Kota-Bundi Parliamentary Constituency Railways’ Development in Rajasthan (2014-Present) 4 Gmb
NEW RAILWAYS New Rajasthan A progressive journey Since 2014 Kota-Bundi Parliamentary Constituency Railways’ Development in Rajasthan (2014-Present) 4 gmb Capital investment increased by 327%, ` 682 crore (2009-14) to ` 2,911 crore (2014-19) All metre gauge track sanctioned for gauge conversion. Accelerated electrification with 100% track sanctioned for electrification. All unmanned level crossing gates (UMLCs) to be eliminated by Sept. 2018. 518 unmanned level crossings (UMLC) & 207 manned level crossings eliminated in 2014-18. Energy efficient LED fittings at all railway stations & service buildings provided. Major infrastructure Inputs in last 4 years 63 km of new lines completed 182 km doubling done 384 km electrification done 37% of western DFC passing through Rajasthan resulting in increase of industrial development. Wi-Fi provided at 16 stations. Works in progress 8 works of new lines: 696 km at the cost of ` 5,634 crore 9 works of doubling: 859 km at the cost of ` 5,749 crore 4 works of gauge conversion: 551 km at the cost of 2,943 crore 23 works of electrification: 4,519 km at the cost of 3,998 crore Green: Ajmer Division Orange: Kota Division Violet: Jaipur Division Red: Bikaner Division Brown: Jodhpur Division Blue: Agra Division INPUTS BY RAILWAY IN KOTA-BUNDI PARLIAMENTARY CONSTITUENCY 4 gmb KOTA-BUNDI PARLIAMENTARY CONSTITUENCY A. ASSEMBLY SEGMENTS: Kota North, Kota South, Keshoraipatan, Bundi, Ramganj Mandi, Sangod, Ladpura, Pipaloda B. WORKS COMPLETED IN LAST FOUR YEARS: B 1. INFRASTRUCTURAL DEVELOPMENTS: v Construction of road over bridge (ROB) between Ramganj Mandi-Morak on level crossing gate no. 82 on cost sharing basis.
[Show full text]