Annexure-III Details of Tenders Awarded from CMC for Hired HEMM Contracts (from FY 2008-09, as per records available) Sl. Concerned Date of Name of Award Value Likely Period Name of the Work NIT No. LOA No. No. Area LOA Agency (Rs.) of Contract 1 Hiring of HEMM for removal of OB, BCCL/GM(CMC)/F-HEMM- GM(CMC)/HEMM/200 16-06-2008 M/s Ujjal extraction and transportation of coal with OS/2008/21 dtd. 11.01.2008 8/487 dtd. 16.06.2008 Transport firefighting from VIIIA, VIII, VII, V/VI & IV 68,84,48,000/- 36 months Agency, seams of Chandore Patch Phase-II of Katras Burdwan. Area. 2 Hiring of HEMM for removal of OB, BCCL/GM(CMC)/F-HEMM- GM(CMC)/HEMM/200 16-06-2008 M/s Ujjal extraction and transportation of coal from V, OS/2008/37 dtd. 19.01.2008 Bastacolla/ 8/488 dtd. 14/16.06.2008 Transport 11,18,72,000/- 12 months VI, VII, VIII & VIIIA Seams of L-3 Patch of Kustore Agency, ROCP under Kustore Area. Burdwan. 3 Hiring of HEMM for removal of OB, BCCL/GM(CMC)/F-HEMM- GM:CMC:HEMM- 15-12-2008 M/s Dhansar extraction and transportation of coal from IV OS/2008/502 dtd. 17.06.2008 OS:Gondudih:2008:1100 Kusunda Engg. Co. Pvt. 64,53,68,560/- 36 months Top, IV Bottom, III and II seams of Gondudih dtd. 15.12.2008 Ltd., . P Patch of Kusunda Area. 4 Hiring of HEMM for removal of OB, BCCL/GM(CMC)/F-HEMM- BCCL/GM(CMC)/F- 13-03-2009 extraction and transportation of coal from OS/2008/1159 dtd. Bastacolla/ HEMM-OS/2009/362 M/s GTS Coal 1,36,75,125/- 3 months small patch "A" of ROCP/SJ of Kustore Area. 30.12.2008 Kustore dtd. 13.03.2009 Sales, Dhanbad.

5 Hiring of HEMM for removal of OB, BCCL/GM(CMC)/F-HEMM- BCCL/GM(CMC)/F- 24-04-2009 extraction and transportation of coal with OS/2008/1107 dtd. HEMM-OS/2009/536 M/s Dhansar firefighting from XV, XIV, XIII, XII, XI & X 17.12.2008 Area dtd. 23/24.04.2009 Engg. Co. Pvt. 253,56,43,140/- 72 months seams of Section of Mudidih Colliery Ltd., Dhanbad. under Sijua Area 6 Hiring of HEMM for removal of OB, BCCL/GM(CMC)/F-HEMM- GM:CMC:HEMM- 03-07-2009 extraction and transportation of coal from OS/2008/1034 dtd. OS:Phulratitand:2008/88 M/s BKB V/VI/VII (combined) & VII seams from 26.11.2008 6 dtd. 03.07.2009 Transport Pvt. 42,71,93,600/- 36 months extension patch of West Phularitand of Ltd., Bokaro. Phularitand Colliery under Barora Area. 7 Hiring of HEMM for removal of OB, BCCL/GM(CMC)/F-HEMM- GM(CMC)/HEMM/Bho 13-09-2009 extraction and transportation of coal from OS/2009/02 dtd. 01.01.2009 wrah(N)/2009/1398 dtd. M/s BLA Infra EJ Area 48,07,30,000/- 36 months XIVA & XV seams of Bhowrah (North) 13.09.2009 (JV), Raniganj. Colliery of EJ Area. 8 Hiring of HEMM for removal of OB, BCCL/GM(CMC)/F-HEMM- GM(CMC)/HEMM/Kali 14-09-2009 extraction and transportation of coal from OS/2009/563 dtd. 29.04.2009 mondir/2009/1354 dtd. M/s BKB XI/XII, VIIIC/IX/X, VIIIB, VIIIA, VIII, 14.09.2009 Block-II Transport Pvt. 285,11,85,700/- 72 months V/VI/VII, IV/V/VI/VII seams of Kalimandir Ltd., Bokaro. Patch-II of Jamunia OCP under Block-II Area.

9 Hiring of HEMM for removal of OB, BCCL/GM(CMC)/F-HEMM- GM(CMC)/HEMM/Mur 15-09-2009 M/s BKB extraction and transportation of coal from OS/2009/420 dtd. 27.03.2009 Barora aidih/2009/1364 dtd. Transport Pvt. 67,36,88,820/- 36 months Patch of Colliery of Barora Area. 15.09.2009 Ltd., Bokaro. 10 Hiring of HEMM for removal of OB, BCCL/GM(CMC)/F-HEMM- GM(CMC)/HEMM/Kan 15-09-2009 extraction and transportation of coal from OS/2009/499 dtd. 13.04.2009 tapahari/2009/1363 dtd. M/s BKB VIIIA, VIII (Top & Bottom) and VII seams of Katras 15.09.2009 Transport Pvt. 99,76,15,600/- 36 months Kantapahari Patch of AKWM Colliery under Ltd., Bokaro. Katras Area. 11 Hiring of HEMM for removal of OB, BCCL/GM(CMC)/F-HEMM- GM(CMC)/HEMM/Gasl 18-09-2009 M/s Dhansar extraction and transportation of coal from XV OS/2009/419 dtd. 27.03.2009 itand/2009/1396 dtd. Katras Engg. Co. Pvt. 232,63,33,800/- 36 months (Top & Bottom), XIV & XIII seams of 18.09.2009 Ltd., Dhanbad. Gaslitand Colliery under Katras Area. 12 Hiring of HEMM for removal of OB, BCCL/GM(CMC)/F-HEMM- GM(CMC)/HEMM/Kus 18-09-2009 M/s Dhansar extraction and transportation of coal of IX/X OS/2009/417 dtd. 27.03.2009 unda/2009/1395 dtd. Kusunda Engg. Co. Pvt. 379,77,31,380/- 60 months & V/VI/VII/VIII seams of Patch-B of 18.09.2009 Ltd., Dhanbad. Kusunda Colliery uner Kusunda Area. 13 Hiring of HEMM for removal of OB, BCCL/GM(CMC)/F-HEMM- BCCL/GM(CMC)/F- 24-12-2009 M/s Dhansar extraction and transportation of coal from III OS/2009/836 dtd. 29.06.2009 LOA/HEMM Engg. Co. Pvt. 22,68,13,510/- 24 months seam & IVB seam in Patch-I of Jeenagora/2009/1905 Ltd., Dhanbad. Colliery of . dtd. 24.12.2009 14 Hiring of HEMM for removal of OB, BCCL/GM(CMC)/F-HEMM- BCCL/GM(CMC)/F- 26-12-2009 M/s SAR extraction and transportation of coal from OS/2009/845 dtd. 30.06.2009 LOA/HEMM EJ Area Parivahan Pvt. 35,45,50,500/- 30 months XIV, XIII, XI/XII and IX/X seams of Bhowrah(S)/2009/1911 Ltd., Kolkata. Bhowrah (S) 3 Pit OCP under EJ Area. dtd. 26.12.2009 15 Hiring of HEMM for removal of OB, BCCL/GM(CMC)/F-HEMM- BCCL/GM(CMC)/F- 26-12-2009 extraction and transportation of coal from IX OS/2009/1033 dtd. Bastacolla/ LOA/HEMM M/s GTS Coal 1,07,42,500/- 3 months & V to VII seams of Patch-B of ROCP/South 28.07.2009 Kustore ROCP/2009/1912 dtd. Sales, Dhanbad. of Kustore Area. 26.12.2009 16 Hiring of HEMM for removal of OB, BCCL/GM(CMC)/F-HEMM- BCCL/GM(CMC)/F- extraction and transportation of coal of X OS/2009/733 dtd. 08.06.2009 LOA/HEMM M/s Avinash seam (IX/X) & 4 feet seam (XA) with Bastacolla Kujama/2009/1918 dtd. 28-12-2009 Transport, 161,13,52,070/- 60 months firefighting at Kujama X seam patch of 28.12.2009 Asansol. Bastacolla Area. 17 Hiring of HEMM for removal of OB, BCCL/GM(CMC)/F-HEMM- BCCL/GM(CMC)/F- 28-12-2009 M/s Avinash extraction and transportation of coal from OS/2009/917 dtd. 09.07.2009 LOA/HEMM CV Transport, 76,87,62,090/- 36 months Basantimata Patch of CV Area. Bastantimata/2009/1917 Asansol. dtd. 28.12.2009

1 of 8 Sl. Concerned Date of Name of Award Value Likely Period Name of the Work NIT No. LOA No. No. Area LOA Agency (Rs.) of Contract 18 Hiring of HEMM for removal of 50.79 LCM BCCL/GM(CMC)/F-HEMM- BCCL/GM(CMC)/F- 28-12-2009 OB, rehandling of 2.37 LCM OB and for OS/2009/734 dtd. 08.06.2009 LOA/HEMM M/s BKB extraction and transportation of 28.55 LMT /2009/1916 Sijua Area Transport Pvt. 52,36,96,000/- 30 months coal with firefighting from IV, V/VI & VII dtd. 28.12.2009 Ltd., Bokaro. seams of Tetulmari Colliery under Sijua Area.

19 Hiring of HEMM for removal of OB, BCCL/GM(CMC)/F-HEMM- BCCL/GM(CMC)/F- 18-03-2010 M/s Dhanbad extraction and transportation of coal of XI/XII OS/2009/996 dtd. 22.07.2009 LOA/HEMM Engineering & Kusunda/ seams with firefighting from Patch-A of Ena Ena/2010/348 dtd. Mining 31,58,82,000/- 24 months Kustore Project of Kustore Area. 18.03.2010 Organization JV, Dhanbad. 20 Hiring of HEMM for removal of OB, BCCL/GM(CMC)/F-HEMM- BCCL/GM(CMC)/F- 18-03-2010 extraction and transportation of coal from OS/2009/1516 dtd. LOA/HEMM M/s Ambey Mohuda Top, Middle & Bottom seams at 14.10.2009 WJ Murulidih/2010/349 dtd. Mining Pvt. 12,10,39,000/- 12 months Patch-A, B, C & D of Murulidih Colliery of 18.03.2010 Ltd. WJ Area. 21 Hiring of HEMM for removal of OB, BCCL/GM(CMC)/F-HEMM- BCCL/GM(CMC)/F- 22-03-2010 M/s Ujjal extraction and transportation of coal from XV OS/2009/941 dtd. 13.07.2009 LOA/HEMM Transport seam of Central Kirkend and West Gopalichuk PB Gopalichuk/2010/367 11,86,88,000/- 24 months Agency, section of Gopalichuk Colliery of PB Area. dtd. 22.03.2010 Burdwan. 22 Hiring of HEMM for removal of OB, BCCL/GM(CMC)/F-HEMM- BCCL/GM(CMC)/F- 11-06-2010 M/s Mala extraction and transportation of coal with OS/2009/1741 dtd. LOA/HEMM Kumar Kusunda 50,60,93,595/- 36 months firefighting from XIV seam of Patch-A at 19.11.2009 Simlabahal/2010/867 Engineers Pvt. Simlabahal Colliery of Kusunda Area. dtd. 11.06.2010 Ltd., Dhanbad. 23 Hiring of HEMM for removal of OB, BCCL/GM(CMC)/F-HEMM- BCCL/GM(CMC)/F- 21-12-2010 M/s Faridabad extraction and transportation of coal with OS/2010/1074 dtd. LOA/HEMM L5 Bastacolla/ Gurgaon firefighting from IX/X, VIIIA & 21.07.2010 ROCP/2010/3829 dtd. 39,04,84,900/- 36 months Kustore Minerals, V/VI/VII/VIII Seams of L-5 Patch of 21.12.2010 Gurgaon. ROCP/South Jharia of Kustore Area. 24 Hiring of HEMM for removal of OB, BCCL/GM(CMC)/F-HEMM- BCCL/GM(CMC)/F- 21-12-2010 extraction and transportation of coal with OS/2010/1079 dtd. LOA/HEMM M/s VIN-Balaji- firefighting from VIIIA, VII, V/VI, IV(Top) 23.07.2010 Sijua Area S.Bansjora/2010/3828 JTT (JV), 55,30,93,200/- 24 months & IV(Bottom) seams of Patch-A & B of dtd. 21.12.2010 Kolkata. Sendra Bansjora Colliery of Sijua Area. 25 Hiring of HEMM for removal of OB, BCCL/GM(CMC)/F-HEMM- BCCL/GM(CMC)/F- 21-12-2010 extraction and transportation of coal from OS/2010/1078 dtd. LOA/HEMM M/s KRR Infra IX/X, VIIIB, VIIIA, V/VI/VII and IV seams 23.07.2010 Govindpur Govindpur/2010/3827 Projects Pvt. 256,84,50,000/- 72 months of Patch-A of Govindpur Colliery under dtd. 21.12.2010 Ltd. Hyderabad. Govindpur Area. 26 Hiring of HEMM for removal of OB, BCCL/GM(CMC)/F-HEMM- BCCL/GM(CMC)/F- 14-02-2011 M/s Calcutta extraction and transportation of coal with OS/2010/1071 dtd. LOA/HEMM L6 Industrial Bastacolla/ firefighting from IX/X, VIIIA & 21.07.2010 ROCP/2011/4118 dtd. Supply 65,40,85,000/- 48 months Kustore V/VI/VII/VIII Seams of L-6 Patch of 14.02.2011 Corporation, ROCP/South Jharia of Kustore Area. Kolkata. 27 Hiring of HEMM for removal of OB, BCCL/GM(CMC)/F-HEMM- BCCL/GM(CMC)/F- 03-03-2011 M/s RKTPL- extraction and transportation of coal up to OS/2010/1070 dtd. LOA/HEMM CV BTC (JV), 54,57,92,070/- 36 months Gopinath Bottom seam of Dahibari OCP of 21.07.2010 DBOCP/2011/4207 dtd. Dhanbad. CV Area. 03.03.2011 28 Hiring of HEMM for removal of OB, BCCL/GM(CMC)/F-HEMM- BCCL/GM(CMC/F- 03-03-2011 extraction and transportation of coal from OS/2010/1073 dtd. LOA/HEMM M/s Dhansar VIII, VII/V & VI, IV Top & IV Bottom 21.07.2010 Lodna Jeenagora/2011/4208 Engg. Co. Pvt. 119,43,53,120/- 29 months seasms of Patch-A (combined) of Jeenagora dtd. 03.03.2011 Ltd., Dhanbad. Colliery under Lodna Area. 29 Hiring of HEMM for removal of OB, BCCL/GM(CMC)/F-HEMM- BCCL/GM(CMC)/F- 08-04-2011 extraction and transportation of coal with OS/2010/3566 dtd. LOA/HEMM M/s VIN-Balaji- firefighting from XIV, XIII, XII, XI, X & IX 18.11.2010 Sijua Area Basdeopur/2011/60 dtd. JTT (JV), 62,25,19,000/- 36 months seams of Ekra and Basdeopur Sections of 08.04.2011 Kolkata. Basdeopur Colliery under Sijua Area. 30 Hiring of HEMM including surface miner for BCCL/GM(CMC)/F-HEMM- BCCL/GM(CMC)/F- 26-04-2011 removal of OB, extraction and transportation OS/2010/3392 dtd. LOA/HEMM Crusher M/s KRR Infra of coal from XI/XII, VIIIC/IX/X, VIIIB, 14.10.2010 III/2011/158 dtd. Block-II Projects Pvt. 337,85,14,450/- 66 months VIIIA, VIII & V/VI/VII seams of Crusher 26.04.2011 Ltd. Hyderabad. Patch-III of Block-II Mine of Block-II Area.

31 Hiring of HEMM for removal of OB, BCCL/GM(CMC)/F-HEMM- BCCL/GM(CMC)/F- 28-06-2011 M/s Upendra extractiona and transportation of coal from OS/2011/4159 dtd. LOA/HEMM Prasad PB 7,43,91,000/- 18 months 5/15 patch of XV seam of Khaira Section of 23.02.2011 /2011/386 Brothers, Kenduadih Colliery of PB Area. dtd. 28.06.2011 Bokaro. 32 Hiring of HEMM for removal of OB, BCCL/GM(CMC)/F-HEMM- BCCL/GM(CMC)/F- 19-07-2011 M/s NCC extraction and transportation of coal from OS/2011/4030 dtd. LOA/HEMM WJ Limited, 70,55,82,000/- 20 months Lohapatti Middle and Lohapatti Bottom seams 27.01.2011 Lohapatti/2011/496 dtd. Hyderabad. at Lohapatti Colliery of WJ Area. 19.07.2011 33 Hiring of HEMM for removal of OB, BCCL/GM(CMC)/F-HEMM- BCCL/GM(CMC)/F- 22-09-2011 extraction and transportation of coal from OS/2011/4179 dtd. LOA/HEMM VIII, V/VI(Top), V/VI(Bot), IV(Top), 01.03.2011 Gondudih/2011/885 dtd. M/s Arvind IV(Bot), III, II(T+M), II(T) and II(Mid) Kusunda 22.09.2011 Construction 292,89,63,000/- 60 months seams of Patch-Q, part Patch-N and part Patch- Co. Pvt. Ltd. P of Gondudih Colliery of Kusunda Area.

2 of 8 Sl. Concerned Date of Name of Award Value Likely Period Name of the Work NIT No. LOA No. No. Area LOA Agency (Rs.) of Contract 34 Hiring of HEMM for filling of trench and BCCL/GM(CMC)/F-HEMM- BCCL/CGM(CMC)/F- 15-10-2011 blanketing of surface cracks with soil OS/2011/170 dtd. 30.04.2011 LOA/HEMM M/s Babu Ram (mitti)/OB for dealing with X seam fire at Sijua Area G.Gareria/2011/987 dtd. & Co., 79,65,578.81 3 months Gopal Gareria at Sendra Basnsjora Colliery of 15.10.2011 Dhanbad. Sijua Area. 35 Hiring of HEMM for removal of OB, BCCL/GM(CMC)/F-HEMM- BCCL/CGM(CMC)/F- 07-11-2011 extraction and transportation of coal from OS/2010/3844 dtd. LOA/HEMM M/s AT-Libra IV(Top), IV(Bot), III(Top) and III(Bot) seams 27.12.2010 Golukdih/2011/1216 dtd. Bastacolla BPL (JV), 252,01,39,290/- 72 months of Golukdih NC Project (Northern Sector) of 07.11.2011 Dhanbad. GOCP/KOCP of Bastacolla Area.

36 Hiring of HEMM for removal of OB, BCCL/GM(CMC)/F-HEMM- BCCL/CGM(CMC)/F- 07-11-2011 M/s Dhansar extraction and transportation of coal from OS/2011/21 dtd. 08.04.2011 LOA/HEMM Kusunda Engg. Co. Pvt. 8,29,90,830/- 12 months V,VI,VII & VIII seams of Dhansar Colliery of Dhansar/2011/1215 dtd. Ltd., Dhanbad. Kusunda Area. 07.11.2011 37 Hiring of HEMM including surface miner for BCCL/GM(CMC)/F-HEMM- BCCL/CGM(CMC)/F- 23-11-2011 removal of OB, extraction and transportation OS/2011/20 dtd. 04.04.2011 LOA/HEMM M/s Madhucon of coal from V/VI/VII seams of Patch-A and Phularitand/2011/1311 Barora Projects Ltd., 422,06,27,760/- 84 months XI/XII, IX/X, VIIIC, VIIIB, VIIIA & dtd. 23.11.2011 Hyderabad. V/VI/VII Seams of Patch-B of Phularitand Colliery OC of Barora Area. 38 Hiring of HEMM for protective work against BCCL/GM(CMC)/F-HEMM- BCCL/CGM(CMC)/F- 25-11-2011 fire in No. V/VI, VII and VIII seams beneath OS/2011/155 dtd. 26.04.2011 LOA/HEMM M/s Md. Wali and within 45 mtr. Of railway acquired land of E.Bassuria/2011/1323 Kusunda Imam, 51,50,333.60 6 months Kusunda-Tetulmari Link Line at East dtd. 25.11.2011 Dhanbad. Bassuriya Collilery of Kusunda Area.

39 Hiring of HEMM for removal of OB, BCCL/GM(CMC)/F-HEMM- BCCL/CGM(CMC)/F- 16-12-2011 M/s Dhanbad extraction and transportation of coal with OS/2011/316 dtd. 31.05.2011 LOA/HEMM Engineering & firefighting from XIV seam of 4 & 5 Pit Patch EJ Area Bhowrah(S)/2011/1443 Mining 8,21,24,150/- 12 months of Bhowrah (S) Colliery of EJ Area. dtd. 16.12.2011 Organization JV, Dhanbad. 40 Hiring of HEMM for removal of OB, BCCL/GM(CMC)/F-HEMM- BCCL/CGM(CMC)/F- 16-12-2011 extraction and transportation of coal with OS/2011/403 dtd. 01.07.2011 LOA/HEMM NT- M/s Saisree firefighting from VIIIA, VIII, VII, V/VI, IVT, Lodna ST/2011/1444 dtd. Engineering 92,28,44,000/- 36 months IVB seams at NT/ST OCP Patch-A of Lodna 16.12.2011 Pvt. Ltd. Area. 41 Hiring of HEMM for removal of OB, BCCL/GM(CMC)/F-HEMM- BCCL/GM(CMC)/F- 01-02-2012 extraction and transportation of coal from OS/2011/1043 dtd. LOA/HEMM VIII, V/VI(Top), V/VI(Bot), IV(Top), 25.10.2011 Gondudih/2012/129 dtd. M/s Sadbhav IV(Bot), III, II(T+M), II(T) and II(Mid) Kusunda 01.02.2012 Engg. Ltd., 287,75,82,720/- 60 months seams of Patch-Q, part Patch-N and part Patch- Ahmedabad. P of Gondudih Colliery of Kusunda Area.

42 Hiring of HEMM for removal of OB, BCCL/GM(CMC)/F-HEMM- BCCL/GM(CMC)/F- 22-02-2012 M/s Sainik extraction and transportation of coal with OS/2011/913 dtd. 29.09.2011 LOA/HEMM Mining & firefighting from VIIIA, IV/V/VI/VII seams Barora Damoda/2012/194 dtd. 32,64,02,000/- 24 months Allied Services of ND OC Patch of Damoda Colliery under 22.02.2012 Ltd., Gurgaon. Barora Area. 43 Hiring of HEMM for removal of OB, BCCL/GM(CMC)/F-HEMM- BCCL/GM(CMC)/F- 22-02-2012 extraction and transportation of coal with OS/2011/419 dtd. 06.07.2011 LOA/HEMM M/s Avinash firefighting from X seam and V,VI,VII & VIII Bastacolla Ghanoodih/2012/193 Transport, 30,15,21,440/- 24 months (combined seam) of Ghanoodih Colliery of dtd. 22.02.2012 Asansol. Bastacolla Area. 44 Hiring of HEMM for removal of OB, BCCL/GM(CMC)/F-HEMM- BCCL/GM(CMC)/F- 22-02-2012 M/s Faridabad extraction and transportation of coal with OS/2011/296 dtd. 27.05.2011 LOA/HEMM Gurgaon firefighting from XV seam of River Side EJ Area Bhowrah(S)/2012/192 5,41,94,725/- 12 months Minerals, Patch of Bhowrah (South) Colliery of EJ dtd. 22.02.2012 Gurgaon. Area. 45 Hiring of HEMM for removal of OB, BCCL/GM(CMC)/F-HEMM- BCCL/GM(CMC)/F- 02-11-2012 M/s Mahalaxmi extraction and transportation of coal from L- OS/2012/523 dtd. 01.06.2012 LOA/HEMM Infracontract 11, L-10, Salanpur-C and Salanpur-D seams CV Chaptoria/2012/1116 145,86,80,000/- 36 months Pvt. Ltd., of Chaptoria OC Patch of Damagoria Colliery dtd. 02.11.2012 Ahmedabad. of CV Area. 46 Hiring of HEMM for removal of OB, BCCL/GM(CMC)/F-HEMM- BCCL/GM(CMC)/F- 20-11-2012 M/s GJS extraction and transportation of coal from OS/2012/687 dtd. 09.07.2012 LOA/HEMM Infratech Pvt. XI/XII, IX/X, VIIIB, VIIIA & V/VI/VII Govindpur Kooridih/2012/1189 dtd. 163,28,04,000/- 48 months Ltd., seams at Patch-A of Block-IV/Kooridih 20.11.2012 Hyderabad. Colliery of Govindpur Area. 47 Hiring of HEMM for removal of OB, BCCL/GM(CMC)/F-HEMM- BCCL/GM(CMC)/F- 06-12-2012 extraction and transportation of coal with OS/2012/411 dtd. 30.04.2012 LOA/HEMM N. M/s KRR Infra firefighting from IX/X, L-II, VIIIA, V/VI/VII Lodna /2012/1245 dtd. Projects Pvt. 99,20,81,000/- 30 months and V/VI/VII/VIII seams at North Tisra Patch- 06.12.2012 Ltd. Hyderabad. A of Lodna Area. 48 Hiring of HEMM for removal of OB, BCCL/GM(CMC)/F-HEMM- BCCL/GM(CMC)/F- 08-01-2013 extraction and transportation of coal from OS/2012/820 dtd. 08.08.2012 LOA/HEMM M/s Sadbhav Khudia, Palasia, GP(Top), GP(Bottom), Dahibari/2013/105 dtd. Annapurna CV 471,78,08,000/- 48 months Brindabanpur (Top & Bottom) and Kalimata 28.01.2013 (JV), group of seams at Basantimata Dahibari Patch Ahmadabad. of Dahibari Colliery of CV Area.

3 of 8 Sl. Concerned Date of Name of Award Value Likely Period Name of the Work NIT No. LOA No. No. Area LOA Agency (Rs.) of Contract 49 Hiring of HEMM for removal of OB, BCCL/GM(CMC)/F-HEMM- BCCL/GM(CMC)/F- 28-01-2013 M/s Sadbhav- extraction and transportation of coal from XI, OS/2012/832 dtd. 10.08.2012 LOA/HEMM Vishnushiva IX/X, VIIIC, VIIIB, VIIIA & V/VI/VII seams Govindpur Maheshpur/2013/106 210,49,03,000/- 60 months JV, of Patch F-1 of Maheshpur Colliery of dtd. 28.01.2013 Ahmedabad. Govindpur Area. 50 Hiring of HEMM for removal of OB, BCCL/GM(CMC)/F-HEMM- BCCL/GM(CMC)/F- 18-03-2013 M/s Mahalaxmi extraction and transportation of coal from OS/2012/1126 dtd. LOA/HEMM Infracontract VIIIA, VIII(Top), VIII(Bot), VII, V/VI & IV 06.11.2012 Katras Kumarijore/2013/375 124,04,04,200/- 36 months Pvt. Ltd., seams of Kumarijore Patch of AKWMC of dtd. 18.03.2013 Ahmedabad. Katras Area. 51 Hiring of HEMM for removal of OB, BCCL/GM(CMC)/F-HEMM- BCCL/GM(CMC)/F- 18-03-2013 extraction and transportation of coal from IX, OS/2012/1173 dtd. LOA/HEMM M/s Sanjay VIIIC, VIIIB, VIIIA, VII & V/VI seams of 14.11.2012 Katras Salanpur/2013/376 dtd. Udyog Pvt. 16,56,16,000/- 24 months Patch-II of Salanpur Collilery of Katras Area. 18.03.2013 Ltd., Dhanbad.

52 Hiring of HEMM for removal of OB, BCCL/GM(CMC)/F-HEMM- BCCL/GM(CMC)/F- 08-05-2013 extraction and transportation of coal with OS/2012/1218 dtd. LOA/HEMM M/s Susi firefighting from XIV, XIII, XI/XII & X 28.11.2012 Bhowrah(N)/2013/606 Logistic's Pvt. EJ Area 49,31,53,000/- 36 months seams of Patch C-1 beneath and along BCB dtd. 08.05.2013 Ltd. JV, siding No. 5&6 of Bhowrah (N) Colliery of EJ Hyderabad. Area. 53 Hiring of HEMM for removal of OB, BCCL/GM(CMC)/F-HEMM- BCCL/GM(CMC)/F- 08-05-2013 extraction and transportation of coal from OS/2012/1133 dtd. LOA/HEMM M/s RK Mining XIV, XIII/XII & XI seams of 3rd Patch of EB 07.11.2012 PB Kenduadih/2013/605 Pvt. Ltd., 9,28,99,500/- 18 months Section of Kenduadih Colliery of PB Area. dtd. 08.05.2013 Hyderabad.

54 Hiring of HEMM for removal of OB, BCCL/GM(CMC)/F-HEMM- BCCL/GM(CMC)/F- 08-06-2013 Kamladityya extraction and transportation of coal from III, OS/2012/1172 dtd. LOA/HEMM East Construction II(Top), II(Mid) & II(Top & Mid) seams of 14.11.2012 Kusunda Bassuria/2013/786 dtd. 29,17,90,000/- 30 months Pvt. Ltd., Patch-A of East Bassuria Colliery of Kusunda 08.06.2013 Bokaro Area. 55 Hiring of HEMM for removal of OB, BCCL/GM(CMC)/F-HEMM- BCCL/GM(CMC)/F- 17-07-2013 extraction and transportation of coal from OS/2013/427 dtd. 01.04.2013 LOA/HEMM M/s RK Mining XI/XII, X, IX, VIIIC, VIIIA, VII, V/VI and Govindpur Akashkinaree/2013/1031 Pvt. Ltd., 248,29,12,000/- 72 months IV(Top) seams at Patch-B of New dtd. 17.07.2013 Hyderabad. Akashkinaree Colliery of Govindpur Area. 56 Hiring of HEMM for removal of OB, BCCL/GM(CMC)/F-HEMM- BCCL/GM(CMC)/F- 17-07-2013 M/s Dhansar extraction and transportation of coal with OS/2013/428 dtd. 01.04.2013 LOA/HEMM Kusunda Engg. Co. Pvt. 26,00,10,100/- 12 months firefighting from XI/XII seams of Patch-C of Ena/2013/1030 dtd. Ltd., Dhanbad. Ena OCP of Kusunda Area. 17.07.2013 57 Hiring of HEMM for removal of OB, BCCL/GM(CMC)/F-HEMM- BCCL/GM(CMC)/F- 24-08-2013 M/s Shaili extraction and transportation of coal with OS/2013/553 dtd. 24.04.2013 LOA/HEMM Block- Paradigm firefighting from XI/XII, VIIIC/IX/X, VIIIB, II/2013/1188 dtd. Block-II Infratech Pvt. 350,10,34,000/- 60 months VIIIA, VIII and V/VI/VII seams at Crusher- 24.08.2013 Ltd., III Patch of Block-II OCP of Block-II Area. Hyderabad. 58 Hiring of HEMM for removal of OB, BCCL/GM(CMC)/F-HEMM- BCCL/GM(CMC)/F- 21-10-2013 M/s Mahalaxmi extraction and transportation of coal from III, OS/2012/1219 dtd. LOA/HEMM NT- Infracontract Lodna 145,83,96,000/- 48 months II(T), II(B) & I seams of Patch-E of NT-ST 28.11.2012 ST/2013/1458 dtd. Pvt. Ltd., Colliery of Lodna Area. 21.10.2013 Ahmedabad. 59 Hiring of HEMM for removal of OB, BCCL/GM(CMC)/F-HEMM- BCCL/GM(CMC)/F- 21-10-2013 M/s UPB- extraction and transportation of coal from XV OS/2013/433 dtd. 02.04.2013 LOA/HEMM PB Karan (JV), 12,69,88,000/- 24 months seam of 6/15 Patch of Khaira Section of Kenduadih/2013/1457 Ranchi. Kenduadih Colliery of PB Area. dtd. 21.10.2013 60 Hiring of HEMM for removal of OB, BCCL/GM(CMC)/F-HEMM- BCCL/GM(CMC)/F- extraction and transportation of coal with OS/2013/438 dtd. 03.04.2013 LOA/HEMM M/s Saakar- firefighting in dumped loose OB from Kusunda Godhur/2013/1613 dtd. 22-11-2013 Saraswati JV, 186,00,15,600/- 60 months V/VI/VII/VIII seams at Patch-A of Godhur 22.11.2013 Ahmedabad. Colliery of Kusunda Area. 61 Hiring of HEMM for removal of OB, BCCL/GM(CMC)/F-HEMM- BCCL/GM(CMC)/F- 22-11-2013 M/s Sadbhav extraction and transportation of coal from OS/2013/953 dtd. 02.07.2013 LOA/HEMM Dhansar- Engineering Kusunda 302,99,29,000/- 60 months IV(B), III, II, I(T) & I(B) seams of Patch-J of J/2013/1614 dtd. Ltd., Dhansar Colliery of Kusunda Area. 22.11.2013 Ahmadabad. 62 Hiring of HEMM for removal of OB, BCCL/GM(CMC)/F-HEMM- BCCL/GM(CMC)/F- 31-12-2013 extraction and transportation of coal with OS/2013/1094 dtd. LOA/HEMM Gaslitand- M/s RK firefighting from XVI(T), XVI(B), XV(T), 31.07.2013 Katras II/2013/1787 dtd. Transport Co., 208,20,97,435/- 24 months XV(B), XIV & XIII seams of Patch-II of 31.12.2013 Durg, CG. Gaslitand Colliery of Katras Area. 63 Hiring of HEMM for removal of OB, BCCL/GM(CMC)/F-HEMM- BCCL/GM(CMC)/F- 20-01-2014 extraction and transportation of coal from OS/2013/1129 dtd. LOA/HEMM M/s SUPL-BLA XIV, XIII, XI/XII, IX/X, X & IX seams of 3 14.08.2013 EJ Area Bhowrah(S)-3 Pit Infra JV, 155,21,12,000/- 63 months Pit West OCP of Bhowrah (S) Colliery of EJ West/2014/1878 dtd. Kolkata. Area. 20.01.2014 64 Hiring of HEMM for removal of OB, BCCL/GM(CMC)/F-HEMM- BCCL/GM(CMC)/F- 27-01-2014 extraction and transportation of coal with OS/2013/1073 dtd. LOA/HEMM Sendra M/s Saakar- firefighting from X, IX, VIIIA, VIII, VII, 27.07.2013 Bansjora-Patch- Sijua Area Mass JV, 387,78,36,109/- 72 months V/VI(comb), IV(T) and IV(B) seams of Patch- X/2014/1909 dtd. Ahmedabad. X of Sendra Bansjora Colliery of Sijua Area 27.01.2014 including diversion of Nagri Jore.

4 of 8 Sl. Concerned Date of Name of Award Value Likely Period Name of the Work NIT No. LOA No. No. Area LOA Agency (Rs.) of Contract 65 Hiring of HEMM for removal of OB, BCCL/GM(CMC)/F-HEMM- BCCL/GM(CMC)/F- 24-02-2014 extraction and transportation of coal with OS/2013/946 dtd. 01.07.2013 LOA/HEMM Mega M/s Sadbhav firefighting from VIIIC, VIIIA, VIII & VII Project Engineering Katras 258,42,10,988/- 36 months seams of AKWMC of Katras Area and Katras/2014/1994 dtd. Ltd., Tetulmari Colliery of Sijua Area named as 24.02.2014 Ahmadabad. "Mega Project" of Katras Area. 66 Hiring of HEMM for removal of OB, BCCL/GM(CMC)/F-HEMM- BCCL/GM(CMC)/F- 25-09-2014 extraction and transportation of coal from OS/2014/2231 dtd. LOA/HEMM Jeenagora VIII, VII, V/VI, IV(Top), IV(Bot), III, 15.05.2014 Patch-F/2014/3045 dtd. AT-Devprabha Lodna 452,17,12,300/- 60 months II(Top), II(Bot) and I seams of Patch-F of 25.09.2014 (JV), Dhanbad. Jeenagora Colliery, a part of NT-ST (expansion) Project of Lodna Area. 67 Hiring of HEMM for removal of OB, BCCL/GM(CMC)/F-HEMM- BCCL/GM(CMC)/F- 25-09-2014 extraction and transportation of coal with OS/2014/2169 dtd. LOA/HEMM Kankee M/s Dhansar firefighting from XV, XIV & XIII seams of 25.09.2014 Sijua Area Patch-A/2014/3044 dtd. Engg. Co. Pvt. 1,24,09,09,180.70 36 months Patch-A of Kankanee Colliery of Sijua Area. 25.09.2014 Ltd., Dhanbad.

68 Hiring of HEMM for removal of OB, BCCL/GM(CMC)/F-HEMM- BCCL/GM(CMC)/F- 25-09-2014 Oriental extraction and transportation of coal from III, OS/2014/2139 dtd. LOA/HEMM Nichitpur Structural II (Top) & II(Middle) seams of Patch-A of 22.04.2014 Sijua Area Patch-A/2014/3043 dtd. Engineers Pvt. 1,64,07,42,537.50 48 months Nichitpur Colliery of Sijua Area. 25.09.2014 Ltd., New Delhi. 69 Hiring of HEMM for removal of OB, BCCL/GM(CMC)/F-HEMM- BCCL/GM(CMC)/F- Oriental extraction and transportation of coal from OS/2014/2130 dtd. LOA/HEMM Structural XI/XII, X, IX, VIIIC, VIIIB, VIIIA, VII, V/VI 19.04.2014 Govindpur Akashkinaree Patch- 25-09-2014 Engineers Pvt. 378,18,86,259/- 72 months and IV(Top) seams at Patch-B of New B/2014/3042 dtd. Ltd., New Akashkinaree Colliery of Govindpur Area. 25.09.2014 Delhi. 70 Hiring of HEMM for removal of OB, BCCL/GM(CMC)/F-HEMM- BCCL/GM(CMC)/F- 10-10-2014 extraction and transportation of coal from OS/2013/1093 dtd. LOA/HEMM Patch-K AT-DEV PL Kusunda 28,98,59,698/- 36 months V/VI/VII/VIII seams of Patch-K of Dhansar 31.07.2013 Dhansar/2014/3100 dtd. (JV), Dhanbad. Colliery of Kusunda Area. 10.10.2014 71 Hiring of HEMM for removal of OB, BCCL/GM(CMC)/F-HEMM- BCCL/GM(CMC)/F- 05-11-2014 extraction and transportation of coal with OS/2014/2660 dtd. LOA/HEMM M/s Dhansar firefighting from XV to XI seams of Central 04.08.2014 Gopalichuk Phase- PB Engg. Co. Pvt. 2,31,76,45,987.50 36 months Kirkend & West Gopalichuck Section OC I/2014/3288 dtd. Ltd., Dhanbad. Patch, Phase-I of Gopalichuck Colliery of PB 05.11.2014 Area. 72 Hiring of HEMM for removal of OB, BCCL/GM(CMC)/F-HEMM- BCCL/GM(CMC)/F- 05-11-2014 extraction and transportation of coal from OS/2014/2569 dtd. LOA/HEMM M/s Dhansar VIIIA, VIIIT, VIIIB, VII, V/VI, IV & III 19.07.2014 Katras Kumarijore Engg. Co. Pvt. 174,00,73,353/- 36 months seams of Kumarijore Patch of AKWMC of Patch/2014/3287 dtd. Ltd., Dhanbad. Katras Area. 05.11.2014 73 Hiring of HEMM for removal of OB and BCCL/GM(CMC)/F-HEMM- BCCL/GM(CMC)/F- 05-11-2014 Jhama, extraction and transportation of coal OS/2014/2346 dtd. LOA/HEMM VINIRRMAA- from XI/XII, VIIIC/IX/X, VIIIB, VIIIA, VIII, 07.06.2014 Kalimandir Patch- Block-II SCKC (JV), 219,85,15,202/- 36 months V/VI,VII & IVB/IVT/V/VI/VII seams of Kali III/2014/3286 dtd. Hyderabad. Mandir Patch-III of Block-II Mine of Block-II 05.11.2014 Area. 74 Hiring of HEMM for removal of OB, BCCL/GM(CMC)/F-HEMM- BCCL/GM(CMC)/F- extraction and transportation of coal from OS/2014/2341 dtd. LOA/HEMM BGR Mining & IV(B), III(T), III(B), II(B) and I (combined) 06.06.2014 Bastacolla Dobari/2014/3285 dtd. 05-11-2014 Infra Pvt. Ltd., 1054,33,17,000/- 72 months seams of OC Patch of Dobari Colliery of 05.11.2014 Hyderabad. Bastacolla Area. 75 Hiring of HEMM for removal of OB, BCCL/GM(CMC)/F-HEMM- BCCL/GM(CMC)/F- 05-11-2014 extraction and transportation of coal from OS/2014/2305 dtd. LOA/HEMM Borira Mahalaxmi Laikdih (Top), Laikdih (Middle), Laikdih 03.06.2014 Patch/2014/3284 dtd. Infracontract CV 380,71,59,300/- 36 months (Bottom), L-10, Salanpur-C and Salanpur-D 05.11.2014 Pvt. Ltd., seams of Borira OC Patch of Damagoria Ahmedabad. Colliery of CV Area. 76 Hiring of HEMM for removal of OB, BCCL/GM(CMC)/F-HEMM- BCCL/GM(CMC)/F- 05-11-2014 extraction and transportation of coal from XI, OS/2014/2236 dtd. LOA/HEMM DECO-AMPL- X, VIIIC, VIIIA, VIII(Top), VIII(Bot), VII, 16.05.2014 Kantapahari Patch- Katras BKB (JV), 805,87,18,182/- 96 months V/VI, IV and III Seams of Kantapahari Patch- II/2014/3283 dtd. Dhanbad. II of AKWMC Colliery and AARC of Katras 05.11.2014 Area. 77 Hiring of HEMM for removal of OB, BCCL/GM(CMC)/F-HEMM- BCCL/GM(CMC)/F- 05-11-2014 Saisree extraction and transportation of coal with OS/2014/2140 dtd. LOA/HEMM Patch-A N Engineers Pvt. firefighting from IX/X, L-II, VIIIA, V/VI/VII 22.04.2014 Lodna Tisra/2014/3282 dtd. 155,89,16,470/- 30 months Ltd., and V/VI/VII/VIII seams at North Tisra Patch- 05.11.2014 Hyderabad. A of Lodna Area. 78 Hiring of HEMM for removal of OB, BCCL/GM(CMC)/F-HEMM- BCCL/GM(CMC)/F- 02-12-2014 extraction and transportation of coal from OS/2013/1129 dtd. LOA/HEMM 3 Pit West AT-DEV PL XIV, XIII, XI/XII, IX/X, X & IX seams of 3 14.08.2013 EJ Area Bhowrah(S)/2014/3442 154,95,77,800/- 63 months (JV), Dhanbad. Pit West OCP of Bhowrah (S) Colliery of EJ dtd. 02.12.2014 Area. 79 Hiring of HEMM for removal of OB, BCCL/GM(CMC)/F-HEMM- BCCL/GM(CMC)/F- 18-12-2014 extraction and transportation of coal with OS/2014/2741 dtd. LOA/HEMM Crusher Shaili Infra firefighting from VIIIB, VIIIA, VIII & 14.08.2014 Block-II Patch-IIA Block- Ltd., 101,64,63,045/- 24 months V/VI/VII seams of Crusher Patch-IIA of II/2014/3478 dtd. Hyderabad. Block-II Mine of Block-II Area. 18.12.2014

5 of 8 Sl. Concerned Date of Name of Award Value Likely Period Name of the Work NIT No. LOA No. No. Area LOA Agency (Rs.) of Contract 80 Hiring of HEMM for removal of OB, BCCL/GM(CMC)/F-HEMM- BCCL/GM(CMC)/F- 18-12-2014 extraction and transportation of coal with OS/2014/2730 dtd. LOA/HEMM Choitodih Hilltop-BKB firefighting from XVIH, XVIE, XVIC, 13.08.2014 Katras Patch-A/2014/3477 dtd. 3,21,02,68,904.83 60 months (JV), Dhanbad. XVIA/XVI & XV seams of Patch-A of Katras 18.12.2014 Choitodih Colliery of Katras Area. 81 Hiring of HEMM for removal of OB, BCCL/GM(CMC)/F-HEMM- BCCL/GM(CMC)/F- 18-12-2014 Mahalaxmi extraction and transportation of coal from L- OS/2014/2471 dtd. LOA/HEMM Chaptoria Infracontract 11, L-10, Salanpur-C and Salanpur-D seams 30.06.2014 CV Area OC Patch/3476 dtd. 186,20,10,296/- 24 months Pvt. Ltd., of Chaptoria OC Patch of Damagoria Colliery 18.12.2014 Ahmedabad. of CV Area. 82 Hiring of HEMM for removal of OB, BCCL/GM(CMC)/F-HEMM- BCCL/GM(CMC)/F- 18-12-2014 extraction and transportation of coal from XI, OS/2014/2375 dtd. LOA/HEMM Patch F-1 Ambey Mining IX/X, VIIIC, VIIIB, VIIIA & V/VI/VII seams 11.06.2014 Govindpur Maheshpur/2014/3475 Pvt. Ltd., 320,62,56,117/- 60 months of Patch F-1 of Maheshpur Colliery of dtd. 18.12.2014 Kolkata. Govindpur Area. 83 Hiring of HEMM for removal of OB, BCCL/GM(CMC)/F-HEMM- BCCL/GM(CMC)/F- 06-02-2015 extraction and transportation of coal from OS/2014/3031 dtd. LOA/HEMM Gondudih VIII, V/VI(Top), V/VI(Bot), IV(Top), 23.09.2014 Kusunda/2015/158 dtd. AMR IV(Bot), III, II(T+M), II(T) and II(Mid) Kusunda 06.02.2015 Limited, 3,45,92,13,505.46 36 months seams of Patch-Q, part Patch-N and part Patch- Hyderabad. P of Gondudih Colliery of Kusunda Area.

84 Hiring of HEMM for removal of OB, BCCL/GM(CMC)/e-Tender/F- BCCL/GM(CMC)/F- 09-04-2015 Kandla Projects extraction and transportation of coal from III, HEMM-OS/2014/2977 dtd. LOA/HEMM Patch A-2 Pvt. Ltd., I & L-1 seams of OC Patch-A2 at Ghutway 09.09.2014 Barora Damoda/2015/461 dtd. 44,86,26,870/- 24 months Gandhidham, section of Damoda Colliery of Barora Area. 09.04.2015 GJ. 85 Hiring of HEMM for removal of OB, BCCL/GM(CMC)/F-HEMM- BCCL/GM(CMC)/F- 09-04-2015 extraction and transportation of coal with OS/2014/3449 dtd. LOA/HEMM Patch/ Libra Business firefighting from XA and IX/X seams of Patch-05.12.2014 Lodna Patch-C Pvt. Ltd., 36,55,97,970/- 18 months C of Kujama Colliery of Lodna Area. Kujama/2015/460 dtd. Dhanbad. 09.04.2015 86 Hiring of HEMM for removal of OB, BCCL/GM(CMC)/e-Tender/F- BCCL/GM(CMC)/F- 30-04-2015 extraction and transportation of coal with HEMM-OS/2014/2742 dtd. LOA/Patch-B NT-ST Avinash firefighting from IX/X, VIIIA, VIII, V/VI/VII, 14.08.2014 OCP Lodna/2015/583 Lodna Transport, 679,05,80,000/- 108 months VII, V/VI, IV(Top) & IV(Bot) seasms of dtd. 30.04.2015 Dhanbad. Patch-B of NT-ST OCP of Lodna Area, BCCL. 87 Hiring of HEMM for removal of OB, BCCL/GM(CMC)/e-Tender/F- BCCL/GM(CMC)/F- 30-05-2015 extraction and transportation of coal from V, HEMM-OS/2015/310 dtd. LOA/Patch-X ASP Coll GTS DECO JV, IV(Top), IV(Bot), III(Top) and III (Bot) 09.03.2015 EJ Area EJ Area/2015/745 dtd. 36,70,98,440/- 730 days Dhanbad. seams of Patch-X of Amalgamated - 30.05.2015 Patherdih Colliery of EJ Area. 88 Hiring of HEMM for removal of OB, BCCL/GM(CMC)/e-Tender/F- BCCL/GM(CMC)/F- 30-05-2015 extraction and transportation of coal from IV HEMM-OS/2015/311 dtd. LOA/H-HEMM Libra Business (Top), IV(Bot), III, II(Top), II(Mid) and 09.03.2015 Patch/Patch-B_East Kusunda Pvt. Ltd., 179,88,37,036/- 1460 days II(Top+Mid) seams of Patch-B of East Bassuriya_Kusunda/201 Dhanbad. Bassuriya Colliery of Kusunda Area. 5/744 dtd. 30.05.2015

89 Hiring of HEMM for removal of OB, BCCL/GM(CMC)/e-Tender/F- BCCL/GM(CMC)/F- extraction and transportation of coal with HEMM-OS/2015/312 dtd. LOA/H-HEMM/Patch- firefighting from XIV, XIII, XI/XII, XII, XI, 09.03.2015 DE_Mega M/s R.K. IX/X, VIIIA, V/VI/VII/VIII, IV(T), IV(B), Project_Kusunda/2015/7 Kusunda 30-05-2015 Transport Co., 2043,53,93,000/- 2555 days III, II, I(T) and I(B) seams at Patch-DE (Mega 43 dtd. 30.05.2015 Durg, CG. Project) of Dhansar-Ena Colliery of Kusunda Area along with crushing of coal by portable crusher. 90 Hiring of HEMM for removal of OB, BCCL/GM(CMC)/e-Tender/F- BCCL/GM(CMC)/F- 30-05-2015 extraction and transportation of coal from HEMM-OS/2015/313 dtd. LOA/H-HEMM/Incline M/s R.K. seams III, II, I & L-1 at Incline Patch of 09.03.2015 Barora Patch_Albion_Damoda_ Transport Co., 1,08,02,25,841.15 1095 days Albion Section of Damoda Colliery, Barora Barora/2015/742 dtd. Durg, CG. Area. 30.05.2015 91 Hiring of HEMM for removal of OB, BCCL/GM(CMC)/e-Tender/F- BCCL/GM(CMC)/F- 13-06-2015 extraction and transportation of coal with HEMM-OS/2015/314 dtd. LOA/Mega Patch- M/s Sushee firefighting from XVA, XV, XIVA, XIV, 09.03.2015 D_Joyrampur_Lodna Lodna Infra Pvt. Ltd., 4194,60,80,377/- 2920 days XIIIB, XIIIA, XIII, XI/XII, XA & IX/X seam Area/2015/818 dtd. Hyderabad. of Mega Patch-D of Joyrampur Colliery, 13.06.2016 Lodna Area. 92 Hiring of HEMM for removal of OB, BCCL/GM(CMC)/e-Tender/F- BCCL/GM(CMC)/F- 11-12-2015 Oriental extraction and transportation of coal from HEMM-OS/2015/846 dtd. LOA/Patch-B_Block- Structural XI/XII, IX/X, VIIIB, VIIIA & V/VI/VII 17.06.2015 IV/2015/1465 dtd. Govindpur Engineers Pvt. 254,03,77,340/- 2555 days Seams of OC Patch-B of Amalgamated Block- 11.12.2015 Ltd., New IV Govindpur Colliery of Govindpur Area. Delhi. 93 Hiring of HEMM for removal of OB, BCCL/GM(CMC)/e-Tender/F- BCCL/GM(CMC)/F- 11-12-2015 extraction and transportation of coal from HEMM-OS/2015/936 dtd. LOA/Patch- M/s Dhansar XI/XII, IX/X, VIIIA, VIIIB, VIIIC & 06.07.2015 B_Phularitand/2015/146 Barora Engg. Co. Pvt. 455,92,30,715/- 2190 days V/VI/VII Seams (including land acquisition) 4 dtd. 11.12.2015 Ltd., Dhanbad. of leftout OC Patch-B of Phularitand Colliery of Barora Area.

6 of 8 Sl. Concerned Date of Name of Award Value Likely Period Name of the Work NIT No. LOA No. No. Area LOA Agency (Rs.) of Contract 94 Hiring of HEMM for removal of OB, Jhama, BCCL/GM(CMC)/e-Tender/F- BCCL/GM(CMC)/F- 30-01-2016 Integral extraction and transportation of coal from HEMM-OS/2015/1075 dtd. LOA/Kalimandir Patch Construction VIIIB, VIIIA, VIII, V/VI/VII & 19.08.2015 II(A)_Block-II/2016/66 Block-II Company India 64,47,44,801.60 730 days IVB/IVT/V/VI/VII seams of Kali Mandir dtd. 30.01.2016 Pvt. Ltd., Patch-II(A) of Block-II OCP of Block-II Area. Vijayawada. 95 Hiring of HEMM for removal of OB, BCCL/GM(CMC)/e-Tender/F- BCCL/GM[CMC]/F- 12-03-2018 extraction and transportation of Coal with HEMM-OS/2015/ 959 dtd. LOA/S.Jharia OC Patch M/s AMR- firefighting from VIIIA, V/VI/VII/VIII, 11/07/2015 _ROCP_Bastacolla/2018 Devprabha Bastacolla 803,42,77,602/- 1825 days IV(Top), IV(Bot), III(Top), III(Bot), II(Bot), /117 dtd. 12.03.2018 Consortium, I(Top) & I(Bot) seams of South Jharia OC Hyderabad. Patch of ROCP of Bastacolla. 96 Hiring of HEMM for removal of OB, BCCL/CMC/e-Tender/F- BCCL/CMC/F- 04-05-2018 extraction and transportation of Coal with fire-HEMM-OS/2017/488 dtd. LOA/Patch C Godhur BPPL-UCC fighting from IX/X, X, IX, VIIIA, VII/VIII & 02.12.2017 Kusunda Kusunda 228,03,91,796/- 1460 days (JV), Kolkata. V/VI seams of Patch-C of New Godhur- Kusunda/2018/268 dtd. Kusunda Colliery, Kusunda Area 04.05.2018 97 Hiring of HEMM for removal of OB, BCCL/CMC/e-Tender/F- BCCL/CMC/F- 04-05-2018 extraction and transportation of Coal with fire-HEMM-OS/2017/492 dtd. LOA/Tetulmari Patch A Hilltop Hirise fighting from XIII, XII, XI, X, VIIIC, VIIIA, 04.12.2017 Mudidih Sijua/2018/269 Sijua Area Pvt. Ltd., 3,92,86,31,762.50 1825 days VIII & VII seams of Tetulmuri (Patch-A) of dtd. 04.05.2018 Kolkata. Mudidih Colliery, Sijua Area, BCCL

98 Hiring of HEMM for removal of OB, BCCL/CMC/e-Tender/F- BCCL/CMC/F-LOA/NC 15-05-2018 BGR Mining 390,55,23,030/- 2190 days extraction and transportation of Coal from HEMM-OS/2018/72 dtd. Patch- and Infra Ltd., IV(T),IV(B),III(T),III(B) seams of NC Patch 12/02/2018 Bastacolla II_Kuya_Bastacolla/201 Hyderabad. II of Kuya OCP of Bastacolla Area , BCCL. 8/301 dtd. 15.05.2018

99 Hiring of HEMM for removal of OB and BCCL/CMC/e-Tender/F- BCCL/CMC/F- 15-05-2018 Jhama, extraction and transportation of Coal HEMM-OS/2017/493 dtd. LOA/Patch7- KC HHPL JV, PB 14,43,06,833/- 730 days from XVA & XV seams of Patch 7/15 of 05.12.2017 15_Kenduadih_PB/2018 Dhanbad. Kenduadih Colliery of PB Area. /300 dtd. 15.05.2018 100 Hiring of HEMM for removal of OB, BCCL/CMC/e-Tender/F- BCCL/CMC/F- 13-06-2018 Hilltop Hirise extraction and transportation of Coal with HEMM-OS/2018/73 dtd. LOA/PatchB_Kankanee Sijua Area Pvt. Ltd., 119,44,72,225/- 1095 days firefighting from XV, XIV and XIII seams of 12.02.2018 _Sijua/2018/386 dtd. Kolkata. Patch B of Kankanee colliery of Sijua Area. 13.06.2018 101 Hiring of HEMM for removal of OB, BCCL/CMC/e-Tender/F- BCCL/CMC/F- 14-07-2018 extraction and transportation of Coal with HEMM-OS/2018/196 dtd. LOA/Patch Hilltop Hirise firefighting from XII & XI seam of Patch C of 19.04.2018 Sijua Area C_Kankanee_Sijua/2018 Pvt. Ltd., 57,60,06,980/- 548 days Kankanee Colliery of Sijua Area. /474 dtd. 14.07.2018 Kolkata.

102 Hiring of HEMM for removal of OB, BCCL/CMC/e-Tender/F- BCCL/CMC/F- 03-08-2018 extraction and transportation of Coal from V, HEMM-OS/2018/302 dtd. LOA//Patch GTS Coal IV(T), IV(B) and III seams of COCP Patch X- 16.05.2018 EJ Area XI_ASP_EJ/2018/513 18,58,67,296/- 365 days Sales, Dhanbad. 1 (extension of COCP Patch-X) of ASP dtd. 03.08.2018 Colliery of E.J. Area. 103 Hiring of HEMM for removal of OB, BCCL/CMC/e-Tender/F- BCCL/CMC/F- 09-11-2018 extraction and transportation of Coal from HEMM-OS/2018/396 dtd. LOA/East Avinash Salanpur C and Salanpur D seam of East 16.06.2018 CV Area Ramnagar_Damagoria_ Transport, 1,36,24,20,056.51 913 days Ramnagar Patch of Damagoria Colliery of CV/2018/722 dtd. Dhanbad. C.V. Area. 09.11.2018 104 Hiring of HEMM for removal of OB, BCCL/CMC/e-Tender/F- BCCL/CMC/F- 30-01-2019 Devprabha extraction and transportation of Coal with fire-HEMM-OS/2018/580 dtd. LOA/Patch4A_Bhowra( Construction fighting from XIV, XIII, XI/XII, X & IX 05.09.2018 EJ Area South)_EJ/2019/62 dtd. 298,19,29,847/- 1460 days Pvt Ltd, Seam OF 4A Patch of Bhowrah (South) 30.01.2019 Dhanbad. Colliery of E.J. Area. 105 Hiring of HEMM for removal of OB, BCCL/CMC/e-Tender/F- BCCL/CMC/HEMM/LO 10-09-2019 Dhansar extraction and transportation of Coal with fire-HEMM-OS/2019/291 dtd. A/Bansdeopur.Sijua/201 Engineering Co. fighting from XIV, XIII, XII, XI, X & IX 25.07.2019 Sijua Area 9/371 dtd. 10.09.2019 71,17,77,030/- 548 days Pvt. Ltd., seams of Bansdeopur Patch, Bansdeopur Kolkata. Colliery of Sijua Area 106 Hiring of HEMM for removal of OB, BCCL/CMC/e- BCCL/CMC/HEMM/LO 24-10-2019 extraction and transportation of Coal with fire-Tender/HEMM/2019/364 dtd. A/Benedih-Block- Dhansar fighting from XIII, XI/XII, VIIIC/IX/X, 05.09.2019 II/2019/442 dtd. Engineering Co. Block-II 2,35,46,28,016.48 1278 days VIIIB, VIIIA seams of Benedih Patch, 24.10.2019 Pvt. Ltd., Amalgamated Block-II OCP of Block-II Area, Kolkata. BCCL. 107 Hiring of HEMM for removal of OB, BCCL/CMC/e- BCCL/CMC/HEMM/LO 24-10-2019 extraction and transportation of Coal with fire-Tender/HEMM/2019/374 dtd. A/Gondudih-Khas- M/s Hilltop fighting from VIIIB, VIIIA, VIII, VII, V/VI, 12.09.2019 Kusunda/2019/443 dtd. Kusunda Hirise Pvt.Ltd., 4,90,83,41,803.78 2190 days IV (Top), IV (Bot), III and II (T+B) seam of 24.10.2019 Kolkata. Patch-R of Gondudih-Khas-Kusunda Colliery, Kusunda Area. 108 Hiring of HEMM for removal of OB and BCCL/CMC/e- BCCL/CMC/HEMM/LO 18-11-2019 extraction and transportation of coal from L- Tender/HEMM/2019/421 dtd. A/Damagoria- M/s AT-JT 10, Laikdih (Bottom), Salanpur-C & Salanpur- 09.10.2019 CV Area CV/2019/487 dtd. (JV), , 61,44,63,556.80 548 days D seam of Borira patch-A of Damagoria 18.11.2019 Dhanbad. Colliery, CV Area, BCCL.

7 of 8 Sl. Concerned Date of Name of Award Value Likely Period Name of the Work NIT No. LOA No. No. Area LOA Agency (Rs.) of Contract 109 Hiring of HEMM for removal of OB, BCCL/CMC/e- BCCL/CMC/HEMM/LO 24.12.2019 extraction and transportation of coal from XV Tender/HEMM/2019/379 A/Gopalichuck- PB Area KC HHPL JV 80,34,52,222.70 913 days seam of Phase-III Patch, Gopalichuck Date:17.09.2019 PB/2019/523 dtd. Colliery, PB Area, BCCL 24.12.2019 110 Hiring of HEMM for removal of OB, BCCL/CMC/e- BCCL/CMC/HEMM/LO 24.12.2019 extraction and transportation of Coal with fire-Tender/HEMM/2019/433 A/COCP/FIRE PATCH- STG Associates fighting from IX/X and VIIIA seams of COCP Date: 15.10.2019 EJ Area A/EJ/2019/524 dtd. 48,04,50,480.35 1095 days JV Fire Patch-A, ASP Colliery of EJ Area, BCCL 24.12.2019

111 Hiring of HEMM for removal of OB, BCCL/CMC/e-Tender/F- BCCL/CMC/HEMM/LO 18.01.2020 extraction and transportation of Coal from HEMM-OS/2019/503, Date: A/Patch-B/Nichitpur Dhansar VIII/VIIIA, VII, V/VI, IV, III and II seams of 03.12.2019 Sijua Colliery/2020/28 dtd. Engineering Co. 2,82,25,88,720.54 1825 days Patch-B, Nichitpur Colliery of Sijua Area, 18.01.2020 Pvt. Ltd. BCCL including diversion of Drain No.2. 112 Hiring of HEMM for removal of OB and BCCL/CMC/e-Tender/F- BCCL/CMC/HEMM/LO 24.03.2020 extraction and transportation of coal with HEMM-OS/2019/497 A/NKGC/Patch- M/s UCC Infra firefighting from IX/X, X, IX, VIIIA, VII/VIII Date:03.12.2019 Kusunda C/Kusunda/2020/121 259,80,77,890/- 2190 days JV & V/VI seams of Patch-C of New Godhur dtd. 24.03.2020 Kusunda Colliery of Kusunda Area 113 Hiring of HEMM for removal of OB, BCCL/CMC/e- BCCL/CMC/HEMM- 07.04.2020 extraction and transportation of Coal from Tender/HEMM/2020/62 33/LOA/PatchX2/EJ/202 M/s STG III(T&B), IV(B), IV(T), VI, VII, VIII and Date:29.01.2020 EJ Area 0/126 dtd. 07.04.2020 90,59,99,534.45 1095 days Associates JV Local seams of Patch-X2 of ASP Colliery, EJ Area, BCCL. 114 Hiring of HEMM for removal of OB, BCCL/CMC/e- BCCL/CMC/H- extraction and transportation of Coal from Tender/HEMM/2020/107 HEMM/LOA/Bastacolla M/s Devprabha Bastacolla IV(T), IV(B), III(T), III(B), and II(B) seams Date:05.03.2020 OCP-I/2020/210 18.06.2020 Construction 4,86,54,60,175.00 1825 days Area of Bastacolla OCP-I of Bastacolla Colliery, Date:18.06.2020 Pvt. Ltd. Bastacolla Area, BCCL. 115 Hiring of HEMM for removal of OB, BCCL/CMC/HEMM/e- BCCL/CMC/H- extraction and transportation of coal from Tender/2020/132 HEMM/LOA/Basantima M/s Bishnu GP(Top & Bottom), BP(Top) and Kalimati Date:15.04.2020 ta-Dahibari/Patch- CV Area 18.06.2020 Transport 28,95,40,708.61 548 days Seams of Basantimata-Dahibari Patch-C of C/CV/2020/209 Company Basantimata-Dahibari Colliery, CV Area, Date:18.06.2020 BCCL. 116 Hiring of HEMM for removal of OB and BCCL/CMC/HEMM/e- BCCL/CMC/H- extraction and transportation of coal from L- Tender/2020/129 HEMM/AAK/LOA/Bori M/s SATYAM- 10, Laikdih (Bottom), Salanpur-C & Salanpur- Date:11.04.2020 CV Area ra Patch-A/Damagoria 30.06.2020 62,23,32,876.00 548 days P&P (JV) D seam of Borira Patch-A of Damagoria Coll. CV/2020/221 Colliery, CV Area, BCCL. Date:30.06.2020 117 Hiring of HEMM for removal of OB, BCCL/CMC/HEMM/e- BCCL/CMC/H- extraction and transportation of coal with fire- Tender/2020/171 HEMM/AAK/LOA/AK M/s BSMCPL- fighting from VII, V/VI, IV & III seam of O C Date:19.05.2020 Katras Area WMC/Tetulmari 31.07.2020 2,65,03,89,024.00 2190 days BEPL JV Tetulmari Patch of AKWMC Colliery of Patch/Katras/2020/253 Katras Area, BCCL. Date:31.07.2020 118 Hiring of HEMM for removal of OB, BCCL/CMC/HEMM/e- BCCL/CMC/H- extraction and transportation of coal with Tender/2020/177 HEMM/AAK/LOA/Patc firefighting from XVIH, XVIE, XVIC, XVIB, Date: 28.05.2020 h B Choitodih/AGKCC M/s Dhansar XVIA/XVI & XV seams of OC Patch B of Katras Area Katras/2020/254 31.07.2020 Engineering Co. 3,99,99,23,063.00 1825 days Katras-Choitodih Section of Amalgamated Date: 31.07.2020 Pvt. Ltd. Gaslitand Katras Choitodih Colliery of Katras Area 119 Hiring of HEMM for removal of OB, BCCL/CMC/H-HEMM/e- BCCL/CMC/H-HEMM- extraction and transportation of Coal with fire-Tender/2020/238 Dated 44/LOA/New M/S Ambey fighting from XIII, XI/XII, VIIIC/IX/X, 16/07/2020 Benidih/Block- Block II 20-10-2020 Mining Private 8,02,26,93,883.82 2190 days VIIIB, VIIIA, VIII & V/VI/VII seams of New II/2020/352 Dtd. Limited Benedih Patch of Amalgamated Block-II 20/10/2020 OCP, Block-II Area of BCCL. 120 Hiring of HEMM for removal of OB, BCCL/CMC/HEMM/e- BCCL/CMC/H-HEMM- extraction and transportation of Coal with Tender/2020/241 Dated 45/LOA/Kujama Patch M/s Devprabha firefighting from IX/X, VIIIA, VIII, V/VI/VII 20/07/2020 G/Lodna/2020/420 Dtd. Lodna 04-12-2020 Construction 5,60,33,03,086.06 2555 days & V/VI/VII/VIII Seams of Kujama OC Hired 04/12/2020 Pvt. Ltd. Patch-G of Lodna Area, BCCL.

121 HEMM for removal of OB, extraction and BCCL/CMC/H-HEMM/e- BCCL/CMC/H-HEMM- transportation of Coal from III, I & L-1 seams Tender/2020/286 Dated 48/LOA/Patch A- of Patch A-3 (Revised) of Old Ghutway 27/08/2020 3(Revised)/Barora/2020/ Barora 04-12-2020 M/s SUPL JV 1,16,51,98,011.56 1095 days section, Damoda Colliery, Barora Area, 421 Dtd. 04/12/2020 BCCL.

8 of 8