Investment proposal (project) application form of GREENFIЕLD land lot №1 General information Title of the investment proposal (project) Construction of a recreational complex «Stanchyany» Location (district, city/village, street), land photo, region, Vyzhnytsa district, Bagna vil scheme of location

Owner (owners) The united territorial community of Available documents, that certify the ownership General plan of construction (official act, certificate of ownership) Preliminary cost (balanced cost, assessed value) 100,0 ths. UAH The actual usage Pasture Technical parameters of a land lot Area of the available land lot, ha 45,4 Border surroundings (description, scheme) Borders with the state forestry Level difference on the land lot, m 50 m Cadastral end use Pasture Proposed end use For construction of tourist and recreation center, skiing track Ground-based obstacles (risk of flood and No obstacles landslide, ecological conditions) Underground obstacles (level of surface and No obstacles subterranean waters) Limitations in use (due to construction, ecology According to requirements of land ownership and etc.) good-neighborly relations Utilities Water (availability, parameters) Distance to the source of fresh water – 250 m Drainage system (availability, parameters) Not available Supplying with gas (availability, parameters) Distance to the gas supplying net – 3,1 km. Electricity (availability, parameters) Distance to the available electrical substation -1 km Availability Ways of communication to the object (autoroads, Automobile gravel road railways) The nearest international airport, km, time International airport «Chernivtsi», 70 km, 1 hour. The nearest entry point, km Entry point «Porubne», 90 km The nearest autoroads of international and Distance to the auto-road Р62 «Chernivtsi – national significance, km – Vyzhnytsa» – 6 km The nearest railway station, km Railway station «Vyzhnytsa», 12 km Contact information Proposal is provided by (organization, name of The united territorial community of Vyzhnytsia owner, Internet page ) Contact (name, position, telephone N, e-mail) Proshchiuk Vasyl – tel.: +38(03730)65413; Kordyak Ivan – tel.: +38(03730)65431; e-mail: [email protected]

Investment proposal (project) application form of GREENFIELD land lot №2 General information Title of the investment proposal (project) Construction of a brick producing factory Location (district, city/village, street), land photo, N.Synivtsi vil., district of Chernivtsi scheme of location region

Owner (owners) The united territorial community of Terebleche Available documents certifying the ownership Documents are not available. Lands outside of the (official act, certificate of ownership) village. Preliminary cost, ths. UAH No monetary estimation The actual usage Not used Conditions of usage Auction selling of ownership or tenant right on a land lot Technical parameters of a land lot Area of the available lot of land, ha 4,5 Border surroundings (description, scheme) Next to gravel road T 2606 , living zone – 300 m. Level difference on the land lot, m Flat ground Cadastral end use Lands of brick factory Proposed end use For public building Ground-based obstacles (risk of flood and No obstacles landslide, ecological conditions) Underground obstacles (level of surface and No obstacles subterranean waters) Limitations in use (due to construction, ecology No limitations etc.) Utilities Water (availability, parameters) Well (300 m), possibility to drill a well Drainage system (availability, parameters) Placing the autonomic system of treatment facilities Supplying with gas (availability, parameters) Not available Electricity (availability, parameters) Transmission facilities (0,4 kw) on the land lot Availability Ways of communication to the object (autoroads, Gravel autoroad railways) The nearest international airport, km, time International airport «Chernivtsi» – 45 km, 60 min The nearest entry point, km Entry point with , CP «Porubne», 7km The nearest autoroads of international and Autoroad «Porubne – Chernivtsi» 4 km national significance, km The nearest railway station, km Railway station «Hlyboka» – 25 km Contact information Proposal is provided by (organization, name of The united territorial community of Terebleche, owner, Internet page ) The Head of UTC - Saka Valery tel.: 3-43-67, 0505873667

Investment proposal (project) application form of GREENFIELD land lot №3 General information Title of the investment proposal (project) Construction of a commercial pavilion, a storage room and equipment of children’s playground Location (district, city/village, street), land photo, The center of the Turyatka village, Hlyboka district scheme of location of Chernivtsi region

Owner (owners) Turyatka village council Available documents certifying the ownership Lands of reserve of Turyatka village council (official act, certificate of ownership) Preliminary cost, ths. UAH 120,0 The actual usage Not used Conditions of usage Auction selling of ownership or tenant right on land lot Technical parameters of a land lot Area of the available lot of land, ha 0,30 Border surroundings (description, scheme) Autoroad, objects of public building Level difference on the land lot, m Flat ground Cadastral end use For farming Proposed end use For public building Ground-based obstacles (risk of flood and No obstacles landslide, ecological conditions) Underground obstacles (level of surface and No obstacles subterranean waters) Limitations in use (due to construction, ecology Necessity of conversion into the category of lands etc.) of living and public buildings according to master plan of settlement, land and economic plan with abidance by state standards and building rules. Utilities Water (availability, parameters) Possibility to drill a well Drainage system (availability, parameters) Placing the autonomic system of treatment facilities Supplying with gas (availability, parameters) Not available Electricity (availability, parameters) Transmission facilities (0,4 kw) on the land lot Availability Ways of communication to the object (autoroads, Next to gravel autoroad T2606 railways) The nearest international airport, km, time International airport «Chernivtsi» – 45 km, 60 min The nearest entry point, km Entry point with Romania, CP «Porubne», 12 km The nearest autoroads of international and 12 km national significance, km The nearest railway station, km Railway station «Hlyboka» – 28 km Contact information Proposal is provided by (organization, name of Turyatka village council, Head – Dutkovych Ivan, owner, Internet page ) tel.: +38(03734)53131, mob. +38(050)5601938

Investment proposal (project) application form of GREENFIЕLD land lot №4 General information Title of the investment proposal (project) Creation of a new production in industrial zone of Chernivtsi region Location (district, city/village, street), land photo, Zastavna district, Zastavna, Bajanskyi str. scheme of location

Owner (owners) Community of Zastavna in the person of the city council Available documents that certify the ownership Lands of reserve of Zastavna city council (official act, certificate of ownership) Preliminary cost, ths. UAH 1408,6 The actual usage Used for personal farming Technical parameters of a land lot Area of the available lot of land, ha 2 Border surroundings (description, scheme) Borders with railway station of branch «Verenchanka – Vikna Bukovyny», surfaced road, repair facilities, available land lots for extension. Level difference on the land lot, m Flat ground, level difference – up to 1 m Cadastral end use For personal farming Proposed end use Industrial production Ground-based obstacles (risk of flood and No risk of flood or landslide landslide, ecological conditions) Underground obstacles (level of surface and Lower than 10 m subterranean waters) Limitations in use (due to construction, ecology No ecological or constructional limitations, located etc.) outside of safeguard zone Utilities Water (availability, parameters) Central water supplying and drainage system, 100m Drainage system (availability, parameters) to the connection point Supplying with gas (availability, parameters) Pipeline of medium pressure, 300 m Electricity (availability, parameters) Available transformer substation (10 kw) – 20 m Availability Ways of communication to the object (autoroads, Autoroad with hard surface railways) The nearest international airport, km, time International airport «Chernivtsi» – 45 km, 60 min The nearest entry point, km Entry point with , «Mamalyga – Cryva», 84 km The nearest autoroads of international and E 85 «Ternopyl – Chernivtsi», 5 km national significance, km The nearest railway station, km Railway station «Verenchanka» – 7 km, branch railway «Verenchanka – Vikna Bukovyny» serves only goods transportation – 50 m Contact information Proposal is provided by (organization, name of Department of economic development and owner, Internet page ) infrastructure of Zastavna district administration (http://zastavnaeconomy.at.ua), Zastavna city council: www.zmr.gov.ua Contact (name, position, telephone N, e-mail) Stasiuk Volodymyr, deputy head of department of economic development and infrastructure, tel./fax: +38(03737)31989, e-mail: [email protected]. Radysh Vasyl – head of Zastavna city council, tel.: +38(03737)31390, e-mail: [email protected]

Investment proposal (project) application form of GREENFIЕLD land lot «5 General information Title of the investment proposal (project) Construction and usage of a recreational complex Location (district, city/village, street), land photo, Chernivtsi region, Kelmentsi district, out of scheme of location Makarivka vil, «Tutovniki» stow

Owner (owners) Manager – Main Department of State Committee of Land Resourses Available documents, that certify the ownership Not available (official act, certificate of ownership) Preliminary cost (balanced cost, assessed value) Not available ths. UAH. The actual usage Not in use Technical parameters of a land lot Area of the available land lot, ha 2,0 ha Border surroundings (description, scheme) Borders with: to the East– Dniester riverside; to the North, West and South – with lands of agricultural exploitation. Level difference on the land lot, m 6-7º Cadastral end use Lands of agricultural exploitation Proposed end use Construction for the recreational usage Ground-based obstacles (risk of flood and No obstacles landslide, ecological conditions) Underground obstacles (level of surface and No obstacles subterranean waters) Limitations in use (due to construction, ecology According to the nature protection requirements etc.) Utilities Water (availability, parameters) Water tower in Makarivka vil., 1,5 km Drainage system (availability, parameters) Not available Supplying with gas (availability, parameters) Possibility of supplying with gas, distance to the available gas pipe line – 9 km. Electricity (availability, parameters) Distance to the available electrical substation – 1 km Availability Ways of communication to the object (autoroads, Automobile; distance to the nearest settlement railways) (Makarivka vil.) – 0,5 km (unsurfaced road). The nearest international airport, km, time International airport «Chernivtsі», 111 km, 1 hour 30 min. The nearest entry point, km Entry point «Кelmentsі», 30 km The nearest autoroads of international and 14 km to the autoroad Р63 Кrokva - Vartykivtsi - national significance, km Ivanivtsi - Checkpoint «Rososhany» The nearest railway station, km Railway station «Lenkivtsi», 7 km Contact information Proposal is provided by (organization, name of Kelmentsi district state administration, owner, Internet page ) www.kelmenci.oda.cv.ua Contact (name, position, telephone N, e-mail) Angelica Karalash – Main Specialist of Agro- industrial and Economic Development Department, District State Administration, tel.: +38(03732) 20699, e-mail: [email protected]

Investment proposal (project) application form of GREENFIELD land lot №6 General information Title of the investment proposal (project) Free lot land of former tractor brigade Location (district, city/village, street), land photo, Moshanec village, Kelmentsi district of Chernivtsi scheme of location region

Owner (owners) Moshanec village council Available documents certifying the ownership Not available (official act, certificate of ownership) Preliminary cost, ths. UAH Not available The actual usage Not used Technical parameters of a land lot Area of the available lot of land, ha 2,00 ha Border surroundings (description, scheme) Abuts upon four nearby lot lands: 7322086400:02:001:0098 area 0,4337 hа;

7322086400:01:002:0133 area 0,3151 hа;

7322086400:01:002:0144 area 0,0494 hа;

7322086400:01:002:0054 area 0,245 hа; Level difference on the land lot, m No obstacles Cadastral end use No obstacles Proposed end use No obstacles Ground-based obstacles (risk of flood and No obstacles landslide, ecological conditions) Underground obstacles (level of surface and Pipes of the plumbing system, cables of electric subterranean waters) network Limitations in use (due to construction, ecology No obstacles etc.) Utilities Water (availability, parameters) Plumbing is from building of Roznovskogo Drainage system (availability, parameters) Not available Supplying with gas (availability, parameters) Distance to the nearest source – 1,0 km Electricity (availability, parameters) Distance to the nearest source – 0,2 km Availability Ways of communication to the object (autoroads, Asphalt-paved coverage railways) The nearest international airport, km, time International airport «Chernivtsi» – 80 km The nearest entry point, km «Kelmenci», 22 km The nearest autoroads of international and 6 km national significance, km The nearest railway station, km Railway station «Larga» – 15 km Contact information Proposal is provided by (organization, name of Moshanec village council, Head – Grubiy Stanislav, owner, Internet page ) tel.: (03732) 3-77-35, e-mail: [email protected]

Investment proposal (project) application form of GREENFIELD land lot №7 General information Title of the investment proposal (project) Free lot land of former farm Location (district, city/village, street), land photo, Moshanec village, Kelmentsi district of Chernivtsi scheme of location region

Owner (owners) Moshanec village council Available documents certifying the ownership Not available (official act, certificate of ownership) Preliminary cost, ths. UAH Not available The actual usage Not used Technical parameters of a land lot Area of the available lot of land, ha 10,50 ha Border surroundings (description, scheme) Abuts upon three nearby lot lands: 7322086400:02:002:0094;

7322086400:02:002:0117;

7322086400:02:002:0096;there are operating building on that Level difference on the land lot, m No obstacles Cadastral end use No obstacles Proposed end use No obstacles Ground-based obstacles (risk of flood and No obstacles landslide, ecological conditions) Underground obstacles (level of surface and Pipes of the plumbing system, cables of electric subterranean waters) network Limitations in use (due to construction, ecology No obstacles etc.) Utilities Water (availability, parameters) Plumbing is from building of Roznovskogo Drainage system (availability, parameters) Not available Supplying with gas (availability, parameters) Distance to the nearest source – 0,4 km Electricity (availability, parameters) Distance to the nearest source – 0,2 km Availability Ways of communication to the object (autoroads, Asphalt-paved coverage railways) The nearest international airport, km, time International airport «Chernivtsi» – 80 km The nearest entry point, km «Kelmenci», 22 km The nearest autoroads of international and 6 km national significance, km The nearest railway station, km Railway station «Larga» – 15 km Contact information Proposal is provided by (organization, name of Moshanec village council, Head – Grubiy Stanislav, owner, Internet page ) tel.: (03732) 3-77-35, e-mail: [email protected]

Investment proposal (project) application form of GREENFIELD land lot №8 General information Title of the investment proposal (project) Free lot land of Babino village Location (district, city/village, street), land photo, Babino village, Kelmentsi district of Chernivtsi scheme of location region

Owner (owners) Babino village council Available documents certifying the ownership Not available (official act, certificate of ownership) Preliminary cost, ths. UAH Not available The actual usage Not used Technical parameters of a land lot Area of the available lot of land, ha 0,1457 hа Border surroundings (description, scheme) School stadium, dwelling-house Level difference on the land lot, m No obstacles Cadastral end use No obstacles Proposed end use No obstacles Ground-based obstacles (risk of flood and No obstacles landslide, ecological conditions) Underground obstacles (level of surface and Sewage system subterranean waters) Limitations in use (due to construction, ecology No obstacles etc.) Utilities Water (availability, parameters) Not available Drainage system (availability, parameters) Not available Supplying with gas (availability, parameters) Not available Electricity (availability, parameters) The line of electricity transmissions passes near an area Availability Ways of communication to the object (autoroads, Hard coverage – 5 m railways) The nearest international airport, km, time International airport «Chernivtsi» – 88 km The nearest entry point, km «Kelmenci» The nearest autoroads of international and 3 km national significance, km The nearest railway station, km Railway station «Larga» – 9 km Contact information Proposal is provided by (organization, name of Babino village council, Head – Grygoroshenko owner, Internet page ) Viktor, tel.: (03732) 3-56-36, e-mail: [email protected]

Investment proposal (project) application form of GREENFIELD land lot №9 General information Title of the investment proposal (project) Free lot land of Vovchinets village Location (district, city/village, street), land photo, Vovchinets village, Kelmentsi district of Chernivtsi scheme of location region

Owner (owners) Main Department of State Committee of Land Resourses of Chernivtsi region Available documents certifying the ownership Not available (official act, certificate of ownership) Preliminary cost, ths. UAH Not available The actual usage Not used Technical parameters of a land lot Area of the available lot of land, ha 11,40 hа Border surroundings (description, scheme) Pastures and areas of a ration fund Level difference on the land lot, m No obstacles Cadastral end use No obstacles Proposed end use No obstacles Ground-based obstacles (risk of flood and No obstacles landslide, ecological conditions) Underground obstacles (level of surface and No obstacles subterranean waters) Limitations in use (due to construction, ecology No obstacles etc.) Utilities Water (availability, parameters) Not available Drainage system (availability, parameters) Not available Supplying with gas (availability, parameters) Distance to the nearest source – 1,0 km Electricity (availability, parameters) Distance to the nearest source – 20 m Availability Ways of communication to the object (autoroads, Asphalt-paved coverage, width 5 m railways) The nearest international airport, km, time International airport «Chernivtsi» – 107 km The nearest entry point, km Kelmenci The nearest autoroads of international and 3 km national significance, km The nearest railway station, km Railway station «Larga» – 6 km Contact information Proposal is provided by (organization, name of Vovchinets village council, Head – Zulepa owner, Internet page ) Valentines, tel.: (03732) 43239, e-mail: [email protected]

Investment proposal (project) application form of GREENFIELD land lot №10 General information Title of the investment proposal (project) Free lot land of former tractor brigade of Vovchinets village Location (district, city/village, street), land photo, Vovchinets village, Kelmentsi district of Chernivtsi scheme of location region

Owner (owners) Main Department of State Committee of Land Resourses of Chernivtsi region Available documents certifying the ownership Not available (official act, certificate of ownership) Preliminary cost, ths. UAH Not available The actual usage Not used Technical parameters of a land lot Area of the available lot of land, ha 1,40 hа Border surroundings (description, scheme) Settlement, housing apartments Level difference on the land lot, m No obstacles Cadastral end use No obstacles Proposed end use No obstacles Ground-based obstacles (risk of flood and No obstacles landslide, ecological conditions) Underground obstacles (level of surface and No obstacles subterranean waters) Limitations in use (due to construction, ecology Through a closeness to the settlemen is limitation in etc.) harmful extrass in an atmosphere Utilities Water (availability, parameters) Not available Drainage system (availability, parameters) Not available Supplying with gas (availability, parameters) Distance to the nearest source – 10 m Electricity (availability, parameters) Distance to the nearest source – 20 m Availability Ways of communication to the object (autoroads, Asphalt-paved coverage, width 5 m railways) The nearest international airport, km, time International airport «Chernivtsi» – 107 km The nearest entry point, km Kelmenci The nearest autoroads of international and 3 km national significance, km The nearest railway station, km Railway station «Larga» – 6 km Contact information Proposal is provided by (organization, name of Vovchinets village council, Head – Zulepa owner, Internet page ) Valentines, tel.: (03732) 43239, e-mail: [email protected]

Investment proposal (project) application form of GREENFIELD land lot №11 General information Title of the investment proposal (project) Territory of former sugar plant of Nelipivtsi village Location (district, city/village, street), land photo, Nelipivtsi village, Kelmentsi district of Chernivtsi scheme of location region

Owner (owners) The former «Kelmenetski sugar plant» Available documents certifying the ownership Certificate of ownership (official act, certificate of ownership) Preliminary cost, ths. UAH Not available The actual usage Not used Technical parameters of a land lot Area of the available lot of land, ha 4,0 hа Border surroundings (description, scheme) From one side road Kelmenci-Lukachivka, from other side road Kelmenci-Rososhany, from the third party - Nelipivtsi village and from a fourth side – houses. Level difference on the land lot, m No obstacles Cadastral end use No obstacles Proposed end use For industry Ground-based obstacles (risk of flood and No obstacles landslide, ecological conditions) Underground obstacles (level of surface and No obstacles subterranean waters) Limitations in use (due to construction, ecology No obstacles etc.) Utilities Water (availability, parameters) Not available Drainage system (availability, parameters) Not available Supplying with gas (availability, parameters) Distance to the nearest source – 800 m Electricity (availability, parameters) Distance to the nearest source – 100 m Availability Ways of communication to the object (autoroads, Asphalt-paved coverage, width 10 m railways) The nearest international airport, km, time International airport «Chernivtsi» – 100 km The nearest entry point, km Kelmenci The nearest autoroads of international and 50 m national significance, km The nearest railway station, km Railway station «Larga» – 10 km Contact information Proposal is provided by (organization, name of Nelipivtsi village council, Head – Plaksiichuk owner, Internet page ) Semen, tel.: (03732)3-37-75, e-mail: [email protected]

Investment proposal (project) application form of GREENFIELD land lot №12 General information Title of the investment proposal (project) Free lot land in the center of Buzovica village Location (district, city/village, street), land photo, Buzovica village, Centralna str.,45, Kelmentsi scheme of location district of Chernivtsi region

Owner (owners) The united territorial community of Buzovica Available documents certifying the ownership Not available (official act, certificate of ownership) Preliminary cost, ths. UAH 70 grn/m The actual usage Not used Technical parameters of a land lot Area of the available lot of land, ha 0,0780 hа Border surroundings (description, scheme) Reserve land, lands of Ukravtodor (bus stop) Level difference on the land lot, m No obstacles Cadastral end use No obstacles Proposed end use For the commercial use Ground-based obstacles (risk of flood and No obstacles landslide, ecological conditions) Underground obstacles (level of surface and No obstacles subterranean waters) Limitations in use (due to construction, ecology No obstacles etc.) Utilities Water (availability, parameters) Not available Drainage system (availability, parameters) Not available Supplying with gas (availability, parameters) Distance to the nearest source – 0,1 km Electricity (availability, parameters) Distance to the nearest source – 0,1 km Availability Ways of communication to the object (autoroads, Asphalt-paved coverage railways) The nearest international airport, km, time International airport «Chernivtsi» – 98 km The nearest entry point, km Kelmenci The nearest autoroads of international and 0,1 km national significance, km The nearest railway station, km Railway station «Larga» – 20 km Contact information Proposal is provided by (organization, name of Buzovica village council, Head – Perchuk Tetiana, owner, Internet page ) tel.: (03732) 2-66-36, e-mail: [email protected]

Investment proposal (project) application form of GREENFIELD land lot №13 General information Title of the investment proposal (project) Free lot land under building of pharmacy Location (district, city/village, street), land photo, Buzovica village, Kelmentsi district of Chernivtsi scheme of location region

Owner (owners) The united territorial community of Buzovica Available documents certifying the ownership 7322081200:01:002:0011 (official act, certificate of ownership) Preliminary cost, ths. UAH Not available The actual usage Not used Technical parameters of a land lot Area of the available lot of land, ha 0,05 hа Border surroundings (description, scheme) Bar “Oazis” Level difference on the land lot, m No obstacles Cadastral end use No obstacles Proposed end use Building of pharmacy Ground-based obstacles (risk of flood and No obstacles landslide, ecological conditions) Underground obstacles (level of surface and No obstacles subterranean waters) Limitations in use (due to construction, ecology Inhibition of nature protection requirements etc.) Utilities Water (availability, parameters) Not available Drainage system (availability, parameters) Not available Supplying with gas (availability, parameters) Distance to the nearest source – 0,01 km Electricity (availability, parameters) Distance to the nearest source – 0,016 km Availability Ways of communication to the object (autoroads, Highway railways) The nearest international airport, km, time International airport «Chernivtsi» – 110 km The nearest entry point, km Kelmenci – 22 km The nearest autoroads of international and 0,05 km national significance, km The nearest railway station, km 3 km Contact information Proposal is provided by (organization, name of Buzovica village council, Head – Perchuk Tetiana, owner, Internet page ) tel.: (03732) 2-66-36, e-mail: [email protected]

Investment proposal (project) application form of GREENFIELD land lot №14 General information Title of the investment proposal (project) Former economic court of Perkivci village Location (district, city/village, street), land photo, Perkivci village, Kelmentsi district of Chernivtsi scheme of location region

Owner (owners) Communal Available documents certifying the ownership Not available (official act, certificate of ownership) Preliminary cost, ths. UAH Not available The actual usage Not used Technical parameters of a land lot Area of the available lot of land, ha 1,17 hа Border surroundings (description, scheme) Lot lands for the conduct of the personal peasant economy, pasture Level difference on the land lot, m No obstacles Cadastral end use No obstacles Proposed end use No obstacles Ground-based obstacles (risk of flood and No obstacles landslide, ecological conditions) Underground obstacles (level of surface and No obstacles subterranean waters) Limitations in use (due to construction, ecology No obstacles etc.) Utilities Water (availability, parameters) Not available Drainage system (availability, parameters) Not available Supplying with gas (availability, parameters) Not available

Electricity (availability, parameters) Not available

Availability Ways of communication to the object (autoroads, Asphalt railways) The nearest international airport, km, time International airport «Chernivtsi» – 85 km The nearest entry point, km Kelmenci The nearest autoroads of international and 250 m national significance, km The nearest railway station, km Railway station «Larga» – 25 km Contact information Proposal is provided by (organization, name of Perkivci village council, Head – Bilyk Vissarion, owner, Internet page ) tel.: (03732) 2-05-62, e-mail: р[email protected]

Investment proposal (project) application form of GREENFIЕLD land lot №15 General information Title of the investment proposal (project) Construction and servicing of a Mall or Center of Wayside Service Location (district, city/village, street), land photo, district, vil., Holovna str. scheme of location

Owner (owners) Community of Berehomet vil. of Kitsman district Available documents certifying the ownership Not available (official act, certificate of ownership) Preliminary cost, ths. UAH 1 256,993 The actual usage Free of usage Technical parameters of a land lot Area of the available lot of land, ha 0,68 Border surroundings (description, scheme) Borders with autoroad and domestic building Level difference on the land lot, m Flat ground Cadastral end use Commercial Proposed end use Commercial Ground-based obstacles (risk of flood and No obstacles landslide, ecological conditions) Underground obstacles (level of surface and No obstacles subterranean waters) Limitations in use (due to construction, ecology According to conditions and limitations of land lot etc.) development, defined in documentation of territory development Utilities Water (availability, parameters) There is a necessity of construction of self- contained source of water supplying Drainage system (availability, parameters) There is a necessity of placing of local treating facility Supplying with gas (availability, parameters) Gas supplying network and power network border Electricity (availability, parameters) with the land lot Availability Ways of communication to the object (autoroads, Autoroad of state significance railways) The nearest international airport, km, time International airport «Chernivtsi» – 27 km, 45 min The nearest entry point, km Entry point with Romania, «Porubne», 62 km The nearest autoroads of international and Borders with autoroad of state significance Н-10/ national significance, km М-19 «Stryi – Ivano-Frankivsk – Chernivtsi – Mamalyga/Domanove-Kovel-Chernivtsi- Terebleche» The nearest railway station, km Railway station «Oroshany» – 5 km Contact information Proposal is provided by (organization, name of Berehomet village council, 59332, Chernivtsi owner, Internet page ) region, Kitsman district, vil. Berehomet, ul. Holovna, 24 Contact (name, position, telephone N, e-mail) The Head - Hrapko Grigory tel.:(03736) 64140, 64130

Investment proposal (project) application form of GREENFIЕLD land lot №16 General information Title of the investment proposal (project) Construction and servicing of the Industrial Production Complex Location (district, city/village, street), land photo, Kitsman district, Revakivtsi vil. scheme of location

Owner (owners) State property Available documents certifying the ownership Not available (official act, certificate of ownership) Preliminary cost, ths. UAH 1 061,650 The actual usage Free of usage Technical parameters of a land lot Area of the available lot of land, ha 0,96 Border surroundings (description, scheme) Borders with lands of «Bruk-Bet Ltd» and lands of village council Level difference on the land lot, m Flat ground Cadastral end use Commercial Proposed end use Commercial Ground-based obstacles (risk of flood and No obstacles landslide, ecological conditions) Underground obstacles (level of surface and No obstacles subterranean waters) Limitations in use (due to construction, ecology According to conditions and limitations of land lot etc.) development defined in territory development documentation Utilities Water (availability, parameters) There is a necessity of construction a self-contained source of water supplying Drainage system (availability, parameters) There is a necessity of placing a treating facility Supplying with gas (availability, parameters) Gas supplying network and power network border Electricity (availability, parameters) with the land lot Availability Ways of communication to the object (autoroads, Gravel autoroad railways) The nearest international airport, km, time International airport «Chernivtsi» – 27 km, 45 min The nearest entry point, km Entry point with Romania, «Porubne», 63 km The nearest autoroads of international and Borders with autoroad of state significance Н-10/ national significance, km М-19 «Stryi – Ivano-Frankivsk – Chernivtsi – Mamalyga/Domanove – Kovel – Chernivtsi – Terebleche» – 0,5 km The nearest railway station, km Railway station «Oroshany» – 5 km Contact information Proposal is provided by (organization, name of Berehomet village council, 59332, Chernivtsi owner, Internet page ) region, Kitsman district, vil. Berehomet, ul. Holovna, 24 Contact (name, position, telephone N, e-mail) The Head - Hrapko Grigory tel.:(03736) 64140, 64130

Investment proposal (project) application form of GREENFIELD land lot №17 General information Title of the investment proposal (project) Development of frontier infrastructure in Mamalyha vil. Location (district, city/village, street), land photo, Mamalyha vil., Novoselytsa district of Chernivtsi scheme of location region

Owner (owners) Lands of reserve of Mamalyha village council Available documents certifying the ownership Cadastral plan of the land lot (official act, certificate of ownership) Preliminary cost, ths. UAH Starting price - 5 hrn/m2 (according to lease agreement). Starting price – 40 hrn/m2 (for sale). The actual usage Tilled soil Technical parameters of a land lot Area of the available lot of land, ha 3,0 Border surroundings (description, scheme) to the North – international autoroad; to the South – lands of Lviv railway; to the East – lands of CP «Mamalyga»; to the West – lands of reserve of Mamalyga village council Level difference on the land lot, m Flat ground Cadastral end use For farming Proposed end use For objects of service zone Ground-based obstacles (risk of flood and No obstacles landslide, ecological conditions) Underground obstacles (level of surface and Underground communication cable, 2,2 m under subterranean waters) ground Limitations in use (due to construction, ecology Necessity of conversion into the category of lands etc.) of living and public buildings according to the land and economic plan Utilities Water (availability, parameters) Distance to artesian well – 0,1 km Drainage system (availability, parameters) Placing the autonomic system of treatment facilities Supplying with gas (availability, parameters) Possibility to connect to gas supplying network of Mamalyha vil. – 100 m Electricity (availability, parameters) Available, 0,4 kw (up to 100 m) Availability Ways of communication to the object (autoroads, International autoroad Stryi – Ivano-Frankivsk – railways) Mamalyha (to Kyshyniv) The nearest international airport, km, time International airport «Chernivtsi» – 52 km, 60 min The nearest entry point, km Next to entry point with Moldova, CP «Mamalyha» (Customs post of Kelmentsi Customs) The nearest autoroads of international and Next to international autoroad Stryi – Ivano- national significance, km Frankivsk – Mamalyha (to Kyshyniv) The nearest railway station, km 1,5 km Contact information Proposal is provided by (organization, name of Novoselytsa district state administration owner, Internet page ) Contact (name, position, telephone N, e-mail) Istratiy Liudmyla, tel. +38(03733)20990, mob. tel. +38(050)6906101

Investment proposal (project) application form of GREENFIELD land lot №18 General information Title of the investment proposal (project) Building and introduction is to exploitation of sunny power-station Location (district, city/village, street), land photo, Stalnivci vil., Novoselytsa district of Chernivtsi scheme of location region

Owner (owners) Mamalyha village council Available documents certifying the ownership In development (official act, certificate of ownership) Preliminary cost, ths. UAH - The actual usage Tilled soil Technical parameters of a land lot Area of the available lot of land, ha 10 ha Border surroundings (description, scheme) - Level difference on the land lot, m No obstacles Cadastral end use No obstacles Proposed end use For producing of electric power Ground-based obstacles (risk of flood and No obstacles landslide, ecological conditions) Underground obstacles (level of surface and No obstacles subterranean waters) Limitations in use (due to construction, ecology On lot land a two unoccupied building is located etc.) Utilities Water (availability, parameters) Available Drainage system (availability, parameters) Not available Supplying with gas (availability, parameters) Not available Electricity (availability, parameters) Available Availability Ways of communication to the object (autoroads, Autoroads railways) The nearest international airport, km, time 60 km, 60 min The nearest entry point, km 7 km The nearest autoroads of international and 5 km national significance, km The nearest railway station, km 5 km Contact information Proposal is provided by (organization, name of Mamalyha village council owner, Internet page ) Contact (name, position, telephone N, e-mail) Shova A., тел. 0503741174, [email protected]

Investment proposal (project) application form of GREENFIЕLD land lot №19 General information Title of the investment proposal (project) Construction of a tourist complex Location (district, city/village, street), land photo, Chernivtsi region, district, Putyla, scheme of location Meshkova str.

Owner (owners) Putyla town council Available documents, that certify the ownership Lands of reserve of Putyla town council (official act, certificate of ownership) Preliminary cost (balanced cost, assessed value) 3000 ths. UAH The actual usage Pasture Technical parameters of a land lot Area of the available land lot, ha 2,05 ha Border surroundings (description, scheme) Lands of reserve of Putyla town council Level difference on the land lot, m Up to1,5 m Cadastral end use For construction and service providing Proposed end use For construction of tourist complex Ground-based obstacles (risk of flood and No obstacles landslide, ecological conditions) Underground obstacles (level of surface and No obstacles subterranean waters) Limitations in use (due to construction, ecology According to requirements of land ownership and etc.) good-neighborly relations Utilities Water (availability, parameters) Distance to the source of fresh water – 250 m Drainage system (availability, parameters) Distance to the town drainage system – 400 m. Supplying with gas (availability, parameters) Not available Electricity (availability, parameters) Electrical substation with the capacity of 380 kw Availability Ways of communication to the object (autoroads, Borders with the autoroad with hard surface railways) Т 2601 The nearest international airport, km, time International airport «Chernivtsi», 120 km., 120 min. The nearest entry point, km Checkpoint «Rus’ka», 35 km The nearest autoroads of international and Distance to the road of regional significance - 550 national significance, km m, to the state road – 15 km The nearest railway station, km «Vyzhnytsa», 45 km Contact information Proposal is provided by (organization, name of Economic Department of a District State owner, Internet page ) Administration Contact (name, position, telephone N, e-mail) Chopa Roman – Head of Economic Department of District State Administration, tel.: +38(03738) 21292; e-mail: [email protected]

Investment proposal (project) application form of GREENFIЕLD land lot №20 Загальна інформація Title of the investment proposal (project) Construction of a recreation complex «Clean recreation» Location (district, city/village, street), land photo, Chernivtsi region, district, Lomachyntsi, scheme of location «Vyshneva» stow

Owner (owners) Manager – Main department of State Committee of Land Resourses Available documents, that certify the ownership Not available (official act, certificate of ownership) Preliminary cost (balanced cost, assessed value) Not available ths. UAH. The actual usage Not in use Technical parameters of a land lot Area of the available land lot , ha 20,0 Border surroundings (description, scheme) Area of State Enterprise «Sokyryany forestry»; borders with lands in usage of the Dniester-Prut basin management board Level difference on the land lot, m 20,0 Cadastral end use For recreational purposes Proposed end use For construction of a recreational complex Ground-based obstacles (risk of flood and No obstacles, ecological conditions are satisfactory landslide, ecological conditions) Underground obstacles (level of surface and No obstacles subterranean waters) Limitations in use (due to construction, ecology Riverside etc.) Utilities Water (availability, parameters) Distance to a water supplying source – 100 m Drainage system (availability, parameters) Not available Supplying with gas (availability, parameters) Distance to a source of gas supply – 500 m Electricity (availability, parameters) Distance to a source of electricity – 200 m Availability Ways of communication to the object (autoroads, Autoroad (gravel), 500 m railways) The nearest international airport, km, time International airport «Chernivtsi», 150 km, 3 hours The nearest entry point, km International border crossing point «Sokyryany – Oknytsa», 25 km The nearest autoroads of international and Chernivtsi – Kamyanets-Podil’skyi, 90 km national significance, km (hardsurfaced road) The nearest railway station, km «Sokyryany», 25 km Contact information Proposal is provided by (organization, name of Department of economic development, trade and owner, Internet page ) infrastructure of Sokyryany district state administration Contact (name, position, telephone N, e-mail) Seleznyova Larysa – The Head of Department of Economic Development, Trade and Infrastructure of District State Administration, tel. +38(03739)22083, е-mail: [email protected]

Investment proposal (project) application form of GREENFIЕLD land lot №21 Загальна інформація Title of the investment proposal (project) Lot land Location (district, city/village, street), land photo, Chernivtsi region, Sokyriany district, Kobolchyn scheme of location village

Owner (owners) Main department of State Committee of Land Resourses of Chernivtsi region Available documents, that certify the ownership Not available (official act, certificate of ownership) Preliminary cost (balanced cost, assessed value) Not available ths. UAH. The actual usage Not in use Technical parameters of a land lot Area of the available land lot , ha No obstacles Border surroundings (description, scheme) No obstacles Level difference on the land lot, m No obstacles Cadastral end use 7324084500:03:001:0725 Proposed end use Earth of the agricultural setting Ground-based obstacles (risk of flood and No obstacles landslide, ecological conditions) Underground obstacles (level of surface and No obstacles subterranean waters) Limitations in use (due to construction, ecology No obstacles etc.) Utilities Water (availability, parameters) Not available Drainage system (availability, parameters) Not available Supplying with gas (availability, parameters) Not available Electricity (availability, parameters) Not available Availability Ways of communication to the object (autoroads, Cart-road railways) The nearest international airport, km, time 150 km The nearest entry point, km 20 km The nearest autoroads of international and 30 km national significance, km The nearest railway station, km 20 km Contact information Proposal is provided by (organization, name of owner, Internet page ) Contact (name, position, telephone N, e-mail)

Investment proposal (project) application form of GREENFIЕLD land lot №22 Загальна інформація Title of the investment proposal (project) Lot land Location (district, city/village, street), land photo, Chernivtsi region, Sokyriany district, Kobolchyn scheme of location village

Owner (owners) Main department of State Committee of Land Resourses of Chernivtsi region Available documents, that certify the ownership Not available (official act, certificate of ownership) Preliminary cost (balanced cost, assessed value) Not available ths. UAH. The actual usage Not in use Technical parameters of a land lot Area of the available land lot , ha No obstacles Border surroundings (description, scheme) No obstacles Level difference on the land lot, m No obstacles Cadastral end use 7324084500:03:001:0488 Proposed end use Earth of the agricultural setting Ground-based obstacles (risk of flood and No obstacles landslide, ecological conditions) Underground obstacles (level of surface and No obstacles subterranean waters) Limitations in use (due to construction, ecology No obstacles etc.) Utilities Water (availability, parameters) Not available Drainage system (availability, parameters) Not available Supplying with gas (availability, parameters) Not available Electricity (availability, parameters) Not available Availability Ways of communication to the object (autoroads, Cart-road railways) The nearest international airport, km, time 150 km The nearest entry point, km 20 km The nearest autoroads of international and 30 km national significance, km The nearest railway station, km 20 km Contact information Proposal is provided by (organization, name of owner, Internet page ) Contact (name, position, telephone N, e-mail)

Investment proposal (project) application form of GREENFIЕLD land lot №23 General information Title of the investment proposal (project) Organization of fuel pallets production from logging debris Location (district, city/village, street), land photo, Storojynets district, Komarivtsi vil., Pans’ka str. scheme of location

Owner (owners) Komarivs’ka village council Available documents, that certify the ownership Certificate of ownership (official act, certificate of ownership) Preliminary cost (balanced cost, assessed value) 2 623,19028 ths. UAH. The actual usage Not in use Technical parameters of a land lot Area of the available land lot, ha 7,9708 Border surroundings (description, scheme) Borders with lands of reserve of village council and private land lots. Level difference on the land lot, m Flat ground Cadastral end use Allocation and exploitation of the main and auxiliary buildings and constructions of the plants of processing, machine-building and other industries. Proposed end use Allocation and exploitation of the main and auxiliary buildings and constructions of the plants of processing, machine-building and other industries. Ground-based obstacles (risk of flood and No obstacles landslide, ecological conditions) Underground obstacles (level of surface and No obstacles subterranean waters) Limitations in use (due to construction, ecology No limitations etc.) Utilities Water (availability, parameters) Distance to the nearest water source (river) – 700 m. Drainage system (availability, parameters) Not available Supplying with gas (availability, parameters) Distance to the gas-pipe - 200 m Electricity (availability, parameters) Distance to the transformer facilities - 100 m Availability Ways of communication to the object (autoroads, Gravel autoroad with the width 6 m. railways) The nearest international airport, km, time International airport «Chernivtsi» – 40 km. (30 min.), «Lviv» – 280 km. (4 h.) The nearest entry point, km «Krasnoil’sk» – 35 km, «Porubne» – 55 km The nearest autoroads of international and Distance to the state road To Р-62 – 100 m national significance, km Distance to the international road – 25 km The nearest railway station, km «Storojynets» - 15 km Contact information Proposal is provided by (organization, name of Komarivtsi village council owner, Internet page ) Contact (name, position, telephone N, e-mail) Bajura S. The head of the Komarivtsi village, tel. +38(037235)43300, e-mail: [email protected]

Investment proposal (project) application form of GREENFIЕLD land lot №24 Загальна інформація Title of the investment proposal (project) Creation of an agricultural company on production and sales of grain crops, grain legumes, industrial crops, potato plants and vegetables Location (district, city/village, street), land photo, Chernivtsi region, district, Dankivtsi scheme of location

Owner (owners) Manager – Main Department of the State Committee of Land Resourses Available documents, that certify the ownership Not available (official act, certificate of ownership) Preliminary cost (balanced cost, assessed value) Not available ths. UAH. The actual use Not in use Technical parameters of a land lot Area of the available land lot, ha 31,8 Border surroundings (description, scheme) Borders with agricultural lands Level difference on the land lot, m Flat ground Cadastral end use Lands of agricultural designation Proposed end use For farming, agricultural and goods production Ground-based obstacles (risk of flood and No obstacles, ecological conditions are satisfactory landslide, ecological conditions) Underground obstacles (level of surface and No obstacles subterranean waters) Limitations in use (due to construction, ecology According to the nature protection requirements etc.) Utilities Water (availability, parameters) Not available, distance to the nearest source – 1 m Drainage system (availability, parameters) Not available, distance to the nearest source – 12 m Supplying with gas (availability, parameters) Not available, distance to the nearest source – 1 m Electricity (availability, parameters) Not available, distance to the nearest saurce – 1 m Availability Ways of communication to the object (autoroads, Auto-roads (gravel), 1 km railways) The nearest international airport, km, time International airport «Chernivtsi», 70 km, 1 hour

The nearest entry point, km CP «Mamalyga», 50 km The nearest autoroads of international and Auto-road «Jytomyr - Chernivtsi - Terebleche», 7 national significance, km km The nearest railway station, km «Kamyanets-Podil’skyi», 27 km Contact information Proposal is provided by (organization, name of Khotyn district state administration, http:// owner, Internet page ) khotyn.oda.cv.ua/ Contact (name, position, telephone N, e-mail) Mackuliak Ivan – The Head of the Sector of Social and Economic Development of Department of Economic Development and Infrastructure of Khotyn District State Administration, tel.: +38(03731)21729

Investment proposal (project) application form of GREENFIЕLD land lot №25 General information Title of the investment proposal (project) Creation of a municipal solid waste treatment and utilization plant Location (district, city/village, street), land photo, Chernivtsi region, Khotyn district, Khotyn scheme of location Location on the City general plan

Owner (owners) Property of the Khotyn territorial community, is in the usage of the utility plant «Khotynblagoustriy» Available documents, that certify the ownership Not available (official act, certificate of ownership) Preliminary cost (balanced cost, assessed value) Land sales price – 40 hrn. per 1 m2 ths. UAH Land leasehold right sales price – 5 hrn. per 1 m2 Owner (owners) Used as a municipal dump Technical parameters of a land lot Area of the available land lot, ha 7,6 ha Border surroundings (description, scheme) Lands of Khotyn territorial community Level difference on the land lot, m Up to 1 m Cadastral end use Lands of reserve of Khotyn city council Proposed end use For storage and treatment the municipal solid waste Ground-based obstacles (risk of flood and No obstacles landslide, ecological conditions) Underground obstacles (level of surface and Level of surface and subterranean waters – 4 m subterranean waters) Limitations in use (due to construction, ecology According to the legislature in the sphere of solid etc.) waste management Utilities Water (availability, parameters) Distance to the nearest source –1,5 km Drainage system (availability, parameters) Not available Supplying with gas (availability, parameters) Distance to the nearest source – 1,0 km Electricity (availability, parameters) Distance to the nearest source – 0,9 km Availability Ways of communication to the object (autoroads, Gravel road of width - 8 m railways) The nearest international airport, km, time International airport «Chernivtsi» – 71 km, 1,5 h. The nearest entry point, km Checkpoint «Mamalyga» - 30 km The nearest autoroads of international and Distance to state autoroad «Porubne – national significance, km Vasikovychi» - 0,5 km The nearest railway station, km «Kamyanets-Podil’skyi» – 25 km Contact information Proposal is provided by (organization, name of Khotyn City Council, 60000, Chernivtsi region. owner, Internet page ) Khotyn, Nezalejnosti str., 52, tel. +38(03731)21261 /+38(03731)22836 Contact (name, position, telephone N, e-mail) Storchak Volodymyr – Deputy City Head, tel. +38(050)7804747

Investment proposal (project) application form of GREENFIELD land lot №26 General information Title of the investment proposal (project) Lot land of Lunka village Location (district, city/village, street), land photo, Lunka village, district of Chernivtsi region scheme of location

Owner (owners) Lunka village council Available documents certifying the ownership 7320783000:03:001:0415 (official act, certificate of ownership) Preliminary cost, ths. UAH Not available The actual usage Not used Technical parameters of a land lot Area of the available lot of land, ha 12,970 hа Border surroundings (description, scheme) Within the limits of settlement Level difference on the land lot, m Flat area Cadastral end use Haymaking Proposed end use For the commercial use Ground-based obstacles (risk of flood and No obstacles landslide, ecological conditions) Underground obstacles (level of surface and No obstacles subterranean waters) Limitations in use (due to construction, ecology No obstacles etc.) Utilities Water (availability, parameters) Not available Drainage system (availability, parameters) Not available Supplying with gas (availability, parameters) Not available

Electricity (availability, parameters) To existent transformer substation by power 2х400, are 250 m.

Availability Ways of communication to the object (autoroads, Autoroad railways) The nearest international airport, km, time International airport «Chernivtsi» – 30 min. The nearest entry point, km Entry point with Romania, «Vadul-Siret» The nearest autoroads of international and Road of international value Chernivtsa- Kyiv,35 national significance, km The nearest railway station, km Railway station «Chernivtsi» – 40 km Contact information Proposal is provided by (organization, name of A. Preskure - The Head of Department of Economic owner, Internet page ) Development and Infrastructure of District State Administration, tel.2-15-02 Lupu Dmitro (240) 3-33-32

Investment proposal (project) application form of GREENFIELD land lot №27 General information Title of the investment proposal (project) Lot land of Hryatska village Location (district, city/village, street), land photo, Hryatska village, Hertsa district of Chernivtsi scheme of location region

Owner (owners) Hryatska village council Available documents certifying the ownership Not available (official act, certificate of ownership) Preliminary cost, ths. UAH Not available The actual usage Not used Technical parameters of a land lot Area of the available lot of land, ha 5,0 hа Border surroundings (description, scheme) Within the limits of settlement Level difference on the land lot, m No obstacles Cadastral end use Plough-land Proposed end use For the commercial use Ground-based obstacles (risk of flood and No obstacles landslide, ecological conditions) Underground obstacles (level of surface and No obstacles subterranean waters) Limitations in use (due to construction, ecology No obstacles etc.) Utilities Water (availability, parameters) Not available Drainage system (availability, parameters) Not available Supplying with gas (availability, parameters) Not available

Electricity (availability, parameters) Not available

Availability Ways of communication to the object (autoroads, Autoroad railways) The nearest international airport, km, time International airport «Chernivtsi» – 30 min. The nearest entry point, km Entry point with Romania, «Vadul-Siret» The nearest autoroads of international and Road of international value Chernivtsa- Kyiv,35 national significance, km The nearest railway station, km Railway station «Chernivtsi» – 40 km Contact information Proposal is provided by (organization, name of A. Preskure - The Head of Department of Economic owner, Internet page ) Development and Infrastructure of District State Administration, tel.2-15-02 Lupu Dmitro (240) 3-33-32

Investment proposal (project) application form of GREENFIELD land lot №28 General information Title of the investment proposal (project) Lot land of Godinivka village Location (district, city/village, street), land photo, Godinivka village, Hertsa district of Chernivtsi scheme of location region

Owner (owners) The united territorial community of Ostrica Available documents certifying the ownership Not available (official act, certificate of ownership) Preliminary cost, ths. UAH Not available The actual usage Not used Technical parameters of a land lot Area of the available lot of land, ha 2,0 hа Border surroundings (description, scheme) Within the limits of settlement Level difference on the land lot, m Flat area Cadastral end use Pasture Proposed end use For the commercial use Ground-based obstacles (risk of flood and No obstacles landslide, ecological conditions) Underground obstacles (level of surface and No obstacles subterranean waters) Limitations in use (due to construction, ecology No obstacles etc.) Utilities Water (availability, parameters) Not available Drainage system (availability, parameters) Not available Supplying with gas (availability, parameters) Not available

Electricity (availability, parameters) To existent transformer substation by power 2х400, are 250 m.

Availability Ways of communication to the object (autoroads, Autoroad railways) The nearest international airport, km, time International airport «Chernivtsi» – 30 min. The nearest entry point, km Entry point with Romania, «Vadul-Siret» The nearest autoroads of international and Road of international value Chernivtsa- Kyiv,35 national significance, km The nearest railway station, km Railway station «Chernivtsi» – 40 km Contact information Proposal is provided by (organization, name of A. Preskure - The Head of Department of Economic owner, Internet page ) Development and Infrastructure of District State Administration, tel.2-15-02 Lupu Dmitro (240) 3-33-32

Investment proposal (project) application form of GREENFIЕLD land lot №29 General information Name of investment proposal (project) Health centre Location (district, settlement, street), photo of a Striletskyi Kut village, Kitsman district, Chernivtsi plot, location plan region

Owner (s) Bukovyna interregional company “Modul” LTD Available documents about property (state acts, State Act for the right of permanent land use since property certificate) 29.02.1998 №000463 І-ЧВ Estimated cost (balance, assessed, etc.), thousand UAH Current use Not in use Technical characteristics of a plot of land Area of an available plot, ha 4,49 ha Surroundings (description, plan) Revniansk forestry and Chernivtsi forestry Elevation on a plot of land, m Flat area Cadastre purpose Health purpose of land Suggested purpose Building and exploitation of health centre Ground obstacles (risk of flood, landslide, No ecological condition) Underground obstacles (level of surface and No subsoil waters) Use restrictions (building, ecological, etc.) No Communications Water (availability, parameters) Local. The need to bore a well (water with silver ions) Sewage system (availability, parameters) No Gas supply (availability, parameters) 600 m Power supply (availability, parameters) 600 m, there are technical conditions for arrangement Accessibility Access roads to project (automobile, railway) 2 automobile roads of district significance The nearest international airport, km, time 150 km The nearest checkpoint, km 50 km The nearest automobile roads of international 10 km and state significance, km The nearest railway station, km 10 km Contact information A proposal was prepared by (name of enterprise, Bukovyna interregional company “Modul” LTD organization, institution, owner, site) Contact persons (first name, last name, tel., e- Mykola Filatov, director, tel.: +380509058404 mail) [email protected],

Investment proposal (project) application form of GREENFIЕLD land lot №30 General information Name of investment proposal (project) Construction of multistoried apartment building Location (district, settlement, street), photo of Lukiianovycha st., Chernivtsi city a plot, location plan

Owner (s) The territorial community of Chernivtsi Available documents about property (state Detailed plan of the territory acts, property certificate) Estimated cost (balance, assessed, etc.), Not specified thousand UAH Current use Reserved land Technical characteristics of a plot of land Area of an available plot, ha 6,5 hectares Surroundings (description, plan) Borders on district, Chernivtsi region Elevation on a plot of land, m About 1 m Cadastre purpose Reserved land Suggested purpose Reserved area for compact building estate (according to the general plan of Chernivtsi city) Ground obstacles (risk of flood, landslide, There are no threats ecological condition) Underground obstacles (level of surface and High level of surface water subsoil waters) Use restrictions (building, ecological, etc.) Following the state rules of land usage and good neighborhood Communications Water (availability, parameters) Not available Sewage system (availability, parameters) Not available Gas supply (availability, parameters) Available Power supply (availability, parameters) Available Accessibility Access roads to project (automobile, railway) The land plot is located nearby H03,H10 highways The nearest international airport, km, time Chernivtsi city, 10 km The nearest checkpoint, km Porubne, 40 km The nearest automobile roads of international The land plot is located nearby H03,H10 highways and state significance, km The nearest railway station, km Chernivtsi city, 7,2 km to the railway station Contact information A proposal was prepared by (name of Chernivtsi City Council enterprise, organization, institution, owner, site) Contact persons (first name, last name, tel., e- Horodenskyi Yaroslav, 553-808 mail) [email protected]

Investment proposal (project) application form of GREENFIЕLD land lot №31 General information Name of investment proposal (project) Construction of multistoried apartment building Location (district, settlement, street), photo of a 128-132 Aleksandri St., Chernivtsi city plot, location plan

Owner (s) The territorial community of Chernivtsi Available documents about property (state acts, Detailed plan of the territory property certificate) Estimated cost (balance, assessed, etc.), thousand Not available UAH Current use Reserve land Technical characteristics of a plot of land Area of an available plot, ha 9,0 hectares Surroundings (description, plan) Borders on private and communal property land plots Elevation on a plot of land, m 3 m Cadastre purpose Reserve land Suggested purpose Reserved area for building estate (according to the general plan of Chernivtsi city) Ground obstacles (risk of flood, landslide, No risks of flood and landslides ecological condition) Underground obstacles (level of surface and Surface water level is normal subsoil waters) Use restrictions (building, ecological, etc.) Following the state rules of land usage and good neighborhood Communications Water (availability, parameters) Not available Sewage system (availability, parameters) Not available Gas supply (availability, parameters) Available Power supply (availability, parameters) Available Accessibility Access roads to project (automobile, railway) The land plot is located nearby: М19, Н03, Н10 highways The nearest international airport, km, time Chernivtsi city, 12,5 km The nearest checkpoint, km Porubne, 42,5 km The nearest automobile roads of international The land plot is located nearby : М19, Н03, Н10 and state significance, km highways The nearest railway station, km Chernivtsi city, 6,8 км (to the railway station). Contact information A proposal was prepared by (name of enterprise, Chernivtsi City Council organization, institution, owner, site) Contact persons (first name, last name, tel., e- Horodenskyi Yaroslav, mail) 553-808, [email protected]

Investment proposal (project) application form of GREENFIЕLD land lot №32 General information Name of investment proposal (project) Construction of multistoried apartment building Location (district, settlement, street), photo of a Chernivtsi city, determined by Mudroho st. and plot, location plan Pryvokzalna st.

Owner (s) The territorial community of Chernivtsi Available documents about property (state acts, Detailed plan of the territory property certificate) Estimated cost (balance, assessed, etc.), thousand Not available UAH Current use Reserved land Technical characteristics of a plot of land Area of an available plot, ha 5,0 hectares Surroundings (description, plan) Borders on private and communal property land plots Elevation on a plot of land, m 1 m Cadastre purpose Reserved land Suggested purpose Projected area of multistoried apartment building (according to the general plan of Chernivtsi city) Ground obstacles (risk of flood, landslide, No threats ecological condition) Underground obstacles (level of surface and Surface water level is normal subsoil waters) Use restrictions (building, ecological, etc.) Following the state rules of land usage and good neighborhood Communications Water (availability, parameters) Available Sewage system (availability, parameters) Available Gas supply (availability, parameters) Available Power supply (availability, parameters) Available Accessibility Access roads to project (automobile, railway) The land plot is located nearby (Mudroho st.) local highway The nearest international airport, km, time Chernivtsi city, 14 km The nearest checkpoint, km Porubne, 50 km The nearest automobile roads of international The land plot is located nearby: Е85 highway and state significance, km The nearest railway station, km Chernivtsi city, 6 km (to the railway station). Contact information A proposal was prepared by (name of enterprise, Chernivtsi City Council organization, institution, owner, site) Contact persons (first name, last name, tel., e- Horodenskyi Yaroslav, mail) 553-808, [email protected]

Investment proposal (project) application form of GREENFIЕLD land lot №33 General information Name of investment proposal (project) Construction of multistoried apartment building Location (district, settlement, street), photo of a Chernivtsi city, determined by Luhova st. and plot, location plan Ternivska st.

Owner (s) The territorial community of Chernivtsi Available documents about property (state acts, The general plan of Chernivtsi city property certificate) Estimated cost (balance, assessed, etc.), thousand Not available UAH Current use Reserved land Technical characteristics of a plot of land Area of an available plot, ha 7,0 hectares Surroundings (description, plan) Borders on private and communal property land plots Elevation on a plot of land, m Nearly about 3 m Cadastre purpose Reserved land Suggested purpose No threats Ground obstacles (risk of flood, landslide, Surface water level is normal ecological condition) Underground obstacles (level of surface and Following the state rules of land usage and good subsoil waters) neighborhood Use restrictions (building, ecological, etc.) There are no threats Communications Water (availability, parameters) Not available Sewage system (availability, parameters) Not available Gas supply (availability, parameters) Available Power supply (availability, parameters) Available Accessibility Access roads to project (automobile, railway) The area is surrounded by residential streets The nearest international airport, km, time Chernivtsi, 13 km The nearest checkpoint, km Porubne, 47 km The nearest automobile roads of international and The land plot is located nearby: Е85 highway state significance, km The nearest railway station, km Chernivtsi city, 7 km (to the railway station). Contact information A proposal was prepared by (name of enterprise, Chernivtsi City Council organization, institution, owner, site) Contact persons (first name, last name, tel., e- Horodenskyi Yaroslav, 553-808 mail) [email protected]