NEW RAILWAYS New A progressive journey Since 2014

Kota-Bundi Parliamentary Constituency Railways’ Development in Rajasthan (2014-Present) 4 gmb

Capital investment increased by 327%, ` 682 crore (2009-14) to ` 2,911 crore (2014-19) All metre gauge track sanctioned for gauge conversion. Accelerated electrification with 100% track sanctioned for electrification. All unmanned level crossing gates (UMLCs) to be eliminated by Sept. 2018. 518 unmanned level crossings (UMLC) & 207 manned level crossings eliminated in 2014-18. Energy efficient LED fittings at all railway stations & service buildings provided. Major infrastructure Inputs in last 4 years 63 km of new lines completed 182 km doubling done 384 km electrification done 37% of western DFC passing through Rajasthan resulting in increase of industrial development. Wi-Fi provided at 16 stations. Works in progress 8 works of new lines: 696 km at the cost of ` 5,634 crore 9 works of doubling: 859 km at the cost of ` 5,749 crore 4 works of gauge conversion: 551 km at the cost of 2,943 crore 23 works of electrification: 4,519 km at the cost of 3,998 crore

Green: Division Orange: Kota Division Violet: Jaipur Division Red: Bikaner Division Brown: Jodhpur Division Blue: Agra Division INPUTS BY RAILWAY IN KOTA-BUNDI PARLIAMENTARY CONSTITUENCY 4 gmb

KOTA-BUNDI PARLIAMENTARY CONSTITUENCY A. ASSEMBLY SEGMENTS: Kota North, Kota South, Keshoraipatan, Bundi, Ramganj Mandi, Sangod, Ladpura, Pipaloda B. WORKS COMPLETED IN LAST FOUR YEARS: B 1. INFRASTRUCTURAL DEVELOPMENTS: v Construction of road over bridge (ROB) between Ramganj Mandi-Morak on level crossing gate no. 82 on cost sharing basis. (Railway cost ` 8 crore) at the cost of ` 15 crore v 16 Road under bridges (RUBs) in lieu of level crossing gates constructed on Kota-Chittorgarh section (03 nos), Kota (01 no), Kota-Ruthiyai section (07 nos), Kota thermal power station (01 no) & in Kota- Nagda section (04 nos) at the cost of ` 21 crore B2. PASSENGER AMENITIES: v Wi-Fi facility &12 CCTV cameras provided at Kota station v Development of station facade & new work portico at Ramganj Mandi station at the cost of ` 2 crore v Improvement of various passenger amenities including facade works, ramp & toilets for divyang passengers at Bundi station v Upgradation of retiring rooms and 04 nos. escalators & 02 lifts provided at Kota station v Electronic train indicator board provided at Bundi station v Coach guidance system, information display system & extension of foot over bridge (FOB) at Ramganj Mandi station v Raising of platform at Ramganj Mandi, Indragarh & Morak stations at the cost of ` 3 crore v Extension of platform at Kota, Bundi & Morak stations at the cost of ` 3 crore v Provision of automatic ticket vending machines (ATVMs) at Kota, Dakaniya Talav & Bundi stations v Renovation of station face lifting and upgradation of passenger amenities by improving waiting halls, shelters, platform surface, foot over bridge & toilets for divyang persons etc. at Indergarh & Ramganj Mandi stations at the cost of ` 3 crore v Provision of on board house keeping facility in Kota based express trains at the cost of ` 4 crore C. OTHERS: v Train no. 19805/06, Kota-Udhampur-Kota Express introduced v Train no. 19809/10, Kota-Jabalpur-Kota Express introduced v Extension of train no. 12415/16, Indore-Nizamuddin-Indore Express up to Sarai Rohilla v Extension of train no. 19803/04, Kota-Jammu Tawi-Kota Express, train no.12471/72, Bandra-Jammu Tawi- Bandra Express, train no.12475/76, Hapa-Jammu Tawi-Hapa Express & train no.12477/78, Jamnagar- Jammu Tawi-Jamnagar Express upto Shri Mata Vaishno Devi Katra v 30 new trains introduced passing enroute with 30 stoppage. D. ON-GOING WORKS: v Kota to Bhonra 30 km doubling of track with electrification including passenger amenities out of 163 Km in Kota-Ruthiyai section at the cost of ` 120 crore v Gurla-Srinagar 42 km track electrification work out of 152 km of Gurla- Chanderia section at the cost of ` 26 crore v Development of circulating area and various passenger amenities at Dakaniya Talav station at the cost of ` 2 crore v Replacement of foot over bridge (FOB) at Indergarh Sumerganj Mandi station v Provision of foot over bridge (FOB) with steps, cover and lighting at Dadhdevi, Gurla, Arnetha, Kapren, Ghatkavarana, Laban, Kanwalpura, Ravtha Road & Alania stations at the cost of ` 14 crore v Construction of road over bridge (ROB) between Gurla-Keshoraipatan on level crossing gate no. 116 on cost sharing basis (Railway cost ` 21 crore) at the cost of ` 43 crore v Construction of road over bridge (ROB) between Laban- on level crossing gate no. 136 W on cost sharing basis (Railway cost ` 21 crore) at the cost of ` 41 crore SOME IMPORTANT PHOTOS

Shri Om Birla, Hon'ble MP-Kota flagging off of Upgradation of Ramgang Mandi station Kota-Jabalpur Express at Kota station

Upgradation of Bundi station Online paperless reservation charting display at Kota station

Provision of cover shed to improve drainage arrangement of limited height subway (LHS)

Lift at Kota station Shri Om Birla, Hon'ble MP-Kota inaugurating escalators at Kota station