuxent River, Maryland EC03-0293-02 February 2004 The NASA STI Program Office…in Profile Since its founding, NASA has been dedicated • CONFERENCE PUBLICATION. to the advancement of aeronautics and space Collected papers from scientific and science. The NASA Scientific and Technical technical conferences, symposia, seminars, Information (STI) Program Office plays a key or other meetings sponsored or cosponsored part in helping NASA maintain this by NASA. important role. • SPECIAL PUBLICATION. Scientific, The NASA STI Program Office is operated by technical, or historical information from Langley Research Center, the lead center for NASA programs, projects, and mission, NASA’s scientific and technical information. often concerned with subjects having The NASA STI Program Office provides access substantial public interest. to the NASA STI Database, the largest collection of aeronautical and space science STI in the • TECHNICAL TRANSLATION. English- world. The Program Office is also NASA’s language translations of foreign scientific institutional mechanism for disseminating the and technical material pertinent to results of its research and development activities. NASA’s mission. These results are published by NASA in the NASA STI Report Series, which includes the Specialized services that complement the STI following report types: Program Office’s diverse offerings include creating custom thesauri, building customized databases, organizing and publishing research • TECHNICAL PUBLICATION. Reports of results…even providing videos. completed research or a major significant phase of research that present the results of For more information about the NASA STI NASA programs and include extensive data Program Office, see the following: or theoretical analysis.
    [Show full text]
  • Operator's Manual
    OPERATOR'S MANUAL WE225, WE235 Trailer Wood Splitter Rev May-2019 Part Number: Z97112_En WE225, WE235 Introduction Trailer Wood Splitter 1. Introduction Review all safety, operation and maintenance information contained in this manual. 1.1 Foreword WARNING! Congratulations on choosing a Wallenstein Trailer Wood Do not attempt to start or operate the machine Splitter! without thoroughly reviewing this manual for This high-quality machine is designed and manufactured safe and proper operation. to meet the needs of an efficient wood splitting operation. Keep this manual with the machine at all times. This manual covers the Wallenstein 20 ton WE Series W034 trailer wood splitters. Model Variants Covered in this Manual • WE225 (Horizontal splitting only) • WE235 (Horizontal and vertical splitting) Units of measurement in Wallenstein Equipment technical manuals are written as: US Customary (SI metric) Keep this manual handy for frequent reference and to pass on to new operators or owners. Call your Wallenstein dealer or distributor if you need assistance, information or additional copies of the manuals. Wallenstein Equipment Inc. • © 2019 www.wallensteinequipment.com 2 WE225, WE235 Trailer Wood Splitter Introduction Table of Contents 1. Introduction ............................................................2 7. Storing the Wood Splitter ...................................32 1.1 Foreword .........................................................2 7.1 Removing from Storage .................................32 1.2 Delivery Inspection Report ..............................4
    [Show full text]
  • 80, 70, 65 SERIES QUEEN AIR Ground Handling Anti-Ice Reservoir
    80, 70, 65 SERIES QUEEN AIR Ground Handling Anti-ice Reservoir Access to the anti-ice reservoir is gained by opening a panel located in the left wing, between the nacelle and the fuselage. Capacity: 3 gals.; Fluid type: Spec TT-I-735 Battery The aircraft electrical system utilizes a 24V, Ni-Cad battery, located in the left engine nacelle behind the firewall. Access is gained by removing the electrical equipment compartment door. NOTE: There are two optional installations where the battery may be on the left forward side of baggage compartment and accessible through the left baggage door, or in the nosecone and accessible by removing the nosecone. Emergency Exits Left rear cabin door. Rear cabin window on right side has emergency release. External Power An external power receptacle is located on the outboard side of the left engine nacelle and uses a standard AN-type plug. This aircraft requires a 28V, DC, negative ground power unit. CAUTION: Battery switch must be ON and all electrical switches OFF prior to connecting ground power unit plug; assure that avionics power is OFF prior to turning the ground power unit ON. Battery must be ON anytime ground power unit is in use. Alternator or generator switch must be OFF while using external power. Fueling Standard configuration incorporates one main G tank and two aux tanks in each wing. The main tank is located inboard of the engine nacelles and the aux tanks are outboard. There are also two optional fuel configurations which may have been used. System capacity: LEADING MAINS EDGE AUXS BOX SECTION AUX Std.
    [Show full text]