British Rail No

Total Page:16

File Type:pdf, Size:1020Kb

British Rail No FOR THE INFORMATION OF RAILWAY STAFF ONLY N—I NE/N British Rail No. 49 North Eastern Region NORTHERN SECTION (including Main line, York to Northallerton and York Yards also Grosmont to Whitby Town (Incl.)) TEMPORARY SPEED RESTRICTIONS. PERMANENT WAY OPERATIONS. SIGNAL ALTERATIONS. APPENDIX INSTRUCTIONS, 8(c. Saturday, 4th December, 1965 o Friday, 10th December, 1965 inclusive Enginemen and Guards must pay particular attention to works contained in this notice and keep a good look-out for hand signals, which will be exhibited at the various localities in accordance with the Rules and Regulations. W o r k at places other than those mentioned may be in progress, of which it may not have been possible t o give previous notice, and Enginemen must be on the look-out and be prepared to stop or run a t reduced speed when and where hand signals may be exhibited. * Supplementary Oper ati*ng Instructions Bookl et (13R31293) a nd N o . 3 Supplements t o the Nor*ther n and Souther n Sectional Appendices, also Wor ki ng Over Other RSegion Booklets have been published commencing 4th December, 1965. Signalling Programmes No. 48 should be retained P until copies of these booklets have been received. A Ne w Table has been inserted i n the No. 3 SuEppl ement to the Nor ther n Sectional Appendi x headed "Mi ddl esbr oughC (Gui sbor ough Juncti on) t o Whi tby" a nd A L L STAFF concerned must I now be i n possession of a Nor t he r n Sectional Appendi x A L N O T I C E N-2 Section A—TEMPORARY SPEED RESTRICTIONS (Until further notice unless otherwise stated.) Warning Boards and Indicators provided unless otherwise shown. In the case o f items marked * the Warning Boards and Indicators will be moved as the work progresses and the restrictions will not operate over more than m i l e at one time. In the case of items marked f tim e has been allowed i n the working timetable for these restrictions. Temporary speed restrictions may be eased or withdrawn earlier than shown. Tr ai nm en must, therefore, be prepared t o find a higher speed ( which m ay be the permanent speed restriction) indicated at the Warning Boards and they must work to such speed. 0 Mileage Location of Work Lines • t at or between Q. t Remarks at or between , affected m. the. m . chg. m.p.r YORK. CHALONER S WHIN TO TWEE DMOU TH Thirsk and Pilmoor Up Fast 22 28 21 52 20 Relaying, lifting and ballasting. Ferryhill No.1 Down Loop 57 18 58 7 15 Condition o f track W ar ni ng Board not provided. Durham North and Down Main 69 60 71 60 20 Ouston Junction Relaying and flooding. Ouston Junction and Up Main 70 70 66 40 40 Condition of track. Durham, North Ouston Junction and Down Slow 74 65 76 58 45 New Down Slow Line Low Fell Junction Newcastle and Manors Down Nor th 0 19 0 39 Jct. , CO Diversionary tracks over tem- porary bridge Heaton North Junction Down and Up 3 30 3 70 60 Subsidence. and Benton Main Dudley and Killingworth Up Main 765 743 20 Reconstructing Bridge N o. 54. Killingworth and Dudley Down Main 7 57 7 79 20 Goswick and Beal Reconstructing Bridge No. 54. Up Fast 60 42 60 22 20 Reconstructing Bridge No. 177. Commencing 22 00, Sun- day, Sth December, until 16 00, W ednesday, 8 t h December Beal and Goswick Down Fast I 6 0 34 60 54 20 Reconstructing Bridge No. 177. Commencing 22 00, Sun- day, 5th Decem ber , unti l 16 00, W ednesday, 8 t h December NORTHALLERTON T O GA T ES HEAD( JUNCTI ON) via H OR D EN Cliff House and Up Main 68 71 67 54 20 Greatham Deep ballasting Fulwell and East Boldon Down and Up 92 22 92 47 30 Subsidence. Main NORTH SHORE B RANCH North Shore and Single 02.2 0 32 15 Portrack Lane Level Reconstruction of Bridge No. 3. Crossing BACKWORTH TO MORPETH (v a S E C HILL) Holywoll and Seghill, Down and Up 7 836 15 Subsidence. South Main 7 Holywall and Seghill, Down and Up 8 9 3 IS Subsidence. North 8 Main' 6 Bedlington North and Down and Up 16 30 16 40 20 Subsidence. Choppington Main 4 Choppington and Down and U p 17 8 17 22 20 Subsidence. H ew ett Main Choppington and Single 17 52 17 6$ IS Subsidence. Hepscott SECTION A—TEMPORARY SPEED RESTRICTIONS—continued Mileage -o E o Location of Work Lines at or between :3 I t at or between Remarks affected- vc1i. 1: • 1- :, 1 m. chs. 1 m. chs. I rn.p.1 - 1EDLINGTON T O N EW B IGGIN 7 iddlington North and Down and Up 0 45 I 0 10 Subsidence. Marchey's House Main Nest Sleekburn and Down and Up 1 22 1 37 10 Subsidence. Marchey's House Main kshington and Down and Up 3 22 3 35 IS Subsidence. Woodhorn Main Noodhorn and Down and Up 4 62 5 I IS Subsidence. Newbiggin Main N I N N I N G T O M A R CHEY'S H O USE Ninning and Marchey's D o w n and Up 0 0 0 10 10 Subsidence. House Main 2AMBOIS B R A N C H Ninning and Freeman's D o w n and Up 0 32 0 36 10 Subsidence. Main • H EA TON S O U T H J U N C T I O N T EMOU TH V IA W A L L SEN D O-lo wdTon-Yon-TNyne and D o w n and Up 3 65 3 71 IS Constructing new underbridgt Percy Main Main No. I8A Preston Colliery and D o w n and Up 5 25 5 28 20 Relaying switches and crossing! Tynemouth South M a i n Until 16 00, Tuesday, 7t1 December RIVERSIDE B R A N C H Riverside Junction and D o w n and Up 0 72 0 78 15 Constructing subway alongsidi St. Peters Main Bridge No. 11 • it. Peter's and D o w n and Up I 70 2 3 10 Embankment fir e near Bridg, Walker Main No 17 Witlington Quay and D o w n and Up 6 13 6 i 9 10 Construction o f new under Percy Main Main bridge No. 53A NEWCASTLE TO CA RLISLE (DUR RAN H ILL exci usive) tAddison and Clara D o w n and Up 6 0 6 34 25 Subsidence. Vale Main Stocksfield and Prudhoe U p Main 1 3 3 12 16 20 Resleepering. Stocksfield and Riding D o w n Main 1 4 40 14 76 20 Relaying. Mill CONSETT N O R T H T O O U ST O N JU N C T ION South Medomsley and Down and Up 1 0 10 9 6 IS Subsidence. Annfield West Main Annfield East and West Down and Up 7 20 6 5 20 Subsidence. Stanley Main West Stanley and Down and Up 4 47 4 12 15 Subsidence. Beamish Main Beamish, Station and Down and Up 3 16 2 74 20 Subsidence. South Pelaw Main N-4 SECTION A—TEMPORARY SPEED RESTRICTIONS—continued Mileage Location of Work Lines at or between at or between affected Remarks m. chs. m . chs. GATESHEAD ( GREE NSFIELD J C T. D U NS T O N L I NES) t o B L A YD O N v i a NORWOOD Derwenthaugh and Down and Up 4 20 4 24 1 5 C onst ruct ing culvert Blaydon Main Main PELAW T O SOU T H SHIELDS Jarrow and St. Bedes Down and Up 3 46 2 54 15 C ons tr uc ti ng new Underbridge Main No. 16. Commencing 0430, Monday, 6th December TURSDALE T O P E LAW via LEA MS1DE Leamside and Down and Up 10 78 II 14 3 0 Subsidence. Newbottle Lane Main Fencehouses and Down and Up 12 38 12 55 2 0 Subsidence. Wapping Bridge Main RELLY M IL L T O C O NSETT N O R TH Bearpark and Witton Down and Up 2 20 238 2 0 Subsidence. U nt il 12-30, Tues- Gilbert Main day, 7th December Bearpark and Witton Down Main 28 238 2 0 Gilbert Relaying and subsidence. Com- mencing 12 30, Tuesday, 7th December until 16 00, Friday, 10th December Witton Gilbert and Up Main 2 38 220 2 0 Subsidence. C o m m e n c i n g Bearpark 12 30, Tuesday, 7t h Dec- ember, until 16 00, Friday, 10th December Bearpark and Witton Down and Up 2 20 238 2 0 Gilbert Subsidence. C o m m e n c i n g Main 16 00, F rid ay, 10t h D e- cember WEAR VALLEY T O WESTGATE- IN - W E ARDAL E Wear Valley and Single 176 263 20 Resleepering. Wolsingham FERRYH ILL N O . 3 T O N O R T O N - O N -T EES SO UTH Mainsforth and D o w n Main 953 933 20 Construction o f new Bridge Bishop Middleham No. 27A DARLINGTON ( S O U T H ) T O SA LTBUR Thornaby East Junction U p Main I I 60 11 54 20 Removing points and crossings. and Bowesfield Commencing OS 00, Sun- day, Sth December, until 16 00, Tuesday, 7t h D e- cember South Bank Down and Up 17 10 17 15 20 Relaying switches and crossings.
Recommended publications
  • Instructions Working of Electric Trains
    BRITISH RAILWAYS (North Eastern Operatir,g Area) INSTRUCTIONS IN CONNECTION WITH THE WORKING OF ELECTRIC TRAINS ON THE TYNESIDE ELECTRIFIED LINES In operation from 1st May, 1952 (Booklet dated 1st January, 1943 is hereby c;ncelled) K. J. COOK, A. DEAN, Mechanical and Civil Engineer. Electrical Engineer. (G. 11/3). ( N.T./W/ 3 ) A. P. HUNTER, F. H. PETTY, Divisional Operating Motive Power Supt. Superintendent. (G. 4). (O. 4918). • A. F. WIGRAM, Signal and Telecommuni- cations Engineer. (S.T. 11/4). Each employee supplied with this book must make himself acquainted with, and will be held responsible for the observance of, the following instructions. The Rules and Regulations of the Railway Execu- tive also apply except as otherwise provided in these Instructions. 1 - 1 1 1 P " TABLE OF CONTENTS n r — • Pages General Instructions 4-11 - - Instructions to Civil and Signal 8( Tele- - communications Engineers' Staff 12-22 - Instructions to Signalmen 23-49 - Instructions to Station Masters, Guards, - Shunters, Station Staff and others 50-54 - Instructions to Electric Trainmen 55-66 ' Hauling or Propelling of Electric Trains in Emergency 67-72 Clearing Third Rail of Snow and Ice 73-75 Appendix Treatment for Electric Shock 76-79 4 GENERAL INSTRUCTIONS Lines 1.—These instructions apply to the North and equipped for South Tyneside Electrified lines of the British Rail- electric traction. ways, North Eastern Operating Area, viz.:— The lines between Newcastle and Tynemouth via Wallsend and Benton. The Riverside Branch. The Main Lines between Newcastle and Benton Quarry Signal Box and from there to Benton Station Signal Box via the South West Curve and to Benton East Signal Box via the South East Curve.
    [Show full text]
  • Instructions Working O F Electric Trains
    LONDON & NORTH EASTERN RAILWAY (North Eastern Area) INSTRUCTIONS IN CONNECTION WITH THE WORKING OF ELECTRIC TRAINS ON THE TYNESIDE ELECTRIFIED LINES In operation from 1st January, 1943 H. W. H. RICHARDS, F. E. HARRISON, Chief Electrical Engineer. Engineer, (N.T./W/ 3) (G. 11/3). E. M. RUTTER, C. M. STEDMAN, Superintendent. Loco. Running Supt. (O. 4918). (G. 4). TABLE OF CONTENTS PAGES. General Instructions 4--11 Instructions to Engineer's Staff 12-22 Instructions to Signalmen 23-45 Instructions to Station Masters, Guards, Shunters, Station Staff and others 46-50 Instructions to Electric Trainmen 51-62 Steam Hauling of Electric Trains in Emergency 63-65 Treatment for Electric Shock 67-70 Every Employee supplied with this Book must make himself thoroughly acquainted with, and will be held responsible for a knowledge of, and com- pliance with, the whole of the following Instructions. The Rules and Regulations of the Company also apply except as otherwise provided in these Instructions. 4 GENERAL INSTRUCTIONS. Portions of 1.—The following portions of the London and line North Eastern Railway (YE. Area) are equipped equipped tor for electric traction :— Electric traction. The Tynemouth Branch between Newcastle and Tynemouth, and between Tynemouth and Manors North. The Riverside Branch. The Main Lines North between Newcastle and Benton Quarry Box. The Newcastle and South Shields Branch. The Quayside Branch, and the several other curves, connections, sidings, and platform lines set out in detail in instruction 41. On these portions of railway the following instructions, so far as applicable, will be in force. GENERAL INSTRUCTIONS. 5 2.--Electrical Energy is supplied from the s Powero Stations of the North Eastern Electric electrical e nerSupplyi Company, Ltd.
    [Show full text]
  • North Eastern Railway Civil Engineering Drawings List
    North Eastern Railway Civil Engineering Drawings List Description: The collection includes a minority of architectural plans, along with drawings of structures such as bridges and viaducts, maps of permanent way routes and alterations, signalling plans and diagrams, with a variety of miscellaneous components for structures and infrastructure. The collection comprises approximately 3500 plans, diagrams and maps on paper, wax linen and linen- backed cartridge paper. System of arrangement: The original arrangement of the drawings has been lost and they derive from a wide variety of applications within the architectural and civil engineering genres. The drawings have therefore been listed in the rolls in which they were found, and every effort made to record the variety of numbering systems used at different times by the railway company departments involved in creating and storing the drawings, representative of the different types of drawing. There is no one single and consistent numbering arrangement. Physical Characteristics: The drawings survive in a variety of formats and sizes – there are wax linen tracings, colour washed linenbacked original office drawings, drawings on cartridge paper, blueprints and other copying processes. Administrative/Biographical History: The North Eastern Railway Company was formed in 1854 as an amalgamation of the York & North Midland Railway, the Leeds Northern Railway and the York, Newcastle & Berwick Railway. It continued to absorb other companies in the north eastern region of England over subsequent decades, including the Stockton & Darlington Railway, South Durham and Lancashire Union Railway and the West Hartlepool Railway. In 1923 the various railway companies of the United Kingdom were grouped into four large amalgamations.
    [Show full text]
  • Railway Collection Sorted by Railway Company/Author and Then by Date (Excludes the Top Level Descriptions of Maps.RLY.Aa, Etc
    Railway Collection sorted by Railway Company/author and then by Date (Excludes the top level descriptions of Maps.RLY.aa, etc. although thefirst 8 entries for Maps.RLY.Z are (sub)-collection level descriptions and can also be ignored). Some items are listed as railway company/author [Not known]. Each entry has two dates which will be the same unless the items described cover a range of years. Maps.RLY.Z.1 1856 Railway timetables to 1948 / pre British Rail. various companies 1945 Maps.RLY.Z.8 1875 Commercial timetables (mostly British Rail, with some hobbyist reprints) 1998 Maps.RLY.Z.7 1886 Miscellaneous collections - some reproductions Including photo copies of Working Time-Tables (mostly pre B.R.). 1968 Maps.RLY.Z.5 1923 Signalling 1982 Maps.RLY.Z.6 1939 Train registers (signal boxes) 1978 Maps.RLY.Z.3 1947 Rules & regulations and Sectional Appendices - General instructions and miscellaneous notices 1971 Maps.RLY.Z.2 1949 Timetables post 1948 - British Railways 1994 21 November 2019 Page 1 of 554 Maps.RLY.Z.4 1960 Temporary speed restrictions 1979 [manuscript list] Maps.RLY.Z.7 (16) 1974 "Western Class 52 withdrawal List" Diesel-Hydraulic Locomotives. 4 leaves 1975 [Not known] Maps.RLY.2542 1826 Family tree of railway companies showing inception and Reproduced from Otley, George : A bibliography of 8 leaves absorption into those familiarly known as London & North railway history, 1965. Western Railway, Midland Railway, London Passenger Transport Board, and Great Western Railway. 1930 Maps.RLY.2517 1830 [Plan showing "The Bridle-Sty-Way from Hillam to Birken"] Possibly N.
    [Show full text]
  • Newcastle City Council and Gateshead Council Green Infrastructure Study – River Tyne Report
    Newcastle City Council and Gateshead Council Green Infrastructure Study – River Tyne Report September 2011 Page 1 February 2011 Third-Party Disclaimer Any disclosure of this report to a third-party is subject to this disclaimer. The report was prepared by Entec at the instruction of, and for use by, our client named on the front of the report. It does not in any way constitute advice to any third-party who is able to access it by any means. Entec excludes to the fullest extent lawfully permitted all liability whatsoever for any loss or damage howsoever arising from reliance on the contents of this report. We do not however exclude our liability (if any) for personal injury or death resulting from our negligence, for fraud or any other matter in relation to which we cannot legally exclude liability. Page ii August 2011 This report has been written for Newcastle City and Newcastle City Council Gateshead Councils by Entec and forms part of the evidence base for the joint Core Strategy, the Green and Gateshead Council Infrastructure Delivery Plans and the Infrastructure Delivery Plan. The work has been funded by Growth Point, through Bridging NewcastleGateshead. Green Infrastructure Study – Main Contributors River Tyne Report John Pomfret Rebecca Evans September 2011 Kay Adams Andy Cocks Anita Hogan Jane Lancaster Laura Black Donna Warren Entec UK Limited Robin Cox Issued by John Pomfret Entec UK Limited Council officers steering this project: Nina Barr, Gables House Derek Hilton-Brown and Theo van Looij Kenilworth Road (Newcastle City Council); Peter Bell and Clive Leamington Spa Gowlett (Gateshead Council).
    [Show full text]
  • A History of Carville Hall, Wallsend Her 4941
    Arbeia Society Local History Notes no. 2 2015 A HISTORY OF CARVILLE HALL, WALLSEND HER 4941 A. T. Croom available from: www.arbsoc.org.uk A History of Carville Hall, Wallsend HER 4941 Carville Hall, situated to the west of the village of Wallsend, was built in the mid- eighteenth century as a gentleman’s country residence and demolished almost 150 years later. It replaced an earlier building called Cousin’s House. The houses stood on land that was owned by the Dean and Chapter of Durham, and the estate was leased, usually on a 21-year basis, until 1859. COUSIN’S HOUSE The original house belonged to a Newcastle alderman called John Cosyn, who described himself in his will as a ‘member of the Free Drapers of Newcastle, draper, [of] Walls End in the county of Northumberland, [and] Key Syde in the towne and countye of NewCastle upon Tyne’. 1 The Wallsend house was built c. 1635 on land overlooking the river, and was enough of a landmark to be shown on seventeenth- and eighteenth-century navigation maps of the River Tyne. The maps usually only pick out churches, quays, staiths and other landmarks such as the Halfway Tree(s); on some maps Cousin’s House is the only private house identified. On the earliest surviving map, of 1650, it is identified as ‘Cossenhouse’, and placed on the wrong side of the Stotspow stream, which is repeated on Captain G. Collin’s Navigational Chart of the River Tyne and its Approaches completed 1693 (Fig. 1). On the Survey of the River of Tyne dated 1670 it was labelled ‘Mr Couzen’s House’ (Fig.
    [Show full text]
  • Planning Committee
    Planning Committee 16 November 2018 To be held on Tuesday 27 November 2018 in room 0.02, Ground Floor, Quadrant East, The Silverlink North, Cobalt Business Park, North Tyneside, NE27 0BY commencing at 10.00am. Agenda Page Item 1. Apologies for absence To receive apologies for absence from the meeting. 2. Appointment of substitutes To be informed of the appointment of any substitute members for the meeting. 3. To receive any declarations of interest You are invited to declare any registerable and/or non-registerable interests in matters appearing on the agenda, and the nature of that interest. You are also requested to complete the Declarations of Interests card available at the meeting and return it to the Democratic Services Officer before leaving the meeting. You are also invited to disclose any dispensation from the requirement to declare any registerable and/or non-registerable interests that have been granted to you in respect of any matters appearing on the agenda. 4. Minutes 3 To confirm the minutes of the meeting held on 30 October 2018. Continued overleaf Members of the public are welcome to attend this meeting and receive information about it. North Tyneside Council wants to make it easier for you to get hold of the information you need. We are able to provide our documents in alternative formats including Braille, audiotape, large print and alternative languages. For further information please call 0191 643 5359. 1 5. Planning officer reports To give consideration to the planning applications contained in the 5 above report
    [Show full text]