Project Report for Forest Department

MINISTRY OF ROAD TRANSPORT AND HIGHWAYS Through PWD B&R

CONSULTANCY SERVICES FOR PREPARATION OF FEASIBILITY SURVEY, DETAILED PROJECT REPORT OF EXISTING TWO LANE PLUS SHOULDER TO (4-LANING OF TO FEROZEPUR KM: 170.00 TO 194.00 OF NEW NH-5 (OLD NH-95) IN THE STATE OF PUNJAB) TO BE EXECUTED ON EPC MODE. PROJECT REPORT

Submitted by: THE EXECUTIVE ENGINEER Central works Division, Punjab PWD (B&R), Ferozepur

Page 1 - Project Report for Forest Department Table of Contents

Description Page No

Chapter – 1

INTRODUCTION ...... 1

1.1 General………………….……………………………………………………………………………………… 3

1.2 Punjab State at a Glance ………………………………………………………………………..…….… 3

1.2.1 Ferozepur District at a Glance………………………………………………………………….. 5

1.2.1.1 Area………………………………………………………………………………………………………. 6

Chapter-2

Proposal

2.1 General……………………………………………………………………………………………. 7

2.2 Proposals ...... 7

Estimate ...... 8

Page 2 - Project Report for Forest Department Chapter -1

1.0 Introduction

1.1 General

The Government of has taken up a massive programme of up- gradation & development of National Highways. Under NH’s development project, hundreds of kilometres have been proposed to be widened to 4/6 lane depending up on the traffic volume. These National Highways would provide high speed connectivity. NH-95 (0ld) renamed as NH-05 (new) is one of the road under this programme.

For the purpose of project preparation, various corridors have been divided into convenient sections, selected on the basis of traffic generation and attraction potential, geographic location and other considerations. This report deals with converting this section from Km. 170.00 (Talwandi Bhai) to Km. 194.00 (Ferozepur) from 2-lane to 4- lanning.

The starting point of this section is at one Kilometer from Talwandi Bhai Chowk (Lat.30°50'51"N, Long.74°54'24"E) (Km 170 of existing NH-95) and moves in the West Direction and ends near village Dhakka Basti (Lat. 30°54'18"N, Long. 74°40'28"E.) (Km-194 of existing NH-95), both in the district Ferozepur of Punjab, traversing through plain terrain. The broad features of the state of Punjab and Ferozepur district in which our Project Road lies are briefed herein under.

1.2 Punjab State at a Glance

The State of Punjab is situated in the North Western part of India and is surrounded by the states of Jammu & Kashmir, Himachal Pradesh, , and it also borders the province to the west. Punjab's capital is Chandigarh, which is administered separately as a Union Territory since it is also the capital of neighbouring Haryana. Other major cities of Punjab include , , , , and . Punjab state is located between 29° 30' N to 32° 32' N latitude and between 73° 55' E to 76° 50' E longitude. Its average elevation is 300 m from the sea level. The total area of the state is 50,362 square kilometres (19,445 square miles). The population is 2.77 crores (2011). The population density per sq. km is 550. Punjab has a literacy rate of 76.70%, The total number of districts in Punjab is 22. Following are some facts and figures about the state:

Page 3 - Project Report for Forest Department

A large portion of the land of the state is under cultivation because the Punjab plain is free from physical handicaps. The deficiency of rainfall has been made up by irrigation facilities. It is only the districts of Ropar and that the cultivated area is less than 60 per cent of the total. It is in these districts that considerable land is covered by Shivalik Hills and the beds of seasonal streams that cannot be brought under cultivation.

The major crops grown in this state include wheat, rice, sugarcane, cotton, maize, etc. Minor crops like millet, barley and fruit and vegetables are also produced in some areas.

The soil of the state is very fertile and it is formed by the deposition of alluvium. From geographical point of view the state is divided into two parts i.e. plain region and hilly region. Irrigation in the state is mainly dependent on canals.

The agricultural industries in the state include mainly cotton textile, sugar and dairy industry. The state is the major producer of milk in the country. It has got highest per capita availability of milk. Operation Flood was launched in the year 1969 – 70 to increase the production of milk in the country.

The three major seasons in Punjab are: summer, rainy and winter. The climate of the plains is excessively hot and dry between April and August, with temperatures as high as 49° C. The rains of the monsoon season begin at the end of June and continue till August. Annual rainfall ranges from about 915 mm (about 36 in) in the north to 102 mm (4 in) in the south. Winters are cool with some frosts. The average temperature in January is 13° C, although at night the temperature sometimes lowers to freezing. In June the average temperature is 34° C occasionally climbing as high as 45° C. Annual average rainfall ranges from 1250 mm in the north to 350 mm in the southwest. More than 70 percent of the annual rainfall occurs during the monsoon season from July to September.

Excluding agriculture, other major industries include the manufacture of scientific instruments, electrical goods, machine tools, textiles, tourism, sewing machines, sports goods, starch, fertilizers, bicycles, and the processing of pine oil and sugar.

Page 4 - Project Report for Forest Department

1.2.1 Ferozepur District at a Glance

The District Ferozepur is situated at India Pakistan border, at the east side , and at the south side Muktsar District is situated. On the north east the River generally separates it from the and districts and on the south west side the district touches the boundaries of Ferozepur. The united stream of the Sutlej and Beas generally separates it from the in the north-west, and farther down from Pakistan with the exception of some areas on each side of the river.

Page 5 - Project Report for Forest Department

Map of District Ferozepur

1.2.1.1 Area

Area and Physiography The total geographical area of the district is 5303 sq. km out of which 3258.78 sq. km fall under Bet area and 196.63 sq. km fall under Border area. The topography of the district is even. It is a plane of alluvial formation sloping gently @ 2ft. per mile from the North East to the South West. The district is divided into three main belts running somewhat parallel to the course of river Sutlej. On South West side, the bet area called "Hittar" having land alluvial dark and gray clay intermixed with straits of sand. On the South East side, the Rohi and Mukhi Plains have light and sandy soil and brackish water in wells. The district has two types of soil namely chestnut brown (Alluvial)-69% and desert soil (31%)

Page 6 - Project Report for Forest Department CHAPTER-2 PROPOSAL

2.1 General:

Based on the survey of complete NH-95 the following observations have been noticed:-

a) Section from Km.92+000 to Km.170+000 (Ludhiana-Moga-Talwandi Bhai Section): Is being widened concentrically by providing Flexible Pavement on both sides of the existing road. b) Section from Km.194+000 to Km.199+000: Is also being widened concentrically by providing Flexible Pavement on both sides of the existing road. c) The available ROW is 60 meter and the existing road alignment is in the centre of ROW. There is no Horizontal curve in the proposed section from Km.170+000 to Km.194+000. d) There is built up area at seven locations (Villages) along the road. A few structures exists in the ROW at these village locations. e) There are five major bridges on the road (In the centre of ROW). The condition of these bridges is good and does not require immediate replacement. Two bridges (adjacent to each other) Feeder and Sirhind Feeder. These are perennial canals, there is no closure.

2.2 Proposals:

As described above and keeping in view the various factors discussed with engineers of Authority following option is proposed.

2.2.1 Concentric Widening with all Flexible Pavement:

a) Maintain the existing centre line of the road as proposed centre line in the complete length except at the location of approaches to bridges.

b) Widen the existing road on both sides with flexible pavement in complete stretch.

Page 7 - Project Report for Forest Department

ESTIMATE FOR CONSTRUCTION OF 4 LANING OF TALWANDI BHAI-FEROZEPUR SECTION OF NH-95 (NEW NH-5) FROM RD 170.0 KM. TO RD 194.0 KM. IN THE STATE OF PUNJAB

CONCENTRIC WIDENING WITH FLEXIBLE PAVEMENT(OPTION-1)

GENERAL ABSTRACT OF COST Amount S. No. Description ( in Rupees) 1 Cost of Road, Service road & Junctions (Road Work)

a Site Clearance & Dismantling 16493044 b Earthwork 146998279 c Granular Sub Base & Base Course 375604565 d Bituminous Course 1309046891769951003 2e RigidStructures Pavement(GSB+DLC+PQC only) Sub Total-(a+b+c+d+e)

a Cost of Steel Bridge 45 M. on Sirhind Feeder 42187500 b Cost of Steel Bridge 100 M. on Rajasthan Feeder 93750000 c Cost of Bridge 30 M. on Ferozepur Feeder 16875000 d Cost of Bridge 30 M. on Phidda Drain 16875000 e Cost of Bridge 30 M. on Drain 16875000 f Cost of Light Vehicular Under Pass (6 No.) 327498507 g Cost of RCC Box Culverts 89601867 h Cost of Hume Pipe Culverts 75649268518345676 3i Cost RCCof Bus Drain Lay bay 13448413533291885 4 SubMiscellaneous Total-(a+b+c+d+e+f+g+h) items/Traffic signs etc 179788272 A Total 2278619733 13090469 B Civil Construction Cost 2291710202 Arboriculture/ Horticulture @ 1.0% of Road Work(1)

Civil Construction Cost in Crores 229.171 C CivilTotal Cost Including per Km contingency (Length = 24.0 Km.)in Crores 23558780879.549 AddCentages 2.80% Contingency of (B) 64167886

Administrative Charges @ 1.0% of B 22917102 Quality Control Charges @ 1.0% of B 22917102 Road Safety Cell Audit Charges @ 0.5% of B 11458551 Construction Supervision Charges @ 2.0% of B 45834204 Maintainace during DLP payable to contractor @ 7.5% of B for four years 171878265

Escalation Cost @ 5.0% PA for 2 years i.e. 10% of B payable to contractor 229171020 D (BiddingTOTAL PROJECT period of COST 1 year + Construction period of 1 years) 2860054332

E Forest Clearance Cost *TOTAL CAPITAL COST = 300305704857201087 Utility Shifting Cost * Lac 30030.57085801630 Crores 300.306

Note : * = Amount of Forest Clearance ,& utility shifting may vary , actual estimate is awaited from the concerned departments

Page 8 -