Ephemeral Stormwater Outfall Restoration Park Drive RSC Fort Dupont Park (National Park Service), SE Washington DC Dcwater

Total Page:16

File Type:pdf, Size:1020Kb

Ephemeral Stormwater Outfall Restoration Park Drive RSC Fort Dupont Park (National Park Service), SE Washington DC Dcwater Ephemeral Stormwater Outfall Restoration Park Drive RSC Fort Dupont Park (National Park Service), SE Washington DC DCWater Project Goals: • Provide stable conveyance ofofof 100100100- 100 ---yearyear storm event through thethethe design ofofof boulder cascades andandand cobble riffles, thus minimizing sediment loading tototo receiving stream channel, • Minimize impacts tototo well vegetated, steep slopes past thethethe gully’s toptoptop ofofof bank • Maximize nutrient uptake andandand improve water quality tototo thethethe unnamed tributary ofofof thethethe Anacostia River bybyby promoting infiltration, detention, andandand seepage through thethethe sand/mulch fill,fill,fill, which increases denitrification andandand sediment filtering, • Dissipate energy atatat thethethe existing outfall discharge point through thethethe design ofofof aaa series ofofof dissipation poolspools. ... Additional Project Benefits: • Enhance thethethe ecological functions ofofof thethethe sitesitesite through thethethe recharging ofofof groundwater andandand creation ofofof riffle/pools complexes, • Attenuate stormwater peak discharges tototo thethethe downstream, unnamed tributary ofofof thethethe Anacostia River through thethethe conversion ofofof surface flow tototo subsubsub- sub ---surfacesurface flow, • Preserve valuable over story trees bybyby minimizing construction impacts tototo thethethe adjacent woodlands, • Install aaa viable demonstration project tototo showcase costcost- ---effectiveeffective andandand ecologically appropriate restoration techniquestechniques. ... Ephemeral Stormwater Outfall Restoration Park Drive RSC Fort Dupont Park (National Park Service), SE Washington DC DCWater Anacostia Valley Area of the Western Shore Uplands Region of the Coastal Plain Province Constructed Summer 2014 Drainage Area = 7 acres Impervious Area = 1 acre 100 yryryrQ = ~35 cfscfscfs Restoration Length = 200’ Bank Height = +15’ Slope = 20% Design/Build Cost = $300,000 Drainage Area PrePrePre-Pre ---RestorationRestoration Condition PrePrePre --- Restoration Condition LOD = TOP OF BANK PrePrePre-Pre ---RestorationRestoration Condition Park Drive RSC instead of Extending Storm Riffles Drain Pipe Cascades Park Drive RSC Construction Heavy Rain During Construction Park Drive RSC Sand/Mulch Seam doubled as haul road Park Drive RSC Series of Cascades Park Drive RSC TieTieTie-Tie ---OutOut Riffles Park Drive RSC Boulder Headwall.
Recommended publications
  • Map Plan and Report for Proposed Sewer District
    MAP, PLAN AND REPORT SEWER DISTRICT FORMATION SCHOHARIE BUSINESS PARK TOWN OF SCHOHARIE, NEW YORK MARCH 11, 2020 197 ELM STREET PO BOX 610 COBLESKILL, NEW YORK 12043 TABLE OF CONTENTS 1 Introduction 1 2 Wastewater System History 1 3 Existing Conditions 1 4 Evaluation of Facilities 5 5 Proposed Sewer District Options 7 6 Conclusion and Recommendations 8 APPENDICES A Schoharie Business Park Mapping B NYSDEC Correspondence C Existing Sewer System Schematic D Water Production Data E Existing SPDES Permit F Mapping of Sewer District Options G Proposed Improvements H User Cost Calculations I Proposed Sewer District Map and Description Page 1 1 INTRODUCTION The Schoharie Business Park (SBP) consists of 13 tax parcels as indicated on the mapping in Appendix A. The Business Park is currently served by private water and sewer systems and a private road network. Recently, NYSDEC has urged the Town to consider forming a Sewer District so that certain administrative and ownership issues related to the sewer system can be addressed. While the water system and the road network also have some technical issues that need attention, the scope of this Map, Plan and Report (MPR) only includes the Sewer System. 2 WASTEWATER SYSTEM HISTORY The wastewater system for the Schoharie Business Park was issued a discharge permit from NYSDEC in March of 2001. In 2002, Schoharie Park Sewage Works, Inc. was formed to operate the wastewater system under the NYS Transportation Corporation Law. In 2017, when many properties within the Schoharie Business Park were sold, Schoharie Park Sewage Works, Inc. was dissolved. This has left two options for the proper administration of the sewer system: 1) the current owner of the Schoharie Business Park (7 Summits, LLC) can form a new Transportation Corporation or 2) the Town of Schoharie can form a Sewer District.
    [Show full text]
  • Infiltration/Inflow Task Force Report
    INFILTRATION/INFLOW TASK FORCE REPORT A GUIDANCE DOCUMENT FOR MWRA MEMBER SEWER COMMUNITIES AND REGIONAL STAKEHOLDERS MARCH 2001 INFILTRATION/INFLOW TASK FORCE REPORT A GUIDANCE DOCUMENT FOR MWRA MEMBER SEWER COMMUNITIES AND REGIONAL STAKEHOLDERS MARCH 2001 Executive Summary This report is the product of the Infiltration/Inflow (I/I) Task Force. It has been developed through the cooperative efforts of the 43 Massachusetts Water Resources Authority (MWRA) member sewer communities, MWRA Advisory Board, The Wastewater Advisory Committee (WAC) to the MWRA, Charles River Watershed Association (CRWA), Fore River Watershed Association (FRWA), Mystic River Watershed Association (MRWA), Neponset River Watershed Association (NRWA), South Shore Chamber of Commerce (SSCC), Massachusetts Department of Environmental Protection (DEP), United States Environmental Protection Agency (EPA), and MWRA. The I/I Task Force recommends implementation of the regional I/I reduction goals and implementation strategies detailed in this report. The report outlines a regional I/I reduction plan with appropriate burdens and benefits for stakeholders. The report is intended to be a guidance document for use by local sewer communities, as well as other regional stakeholders, who may tailor appropriate aspects of the report recommendations to their unique situations. Severe storms in October 1996 and June 1998 led to the unusual circumstance of numerous sanitary sewer overflows (SSOs) from local and MWRA collection systems. In the aftermath of these events, EPA and DEP began an aggressive effort to make MWRA regulate flows from community sewer systems. MWRA recommended cooperative efforts by local collection system operators, as well as regulators and environmental advocates, would be more effective than a prescriptive, enforcement based approach.
    [Show full text]
  • Recommended Standards for Wastewater Facilities
    RECOMMENDED STANDARDS for WASTEWATER FACILITIES POLICIES FOR THE DESIGN, REVIEW, AND APPROVAL OF PLANS AND SPECIFICATIONS FOR WASTEWATER COLLECTION AND TREATMENT FACILITIES 2014 EDITION A REPORT OF THE WASTEWATER COMMITTEE OF THE GREAT LAKES - UPPER MISSISSIPPI RIVER BOARD OF STATE AND PROVINCIAL PUBLIC HEALTH AND ENVIRONMENTAL MANAGERS MEMBER STATES AND PROVINCE ILLINOIS NEW YORK INDIANA OHIO IOWA ONTARIO MICHIGAN PENNSYLVANIA MINNESOTA WISCONSIN MISSOURI PUBLISHED BY: Health Research, Inc., Health Education Services Division P.O. Box 7126 Albany, N.Y. 12224 Phone: (518) 439-7286 Visit Our Web Site http://www.healthresearch.org/store/ten-state-standards Copyright © 2014 by the Great Lakes - Upper Mississippi River Board of State and Provincial Public Health and Environmental Managers This document, or portions thereof, may be reproduced without permission if credit is given to the Board and to this publication as a source. ii TABLE OF CONTENTS CHAPTER PAGE FOREWORD ..................................................................................................................................... v 10 ENGINEERING REPORTS AND FACILITY PLANS 10. General ............................................................................................................................. 10-1 11. Engineering Report Or Facility Plan ................................................................................ 10-1 12. Pre-Design Meeting ....................................................................................................... 10-12
    [Show full text]
  • Design Standards for Stormwater Detention and Retention for Pima County
    Pima County Regional Flood Control District Design Standards for Stormwater Detention and Retention Supplement to Title 16, Chapter 16.48, Runoff Detention Systems Floodplain and Erosion Hazard Management Ordinance Pima County Regional Flood Control District 97 E. Congress St., 3rd Floor Tucson, AZ 85701-1791 (520) 724 -4600 June 2014 _________________ Design Standards for Stormwater Detention and Retention for Pima County REVISIONS Because of ongoing regulatory and technical changes in the fields of floodplain and stormwater management, revisions to this manual will be required from time to time. Such revisions will be approved by the Floodplain Administrator. Hard copy (printed) revisions will not be distributed. It is the holder’s responsibility to keep the document current by periodically checking the Regional Flood Control District’s web page for new digital versions. The revision history of the document is listed below. Chronology of Publication, Updates and Revisions Description Date First Edition June 2014 Chapter 6 Revised to Include Benefits of February 2015 Multiple-Use Basins I _________________ Design Standards for Stormwater Detention and Retention for Pima County TABLE OF CONTENTS No. Description Page No. 1. INTRODUCTION ................................................................................................. 1 1.1 Purpose ......................................................................................................................1 1.2 Ordinance Overview and Detention Requirements ..................................................2
    [Show full text]
  • Type of Waste Treated Wastewater Outfall Number 001 Outfall Location
    Expiration Date: November 30, 2015 Permit Number: 101694 File Number: 71832 Page 1 of 16 Pages NATIONAL POLLUTANT DISCHARGE ELIMINATION SYSTEM WASTE DISCHARGE PERMIT Department of Environmental Quality Western Region - Salem Office 750 Front Street NE, Suite 120, Salem, OR 97301-1039 Telephone: (503) 378-8240 Issued pursuant to ORS 468B.050 and The Federal Clean Water Act ISSUED TO: SOURCES COVERED BY THIS PERMIT: City of Powers Outfall Outfall PO Box 250 Type of Waste Number Location Powers, OR 97466 Treated Wastewater 001 R.M. 28.0 FACILITY TYPE AND LOCATION: RECEIVING STREAM INFORMATION: Trickling Filter - High Rate Basin: South Coast POWERS STP Sub-Basin: Coquille 285 E CEDAR ST POWERS Receiving Stream: South Fork Coquille River LLID: 1241417430803 28.0 D Treatment System Class: Level II County: COOS Collection System Class; Level I EPA REFERENCE NO: OR0026930 Issued in response to Application No. 968383 received October 5,2010. This permit is issued based on the land use findings in jhe permit record. •7 Steve Sclmurbusch Acting Water Quality Manager Western Region North PERMITTED ACTIVITIES Until this permit expires or is modified or revoked, the permittee is authorized to construct, install, modify, or operate a wastewater collection, treatment, control and disposal system and discharge to public waters adequately treated wastewaters only from the authorized discharge point or points established in Schedule A and only in conformance with all the requirements, limitations, and conditions set forth in the attached schedules as follows: Page Schedule A - Waste Discharge Limitations not to be Exceeded 2 Schedule B - Minimum Monitoring and Reporting Requirements....
    [Show full text]
  • Nehemiah Homes at Fort Dupont Planned Unit Development
    202.942.5000 ARNOLD & PORTER 202.942.5999 Fax 555 Twelfth Street, NW Washington, DC 20004-1206 July 17, 2001 Ms. Carol Mitten, Chair District of Columbia Zoning Commission 441 4th Street, N.W. Suite 210 Washington, D.C. 20001 Re: Pre-Hearing Submission Zoning Commission Case No. Ol-12C Nehemiah Homes at Fort Dupont Planned Unit Development Dear Ms. Mitten and Members of the Commission: Pursuant to§ 3013 of the Rules of Practice and Procedure before the Zoning Commission, we are herewith submitting twenty (20) copies of the Pre-Hearing Submission on behalf of the applicant in the above-referenced case. This information includes the following items: 1. Twenty (20) copies of the original application booklet, modified in part to reflect more refined plans. 2. A list of witnesses who will testify at the public hearing, a summary of their testimony, and an estimate of the time required for the applicant's presentation. 3. Additional reports and plans, including: • Architectural Plans by Heffner Architects • Revised Site Plan by Ben Dyer and Associates • Traffic Impact Analysis Study by O.R. George & Associates, Inc. 4. Twenty (20) copies ofreduced plans and two (2) sets of full-size plans 5. As to the requirement in§ 3013.3 to name the property owners in the ~ase of a map amendment, no rezoning is proposed in this application. ZONING COMMISSION 6. Certification pursuant to § 3013.7: ZONING COMMISSION District of Columbia Case No. 01-12 ZONING COMMISSION Washington, DC New York Los Angeles Century City Denver London NorthernDistrict Virginia of Columbia CASE NO.01-12 EXHIBITDeletedEXHIBIT NO.16A1 NO.16 Ms.
    [Show full text]
  • Hydraulics Manual Chapter 13 APPENDIX F – STORM DRAINAGE
    Storm Drainage 13-F-1 APPENDIX F STORM DRAINS 1.0 Introduction This appendix provides information for the planning and hydraulic design of storm drainage systems. The methodology is intended for those with an understanding of basic hydrologic and hydraulic concepts and principles. Hydrologic concepts were discussed in Chapter 7. Important hydraulic principles include flow classification, conservation of mass, conservation of momentum, and conservation of energy. These elements were introduced in Chapter 8. Guidance on procedures to evaluate energy losses associated with storm drain systems is provided in Appendix G. A storm drain is that portion of the highway drainage system which receives surface water through inlets and conveys the water through a network of pipes to an outfall (see figure below). It is composed of different lengths and sizes of pipe connected by appurtenant structures. A section of pipe connecting one inlet or appurtenant structure to another is termed a "segment" or "run". Appurtenant structures include inlet structures (excluding the actual inlet opening), access holes, junction chambers, and other miscellaneous structures. LEFT BRANCH 4 RIGHT BRANCH 1 1 1 1 1 1 1 1 1 1 2 2 2 2 2 2 2 2 2 1 3 1 1 1 2 2 1 1. Lateral storm drain 5 2. Submain storm drain 3. Main or trunk storm drain 5 4. Intercepting storm drain 5. Outfall storm drain Manhole CREEK Typical Closed Conduit Storm Drain System Storm drain system design begins after inlet capacity and spacing (Appendix D) have been determined. Then, on a drainage system map, the connecting pipes, access holes, direction of flow, outfall location, existing drainage features and any necessary horizontal/vertical adjustments to avoid existing utilities would be documented.
    [Show full text]
  • Outfall Design and Construction
    OUTFALL DESIGN AND CONSTRUCTION CONTENTS: Drawing No. 1158-2413 Drawing No. 1158-2414 Drawing No. 1158-2415 Drawing No. 1158-2416 Drawing No. 1158-2417 Drawing No. 1158-241 8 Drawing No. 1 158-2419 Outline Description of Outfall Design and Construction For inspection purposes only. Consent of copyright owner required for any other use. EPA Export 25-07-2013:22:43:47 - WWTP SITE BOUNDARY - PRIMARY DISCHARGE 1. ALL LEVELS SHOWN REWTETOORMiANCE IURYE" MWU AT MLLINHViD I I I I , Clnt For inspection purposes only. Consent of copyright owner required for any other use. LOUTH COUNTY COUNCIL DROGHEDA WASTE WATER DISCHARGE LICENCE APPLICATION PRIMARY D SCrlARGE PO hT COhSTR,CTION 8 DES GN <SECTION 1 ATTACHMENT C.2 L Pm* 0-r. MICHAEL F. GARRlCK EPA Export 25-07-2013:22:43:47 - WWTP SITE BOUNMRY I For inspection purposes only. Consent of copyright owner required for any other use. SECTION I ATTACHMENT CE EPA Export 25-07-2013:22:43:47 WWTP SITE BOUNDARY STORM WATER For inspection purposes only. Consent of copyright owner required for any other use. DROGHEDA WASTE WATER I DlSCnARGE LlCEhCE KEY PLAN SECTlONl#ZWtCHMENT C.B& mpnr(ql: cwSp we RK E S. SEPT '07 EPA Export 25-07-2013:22:43:47 WWTP SITE / CONCRETE APRON I BOUNDARY ON TlhdBER PILES % STDW WATER c OVERPLBW DWOHARGE For inspection purposes only. Consent of copyright owner required for any other use. DROGHEDA WMTE WRTER DISZHARGE LICEMCE rx. STORM WATER OVERFLOW DISCHARGE POIMTS CONSTRUCTION % DESIGN SHEET 1 OF 4 ,( ,( SECTIONd.ATPACHMENT l2.Z.k EPA Export 25-07-2013:22:43:47 STORM WATER OVERFLOWDISCHARGE POINTS For inspection purposes only.
    [Show full text]
  • Sewer Odor Control Master Plan
    CITY OF LOS ANGELES SEWER ODOR CONTROL MASTER PLAN Wastewater Engineering Services Division Bureau of Sanitation AUGUST 2011 2011 Odor Control Master Plan TABLE OF CONTENTS Chapter Title Page ACRONYMS AND ABBREVIATIONS......................................................................... 3 EXECUTIVE SUMMARY .............................................................................................. 5 INTRODUCTION ..................................................................................................................................... 5 EVALUATION OF THE COLLECTION SYSTEM................................................................................. 6 RECOMMENDATIONS/CONSIDERATIONS ....................................................................................... 7 1.0 INTRODUCTION................................................................................................. 9 1.1 HISTORY OF THE SEWER SYSTEM................................................................................................. 9 1.2 ODOR GENERATION ..................................................................................................................... 9 1.3 HISTORY OF ODOR CONTROL..................................................................................................... 10 1.4 COLLECTION SYSTEM SETTLEMENT AGREEMENT AND ORIGIN OF THE MASTER PLAN .............. 13 1.5 PURPOSE AND OBJECTIVES......................................................................................................... 13 1.6 TASK DESCRIPTIONS
    [Show full text]
  • Ward 7 Heritage Guide
    WARD 7 HERITAGE GUIDE A Discussion of Ward 7 Cultural and Heritage Resources Ward 7 Heritage Guide Text by Patsy M. Fletcher, DC Historic Preservation Office Design by Kim Elliott, DC Historic Preservation Office Published 2013 Unless stated otherwise, photographs and images are from the DC Office of Planning collection. This project has been funded in part by U.S. Department of the Interior, National Park Service Historic Preservation Fund grant funds, administered by the District of Columbia’s Historic Preservation Office. The contents and opinions contained in this publication do not necessarily reflect the views or policies of the U.S. Depart- ment of the Interior, nor does the mention of trade names or commercial products constitute endorsement or recommendation by the U.S. Department of the Interior. This program has received Federal financial assistance for the identification, protection, and/or rehabilitation of historic properties and cultural resources in the District of Columbia. Under Title VI of the Civil Rights Act of 1964 and Section 504 of the Rehabilitation Act of 1973, the U.S. Department of the Interior prohibits discrimination on the basis of race, color, national origin, or disability in its Federally assisted programs. If you believe that you have been discriminated against in any program, activity, or facility as described above, or if you desire further information, please write to: Office of Equal Opportunity, U.S. Department of the Interior, 1849 C Street, N.W., Washington, D.C. 20240. TABLE OF CONTENTS Introduction......................................................................................................................5
    [Show full text]
  • Philadelphia Stormwater Manual V2.1 Philadelphia Stormwater Manual V2.1 This Pageintentionallyleftblank Simplified Approach Design Criteria Rooftop Systems
    7 Stormwater Management Practice Design Guidelines 7.1 Green Roofs 7.2 Rain Barrels and Cisterns 7.3 Filter Strips 7.4 Filters 7.5 Bioinfiltration / Bioretention 7.6 Detention Basins 7.7 Berms and Retentive Grading 7.8 Swales 7.9 Constructed Wetlands (see PA Stormwater BMP Manual) 7.10 Ponds & Wet Basins (see PA Stormwater BMP Manual) 7.11 Subsurface Vaults 7.12 Subsurface Infiltration 7.13 Porous Pavement 7.14 Pre-fabricated and Proprietary Designs (see PA Stormwater BMP Manual) 7.15 Inlet and Outlet Controls Philadelphia Stormwater Manual v2.1 This Page Intentionally Left Blank Philadelphia Stormwater Manual v2.1 Simplified Approach Design Criteria Rooftop Systems This section provides the following information about eco-roofs and roof gardens: S Typical cross section S Description S General specifications S Checklist of minimal information to be shown on the permit drawings S Construction inspection requirements and schedule S Link to landscaping requirements S Link to example landscaping plans S Link to operation and maintenance requirements S Link to photos 7.1 S Link to drawings 7.1 S Eco-roof Central City F.A.R. bonus guidelines Green roofs (vegetated roof/eco roof/roof garden) consist of a layer of vegetation that completely covers an otherwise conventional flat or pitched roof. The hydrologic response of a green roof bears closer resemblance to a lawn or meadow than impervious surface. The green roof system is composed of multiple layers including waterproofing, a drainage City of Portland, OR layer, engineered planting media, and specially selected plants. Vegetated roof covers can be optimized to achieve water quantity and quality benefits.
    [Show full text]
  • Progress Report – District of Columbia a G St 2016 Pdate
    A G ST 2016 PDATE PROGRESS REPOR Our Work to Upgrade Reliability District of Columbia Progress Results 1. TRIMMING TREES Many of Pepco’s outages are a direct result of trees We trimmed trees along 52.13 miles of power lines in falling on power lines. Pepco is aggressively trimming the District of Columbia during August, bringing the trees along public rights of way to obtain increased annual total to 278.2 miles. The annual target for clearance between the overhead electric wires and 2016 is 400 miles. existing trees. Pepco also works with District of Columbia communities and homeowners to remove potentially hazardous trees which fall outside of the company’s right of way area. 2. IMPROVING PRIORITY FEEDERS A feeder is an electric power line that distributes In August, we completed work in the Navy Yard area. power to up to 1,100 customers within a specific We continued work in the areas of Fort Davis, geographic area. Each year, across the District of Capitol Hill, Deanwood, Hillbrook and Fort Dupont. Columbia, Pepco selects feeders for additional work We plan to complete 16 projects during 2016. to improve performance. 3. PREPARING FOR SYSTEM GROWT Similar to upgrading electric service to your home to In August, we completed work in the Metro Center accommodate new appliances and electronic devices, area. We continued work on projects in the areas of Pepco is continuing to upgrade power lines and is eorgetown, Foggy Bottom, Petworth and Brookland. adding circuits to accommodate new customers and We plan to complete six projects during 2016.
    [Show full text]