Rochdale Rail Corridor Strategy
Total Page:16
File Type:pdf, Size:1020Kb
Rochdale rail corridor strategy Unlocking potential along the Calder Valley 9662_Rail_Corridor_Strategy__260x190mm_16pp_V5.indd 1 15/04/2020 13:51 Rochdale Rochdale rail corridor strategy We’re in prime position Unlocking potential along the Calder Valley With five rail stations across the borough, and a possible sixth coming down the track, I believe that our exceptional transport links present the next major regeneration opportunity for our borough. Rochdale is ideal for both work and play. While businesses love our location in the Passenger growth has rocketed by more With plans for a new railway station at north east of Greater Manchester, within ROCHDALE than a third in the last decade, with 2.7m Slattocks, Metrolink expansion to Heywood easy reach of major cities like Manchester TOWN rail journeys made from Rochdale last year. and proposals to connect the East CENTRE Leeds and Leeds and in the centre of the UK, M62 The popularity of rail travel means our Lancashire heritage line to the national we’re also in the foothills of the Pennines METROLINK stations are more important than ever before. network at Castleton, there is much to do. and surrounded by the kind of beautiful Bury Within easy reach of major cities like The council has already committed around countryside which makes people want to M62 TRAIN M627(M) M66 Manchester and Leeds, boasting thriving £20m to kickstart this vital work and our create a home here. Bolton town centres and beautiful countryside, plans have been endorsed regionally and M60 it’s no surprise that people are choosing nationally, with £16.5m invested to date by Oldham Around each station we will invest in Rail journey times from Rochdale: M61 Rochdale, and demand for new homes and walking and cycling routes, park and external organisations. business space is increasing all the time. 35 minutes to ride, new public realm and community With this scale of opportunity and Manchester Airport MANCHESTER Railway stations act as a focus for spaces. Along with our partners, we will ambition, we want you to get on board the communities they serve and their develop plans to improve station facilities with these ambitious plans and be part of 13 minutes to importance is only going to grow in the and lobby for further investment in rail our journey. Manchester city centre M602 future. That’s why I see our stations and infrastructure and electrification. CITY Tameside 1 hour 10 minutes to CENTRE the land around them as an untapped But this is not just about growth. Rochdale Leeds city centre opportunity, which will be a major focus for M62 M60 M67 Sheffield Borough Council has declared a climate the borough’s regeneration going forward. Liverpool emergency and is committed to ensuring our borough is carbon neutral by 2050. M60 These plans are already well on track. We have identified capacity for around If we are to achieve this ambitious target, 7,000 new homes along the Calder Valley we need more investment in public corridor, 76 per cent of which will be on transport, cycling and walking facilities. Trafford Stockport brownfield land. These will be developed And we need to create new communities alongside a number of employment and in areas where transport infrastructure Councillor John Blundell leisure opportunities. already exists. Cabinet member for regeneration, TRAIN business, skills and employment at M56 AIRPORT Rochdale Borough Council Rochdale rail corridor strategy 9662_Rail_Corridor_Strategy__260x190mm_16pp_V5.indd 2-3 15/04/2020 13:51 Major growth projects Key Rochdale Littleborough 1,500+ new homes 2 million m2 of land to be redeveloped Smithy Bridge Castleton 1,500+ new homes Rochdale New £11 million cycle corridor M66 Mills Hill Castleton 950 new homes New passenger facilities M62 Smithy Bridge 1,000 new family homes New 100 space parking/drop off facility M62 Littleborough 845 new homes Slattocks A627 (M) Mixed use development close to the station entrance Slattocks 720+ new family homes 100,000m2 of new employment floor space Calder Valley Rail Corridor Motorway network M60 Mills Hill Rochdale rail corridor strategy 9662_Rail_Corridor_Strategy__260x190mm_16pp_V5.indd 4-5 15/04/2020 13:51 ROCHDALE STATION DEVELOPMENT Rochdale OPPORTUNITIES Almost 1.5m journeys were made Plans for Rochdale station and the from Rochdale railway station in surrounding area include: 800m 2018/19, a jump of almost 20 per - 1,500+ new homes, catering for up to (station area) cent from the previous year. 3,600 people - 2 million m2 of land redeveloped for Express train services mean travellers new uses from Rochdale can be in Manchester city - 4,000m2 new retail/commercial space centre in 13 minutes, with a direct link to Manchester Airport set to open soon. - 2,250m2 new office/workspace - New public square in front of the station Commuters benefit from six trains an hour into the city centre and a - 500 space parking facility at Miall Street Metrolink stop, which provides a direct - New entrance and visitor facilities link into Rochdale town centre and - Platform park Kingsway Business park, home to some of the borough’s biggest employers. - Tram – train services to Heywood, Oldham and Bury - Multi-million pound restoration of the Greater Manchester Fire Service Museum with adjoining co worker space 400m - Direct train links to Manchester airport - Improved pedestrian/cycle links between station and town centre, as well as Milkstone and Deeplish. LEGEND SHLAA site (with planning permission) SHLAA site (no planning permission) Anti-clockwise from top left: GMSF draft allocation site Greater Manchester Fire Service Museum (GMFSM); Previously identified employment site Adjoining co worker space; Proposed housing New opportunity site development at Central Park, Rochdale; Constrained land Proposed Rochdale station gateway; Greenbelt Proposed housing at Central Park in Rochdale Potential new public square outside Rochdale station Contours (2m) Rochdale Bourough boundary Rochdale rail corridor strategy 9662_Rail_Corridor_Strategy__260x190mm_16pp_V5.indd 6-7 15/04/2020 13:51 CASTLETON STATION DEVELOPMENT Castleton OPPORTUNITIES Plans for the Castleton station and the Around 180,000 journeys were 800m made from Castleton in 2018/19, surrounding area include: (station area) with journeys into Manchester city - 1,500+ new homes, catering for up to centre taking just 16 minutes. 3,500 people Major plans for this station include the - Expansion of Metrolink to Heywood and creation of over 1,500 new homes. We Bury via Castleton are planning to extend the East Lancs - New £11m cycle corridor railway (ELR), the third biggest tourist - Extension of the East Lancashire railway attraction in Greater Manchester into Castleton. Connecting this to Castleton popular heritage line to the national - New station entrance directly fronting rail network for the first time, via onto Manchester Road Castleton, is expected to increase ELR - Creation of new commercial and annual passenger numbers, currently around 200,000 a year, to a minimum community space around the station of 260,000. - Expansion of parking facilities - Longer trains and additional services at This station will also benefit from the 400m proposed expansion of the Metrolink line peak times. to Heywood and Bury, via an innovative new tram/train system, which sees trams use existing rail lines and stops, such as those at Castleton. A major new £11m cycle corridor LEGEND scheme will complement our plans to SHLAA site (with planning permission) regenerate the station area and promote SHLAA site (no planning permission) GMSF draft allocation site sustainable travel. Previously identified employment site Anti-clockwise from left: New opportunity site St. Martin’s View, alongside the canal; Constrained land Homes at St. Martin’s View; Greenbelt Proposed rail station and surrounding developments Contours (2m) Rochdale Bourough boundary Rochdale rail corridor strategy 9662_Rail_Corridor_Strategy__260x190mm_16pp_V5.indd 8-9 15/04/2020 13:51 MILLS HILL STATION DEVELOPMENT Mills Hill OPPORTUNITIES With 328,616 journeys starting at Mills Hill in 2018/19, this is the busiest 800m (station area) unmanned train station in Greater Manchester, getting passengers into the city centre in 12 minutes. Plans for Mills Hill station and the surrounding area include: - 950 new family homes, catering for up to 2,300 people - Expansion of parking/drop off facilities - Improved accessibility - Longer trains and additional services at peak times - New passenger waiting facilities - New cycle routes from Mills Hill to Middleton town centre. 400m LEGEND SHLAA site (with planning permission) SHLAA site (no planning permission) GMSF draft allocation site Anti-clockwise from left: Previously identified employment site Proposed new housing; New cycle routes will be opened New opportunity site up between Mills Hill and Middleton town centre; Constrained land Platform improvements are one of the proposed Greenbelt improvements for Mills Hill station. Contours (2m) Rochdale Bourough boundary Rochdale rail corridor strategy 9662_Rail_Corridor_Strategy__260x190mm_16pp_V5.indd 10-11 15/04/2020 13:51 SMITHYBRIDGE STATION DEVELOPMENT Smithy Bridge OPPORTUNITIES Almost 200,000 journeys were made from Smithy Bridge in 800m 2018/19, with an average journey (station area) time into Manchester city centre of 19 minutes. Smithy Bridge is also a short walk from Hollingworth Lake, the borough’s premier tourist attraction, which attracts 300,000 visitors per annum. Plans for Smithy Bridge station and the surrounding