Biratnagar Initial Environmental Assessment

Total Page:16

File Type:pdf, Size:1020Kb

Biratnagar Initial Environmental Assessment Technical Assistance Consultant’s Report Project Number: 36188 November 2008 NEPAL: Preparing the Secondary Towns Integrated Urban Environmental Improvement Project (Financed by the: Japan Special Fund and the Netherlands Trust Fund for the Water Financing Partnership Facility) Prepared by: Padeco Co. Ltd. in association with Metcon Consultants, Nepal Tokyo, Japan For Department of Urban Development and Building Construction This consultant’s report does not necessarily reflect the views of ADB or the Government concerned, and ADB and the Government cannot be held liable for its contents. (For project preparatory technical assistance: All the views expressed herein may not be incorporated into the proposed project’s design. TA 7182-NEP PREPARING THE SECONDARY TOWNS INTEGRATED URBAN ENVIRONMENTAL IMPROVEMENT PROJECT V o l u m e 17: BIRATNAGAR INITIAL ENVIRONMENTAL ASSESSMENT in association with Environmental Assessment Document Draft Initial Environmental Examination Document Stage: Draft for Consultation Project Number: 36188 March 2010 Volume 17 Nepal: Secondary Towns Integrated Urban Environmental Improvement Project – Biratnagar Subproject Prepared by Department of Urban Development and Building Construction, Ministry of Physical Planning and Works, Government of Nepal The initial environmental examination is a document of the borrower. The views expressed herein do not necessarily represent those of ADB’s Board of Directors, Management, or staff, and may be preliminary in nature. ACRONYMS AND ABBREVIATIONS ADB – Asian Development Bank AP – affected persons BPL – below poverty level CBO – Community Based Organizations CDC – Compensation Determination Committee CDO – Chief District Officer CFC – Compensation Fixation Committee CPR – Community Property Resource DDC – District Development Committee DOR – Department of Roads DSC – Design and Supervision Consultants DUDBC – Department of Urban Development and Building Construction EA – Executing Agency GON – Government of Nepal GRC – Grievance Redress Committee HA – Hectares H&S – Health and Safety HH – Households IA – Implementing Agency IP – Indigenous People IR – Involuntary Resettlement LA – Land Acquisition LA Act – Land Acquisition Act MPPW – Ministry of Physical Planning and Works NGO – Non-Government Organizations NRs – Nepalese Rupees O&M - Operations and Maintenance PCO – Project Coordination Office PD – Project Director PH – Physically Handicapped PIU – Project Implementation Unit PLI – Poverty Level Income PM – Project Manager PPTA – Project Preparatory Technical Assistance PSA – Poverty and Social Assessment RP – Resettlement Plan R&R – Resettlement and Rehabilitation TA – Technical Assistance ToR – Terms of Reference VDC – Village Development Committee WHH – Women Headed Households 2 WEIGHTS AND MEASURES d - day ha - hectare km - kilometer KV - kilovolts l/pppd - liters per person per day m - meter mg/L - milligrams per liter pH - acidity/alkalinity ppm - parts per million s - second sq. m - square meter sq. km - square kilometer t - ton yr - year CURRENCY EQUIVALENTS (as of 01 March 2010) Currency Unit – <???> NRs 1.00 = <???> $1.00 = <???> NOTE In this report, “$” refers to US Dollars. 3 TABLE OF CONTENTS I. Introduction ..........................................................................................................................6 A. Purpose of the Report....................................................................................................6 B. Extent of the IEE Study..................................................................................................6 1. ADB Policy ....................................................................................................................9 2. Government of Nepal Environmental Policy .................................................................10 3. Multilateral Environmental Requirements.....................................................................12 II. Description of the Subproject .............................................................................................13 A. Project Proponent ........................................................................................................13 B. Subproject Components ..............................................................................................13 C. Environmental Categorization ......................................................................................19 D. Estimated Cost ............................................................................................................19 III. Description of Existing Environment ................................................................................20 A. Physical, Biological and Socio-economic Conditions ...................................................20 1. Geophysical .................................................................................................................20 2. Ecological Profile .........................................................................................................20 3. Protected Areas ...........................................................................................................21 4. Land Use and Land Cover ...........................................................................................21 5. Social and Economic Development .............................................................................22 6. Economic Characteristics ............................................................................................23 7. Infrastructure Facilities.................................................................................................24 8. Quality of Life Values ...................................................................................................25 B. Major Environmental Issues.........................................................................................25 1. Industrial Effluent .........................................................................................................25 2. Inundation, Drainage, and River Flooding ....................................................................26 3. Air Pollution .................................................................................................................27 4. Solid Waste Management ............................................................................................27 5. Water Quality ...............................................................................................................28 IV. Anticipated Environmental Impacts and Mitigation Measures ..........................................28 A. Environmental Impacts and Mitigation Measures .........................................................28 B. Potential Environmental Enhancement Measures ..................................................51 1. Sewer line....................................................................................................................52 2. Storm water drainage ..................................................................................................52 3. Waste stabilization treatment plant ..............................................................................52 4. Sanitation-100% coverage ...........................................................................................52 V. Analysis of Alternatives ......................................................................................................52 A. Project Sites ................................................................................................................52 B. Project Design, Technology Selection, and Operation .................................................53 C. No Project Options ......................................................................................................53 VI. Information Disclosure, Consultation, and Participation...................................................53 VII. Grievance Redress Mechanism ......................................................................................54 A. Mitigation .....................................................................................................................58 B. Monitoring....................................................................................................................71 1. Compliance Monitoring ................................................................................................72 2. Impact/Effects Monitoring ............................................................................................73 1. Institutional Arrangement .............................................................................................78 2. Responsibilities for Mitigation and Monitoring ..............................................................79 3. Skills Needs and Institutional Strengthening ................................................................80 4. Cost Estimates ............................................................................................................80 5. Reporting and Review .................................................................................................82 4 6. Feedback and Adjustment ...........................................................................................82 IX. Findings and Recommendations .....................................................................................82 X. Conclusions .......................................................................................................................83
Recommended publications
  • Nepal Human Rights Year Book 2021 (ENGLISH EDITION) (This Report Covers the Period - January to December 2020)
    Nepal Human Rights Year Book 2021 (ENGLISH EDITION) (This Report Covers the Period - January to December 2020) Editor-In-Chief Shree Ram Bajagain Editor Aarya Adhikari Editorial Team Govinda Prasad Tripathee Ramesh Prasad Timalsina Data Analyst Anuj KC Cover/Graphic Designer Gita Mali For Human Rights and Social Justice Informal Sector Service Centre (INSEC) Nagarjun Municipality-10, Syuchatar, Kathmandu POBox : 2726, Kathmandu, Nepal Tel: +977-1-5218770 Fax:+977-1-5218251 E-mail: [email protected] Website: www.insec.org.np; www.inseconline.org All materials published in this book may be used with due acknowledgement. First Edition 1000 Copies February 19, 2021 © Informal Sector Service Centre (INSEC) ISBN: 978-9937-9239-5-8 Printed at Dream Graphic Press Kathmandu Contents Acknowledgement Acronyms and Abbreviations Foreword CHAPTERS Chapter 1 Situation of Human Rights in 2020: Overall Assessment Accountability Towards Commitment 1 Review of the Social and Political Issues Raised in the Last 29 Years of Nepal Human Rights Year Book 25 Chapter 2 State and Human Rights Chapter 2.1 Judiciary 37 Chapter 2.2 Executive 47 Chapter 2.3 Legislature 57 Chapter 3 Study Report 3.1 Status of Implementation of the Labor Act at Tea Gardens of Province 1 69 3.2 Witchcraft, an Evil Practice: Continuation of Violence against Women 73 3.3 Natural Disasters in Sindhupalchok and Their Effects on Economic and Social Rights 78 3.4 Problems and Challenges of Sugarcane Farmers 82 3.5 Child Marriage and Violations of Child Rights in Karnali Province 88 36 Socio-economic
    [Show full text]
  • NEPAL: Preparing the Secondary Towns Integrated Urban
    Technical Assistance Consultant’s Report Project Number: 36188 November 2008 NEPAL: Preparing the Secondary Towns Integrated Urban Environmental Improvement Project (Financed by the: Japan Special Fund and the Netherlands Trust Fund for the Water Financing Partnership Facility) Prepared by: Padeco Co. Ltd. in association with Metcon Consultants, Nepal Tokyo, Japan For Department of Urban Development and Building Construction This consultant’s report does not necessarily reflect the views of ADB or the Government concerned, and ADB and the Government cannot be held liable for its contents. (For project preparatory technical assistance: All the views expressed herein may not be incorporated into the proposed project’s design. TA 7182-NEP PREPARING THE SECONDARY TOWNS INTEGRATED URBAN ENVIRONMENTAL IMPROVEMENT PROJECT Volume 1: MAIN REPORT in association with KNOWLEDGE SUMMARY 1 The Government and the Asian Development Bank agreed to prepare the Secondary Towns Integrated Urban Environmental Improvement Project (STIUEIP). They agreed that STIUEIP should support the goal of improved quality of life and higher economic growth in secondary towns of Nepal. The outcome of the project preparation work is a report in 19 volumes. 2 This first volume explains the rationale for the project and the selection of three towns for the project. The rationale for STIUEIP is the rapid growth of towns outside the Kathmandu valley, the service deficiencies in these towns, the deteriorating environment in them, especially the larger urban ones, the importance of urban centers to promote development in the regions of Nepal, and the Government’s commitments to devolution and inclusive development. 3 STIUEIP will support the objectives of the National Urban Policy: to develop regional economic centres, to create clean, safe and developed urban environments, and to improve urban management capacity.
    [Show full text]
  • Federal Democratic Republic of Nepal
    FEDERAL DEMOCRATIC REPUBLIC OF NEPAL MINISTRY OF IRRIGATION MINISTRY OF AGRICULTURE DEVELOPMENT FEDERAL DEMOCRATIC REPUBLIC OF NEPAL NEPAL AGRICULTURE RESEARCH COUNCIL MINISTRY OF IRRIGATION MINISTRY OF AGRICULTURE DEVELOPMENT NEPAL AGRICULTUREPREPARATORY RESEARCH SURVEY COUNCIL ON JICA'S COOPERATION PROGRAM FOR AGRICULTUREPREPARATORY AND RURAL SURVEY DEVELOPMENT IN NEPALON JICA'S COOPERATION PROGRAM - FOODFOR AGRICULTURE PRODUCTION ANDAND AGRICULTURERURAL DEVELOPMENT IN TERAI - IN NEPAL - FOOD PRODUCTION AND AGRICULTURE IN TERAI - FINAL REPORT MAIN REPORT FINAL REPORT MAIN REPORT OCTOBER 2013 JAPAN INTERNATIONAL COOPERATION AGENCY OCTOBER(JICA) 2013 JAPAN INTERNATIONALNIPPON KOEI COOPERATION CO., LTD. AGENCY VISION AND SPIRIT(JICA) FOR OVERSEAS COOPERATION (VSOC) CO., LTD. NIPPON KOEI CO., LTD. C.D.C. INTERNATIONAL CORPORATION VISION AND SPIRIT FOR OVERSEAS COOPERATION (VSOC) CO., LTD. 4R C.D.C. INTERNATIONAL CORPORATION JR 13 - 031 FEDERAL DEMOCRATIC REPUBLIC OF NEPAL MINISTRY OF IRRIGATION MINISTRY OF AGRICULTURE DEVELOPMENT FEDERAL DEMOCRATIC REPUBLIC OF NEPAL NEPAL AGRICULTURE RESEARCH COUNCIL MINISTRY OF IRRIGATION MINISTRY OF AGRICULTURE DEVELOPMENT NEPAL AGRICULTUREPREPARATORY RESEARCH SURVEY COUNCIL ON JICA'S COOPERATION PROGRAM FOR AGRICULTUREPREPARATORY AND RURAL SURVEY DEVELOPMENT IN NEPALON JICA'S COOPERATION PROGRAM - FOODFOR AGRICULTURE PRODUCTION ANDAND AGRICULTURERURAL DEVELOPMENT IN TERAI - IN NEPAL - FOOD PRODUCTION AND AGRICULTURE IN TERAI - FINAL REPORT MAIN REPORT FINAL REPORT MAIN REPORT OCTOBER 2013 JAPAN INTERNATIONAL
    [Show full text]
  • Download File
    Sr. No. ShHolderNo Name Address: TotalKitta 1 1301090000809141 AADI DEV RAUNIAR WARD NO 13 10 2 2372 ABHISHEK BERIWAL MOTI LAL VINOD KUMAR 10 3 1301090000005587 ACHUT PRASHAD HUMAGAI DUWAKOT 10 4 1301110000038089 ACHYUT BAHADUR HADA TRIPURESHWOR KATHMANDU 30 5 1301560000013169 AJAY KUMAR SHRESTHA WARD NO.17 10 6 1301230000000429 Ajay Kumar Agrawal Dhalko-17 30 7 2098 AJAY KUMAR SHAH MAIN ROAD, BIRATNAGAR-8 50 8 1717 AJAY KUMAR THAKUR POST BOX NO. 12303 30 9 1301320000003292 Ajit Agrawal Pandetol 30 10 883 AJIT KUMAR RATHI MAIN ROAD, BIRATNAGAR-12 30 11 1301080000052552 AMALA SHRESTHA TEKU-12, KATHMANDU 30 12 1301090000306131 AMAR BAHADUR SHRESTHA WARD NO-6,SHANTICHOWK 30 13 1301120000755997 Ambika Pant Chapagain Bagmati 50 14 1301080000193438 AMBIKA TULADHAR LAZIMPAT, KATHMANDU-02 30 15 311 AMBIKA SHRESTHA BALAJU 30 16 1301060000015321 AMIR DAS RANJIT JAISIDEWAL-20 10 17 1301230000020711 AMIT KUMAR AGRAWAL WARD NO.-10 50 18 1301090000451207 AMIT KUMAR AGRAWAL DHARAN-2 40 19 570 AMIT MAN SHRESTHA 20/8 GHA-PULCHOWK 30 20 1910 AMITA MALLA GHA 484, DURBAR MARG 30 21 1301090000763004 AMRESH NARAYAN JHA BALKHU-14, KATHMANDU 30 22 1301240000061861 AMRIT NATH REGMI 34 20 23 1301070000023129 Amulya Gyawali W.n 3 30 24 1301370000019842 Amulya Man Thaiba Butwal-08 30 25 1301080000038886 ANAND KUMAR AGARWAL J.K WATCH HOUSE BRT-12 30 26 1301040000036728 ANAND KUMAR RUNGTA 12 100 27 1683 ANAND MARU SURYA PRAKASH TRADING CO.THAKURBARI ROAD 30 28 1301300000012459 ANAND RAJ ACHARYA WARD NO 34 30 29 1301090000809350 ANAND SHAH RAUNIAR WARD NO 13 10 30
    [Show full text]
  • BIRATNAGAR, 18–20 March 2014 Prepared by ADB Consultant Team
    Technical Assistance Consultant’s Report Project Number: 44140 Date: March 2014 TA 7566-REG: Strengthening and Use of Country Safeguard Systems Subproject: Strengthening Involuntary Resettlement Safeguard Systems (Nepal) CAPACITY ENHANCEMENT TRAINING ON SOCIAL SAFEGUARDS SYSTEM BIRATNAGAR, 18–20 March 2014 Prepared by ADB Consultant Team This consultant’s report does not necessarily reflect the views of ADB or the Government concerned, and ADB and the Government cannot be held liable for its contents. Training Report Capacity Enhancement Training On Social Safeguards System. 18-20 March 201 Biratnagar TA 7566 REG: Strengthening and Use of Country Safeguards System. NEP Subproject: Strengthening Involuntary Resettlement Safeguard Systems in Nepal niri CET Report Biratnagar 18-20-3-014 – Table of Contents 1 Background: ............................................................................................................................................... 4 1.1. Objectives of the training ................................................................................................................... 4 1.2. Training Schedule: .............................................................................................................................. 4 2. Commencement of the training ................................................................................................................ 4 2.1.Output of the day: .............................................................................................................................
    [Show full text]
  • Existing Environmental Conditions
    Draft EIA Report of the Sunsari River Irrigation Project Existing Environmental Conditions CHAPTER EXISTING ENVIRONMENTAL CONDITIONS 3. EXISTING ENVIRONMENTAL CONDITIONS This chapter documents existing environmental conditions, particularly in the areas of physical, biological, socio-economic and cultural resources in relation to the Project activities. 3.1. Physical Environment 3.1.1. Topography and Climate The Sunsari River Irrigation Project (SRIP) area is located in the south-western part of the Sunsari District located between 26°24′N to 26°30′N in latitude and 87°04′E to 87°12′E in longitude. The elevation ranges from 64 meters to 80 meters above the mean sea level. The study area is rectangular in shape with E-W width varying from 4 to 8 kilometres and N-S length of about 22 kilometres. The western and southern part of the project area is bordered with India. The Project area is located at the eastern bank of the Sapta Koshi River. The terrain starts from foothills of the Siwalik range and slopes gently down to south with an inclination of 5 degrees on an average and is formed by alluvium of old and present rivers. The Project area is dominated by sandy soils having low to moderate water holding capacity. The climate in the project area is sub-tropical. Temperatures are high between March and October, the hottest month being the April, during which the mean daily maximum temperature is about 340C. During the cool period from November to February, mean monthly temperatures are in the range of 16 to 220C. The annual average rainfall between 1970 and 1993 was 1,867mm, raining intensively in the monsoon period, from late May to September.
    [Show full text]
  • FINAL REPORT.Pdf
    Government of Nepal Ministry of Federal Affairs and Local Development Ilam Municipality Ilam Preparation of GIS based Digital Base Urban Map Upgrade of Ilam Municipality, Ilam Final Report Submitted By: JV Grid Consultant Pvt. Ltd, Galaxy Pvt. Ltd and ECN Consultancy Pvt. Ltd June 2017 Government of Nepal Ministry of Federal Affairs and Local Development Ilam Municipality Ilam Preparation of GIS based Digital Base Urban Map Upgrade of Ilam Municipality, Ilam Final Report MUNICIPALITY PROFILE Submitted By: JV Grid Consultant Pvt. Ltd, Galaxy Pvt. Ltd and ECN Consultancy Pvt. Ltd June 2017 Table of Content Contents Page No. CHAPTER - I ..................................................................................................................................................... 1 1.1 NAMING AND ORIGIN............................................................................................................................ 1 1.2 LOCATION.............................................................................................................................................. 1 1.3 SETTLEMENTS AND ADMINISTRATIVE UNITS ......................................................................................... 3 CHAPTER - II.................................................................................................................................................... 4 2.1 PHYSIOGRAPHY......................................................................................................................................4 2.2 GEOLOGY/GEOMORPHOLOGY
    [Show full text]
  • S3 Moon Article
    Nepalese Journal of Biosciences 2: 154-155 (2012) Brief Communication Comparison of populations of Melanagromyza sojae and Liriomyza sativae associated with Mung bean Vigna radiata (Linn.) Wilczek grown in Biratnagar, eastern Nepal Moon Thapa Department of Biology, Birat Campus, Biratnagar, Nepal E-mail: [email protected] Key words : Leaf miners, Diptera, Agromyzidae, legume host, Nepal Agromyzidae are popularly known as leaf miners. The larvae of these flies may form external stem mines, bore internally in stem of herbaceous plants or in the cambium of trees or feed on roots or flower heads. Approximately, there are 2750 described species with many species awaiting formal description. Research was carried out at various times to rear these flies at various places of Eastern Nepal. Those studies showed that major or key pest which causes damage in the absence of effective control measure is stem fly Melanagromyza sojae (Zehntner). Thapa (1997, 2000) has reported 5 species from this host plant. These species were Chromatomyia horticola (Goureau), Liriomyza sativa Blanchard, Ophiomya centrosematis (de Meijere), Melanagromyza sojae (Zehntner), Melanagromyza hibisci Spencer from Biratnagar, eastern Nepal. Thapa (1997) again reported 8 species of economically important agromyzid flies from Eastern terai region, Biratnagar Nepal and discussed their range of host plants. Further, Thapa (2000) reared and described 13 species of agromyzid flies belonging to 5 genera by male genitalia preparation and surveyed and determined 100 species of host plants belonging to 81 genera and 23 families from Eastern Nepal. Poudyal (2003) has reported 4 species of agromyzid flies. Mung bean Vingna radiate (L.) Wilczek var. K851 was at three locations A, B, C of Biratnagar (Lat.
    [Show full text]
  • Biratnagar Airport
    BIRATNAGAR AIRPORT Brief Description Biratnagar Airport is located at north of Biratnagar Bazaar, Morang District of Province No. 1. and serves as a hub airport. This airport is the first certified aerodrome among domestic / Hub airports of Nepal and second after Tribhuvan International Airport. This airport is considered as the second busiest domestic airport in terms of passengers' movement after Pokhara airport. General Information Name BIRATNAGAR Location Indicator VNVT IATA Code BIR Aerodrome Reference Code 3C Aerodrome Reference Point 262903 N/0871552 E Province/District 1(One)/Morang Distance and Direction from City 5 Km North West Elevation 74.972 m. /245.94 ft. Off: 977-21461424 Tower: 977-21461641 Contact Fax: 977-21460155 AFS: VNVTYDYX E-mail: [email protected] Night Operation Facilities Available 16th Feb to 15th Nov 0600LT-1845LT Operation Hours 16th Nov to 15th Feb 0630LT-1800LT Status In Operation Year of Start of Operation 6 July, 1958 Serviceability All Weather Land Approx. 773698.99 m2 Re-fueling Facility Yes, by Nepal Oil Corporation Service Control Service Instrumental Flight Rule(IFR) Type of Traffic Permitted Visual Flight Rule (VFR) ATR72, CRJ200/700, DHC8, MA60, ATR42, JS-41, B190, Type of Aircraft D228, DHC6, L410, Y12 Buddha Air, Yeti Airlines, Shree Airlines, Nepal Airlines, Schedule Operating Airlines Saurya Airlines Schedule Connectivity Tumlingtar, Bhojpur, Kathmandu RFF Category V Infrastructure Condition Airside Runway Type of surface Bituminous Paved (Asphalt Concrete) Runway Dimension 1500
    [Show full text]
  • ZSL National Red List of Nepal's Birds Volume 5
    The Status of Nepal's Birds: The National Red List Series Volume 5 Published by: The Zoological Society of London, Regent’s Park, London, NW1 4RY, UK Copyright: ©Zoological Society of London and Contributors 2016. All Rights reserved. The use and reproduction of any part of this publication is welcomed for non-commercial purposes only, provided that the source is acknowledged. ISBN: 978-0-900881-75-6 Citation: Inskipp C., Baral H. S., Phuyal S., Bhatt T. R., Khatiwada M., Inskipp, T, Khatiwada A., Gurung S., Singh P. B., Murray L., Poudyal L. and Amin R. (2016) The status of Nepal's Birds: The national red list series. Zoological Society of London, UK. Keywords: Nepal, biodiversity, threatened species, conservation, birds, Red List. Front Cover Back Cover Otus bakkamoena Aceros nipalensis A pair of Collared Scops Owls; owls are A pair of Rufous-necked Hornbills; species highly threatened especially by persecution Hodgson first described for science Raj Man Singh / Brian Hodgson and sadly now extinct in Nepal. Raj Man Singh / Brian Hodgson The designation of geographical entities in this book, and the presentation of the material, do not imply the expression of any opinion whatsoever on the part of participating organizations concerning the legal status of any country, territory, or area, or of its authorities, or concerning the delimitation of its frontiers or boundaries. The views expressed in this publication do not necessarily reflect those of any participating organizations. Notes on front and back cover design: The watercolours reproduced on the covers and within this book are taken from the notebooks of Brian Houghton Hodgson (1800-1894).
    [Show full text]
  • Nepal Orthodox Tea: Analysis of Industry, Production, and Market Potential
    Nepal Orthodox Tea: Analysis of industry, production, and market potential By Rudra Bahadur Baral M.S., University of Hohenheim, Germany, 2008 A THESIS submitted in partial fulfillment of the requirements for the degree MASTER OF SCIENCE Department of Agricultural Economics Collage of Agriculture KANSAS STATE UNIVERSITY Manhattan, Kansas 2019 Approved by: Major Professor Dr. Aleksan Shanoyan Copyright © Rudra Baral 2019. Abstract This study covers industry analysis, financial analysis and market analysis of Nepal orthodox tea. It aims to evaluate the industry forces, analyze the financial performance of firms, and assess market potential. The study is based on field survey, key informants’ interviews, and participant observation in combination with data from secondary sources. The financial information of 65 tea processing firms was collected using standard financial formats. The production and trade related statistical data were obtained from National Tea and Coffee Development Board Nepal, Trade and Export Promotion Center Nepal, FAOSTAT, International Trade Center and STATISTA. The results of industry analysis indicate that in general, tea processors have low bargaining power against input suppliers and tea buyers. The processing industry was found to be less attractive for new entrants. The threat of substitutes was found to be low. But there is intense internal competition among processing firms for resources and markets. Limited and inefficient production, low economies of scale, unorganized supply chain system, limited access to global market are the major binding constraints identified by this study. The results of the financial analysis found positive returns of investment and increasing returns to scale. However, the average capacity utilization of the processing firms is found to be 33 percent.
    [Show full text]
  • Assessment of Nicotine Dependence Among Smokers in Nepal
    Aryal et al. Tobacco Induced Diseases (2015) 13:26 DOI 10.1186/s12971-015-0053-8 RESEARCH Open Access Assessment of nicotine dependence among smokers in Nepal: a community based cross-sectional study Umesh Raj Aryal1*, Dharma Nand Bhatta2,3, Nirmala Shrestha1 and Anju Gautam3 Abstract Background: The Fagerström Test for Nicotine Dependence (FTND) and Heaviness of Smoking Index (HSI) are extensively used methods to measure the severity of nicotine dependence among smokers. The primary objective of the study was to assess the nicotine dependence amongst currently smoking Nepalese population. Methods: A community based cross-sectional study was conducted between August and November 2014. Information was collected using semi-structured questionnaire from three districts of Nepal. Data on demographic characteristics, history of tobacco use and level of nicotine dependence were collected from 587 smokers through face to face interviews and self-administered questionnaires. Non-parametric test were used to compare significant differences among different variables. Results: The median age of respondents was 28 (Inter-Quartile Range: 22–40) years and the median duration of smoking was 10 (5–15) years. Similarly, the median age for smoking initiation was 16 (13–20) years and the median smoking pack year was 4.2 (1.5–12). One third of the respondents consumed smokeless tobacco products. Half of the respondents wanted to quit smoking. The median score for FTND and HSI was 4 (2–5) and 2(0–3) respectively. There was significant difference in median FTND score with place of residence (p =0.03), year of smoking (p = 0.03), age at smoking initiation (p = 0.02), smoking pack year (p < 0.001) and consumption of smokeless products (p < 0.05).
    [Show full text]