National Register of Historic Places Continuation Sheet

Total Page:16

File Type:pdf, Size:1020Kb

National Register of Historic Places Continuation Sheet NFS tam 1O«0»« OUB Afpn** Ho. f <B+007« United States Department of the Interior National Park Service National Register of Historic Places Continuation Sheet Section number ___ Page ___ SUPPLEMENTARY LISTING RECORD NRIS Reference Number: 88002959 Date Listed: 1/5/89 Talcottville Historic District Tolland Connecticut Property Name County State Multiple Name This property is listed in tlie National Register of Historic Places in accordance with the attached nomination documentation subject to the following exceptions, exclusions, or amendments, notwithstanding the National Park Service certification included inAthe nomination documentation. Si^hature/15f7the\ Keeper Date of Action Amended Items in Nomination: Item 8: Significance Statement. The district is not eligible under Criterion D because its research potential has not been discussed. Item 7: Description The dedication date for the Mt. Hope Cemetery of 1967 was a typographical error; the date should read 1867. Verified by phone with: John Herzan Connecticut Historical Commission DISTRIBUTION: National Register property file Nominating Authority (without nomination attachment) NPS Form 10-900 OMB No. 1024-0018 (Rev. 8-86) RECEIVED United States Department of the Interior National Park Service V2 11988 National Register of Historic Places NATIONAL Registration Form REGISTER This form is for use in nominating or requesting determinations of eligibility for individual properties or districts. See instructions in Guidelines for Completing National Register Forms (National Register Bulletin 16). Complete each item by marking "x" in the appropriate box or by entering the requested information. If an item does not apply to the property being documented, enter "N/A" for "not applicable." For functions, styles, materials, and areas of significance, enter only the categories and subcategories listed in the instructions. For additional space use continuation sheets (Form 10-900a). Type all entries. 1. Name of Property________________________________________________ historic name TALCOTTVILLE HISTORIC DISTRICT other names/site number 2. Location street & number to 44 ELM HILL ROAD: 11 to 1?? MAIM 5?TPF,T?Tl I not for publication N/A city, town VERNON T I vicinity N/A state CONNECTICUT code 09 county TOLLAND code zip code 06066 3. Classification Ownership of Property Category of Property Number of Resources within Property PT| private I I building(s) Contributing Noncontributing nn public-local fXl district "i 7 buildings PH public-State I I site ____ sites I I public-Federal I I structure ____ structures I I object ____ ____ objects 111 17 Total Name of related multiple property listing: >T /, Number of contributing resources previously listed in the National Register 0______ 4. State/Federal Agency Certification As the designated authority under the National Historic Preservation Act of 1966, as amended, I hereby certify that this lx| nomination I I request for determination of eligibility meets the documentation standards for registering properties in the National Register of Historic Places and meets the procedural and professional requirements set forth in 36 CFR Part 60. In my opiniqg^.the j^pperty [x] meets EH doej^et meet the NationalRegister criteria. EH See continuation sheet. u^i jL»"u*j»3»^^*^r ____________ November 16, 1988 Signature£f€er\\ty\ng official ^ Date Director , Connecticut Historical Commission_____________________________________ State or Federal agency and bureau In my opinion, the property EJ meets EJdoes not meet the National Register criteria. EJsee continuation sheet. Signature of commenting or other official Date 5. National Park Service Certification I, hereby, certify that this property is: [^entered in the National Register. I | See continuation sheet. I | determined eligible for the National Register. I I See continuation sheet. I I determined not eligible for the National Register. I I removed from the National Register. EH other, (explain:) ___________ Signature of the Keeper Date of Action 6. Function or Use Historic Functions (enter categories from instructions) Current Functions (enter categories from instructions) INDUSTRY: manufacturing facility DOMESTIC: single dwellings.______ TNDUSTKT: water works DOMESTIC: multiple dwellings DOMESTIC: single dwellings INDUSTRY: manufacturing facility DOMESTIC: multiple dwellings RELIGION: religious structure 7. Description Architectural Classification Materials (enter categories from instructions) (enter categories from instructions) foundation Brick; stone;: granite Greek Revial walls Wo od: we at her b o ar d; brick; Italianate stucco _______________________ Other: lenticular truss bridge roof Asphalt: stone; slate________ other Metal: iron_________________________ Describe present and historic physical appearance. The Talcottville Historic District is located in the southwest corner of Vernon, Connecticut, and it consists of about 92 acres of land. The village of Talcottville is set on a plateau slightly above the western plain at the confluence of the Tankerhoosen and Hockanum Rivers. The Tankerhoosen River bisects the northern portion of the district, flowing westerly from Dobson Road and the Talcottville Gorge through the mill pond to the property of Cuno, Inc., and Hartford Turnpike. The land rises steadily from the village main street to the railroad right-of-way on the eastern edge of the district. The village street pattern is a simple T, consisting of two streets, with Main Street running from south-to-north, terminating in a cul-de-sac on the north shore of the Tankerhoosen Pond, and Elm Hill Road running from west-to-east uphill to, and across, the railroad right-of-way. The district, including the village, the mill pond and the iron bridge, the Talcottville Gorge, dam and headrace, and the Mount Hope Cemetery, is representative of both nineteenth-century architecture and industrial community development. The district is remarkable for its integrity of design, setting, feeling, and association, which convey the image of a small manufacturing village. The district contains 38 contributing primary resources, six of which are sites or structures other than buildings, and three contributing secondary resources. Further, the district contains 17 non-contributing resources consisting of 2 primary and 15 secondary buildings. The non- contributing primary resources (2 of 40) equal 5% of all primary resources within the district. (The 17 non-contributing primary and secondary resources equal 29-3% of all resources within the district.) The primary resources within the district attain a moderately high level of integrity of design, materials, and workmanship. Alterations are minimal; intrusions are few. The district developed primarily between 1802 and 1913 with two periods of intense development. The first, between 1835 and 1840, followed purchase of the mill site and its environs by Nathaniel 0. Kellogg; the second, between 1854 and 1870, followed purchase of the mill village by the Talcott brothers, Charles D. and Horace W. Talcott. See continuation sheet NPS Form lO*00-« Qua **»»* Ho. 1034-OOIt (« ) United States Department of the Interior National Park Service Taicottviiie Historic Distric National Register of Historic Places Vernon ' ct Continuation Sheet Section number 2 Page 2 Elm Hill Road 13, 19, 25, 26, 26,. 31, 36-38, 44 - Hartford Turnpike 64 Main Street 11, 17, 19, 36, 47, 48, 56, 66, 67, 72, 74, 76, 79, 82, 85, 86, 90, 96, 97, 100, 106, 107-109, 110, 116, 120, 126, 132 NPS Form 10-«00* United States Department of the Interior Talcottviile Historic District National Park Service Vernon, ct . National Register of Historic Places Continuation Sheet Section number 6 Page 2 Historic Functions (con.) Social: meeting hall Education: school Religion: religious structure Funerary: cemetery Transportation: road-related (vehicular) Current Functions (con.) Education: school Funerary: cemetery Transportation: road-related (vehicular) NPS Form !&*»* OM8 Appro** Wo. 1024-00/5 <M«) United States Department of the Interior Taicottviile Historic Distric National Park Service Vernon, ct. National Register of Historic Places Continuation Sheet Section number 7 Page ? The earliest extant building, the John Warburton House, c.l802, at 19 Main Street (Photograph 1), is a vernacular Federal-style house, constructed of brick with a center-chimney plan and a symmetrical facade. It is located on the north shore of Tankerhoosen Pond between the iron bridge and the dam. Several buildings remain from the decade of development under Nathaniel Kellogg. These are located on Main Street, south of its intersection with Elm Hill Road. They include numbers 76, 82, and 86 Main Street and are exemplified by the Greek Revival house, c.l840, at 79 Main Street (Photograph 6). These 1^-story houses are marked by prominent entry porticos with Doric pilasters, a projecting cornice, and sidelights. All have a second-story window at the street-facing gable which is flanked by Doric pilasters and crowned by a projecting cornice. The Nathaniel 0. Kellogg House, c.l840, at 85 Main Street, is set prominently on a large lot on the west side of the street. It is a 2^-story Greek Revival house with pedlmented gables, a three-part entablature, and Doric pilasters. It features a Queen Anne veranda and a south-facing angled window bay, which date from the late nineteenth century. It has a 1-story detached frame garage, constructed in 1971, which is located on the south side of the house, toward the rear of the lot, to minimize its intrusion
Recommended publications
  • 2021 LIMITED ACCESS STATE NUMBERED HIGHWAYS As of December 31, 2020
    2021 LIMITED ACCESS STATE NUMBERED HIGHWAYS As of December 31, 2020 CONNECTICUT DEPARTMENT OF Transportation BUREAU OF POLICY AND PLANNING Office of Roadway Information Systems Roadway INVENTORY SECTION INTRODUCTION Each year, the Roadway Inventory Section within the Office of Roadway Information Systems produces this document entitled "Limited Access - State Numbered Highways," which lists all the limited access state highways in Connecticut. Limited access highways are defined as those that the Commissioner, with the advice and consent of the Governor and the Attorney General, designates as limited access highways to allow access only at highway intersections or designated points. This is provided by Section 13b-27 of the Connecticut General Statutes. This document is distributed within the Department of Transportation and the Division Office of the Federal Highway Administration for information and use. The primary purpose to produce this document is to provide a certified copy to the Office of the State Traffic Administration (OSTA). The OSTA utilizes this annual listing to comply with Section 14-298 of the Connecticut General Statutes. This statute, among other directives, requires the OSTA to publish annually a list of limited access highways. In compliance with this statute, each year the OSTA publishes the listing on the Department of Transportation’s website (http://www.ct.gov/dot/osta). The following is a complete listing of all state numbered limited access highways in Connecticut and includes copies of Connecticut General Statute Section 13b-27 (Limited Access Highways) and Section 14-298 (Office of the State Traffic Administration). It should be noted that only those highways having a State Route Number, State Road Number, Interstate Route Number or United States Route Number are listed.
    [Show full text]
  • CONSERVATION COMMISSION AGENDA March 2, 2021 @6:00 Pm Virtual Meeting
    CONSERVATION COMMISSION AGENDA March 2, 2021 @6:00 pm Virtual Meeting NOTE: Items may be taken out of order at the Chair’s discretion. DECISIONS I. Public Hearings 1. 231 Podunk Road –Local NOI – Proposed Septic system for a new SFH Conservation o Owner/Applicant: AH & DB Custom Homes Representative: M. Dipinto, Three Oaks Agent Environmental Rebecca Gendreau o Request: Issue an OOC. o Documents Presented: Colored site plan o Jurisdiction: Buffer Zone Administrative Assistant o Project Summary: The project includes the construction of a single family home and associated appurtenances. Erin Carson o Staff Notes: • Receipt of legal ad posting and abutter notifications received. • Site visit performed previously (August 2020) to review wetland delineation on the Conservation property for projects previously permitted on the subdivided property. Commission Members • All work is proposed within an existing agricultural field. Ed Goodwin • No work is proposed within the 100-foot state WPA buffer zone. Construction of Chairperson the septic system is the only work proposed within the 200-foot local buffer zone. Steven Chidester o Staff Recommendations: Vice Chair • Sedimentation controls are included at the limit of grading shown on the plan. The David Barnicle limit of grading shall serve as the limit of work. Member • Approval of the project and issuance of SWB OOCs with the SCC standard special Steve Halterman conditions and the above noted recommendation. Member 2. 233 Podunk Road –Local NOI – Proposed Septic system and Construction of a new SFH Erik Gaspar Member o Owner/Applicant: AH & DB Custom Homes Representative: M. Dipinto, Three Oaks Environmental o Request: Issue an OOC.
    [Show full text]
  • Tonight's Debate May Be Decisive
    The weather Inside today Mostly sunny today, high around SO. Area news .. .14-15 H. S. World .... 16 Clear, cold tonight, low 28 to 33. Satur­ Comics............ .19 Family..............6 day, mostly sunny, high In SOs. National Dear Abby.......19 Obituaries........10 weather forecast map on Page 2. Editorial ...........4 Sports.......... 11-13 Plus The Herald’s Gasslfied Exchange Tonight’s debate may be decisive By CLAY F. RICHARDS The final debate will have no set cross-country trip ending in his United Press International topic — unlike the first two, which adopted home town of Grand Rapids, President Ford and Jimmy Carter were devoted to domestic issues and Mich., on election day. go to the colonial capital of foreign and military policy. Carter, ahead in the polls,' will Williamsburg, Va., today for the The wide open format, the follow his usual campaign schedule final, perhaps decisive, debate of the narrowing gap between the two can­ of returning to Plains, Ga., for a Bicentennial presidential election didates in the polls, and the im­ weekend of rest before laudching a before a television audience of up to minence of the election, could similar hectic last-week hop by jet 100 million people. produce a more lively siugfest than across the nation. With 11 days to go in the campaign, formerly between the President and On the eve of the debate Ford and the two will battle it out In a William his Georgia challenger. Carter appeared on the same stage— & Mary College hall devoted to the Ford will use the debate as a but not at the same time — at the an­ gentlemen and scholars of Phi Beta launching pad for a barnstorming nual A1 Smith dinner for Catholic, Kappa.
    [Show full text]
  • Airfield Facilities
    Hartford-Brainard Airport Airport Master Plan Update 1.0 REGIONAL AND AIRPORT OVERVIEW This chapter contains an inventory of existing facilities and characteristics of the Hartford- Brainard Airport (HFD). The inventory is referenced throughout the preparation of the Master Plan Update (MPU) to determine how well the airport meets today’s demands, and to identify areas that may need improvement to accommodate future growth. An inventory of airport pavements, buildings, and other structures is presented, as well as a summary of the airport location, airspace, activity, and environment. This information is presented in the following sections: • Study Area • Regional Economic Development • Existing Airport Facilities • Proposed and On-going Development • Airport Services • Airspace, Air Traffic Control, and Noise Abatement • Existing Airport Activity • Greenhouse Gases Emission • Energy Audit 1.1 Study Area Airport Location HFD is located approximately two miles southeast of downtown Hartford near the intersections of Interstates I-84 and I-91 and approximately 12 miles south of Bradley International Airport, as shown as Figure 1-1. This location is excellent for corporations that desire quick, easy access to downtown Hartford and are not restricted by the 4,400 foot runway. N DRAFT Page 1-1 Hartford-Brainard Airport Airport Master Plan Update Figure 1-1 Hartford-Brainard Airport Location Airport History HFD was dedicated as Brainard Field after Mayor Newton C. Brainard on June 10, 1921 at a site north of the existing location. It holds historical significance as being the first landing spot of Charles Lindbergh after his historic first transatlantic flight. The Connecticut (CT) National Air Squadron was organized at HFD in 1923.
    [Show full text]
  • Production Guide
    Production Guide Spring 2003 STATE OF CONNECTICUT This is a copy of the State of Connecticut Film, Video & Media Office on-line Production Guide available at CTfilm.com. The information is considered reliable but the accuracy of every detail is not guaranteed. Please visit the Connecticut Film Office website for regular updates and other information and services, or call the Connecticut Film Office at 860-571-7130 or 800-392-2122. Connecticut Film, Video & Media Office • 805 Brook Street, Bldg. 4, Rocky Hill, CT 06067 Phone: 860-571-7130 • Fax: 860-721-7088 • www.CTfilm.com • [email protected] The CT Film Office is part of the Connecticut Department of Economic and Community Development Production Guide: Guide Sections & Categories This Production Guide contains information about the individuals, companies and services that will help your work in Connecticut be successful. The guide is divided into ten sections; within each section are detailed categories which you can view. Since the Production Guide is updated several times a year, we encourage you to visit our website, CTfilm.com, for even more up-to-date category information. Guide Sections 1. General Information 6. Transportation 2. Production Crew 7. Support Services 3. Production & Post Production Companies 8. Talent 4. Equipment Rentals & Sales 9. Index 5. Art Department 10. Locations Categories 1. General Information Greetings from the Film Office Director State Filming Information Tax Exemptions Location Permit Regional Film Support Offices State Map Getting Here & Around 2. Production
    [Show full text]
  • National Register of Historic Places Registration Form
    NFS Form 10-900 0MB No. 10844018 (Rav. 8-66) United States Department of the Interior National Park Service National Register of Historic Places Registration Form NATIONAL REGISTER This form is for use In nominating or requesting determinations of eligibility for Individual properties or districts. See Instructions In Qu/de//nea for Completing National Register Forms (National Register Bulletin 13), Complete each Item by marking "x" In the appropriate box or by entering the requested information. If an item does not apply to the property being documented, enter "N/A" for "not applicable." For functions, styles, materials, and areas of significance, enter only the categories and subcategorles listed In the Instructions. For additional space use continuation sheets (Form 10-900a). Type all entries. 1. Name of Property historic name MERRla'T PARKWAY other names/site number Connecticut State Highway Route 15 2. Location street & number see continuation sheet __j not for publication city,Jown see continuation sheet _J vicinity state Connecticut code CT county Fairfield COC(e 001 zip code see continuation sheet 3. Classification Ow nership of Property C ategory of Property Number of Resources within Property i private I building(s) Contributing Noncontrlbuting public-local K1 district .IP -* buildings 8 ^public-State ~ public-Federal ~~ structure vT _ ZZ structures I object __£_ __-_L objects 81 13 Total Name ofnone related multipleK Fproperty K ' listing:a Number of contributing resources.preylously listed In the National Register ______ 4. State/Federal Agency Certification As the designated authority under the National Historic Preservation Act of 1966, as amended, I hereby certify that this H nomination C] request for determination of eligibility meets the documentation standards for registering properties in the National Register of Historic Places and meets the procedural and professional requirements set forth in 36 CFR Part 60.
    [Show full text]
  • Connecticut's Road Program
    I . ' ' > 3 0231 01306 3321 CONNECTICUT'S ROAD PROGRAM STATE HIGHWAY DEPARTMENT CONNECTICUT NOVEMBER , 19 4 6 This is Connecticttt's first ttrban express highway­ the first urban road engineered for motor traffic. It spells the end of those futile attempts to provide major traffic a'rteries throttgh patchwork improvements of existing streets. It marks the beginning of a program of express highway improvements which will bring the freedom of movement, efficiency and safety so sorely needed in our cities and on the main mral roads which serve them. CONTENTS PAGE FOREWORD . 5 STATE HIGHWAY PROGRAM 7 The Urban Problem 7 Main Rural Roads . 9 Secondary State Highways 12 Safety . 13 The Program 16 WILBUR CROSS PARKWAY AND OLD LYME-OLD SAYBROOK BRIDGE 3 3 THE LOCAL ROAD PROGRAM 37 "Out of the Mud" . 37 Unimproved Roads . 37 Construction Costs . 39 Maintenance and Reconstruction Costs 40 FINANCING THE PROGRAM 41 Income 41 Fund Balance and Existing Obligations . 42 Recurring Obligations . 43 Town Road Construction and Maintenance 44 State Highway Construction 44 APPENDIX 49 FOREWORD This report on Connecticut's road program is intended to give the essential background of facts to permit in­ telligent consideration of legislative proposals and the development of long range financial plans for highway improvement and maintenance. All public roads in Connecticut are either state high­ ways or local roads. This report, therefore, outlines the state-wide highway improvement program in which state and local governmental units are respectively engaged. It summarizes the cost of these improvements, and relates to this cost the revenues anticipated from existing fee and tax schedules, and aids from grants.
    [Show full text]
  • !: . 11 AUTOMATIC TRAFFIC COUNTER Ust.Dl¢"Ttnuo,1Kt !Hf: \Iol,.Tjhtto" Fit.Lft1; ◊'I Tt'l-Ttway~
    VQL.. 7 N0. 6 RAFFIC IN CONNECTICUT !: . 11 AUTOMATIC TRAFFIC COUNTER Ust.Dl¢"ttnuo,1kt !Hf: \iOl,.tJhttO" fit.LFt1; ◊'i tt'l-ttWAY~ x' TO 11c1A, C lJ,' Lh CO N, T,A._ •, Tl: P o• IHH". PUBLISHED MONTHLY BY AND FOR THE CONNECTICUT STATE HIGHWAY DEPARTMENT 2 CUTS A~O.) FILLS COVER PICTURE SlJPREJIE COURT SUSTAINS LOWER COURT DECISION The cover picture shows one o! two IN ARBORIO SUIT highway department window displays which were on view at the Business and Technical Litigation between John Arbor!o, Inc., Branch, Hartford public Library, April 26, and the state Highway commissioner has been to May 14~ settled by an oplnlon from the March term or The feature attraction 1n the display the State supreme court or Errors. Chief shown on the cover was the automatic tra!f1c Justice William M. Maltbie presented the counter. The hose by which the counter 1s opinion in which the other judges concurred activated was led from the machine to the that there was no error 1n the Judgment sidewalk outside of the window so that entered by superior court Judge Kenneth observers could stev on 1t and watch the wynn e 1 n r av o r o f the s t a t e H 1 g h wa Y C om - counter OJ;)erate. missioner. A poster on the left 1n the wlndcw The action concerned cla!ms by the con­ offers a graphic l)resentatlon of 1940-44 tractor that he had been compelled to do traffic deaths on connecticut•s two-lane work outside the scope or his contract and r o a d s a s c o mI> a r e d w 1 th i t s d u a 1 - 1 a n e e x -­ that he had been forced to use materials not t> res sways.
    [Show full text]
  • Rebirth of an Urban Classic
    REBIRTH OF AN URBAN CLASSIC 300 MAIN STREET REBIRTH OF AN URBAN CLASSIC BEST-IN-CLASS RENOVATIONS REBIRTH OF AN URBAN CLASSIC Located in the heart of Downtown Stamford, enjoy all the perks of urban life without getting into your car. Multiple restaurants and retail opportunities located in the immediate vicinity, couple with substantial lower cost relative to Manhattan, make 300 Main Street a home run for your office. MULTIPLE SUITES FROM 1,000 SF TO 10,000 SF SPACE FEATURES • Boutique bank headquarters building constructed in 1928 • Stunning views of Downtown • Abundant natural light exposure • Many period details and features • Upgrades and Refurbishment planned • Downtown location is in the heart of Stamford’s vibrant restaurant and pub scene • Alive at 5 and Wednesday Night Jazz concert series along with various retail stores are just steps away • Close proximity to the New Mill River Park and newly updated Stamford Town Center • On site parking • Flexible suite layouts available 12 13 1 STEPS FROM TOP-TIER RETAIL, RESTAURANTS & SUMMER ST. 11 2 STAMFORD TRAIN STATION BROAD ST. WASHINGTON BLVD. 3 8 5 6 9 7 10 RIPPOWAM RIVER 4 University of Mecha Noodle Bar 1 Connecticut 13 2 Target 14 Dunkin Donuts Mill River Park 14 Veterans Park Columbus Park 25 MAIN ST. 3 Row House 15 15 23 Trattoria Bowtie Majestic 6 UConn Dorm 4 Cinemas 16 16 18 19 Barcelona Slavins Hancock 17 5 Wine Bar 17 Pharmacy ATLANTIC ST. 21 Hotel Zero Bartaco 6 18 Degrees 20 22 TRESSER BLVD. 7 Cask Republic 19 Bell Street Garage Courtyard by NBC Universal 8 Marriott 20 Residence Inn by Bobby V’s 9 Marriott 21 Sports Bar The Palace 10 22 The Capital Grille 8 MIN WALK Theatre Stamford Town Ferguson Library 11 23 Center Brother Jimmy’s Stamford 12 BBQ 24 Train Station STAMFORD 25 Mill River Park 24 TRAIN STATION 7TH FLOOR PLAN SUITE 707 SUITE 704 7TH FLOOR PLAN 7TH FLOOR PLAN 1,256 SF 2,785 SF PARTIAL 8TH FLOOR PLAN 10,366 SF REBIRTH OF AN URBAN CLASSIC REBIRTH OF AN URBAN CLASSIC HIGHWAYS 1 U.S.
    [Show full text]
  • Capitol Region Transportation Plan (2015)
    CAPITOL REGION TRANSPORTATION PLAN A guide for transportation investments through the year 2040 MINOR UPDATE ~ 2015 Adopted by the CRCOG Policy Board on April 22, 2015 Table of Contents 2015 Interim Plan Update page 1 Major Policy Directions page 3 Chapter 1 - A Sustainable Transportation System page 6 Chapter 2 - Transit System page 18 Chapter 3 - Highway System page 29 Chapter 4 - Bicycles & Pedestrians page 49 Chapter 5 - Airport Transport page 55 Chapter 6 - Freight Transport System page 62 Chapter 7 - Special Policies page 69 Transportation Security MPO Coordination Air Quality-Transportation Policy Demand Management Policy Chapter 8 - Financial Plan page 77 Chapter 9 - Environmental Justice page 83 Chapter 10 - Public Involvement page 87 Appendix A: Previous & Related Plans page 96 Transportation 2040 April 2015 2015 INTERIM PLAN UPDATE Why a Minor Update? The Capitol Region Council of Governments (CRCOG) is undertaking this minor update of its 2011 Long Range Transportation Plan (LRTP) primarily to comply with federal requirements that Metropolitan Planning Organizations (MPOs) update their LRTPs at least once every four years. CRCOG has chosen to do a minor update rather than a full update, for two reasons. The first reason is that the latest transportation legislation, Moving Ahead for Progress in the 21st Century (MAP-21), requires MPOs to coordinate with their state’s department of transportation to develop performance measures and performance targets that will be used in future planning efforts. Because CRCOG’s LRTP was due to be updated before those metrics were ready, the decision was made to postpone a major update until the metrics were fully developed.
    [Show full text]
  • Town-District Unit May Be Revived Thurscloy
    20 - EVENING HERALD. Wed.. Feb. 20, 1980 Hilton^8 30th Anniversary Celebrated in Puerto Rico Town-District Unit May Be Revived Medallions de Chevreuil aux Myr- tablespoon juice. By BETTY RYDER By CHARLIE MAYNARD of the Board to locate a suitable site tilles, La Pomme Fare! de Puree de Peel zucchini and potatoes and cut in Buckland for the construction of a Family/Travel Editor Celeri, Les Pois Mange-Tout au pi- into two-inch squares. Add chicken Herald Reporter fire station by the District. If the dis­ The first international hotel to ment, Les Pommes de Terre Lorette stock and cook until tender. Cool, MANCHESTER - Mayor iiandifatpr trict’s position in this matter has now carry the Hilton name, recently (Tender filets of venison loin with then place in blender and puree. Add Stephen, Penny today said a changed, I would appreciate being cream, parsley juice, salt, pepper celebrated its 30th anniversary with fragrant myrtle, following a special town-Eighth District liaison apprised of that fact.” a weeklong celebrtion dedicated to method of preparation introduced by and tabasco to taste. committee could be reac- At the district’s regular meeting the people of Puerto Rico and their Emilio Graf, executive chef, to the Serve in deep seashell and sprinkle Tuesday night, the directors ad­ contribution to the extraordinary Wine & Food Gourmet Society of with crabmeat and chopped tiviated if the District direc­ vocated going to the mayor and achievements of the past three Puerto Rico in 1978. Served with an scallions. Serves 8 persons. tors would list the issues to be asking about the possible sale of the decades.
    [Show full text]
  • Ground-Water Resources of North-Central Connecticut
    MA' J964 Ground-Water Resources of North-Central Connecticut GEOLOGICAL SURVEY WATER-SUPPLY PAPER 1752 Prepared in cooperation with the Connecticut ff^ater Resources Commission Ground-Water Resources of North-Central Connecticut By ROBERT V. CUSHMAN GEOLOGICAL SURVEY WATER-SUPPLY PAPER 1752 Prepared in cooperation with the Connecticut Water Resources Commission UNITED STATES GOVERNMENT PRINTING-OFFICE, WASHINGTON : 1964 UNITED STATES DEPARTMENT OF THE INTERIOR STEWART L. UDALL, Secretary GEOLOGICAL SURVEY Thomas B. Nolan, Director The U.S. Geological Survey Library has cataloged this publication as follows; Cushman, Robert Vittum, 1916- Ground-water resources of north-central Connecticut. Washington, U.S. Govt. Print. Off., 1963. v, 97 p. maps (part col.) diagrs., tables. 24 cm. (U.S. Geological Survey. Water-supply paper 1752) Part of illustrative matter fold, in pocket. Prepared in cooperation with the Connecticut Water1 Resources Commission. Bibliography: p. 91-93. (Continued on next card) Cushman, Robert Vittum, 1916- Ground-water resources of north-central Connecticut. 1963. (Card 2) 1. Water, Underground Connecticut. 2. Water-supply Connecti­ cut. 3. Geology Connecticut. 4. Water Composition. I. Connecti­ cut. Water Resources Commission. (Series) For sale by the Superintendent of Documents, U.S. Government Printing Office Washington, D.G. 20402 CONTENTS Pag* Abstract_____________________________________________________ 1 Introduction..____________________________________________________ 3 Location and general features of the area...______________________
    [Show full text]