McCordsville Bike and Pedestrian Master Plan 1 SUMMARY MCCORDSVILLE BIKE AND PEDESTRIAN MASTER PLAN 2 SUMMARY
City of McCordsville Design Team
Tonya Galbraith - Town Manager Ryan Crum - Director of Planning and Building
Stakeholders CONTEXT DESIGN Maria Bond - Director of Community Relations / Mt. Vernon Schools Project Lead, Landscape Architects Stephanie Miller - Principal / McCordsville Elementary Hancock Flat 50 Member - Joe Mayes, Project Manager Bridgette Cook-Jones - Hancock County Tourism Director - Ben Kay, Project Manager Support Christine Owens - Cumberland Assistant Town Manager & Planner Adam Zaklikowski - Fortville Planning Administrator Steve Long - Hancock Health Randy Sorrell - HEDC Director Flory May - Vernon Township Trustee Mel Branson - Buck Creek Township Trustee Bob Bronson - IN DNR Jason Taylor - Fishers City Engineer Susan Bodkin - County Surveyor CMT Keith Lash - Residential developer - VP Lennar Homes Engineering Tom Willey - Commercial Developer - Reliant Partners Aimee Ector - Business owner - Second Stories - Cassie Reiter, Project Engineer John Jokantas - Resident, trail supporter, County E911 Director - Scott Hanson, Project Planner Anna Gremling - MPO City of Lawrence representative Aletha Dunston - Ft. Ben Re-use Authority Director Joe Mitchell - Executive Minister / Outlook Christian Church Scott McCain - Resident & real estate agent Approval / Signature area Ariel Schoen - Resident & biker Mary Gibble - Hancock Community Foundation Director Mary Anne Wietbrock - Pennsy Trail Group Anna Bergmann Jen Higginbotham - Metropoliatan Planning Organization
Steering Committee
Ann Kloc Brianne Schneckenberger Amanda Everidge Mark Witsman Ron Crider Ryan Crum Tonya Galbraith
3 MCCORDSVILLE BIKE AND PEDESTRIAN MASTER PLAN SUMMARY
Executive Summary
The McCordsville Bike and Pedestrian Master Plan booklet documents the process and proposes a comprehensive system within the town and connecting to adjacent communities and systems.
The Town of McCordsville is fast growing bedroom community outside of Indianapolis and the second largest municipality in Hancock County, Indiana. McCordsville is located in the northwest corner of Hancock County just south of Geist Reservoir, bordering both the City of Lawrence in Marion County and the Town of Fishers in Hamilton County. The town is conveniently located along State Highway 67 and less than 10 minutes from I-70, I-69, I-465 and State Road 234.
Due to the town’s rapid growth and development, the elected officials, town staff and citizens have increasingly voiced interest and support to create a walkable and bikeable vison for the future of the Town of the McCordsville. The design team worked with the Town staff and the Indianapolis Metropolitan Planning Organization to create a this 5 step process to collect, propose and implement the plan:
1. Review the existing facilities, assets, programs and uses for strengths, weaknesses, opportunities and threats to inform the planning process. 2. Empower a public engagement process that is collaborative with the Town Staff, Steering committee, stakeholders, community, schools, neighborhoods, and town leadership in a meaningful, innovative dialogue. 3. Utilize technology and graphics to bring life to the storytelling of the existing conditions, gather information, and present the plan. 4. Envision a bold plan that beautifully balances the safety, maintenance, recreational needs, and access while encouraging the increase of pedestrians and bicyclist in the town. 5. Develop a realistic implementation plan that prioritizes action steps and create strategies, short- and long-term phases, and real-world costs.
The proposed plan for this system includes proposing improvements to 12 main corridors and proposing 6 new greenways. Specifically, here are the goals intended to be accomplished by the implementation of this plan:
• Increase the number of people walking and biking for everyday transportation purposes by creating a trail plan that connects people to destinations. • Increase the number of people walking and biking for recreation by creating a trail plan that provides highly accessible and desirable recreation opportunities. • Provide priorities for future bike/pedestrian projects. • Provide feasibility of multi-use trails along riparian corridors. • Establish safe and functional routes for bicycles and pedestrians between community destinations. • Identify “branded” trails within the system that can have additional interest and design elements and a source of community pride. • Recommend policy changes and action steps for a successful implementation.
MCCORDSVILLE BIKE AND PEDESTRIAN MASTER PLAN 4 2 PUBLIC INPUT MCCORDSVILLE BIKE AND PEDESTRIAN MASTER PLAN 6 PUBLIC INPUT
Summary
Public Engagement Events
The design team attended and organized a variety of methods to gain public imput on the McCordsville Bike and Pedestrian Master Plan. Two of the plan’s overall goals specifically relate to the public engagement:
1. Empower a public engagement process that is collaborative with the Town Staff, Steering committee, stakeholders, community, schools, neighborhoods, and town leadership in a meaningful, innovative dialogue. 2. Utilize technology and graphics to bring life to the storytelling of the existing conditions, gather information, and present the plan.
To meet these goals, the design team utilized the following means to engage the public and display the design process: • Steering Committee - a group of town staff, town officials, interest groups and private citizens to help guide the design team. • Stakeholder Group - a group of stakeholders from interest groups, business entities, and adjacent municipalities to provide input and guidance in the overall plan • Pop-up Engagement - our team had a booth at the McCordsville Pathway to Fitness 5K to engage citizens and gather input. • Project Website - provided a 24/7 portal for citizens to visit, see current materials and provide input. • Online Survey - an online survey was published and gathered over 220 results. • Public Approval Process - a public forum to formally adopt the plan for the Town of Mccordsville’s use.
McCordsville Path To Fitness 5k
7 MCCORDSVILLE BIKE AND PEDESTRIAN MASTER PLAN PUBLIC INPUT
Steering Committee Meetings
Website
MCCORDSVILLE BIKE AND PEDESTRIAN MASTER PLAN 8 PUBLIC INPUT
Survey Results McCordsville Bike and Pedestrian Master Plan McCordsville Bike and Pedestrian Master Plan
Q1 When bike and pedestrian facilities are in place, are you more likely to Q2 What do you like MOST about walking and biking in walk or bike within McCordsville?" McCordsville? (Choose 4) Answered: 219 Skipped: 3 Answered: 216 Skipped: 6
100% 100%
80% 80%
60% 60% 40%
40% 20%
20% 0% Good I can The Street Accessi Safe The Conveni I Other network get scenery trees ble neighbo ent don't 0% of to and for rhoods street like Bike Walk Both side... importa shade all cros... to nt... ages... walk...
ANSWER CHOICES RESPONSES ANSWER CHOICES RESPONSES
Bike 19.44% 42 Good network of sidewalk, trails, and paths. 53.42% 117
Walk 25.93% 56 I can get to important destinations and events 21.00% 46 32.88% 72 Both 54.63% 118 The scenery
TOTAL 216 Street trees and shade 33.33% 73
Accessible for all ages and physical capabilities 25.57% 56
Safe 60.27% 132
The neighborhoods 19.18% 42
Convenient street crossings 31.05% 68
I don't like to walk or bike McCordsville 12.79% 28
Other 8.22% 18 Total Respondents: 219
McCordsville Bike and Pedestrian Master Plan McCordsville Bike a2n d/ 2Pe5destrian Master Plan
Q3 How often do you walk or bike from HOME to another destination? Q4 How often do you walk or bike from WORK or SCHOOL to another 1 / 25 destination? Answered: 220 Skipped: 2 Answered: 215 Skipped: 7 100% 100% 80% 80%
60% 60%
40% 40%
20% 20%
0% 0% Six to Four to One to One to I never I never I never Other Six to Four to One to One to I never I never I never Other seven five three three WALK BIKE BIKE or (please seven five three three WALK BIKE BIKE or (please days a days a days a times a from from WALK specify) days a days a days a times a from from WALK specify) week week week month home ... home ... from... week week week month work ... work ... from...
ANSWER CHOICES RESPONSES ANSWER CHOICES RESPONSES 0.47% 1 Six to seven days a week 4.09% 9 Six to seven days a week 3.72% 8 Four to five days a week 10.00% 22 Four to five days a week One to three days a week 4.65% 10 One to three days a week 19.09% 42 One to three times a month 5.58% 12 One to three times a month 25.91% 57 I never WALK from work or school to a destination 8.84% 19 I never WALK from home to a destination 5.00% 11 I never BIKE from work or school to a destination 4.19% 9 I never BIKE from home to a destination 4.09% 9 I never BIKE or WALK from work or school to a destination 64.19% 138 I never BIKE or WALK from home to a destination 20.91% 46 Other (please specify) 8.37% 18 Other (please specify) 10.91% 24 TOTAL 215 TOTAL 220
9 MCCORDSVILLE BIKE AND PEDESTRIAN MASTER PLAN 4 / 25
3 / 25 PUBLIC INPUT
Survey Results McCordsville Bike and Pedestrian Master Plan McCordsville Bike and Pedestrian Master Plan
Q5 Please tell us about the types of WALKING trips you take and how Q6 Please tell us about the types of BIKING trips you take and how often: often: Answered: 218 Skipped: 4 Answered: 221 Skipped: 1 100% 100% 80% 80%
60% 60%
40% 40%
20% 20%
0% 0% I I I I I I I I I I Other I bike I bike I bike I bike I bike I bike I bike I bike I bike Other walk walk walk walk walk walk walk walk walk walk for for to to with to go to to to for the for to to with to to to to exercis leisure school work my shoppin enterta meet parks exe... dog lei... school work my... go ent... mee... par... e or... family g or... inme... friends and... sho... /family
Several times per week Several times per month Several times per week Several times per month Fewer than 1 to 2 times per month N/A Fewer than 1 to 2 times per month N/A
SEVERAL TIMES SEVERAL TIMES FEWER THAN 1 TO 2 N/A TOTAL SEVERAL TIMES SEVERAL TIMES PER FEWER THAN 1 TO 2 TIMES N/A TOTAL PER WEEK PER MONTH TIMES PER MONTH RESPONDENTS PER WEEK MONTH PER MONTH I walk for exercise or 55.35% 26.05% 11.63% 6.98% I bike for exercise or personal 21.96% 22.43% 23.83% 31.78% personal fitness 119 56 25 15 215 fitness 47 48 51 68 214 I walk the dog 40.40% 10.61% 8.08% 40.91% 80 21 16 81 198 I bike for leisure 15.20% 26.47% 27.94% 30.39% 31 54 57 62 204 I walk for leisure 43.20% 28.16% 18.45% 10.68% 89 58 38 22 206 I bike to school 0.00% 1.05% 1.58% 97.37% 0 2 3 185 190 I walk to school 0.00% 0.53% 2.13% 97.34% 0 1 4 183 188 I bike to work 1.05% 0.53% 6.84% 91.58% 2 1 13 174 190 I walk to work 1.08% 0.00% 8.60% 90.32% 2 0 16 168 186 I bike with my family 12.38% 21.78% 24.26% 41.58% I walk with my family 32.68% 31.22% 20.98% 15.61% 25 44 49 84 202 67 64 43 32 205 I bike to go shopping or 3.06% 4.08% 21.94% 70.92% I walk to go shopping or 2.63% 5.79% 20.53% 71.05% errands 6 8 43 139 196 errands 5 11 39 135 190 I bike to entertainment or 3.11% 6.22% 20.73% 69.95% I walk to entertainment or 2.59% 5.18% 27.46% 64.77% restaurants 6 12 40 135 193 restaurants 5 10 53 125 193 I bike to meet friends/family 5.61% 8.67% 21.94% 63.78% I walk to meet friends/family 10.77% 11.28% 23.59% 54.36% 11 17 43 125 196 21 22 46 106 195 I bike to parks and 5.53% 15.08% 26.63% 52.76% I walk to parks and 12.81% 15.76% 28.08% 43.84% recreational amenities 11 30 53 105 199 recreational amenities 26 32 57 89 203 Other 3.36% 2.52% 5.88% 88.24% Other 8.49% 1.89% 4.72% 84.91% 9 2 5 90 106 4 3 7 105 119
5 / 25
6 / 25
MCCORDSVILLE BIKE AND PEDESTRIAN MASTER PLAN 10 PUBLIC INPUT
Survey Results McCordsville Bike and Pedestrian Master Plan McCordsville Bike and Pedestrian Master Plan
Q7 What factors DISCOURAGE WALKING in McCordsville? Select your Q8 What factors DISCOURAGE BIKING in McCordsville? Select your top 3 (1 being the most important reason) top 3 (1 being the most important reason) Answered: 210 Skipped: 12 Answered: 218 Skipped: 4
100% 100%
80% 80%
60% 60% 40% 40% 20% 20% 0% Not Poor Side Side Dest Heav It's Road Poor Pers I I Unat Ther Scho TownOthe 0% enou pave walk walk inat y hard s ligh onal don' don' trac e ol ordi r Not Poor Sidew Sidew Desti Heavy It's Roads Poor Perso Unatt Schoo TownOther gh ment s s ions vehi to and ting safe t t tive are poli nanc enoug pavemalks alks natio vehic hard and light nal racti l ordin c... c... a... a... a... c... c... i... t... f... f... /... n... cy e... h ent and and ns ular to inter ing safet ve/un polic ance co... co... pa... pa... ar... tr... cr... se... y ap... y or...... The first choice Second choice Third choice
The first choice Second choice Third choice THE FIRST SECOND THIRD TOTAL WEIGHTED CHOICE CHOICE CHOICE AVERAGE THE FIRST SECOND THIRD TOTAL WEIGHTED Not enough connected paths and sidewalks 71.74% 14.49% 13.77% CHOICE CHOICE CHOICE AVERAGE 99 20 19 138 1.42
Not enough connected paths and sidewalks 68.32% 15.53% 16.15% Poor pavement conditions 25.00% 55.00% 20.00% 110 25 26 161 1.48 5 11 4 20 1.95
Poor pavement conditions 9.09% 63.64% 27.27% Sidewalks and paths are too close to the road 18.18% 31.82% 50.00% 1 7 3 11 2.18 4 7 11 22 2.32
Sidewalks and paths are too close to the road 17.50% 42.50% 40.00% Sidewalks and paths are too narrow 14.29% 42.86% 42.86% 7 17 16 40 2.23 2 6 6 14 2.29
Sidewalks and paths are too narrow 23.08% 38.46% 38.46% Destinations are too far away to bike to 23.40% 46.81% 29.79% 3 5 5 13 2.15 11 22 14 47 2.06 Heavy vehicular traffic and speeding traffic 33.60% 40.00% 26.40% Destinations are too far away to walk to 33.33% 38.38% 28.28% 42 50 33 125 1.93 33 38 28 99 1.95 It's hard to cross busy roads 18.60% 50.00% 31.40% Heavy vehicular traffic and speeding traffic 24.35% 46.09% 29.57% 16 43 27 86 2.13 28 53 34 115 2.05 Roads and intersections too wide to cross 0.00% 12.50% 87.50% It's hard to cross busy roads 23.47% 40.82% 35.71% 0 1 7 8 2.88 23 40 35 98 2.12 Poor lighting 0.00% 12.50% 87.50% Roads and intersections too wide to cross 5.88% 29.41% 64.71% 0 1 7 8 2.88 1 5 11 17 2.59 Personal safety is a concern - I don't like to bike alone 25.00% 16.67% 58.33% Poor lighting 11.76% 23.53% 64.71% 3 2 7 12 2.33 2 4 11 17 2.53 I don't feel comfortable riding in the road 27.12% 35.59% 37.29% Personal safety is a concern - I don't like to walk alone 21.05% 26.32% 52.63% 16 21 22 59 2.10 4 5 10 19 2.32 I don't feel comfortable riding with young/inexperienced 20.00% 30.00% 50.00% family members McCordsville Bike and Ped4estrian Master 6Plan 10 20 2.30 Unattractive/unappealing scenery (no trees, nothing of 13.51% 32.43% 54.05% interest to explore) 5 12 20 37 2.41 Unattractive/unappealing scenery (no trees, nothing of 16.67% 25.00% 58.33% School policy 0.00% 100.00% 0.00% interest to explore) 4 6 14 24 2.42 McCordsville Bike and Pedestrian Master Plan 0 1 0 1 2.00 There are no places to safely store/lock my bicycle at my 9 / 02.050% 42.86% 57.14% destination 0 6 8 14 2.57 Town ordinance or code 0.00% 0.00% 0.00% 0 0 0 0 0.00 School policy 0.00% 100.00% 0.00% 0 1 0 1 2.00 Other 11.11% 22.22% 66.67% 7 / 25 Town ordinance or code 0.00% 0.00% 0.00% 1 2 6 9 2.56 0 0 0 0 0.00
Other 25.00% 25.00% 50.00% 2 2 4 8 2.25
10 / 25
11 MCCORDSVILLE BIKE AND PEDESTRIAN MASTER PLAN
8 / 25 PUBLIC INPUT
Survey Results McCordsville Bike and Pedestrian Master Plan McCordsville Bike and Pedestrian Master Plan
Q9 What factors ENCOURAGE an increase of WALKING in Q10 What factors ENCOURAGE an increase of BIKING in McCordsville? McCordsville? Select your top 3 (1 being the most important reason) Select your top 3 (1 being the most important reason) Answered: 213 Skipped: 9 Answered: 207 Skipped: 15
100% 100%
80% 80%
60% 60% 40% 40% 20% 20% 0% More Connect More Ameniti Traffic Better Improve A A Other connect ions connect es calming crosswa d change change 0% ed to ed along or lks lightin in in More Connec Bike Places More Amenit Traffi Better Improv A A Other path... larger dest... the... bett... g scho... scho... connec tions rental to connec ies c crossw ed change change netw... ted to or safely ted along calmin alks lighti in in pat... lar... sha... sto... des... the... g ng sch... sch... The first choice Second choice Third choice o...
THE FIRST SECOND THIRD TOTAL WEIGHTED The first choice Second choice Third choice CHOICE CHOICE CHOICE AVERAGE More connected paths and sidewalks 63.06% 19.11% 17.83% THE FIRST SECOND THIRD TOTAL WEIGHTED 99 30 28 157 1.55 CHOICE CHOICE CHOICE AVERAGE
Connections to larger networks outside of McCordsville 19.12% 51.47% 29.41% More connected paths and sidewalks 72.19% 16.56% 11.26% 13 35 20 68 2.10 109 25 17 151 1.39
More connected destinations 24.56% 33.33% 42.11% Connections to larger networks outside of McCordsville 21.59% 53.41% 25.00% 28 38 48 114 2.18 19 47 22 88 2.03
Amenities along the trail and paths (seating, drinking water, 21.43% 46.43% 32.14% Bike rental or share program 31.58% 31.58% 36.84% interpretation signage, fitness nodes) 18 39 27 84 2.11 6 6 7 19 2.05
Traffic calming or better protected paths, trails and sidewalks 35.65% 25.22% 39.13% Places to safely store/lock my bicycle at my destination 8.89% 46.67% 44.44% 41 29 45 115 2.03 4 21 20 45 2.36 Better crosswalks 12.07% 48.28% 39.66% More connected destinations 14.43% 43.30% 42.27% 7 28 23 58 2.28 14 42 41 97 2.28 Improved lighting 12.50% 31.25% 56.25% 2 5 9 16 2.44 Amenities along the trail and paths (seating, drinking water, 14.55% 38.18% 47.27% interpretation signage, fitness nodes) 8 21 26 55 2.33 A change in school/work policy 0.00% 100.00% 0.00% 0 3 0 3 2.00 Traffic calming or better protected paths, trails and sidewalks 36.89% 23.30% 39.81% 38 24 41 103 2.03 A change in school/work facilities (showers, ect) 100.00% 0.00% 0.00% 1 0 0 1 1.00 Better crosswalks 15.15% 42.42% 42.42% 5 14 14 33 2.27 Other 50.00% 16.67% 33.33% 3 1 2 6 1.83 Improved lighting 15.38% 7.69% 76.92% 2 1 10 13 2.62
A change in school/work policy 0.00% 100.00% 0.00% 0 2 0 2 2.00
A change in school/work facilities (bike parking, showers, ect) 0.00% 0.00% 100.00% 0 0 1 1 3.00
Other 0.00% 100.00% 0.00% 11 / 25 0 2 0 2 2.00
12 / 25
MCCORDSVILLE BIKE AND PEDESTRIAN MASTER PLAN 12 PUBLIC INPUT
Survey Results McCordsville Bike and Pedestrian Master Plan McCordsville Bike and Pedestrian Master Plan
Q11 What locations need the most pedestrian and biking improvements? Q12 Enter up to five (5) intersections, streets, corridors, neighborhoods, locations or areas that you would like to become more PEDESTRIAN Answered: 214 Skipped: 8 and/or BICYCLE friendly? (Please be detailed in your description.) 100% Answered: 169 Skipped: 53
80% ANSWER CHOICES RESPONSES
60% Location 1 100.00% 169
Location 2 84.62% 143 40% Location 3 63.31% 107
20% Location 4 36.69% 62
Location 5 17.75% 30 0% Neighb The Inters Bridge Along Rail Near Near Near Connec Other orhood Old ection s major road park school destin tions s Town s street crossi and s ations to nei... and s ngs rec... lar... cro...
Substantial improvements needed Some improvements needed No Improvements needed N/A or Don't know
SUBSTANTIAL SOME NO N/A OR TOTAL WEIGHTED IMPROVEMENTS IMPROVEMENTS IMPROVEMENTS DON'T AVERAGE NEEDED NEEDED NEEDED KNOW Neighborhoods 16.33% 44.90% 31.63% 7.14% 32 88 62 14 196 2.30
The Old Town neighborhood 43.65% 26.90% 4.57% 24.87% 86 53 9 49 197 2.11
Intersections and crosswalks 54.08% 38.27% 4.08% 3.57% 106 75 8 7 196 1.57
Bridges 26.42% 32.12% 8.81% 32.64% 51 62 17 63 193 2.48
Along major streets 63.86% 31.68% 2.97% 1.49% 129 64 6 3 202 1.42
Rail road crossings 56.92% 30.77% 3.59% 8.72% 111 60 7 17 195 1.64
Near park and recreation 29.84% 47.64% 7.85% 14.66% facilities 57 91 15 28 191 2.07 Near schools 26.42% 29.53% 10.88% 33.16% 51 57 21 64 193 2.51
Near destinations 49.48% 33.51% 4.64% 12.37% 96 65 9 24 194 1.80
Connections to larger trail and 56.16% 33.50% 4.93% 5.42% path networks outside of 114 68 10 11 203 1.60 McCordsville Other 20.00% 2.86% 1.43% 75.71% 14 2 1 53 70 3.33 14 / 25
13 / 25
McCordsville Bike and Pedestrian Master Plan McCordsville Bike and Pedestrian Master Plan
Q13 Enter up to five (5) places to bike and walk to within the Town of Q14 Enter up to five (5) places to bike and walk to outside of the Town of McCordsville. McCordsville.
Answered: 139 Skipped: 83 Answered: 137 Skipped: 85
ANSWER CHOICES RESPONSES ANSWER CHOICES RESPONSES Location 1 99.27% 136 Location 1 100.00% 139 Location 2 80.29% 110 Location 2 79.86% 111 Location 3 56.93% 78 Location 3 68.35% 95 Location 4 35.04% 48 Location 4 51.08% 71 Location 5 20.44% 28 Location 5 36.69% 51
13 MCCORDSVILLE BIKE AND PEDESTRIAN MASTER PLAN
16 / 25
15 / 25 PUBLIC INPUT
Survey Results McCordsville Bike and Pedestrian Master Plan McCordsville Bike and Pedestrian Master Plan
Q15 Where do you live? Q16 If you are a McCordsville resident, in what neighborhood or general Answered: 216 Skipped: 6 area do you live?
100% Answered: 196 Skipped: 26
80% 100%
60% 80%
40% 60%
20% 40%
0% McCordsv Outside Hamilton Madison Marion Fishers Lawrence Other 20% ille of County County County/I McCordsv ndianapo ille,... lis 0% WoodVill Bay Deer HighOtheEmerBay GateAust ChamGeis Ston Old Geis Brix CardHampImel McCoRidg Trea haveages CreeCros land r ald Creeway in pion t e Townt ton inal ton Esta rd esto sure ANSWER CHOICES RESPONSES n at k sing Spri Spri k CrosTrac LakeWoodGrov RidgRidg WoodCovetes Poin ne Poin B... ngs ngs East sing e s... e e e s te te McCordsville 87.50% 189
Outside of McCordsville, but in Hancock County 7.87% 17 ANSWER CHOICES RESPONSES
Hamilton County 0.46% 1 Woodhaven 13.78% 27 0.00% 0 Madison County Villages at Brookside 12.76% 25 2.31% 5 Marion County/Indianapolis Bay Creek 12.24% 24 Fishers 0.00% 0 Deer Crossing 12.24% 24 Lawrence 1.85% 4 Highland Springs 8.67% 17 Other 0.00% 0 Other 8.67% 17 TOTAL 216 Emerald Springs 7.65% 15
Bay Creek East 6.63% 13
Gateway Crossing 4.08% 8
Austin Trace 3.57% 7
Champion Lake 3.06% 6
Geist Woods Estates 2.04% 4
Stone Grove 2.04% 4 McCordsville Bike and Pedestrian Master Plan Old Town 1.53% 3
Geist Ridge 1.02% 2 Q17 Where do you work? Brixton Ridge 0.00% 0 Answered: 216 Skipped: 6 Cardinal Woods 0.00% 0 100% Hampton Cove 0.00% 0
80% 17 / 25 Imel Estates 0.00% 0
McCord Pointe McCordsville Bike and Pedestrian 0M.00a%ster Plan 0 60%
Ridgestone 0.00% 0 40% 18 / 25 Treasure Pointe 0.00% 0 20% TOTAL 196
0% McCords Outside Hamilto Madison Marion Lawrenc Fishers Disable Retired Other ville of n County County/ e d McCords County Indiana vill... polis
ANSWER CHOICES RESPONSES
McCordsville 9.26% 20
Outside of McCordsville, but in Hancock County 12.50% 27
Hamilton County 6.48% 14
Madison County 1.39% 3
Marion County/Indianapolis 40.74% 88
Lawrence 5.09% 11
Fishers 5.09% 11
Disabled 0.46% 1
Retired 9.26% 20
Other 9.72% 21 TOTAL 216
20 / 25
MCCORDSVILLE BIKE AND PEDESTRIAN MASTER PLAN 14
19 / 25 PUBLIC INPUT
Survey Results McCordsville Bike and Pedestrian Master Plan McCordsville Bike and Pedestrian Master Plan
Q19 Please indicate your age group Q20 How many children (0- 18 years ) live at your residence? Answered: 217 Skipped: 5 Answered: 218 Skipped: 4
100% 100%
80% 80%
60% 60%
40% 40%
20% 20%
0% 0% Over 3 3 2 1 0 Under 18 18-24 years 25-44 years 45-64 years 65 and older years ANSWER CHOICES RESPONSES
ANSWER CHOICES RESPONSES Over 3 1.84% 4
Under 18 years 0.46% 1 3 11.06% 24
18-24 years 0.46% 1 2 21.20% 46 22.12% 48 25-44 years 48.17% 105 1 43.78% 95 45-64 years 43.58% 95 0 TOTAL 217 65 and older 7.34% 16 TOTAL 218
McCordsville Bike and Pedestrian Master Plan McCordsville Bike and Pedestrian Master Plan
Q21 What is your big idea for the bike and pedestrian plan? Q22 What is the biggest opportunity for the bike and pedestrian plan? Answered: 123 Skipped: 99 Answered: 155 Skipped: 67
23 / 25
22 / 25
25 / 25
24 / 25
15 MCCORDSVILLE BIKE AND PEDESTRIAN MASTER PLAN PUBLIC INPUT
Public Input Conclusions
Public Engagement Conclusions
In conclusion, the public input process was meaningful and guided the design team in the following ways:
• Highlighted known issues and patterns of use within the town that are not readily visible by site visits. • Confirmed problem areas and use patterns that the design team noted. • Provided insights into the community’s culture and opinions of the how the plans would be received. • Confirmed interest from the community to create an improved system within the town. • Helped define destinations, high-use corridors and connection needs to surrounding communities. • Identified priority needs within the system. • Defined the best bicycle facilities to be successfully adopted and used within the community.
This input helped guide the design team and develop the existing conditions and proposed conditions displayed in the following chapters.
MCCORDSVILLE BIKE AND PEDESTRIAN MASTER PLAN 16 3 EXISTING CONDITIONS MCCORDSVILLE BIKE AND PEDESTRIAN MASTER PLAN 18 EXISTING CONDITIONS
Indiana Counties Map Description
McCordsville, IN is located in the northwestern-most corner of Hancock County, which is one of the 8 “Donut” counties that surround Marion County.
Madion Co. McCordsville is a 30 minute drive south-west to the county Hamilton Co. Boone Co. seat of Marion County, Indianapolis, which is also the capital of the state.
Hancock Co. McCordsville is also a 23 minute drive north-west from the Hendricks Co. Marion Co. county seat of Hancock County, Greenfield.
Morgan Co. Shelby Co. Johnson Co.
*maps are not to scale*
Hancock County Map
McCordsville County Boundary County Boundary
19 MCCORDSVILLE BIKE AND PEDESTRIAN MASTER PLAN EXISTING CONDITIONS
Regional Map
Lapel
Westfield Noblesville
Pendleton
Carmel
Fishers Zionsville
Fortville
McCordsville
Maxwell
Lawrence
Greenfield
Indianapolis
Beech Grove New Palestine
Description Legend
The map above shows biking radii to and from 15 minute bike radius McCordsville and the surrounding towns / cities. 30 minute bike radius These radii assume an average biking speed of 10 mph. 60 minute bike radius Average walking speed is roughly 3 mph, therefore, it can be assumed that a pedestrian will walk roughly 1/3 the distance a biker will ride in the same time frame.
MCCORDSVILLE BIKE AND PEDESTRIAN MASTER PLAN 20 EXISTING CONDITIONS
Legend Town Map
Corridor Roadway E 96th St. E 96th St. Waterway McCord Highland Pointe Public park Springs Bay Creek East
Town Boundary N 500 W 500 N
Geist Woods W 600 N Area of Interest Estates
Daniel’s Bay 5 minute bike radius Bay Vineyard Creek Creek 10 minute bike radius Geist N 700 W / Carroll Rd. Carroll / W 700 N Montessori Falling W 900 N 5 minute walk radius W 900 N Water
10 minute walk radius The Villages At Emerald Brookside Springs Neighborhood XXX Deer Woodbury Crossing Wellness Center SR 67 Sports Emerald Park Springs Town Community Hall Park W 800 N W 800 N Future R.R. Bridge Future Town Center Old Play W 750 N W 750 N Town Park
McCordsville Gateway Elementary W 500 N
Meijer W 600 N Crossing W 700 N
Austin Trace Red
N 700 W / Carroll Rd. Carroll / W 700 N Barn
Outlook W 650 N Church
Red Woodhaven Barn W 600 N W 600 N
Easton At Stansbury Stansbury
W 500 N
N
21 MCCORDSVILLE BIKE AND PEDESTRIAN MASTER PLAN EXISTING CONDITIONS
Legend Existing Trail and Sidewalk Facilities
Existing Bike / E 96th St. Pedestrian Facility E 96th St. Proposed Bike /
Pedestrian Facility
N 500 W 500 N
N 600 W 600 N N 700 W / Carroll Rd. Carroll / W 700 N W 900 N W 900 N
Town Hall
W 800 N W 800 N
Future Town Center W 750 N
W 750 N
N 500 W 500 N N 600 W 600 N
W 700 N N 700 W / Carroll Rd. Carroll / W 700 N
W 650 N
W 600 N W 600 N
W 500 N
N
MCCORDSVILLE BIKE AND PEDESTRIAN MASTER PLAN 22 EXISTING CONDITIONS
Legend N 600 W (North) N 600 W (South) Olio Rd. Corridor Roadway Fishers / Geist Res. W 750 N Intersection with 3 Co. Rd. 1000 N (Town Boundary) crosswalks on all 96th St. (Town Boundary) Matchline Matchline walkways Highland Intersection with Springs 01 partial crosswalks Bay 03 Creek McCordsville Intersection with no East crosswalks N 600 W Elementary School Path / Trail W 700 N Sidewalk Champion Lake Protected Path Bay Round Bay Separated Path Creek Barn Creek Stansbury Ditch N 600 W Neighborhood xxx 8 HAWK Bridge North Folk Dry Branch Outlook Beacon 2 Christian Waterway Falling Church Geist Water W 650 N Train Tracks Montessori
W 900 N W 900 N Section (refer to next spread)
On-site Photo X
Topography 02 Emerald Woodhaven The Springs Narrow R.O.W. Villages At Brookside 1 Proposed Bike / HAWK Beacon Pedestrian Facility W 600 N W 600 N Hancock Wellness 7 Center Vicinity Map N 600 W (North) Community Park Dry Branch
Town N 600 W Hall
W 800 N W 800 N 6
N 600 W (South) Future 5 Pleasant Town W Broadway Acres Center Old 4 School W 500 N (Town Boundary) W 500 N (Town Boundary) Park Cemetery Indianapolis W 750 N W 750 N Regional Round Barn Matchline Matchline N Airport / Tuttle’s Stansbury Orchard Ditch
23 MCCORDSVILLE BIKE AND PEDESTRIAN MASTER PLAN EXISTING CONDITIONS
1 N 600 W @ W 600 N 5 N 600 W @ W Broadway
2 N 600 W @ Outlook Christian Church 6 N 600 W @ W 800 N
3 N 600 W @ Cemetery & Park 7 N 600 W @ Hancock Wellness Center
4 N 600 W @ Downtown Neighborhood 8 N 600 W @ Bay Creek
*All images are oriented north.*
MCCORDSVILLE BIKE AND PEDESTRIAN MASTER PLAN 24 EXISTING CONDITIONS
Section 01 - N 600 W (North) R.O.W. R.O.W. ~5’ 8’ 11’ Varies 11’ +/- 8’ ~5’
Shoulder Road Middle Road Shoulder Shared Lane, Turn Lane, Path Typ. Lane, Typ. Typ. Section 02 - N 600 W (North) R.O.W. R.O.W. ~24’ 8’ 11’ Varies 11’ +/- 8’ ~24’
Sidewalk Shoulder Drive Striped Drive Shoulder Shared One-Way Area One-Way Path
Section 03 - N 600 W (South) R.O.W. ~20’ +/- 10’ 11’ Varies 11’ 11’ +/- 9’ ~20’ R.O.W.
Shoulder Drive Striped Drive Turn Lane Shoulder One-Way Area One-Way
25 MCCORDSVILLE BIKE AND PEDESTRIAN MASTER PLAN EXISTING CONDITIONS
Analysis & Summary of Findings
Speed Limits:
W 500 N - W 600 N : 55 MPH W 600 N - Church : 50 MPH Church - School : 40 MPH School - W 800 N : 30 MPH W 800 N - E 96th St. : 40 MPH
R.O.W.:
150’ at N 600 W road curves south of Church 120’ at subdivisions on N 600 W (North) (see section 02 previous page) 100’ at school & wellness center (see section 03 previous page) 80’ at train tracks 60’ through rest of corridor (see section 01 previous page) 45’ at Old Town Neighborhood
Existing Street Condition
Description:
The conditions along N 600 W is a roughly 30-42’ wide, two lane road (with shoulders) with a healthy amount of sidewalks, trails, and bike & pedestrian facilities.
MCCORDSVILLE BIKE AND PEDESTRIAN MASTER PLAN 26 EXISTING CONDITIONS
Legend N 700 W / Carroll Rd. (North) N 700 W / Carroll Rd. (South)
Corridor Roadway
Intersection with Matchline Matchline crosswalks on all Geist walkways Reservoir 96th St. (Town 8 Boundary) Intersection with Persimmon partial crosswalks 01 Ridge Intersection with no crosswalks
Path / Trail E 79th St. W 800 N 5 Sidewalk Christ Bradford Protected Path Presbyterian Creek Geist Church Separated Path Woods Estates N 700 W (Town Boundary) Dry Branch Neighborhood xxx 7 Bridge
Waterway 4
Train Tracks Admiral’s Section (refer to next Bay spread) N 700 W (Town Boundary)
E 75th St. W 750 N On-site Photo X 3 Topography Daniel’s Vineyard Narrow R.O.W.
Proposed Bike / Pedestrian Facility North Folk Dry Branch
W Broadway E 86th St. W 900 N Vicinity Map 6 Meijer
Carroll Rd. Pendleton Pike N 700 W / (North) Living Streams Community 2 Church Crystal Pointe N 700 W (Town Boundary)
Deer N 700 W (Town Boundary) Crossing Austin
Carroll Rd. Trace N 700 W / (South)
Persimmon Creek 02
Woodbury Branch 03
Matchline Matchline N E 65th St. W 650 N 1
27 MCCORDSVILLE BIKE AND PEDESTRIAN MASTER PLAN EXISTING CONDITIONS
1 N 700 W @ W 650 N 5 N 700 W @ W 800 N
2 N 700 W @ Meijer 6 N 700 W @ W 900 N
3 N 700 W @ W 750 N 7 N 700 W @ Geist Woods Estates
4 N 700 W @ Bridge 8 N 700 W @ 96th St.
*All images are oriented north.*
MCCORDSVILLE BIKE AND PEDESTRIAN MASTER PLAN 28 EXISTING CONDITIONS
Section 01 - N 700 W R.O.W. R.O.W. 8’ 3’ 9’ 9’ ~13’
Varies Trail Buffer Drive (One-Way) Drive (One-Way) (asphalt)
Section 02 - N 700 W R.O.W. R.O.W. Varies 9’ 9’ 6’
Utilities, Drainage, etc. Drive (One-Way) Drive (One-Way)
Section 03 - N 700 W R.O.W. R.O.W. 4’ 22’ 4’
Drive (Two-Way)
29 MCCORDSVILLE BIKE AND PEDESTRIAN MASTER PLAN EXISTING CONDITIONS
Analysis & Summary of Findings
Speed Limits:
W 650 N - E 96th St. : 40 MPH
R.O.W.:
70’ at Deer Crossing 60’ at Geist Woods Estates 50’ at Meijer 45’ at Austin Trace (see section 01 previous page) 30’ through rest of corridor (see sections 02 & 03 previous page)
Existing Street Condition
Description:
The conditions along N 700 W is a roughly 22’ wide, two lane road with sidewalks and trails only near the Meijer and Geist Estates / Geist Reservoir, with no other curbing, side walks, trails, or bike & pedestrian facilities.
Sidewalks exist on the west side of the road, but that does not fall within McCordsville’s town boundaries.
MCCORDSVILLE BIKE AND PEDESTRIAN MASTER PLAN 30 EXISTING CONDITIONS
Legend Section (refer to next spread) Corridor Roadway On-site Photo X Intersection with Topography crosswalks on all walkways Narrow R.O.W. W Broadway Intersection with Proposed Bike / partial crosswalks Pedestrian Facility Intersection with no crosswalks
Path / Trail
Sidewalk McCordsville Protected Path Sports Park Separated Path Proportion Neighborhood xxx Air 03 Dry Branch
Bridge N 600 W Town 10 Waterway Hall Stanley Main St. / 36 Chevrolet Train Tracks W 800 N W 800 N 9
S Railroad St.
N Railroad St.
Future 6 8 7 Town
N 600 W N Hanna St. Center
5 Center St.
N McCord St.
02 N 700 W 700 N W Broadway N Form St. 4 Old School Cemetery Vicinity Map 3 Park W 750 N W 750 N Stansbury Ditch Gateway Crossing McCordsville Vicinity Map Lawrence / Apartments Elementary Fort Ben School
W Broadway 2 01
1 Meijer
Gateway Living Streams Crossing Community W Broadway Church
Austin Trace N
31 MCCORDSVILLE BIKE AND PEDESTRIAN MASTER PLAN EXISTING CONDITIONS
1 W Broadway @ N 700 W 6 W Broadway @ Tim’s Bakery
2 W Broadway @ Meijer 7 W Broadway @ N 600 W
3 W Broadway @ PNC Bank 8 W Broadway @ Marathon Gas
4 W Broadway @ Elite Beverages 9 W Broadway @ W 800 N
5 W Broadway @ Waterway 10 W Broadway @ Stanley Chevrolet
*All images are oriented north-east.*
MCCORDSVILLE BIKE AND PEDESTRIAN MASTER PLAN 32 EXISTING CONDITIONS
Section 01 - W Broadway R.O.W. R.O.W. ~28’ ~12’ 6’ 2’ 24’ 16’ 24’ 2’ 6’
Rail Road Drainage Curb Drive Turn Lane Drive Curb (One Way - Two Lanes) (One Way - Two Lanes)
Section 02 - W Broadway R.O.W. R.O.W. 12’ 18’ 18’ 12’
Drive Drive (One Way - Two Lanes) (One Way - Two Lanes)
Section 03 - Main St. / 36 R.O.W. R.O.W. ~28’ 18’ 9’ 24’ 9’ 18’
Rail Road Drainage Shoulder Drive Shoulder Drainage (Two Way)
33 MCCORDSVILLE BIKE AND PEDESTRIAN MASTER PLAN EXISTING CONDITIONS
Analysis & Summary of Findings
Speed Limits:
Caroll Rd / N 700 W - W 750 N : 45 MPH W 750 N - Chevrolet Dealership : 40 MPH Chevrolet Dealership - N 500 W : 55 MPH
R.O.W.:
100’ near PNC 80’ at Meijer (see section 01 previous page) 80’ from Chevrolet Dealership to N 500 W (see section 03 previous page) 60’ through rest of corridor (see section 02 previous page)
Existing Street Condition
Description:
The conditions along W Broadway varies between a 36-62’ wide four lane (with shoulders) road and a 42’ wide two lane (with shoulders) road with no sidewalks only on the south side of the road by the PNC bank and the CVS.
Certain areas of W Broadway have a center turn lane while others have no turn lane, and certain areas have a wide, accomodating shoulder while others have shoulders that are barely distinguishable from the adjacent parking lots.
MCCORDSVILLE BIKE AND PEDESTRIAN MASTER PLAN 34 EXISTING CONDITIONS
W Broadway (Old-Town Zoom-In)
Town Hall S. Railroad St.
W Broadway Marathon 4 McCordsville Gas Sports Park
N. Railroad St. BMV S. Railroad St.
CVS Speedway
Tim’s 1st St. Bakery Scarlet Lane 2nd St.
Brewing Future Town N 600 W 600 N Green Hanna St. Center Touch McCordsville 3 United 01 Methodist 02 1 Church Lawrence / 3rd St. Fort Ben Kinsey’s
Italian Fire N McCord St.
Center St.
N Form St. McCordsville W Broadway Dept. Play Park
Cemetery PNC W 750 N W 750 N
Gateway McCordsville HAWK 2 Stansbury Crossing Elementary Beacon Ditch Apartments School
Legend
Corridor Roadway On-site Photo X 1 N 600 W @ Old Town Neighborhood Intersection with Topography crosswalks on all walkways Narrow R.O.W.
Intersection with Proposed Bike / partial crosswalks Pedestrian Facility Intersection with no Vicinity Map crosswalks
Path / Trail
Sidewalk 2 W 750 N @ N Form St. Protected Path Old-Town Separated Path Zoom-In
Neighborhood xxx
Bridge
Waterway
Train Tracks
Section (refer to next N page)
35 MCCORDSVILLE BIKE AND PEDESTRIAN MASTER PLAN EXISTING CONDITIONS
3 W Broadway @ Commercial Area 4 W Broadway @ DMV
Section 01 - Neighborhood R.O.W. R.O.W. ~11’ 11’ 11’ ~11’ Drive Drive (One Way) (One Way)
Section 02 - W Broadway R.O.W. R.O.W. 12’ 18’ 18’ 12’
Drive Drive (One Way - Two Lanes) (One Way - Two Lanes)
Analysis & Summary of Findings Existing Street Condition
Speed Limits: Description:
Side Streets (Old Town) : 30 MPH The conditions along the streets in the old town neighborhood are roads W Broadway : 40 MPH roughly 22’ wide with no curbing, side walks, trails, or other bike & pedestrian facilities. R.O.W.: W Broadway is a major corridor that runs through the center of the old town 100’ near PNC neighborhood, but only has side walks on the south side of the road near the 60’ through rest of corridor (see section 02 this page) PNC bank and the CVS. 45’ at Old Town Neighborhood roads (see section 01 this page) 20’ at alleys
MCCORDSVILLE BIKE AND PEDESTRIAN MASTER PLAN 36 EXISTING CONDITIONS
Legend N 500 W (North) N 500 W (South)
Corridor Roadway 96th St. (Town Boundary) Matchline Matchline Intersection with crosswalks on all Flat Fork walkways Creek Park Matchline McCord Intersection with Pointe N 500 W partial crosswalks Bee Camp Creek N 500 W Intersection with no crosswalks
Path / Trail 6 Sidewalk W McCord Rd. Dry Branch Mt. Vernon Protected Path High School
Separated Path Champion Neighborhood xxx Racing Engines Bridge Town W 800 N Boundary Waterway 3
Train Tracks
Section (refer to next page) Town Boundary
On-site Photo X Topography
Narrow R.O.W. North Fork Dry Branch Proposed Bike / Pedestrian Facility
Vicinity Map W 750 N
N 500 W (North) W 900 N N 500 W N 500 W N 500 W (South)
2
Geist Apostolic Round Barn & Church Tuttle Orchard
5 01 Woodbury
Main St. / 36 1 4 W 700 N N Matchline Matchline
37 MCCORDSVILLE BIKE AND PEDESTRIAN MASTER PLAN EXISTING CONDITIONS
1 N 500 W @ N 700 N 4 N 500 W @ Church
2 N 500 W @ Residences 5 N 500 W @ Main St. / 36
3 N 500 W @ W 800 N 6 N 500 W @ W McCord St.
*All images are oriented north.*
Section 03 - N 500 W Analysis & Summary of Findings
Speed Limits:
W 700 N - E 96th St. : 45 MPH
R.O.W.:
30’ through entire corridor (see section this page)
Existing Street Condition
Description: R.O.W. R.O.W. 15’ 20’ 15’ The conditions along N 500 W is a roughly 20’ wide, two lane road with no curbing, side walks, trails, or other bike & pedestrian facilities. Drive (Two Way)
MCCORDSVILLE BIKE AND PEDESTRIAN MASTER PLAN 38 EXISTING CONDITIONS
E 96th St. Georgia Rd. Geist Olio Rd. Reservoir Flat Fork Geist Creek Park Highland Timberstone Westbrooke Cambridge Fox Montessori Springs Hollow Circle K Academy 96th St. (Town Boundary) 96th St. (Town Boundary) 1 01 02 9 03 10 7 8 3 2 McCord 5 4 6 N 500 W Highland Bay Pointe Springs Creek Bills Branch N 600 W East N 700 W
W McCord Rd.
Legend Vicinity Map
Corridor Roadway E 96th St. Intersection with crosswalks on all walkways
Intersection with partial crosswalks
Intersection with no crosswalks
Path / Trail
Sidewalk
Protected Path
Separated Path
Neighborhood xxx
Bridge N Waterway
Train Tracks
Section (refer to next spread)
On-site Photo X Topography
Narrow R.O.W.
Proposed Bike / Pedestrian Facility
39 MCCORDSVILLE BIKE AND PEDESTRIAN MASTER PLAN EXISTING CONDITIONS
1 96th St. @ N 600 W 6
2 96th St. @ Fox Hollow 7 96th St. @ Geist Montessori
3 96th St. @ Bridge 8 96th St. @ Timberstone
4 96th St. @ Bills Branch 9 96th St. @ New Development
5 96th St. @ N 700 W 10 96th St. @ Culvert
*Above images are oriented west.* *Above images are oriented east.*
MCCORDSVILLE BIKE AND PEDESTRIAN MASTER PLAN 40 EXISTING CONDITIONS
Section 01 - E 96th St. R.O.W. 9’ 9’ ~6’ 8’ Varies
Drive Drive Drainage Trail (One-Way) (One-Way) (Asphalt)
Section 02 - E 96th St. R.O.W. 6’ 28’ 9’ 9’ ~6’
Trail Buffer / Drainage / Drive (One-Way) Drive (One-Way) (Asphalt) Lighting
Section 03 - E 96th St. R.O.W. R.O.W. 15’ 20’ 15’ Drive (Two Way)
41 MCCORDSVILLE BIKE AND PEDESTRIAN MASTER PLAN EXISTING CONDITIONS
Analysis & Summary of Findings
Speed Limits:
E 96th St. - N 500 W : 40 MPH
R.O.W.: *Measurements are taken from the C.L. of E 96th St. to the southern border of the R.O.W.*
60’ at Bay Creek East 55’ at McCord Pointe 40’ at residences near E 96th & N 700 W 25’ through rest of corridor (see section 03 previous page)
Existing Street Condition
Description:
The conditions along E 96th St. is a roughly 20’ wide, two lane road with a healthy amount of existing sidewalks, trails, and curbing. There are a couple segments that lack bike / pedestrian infrastructure but they are mainly limited to the east half of the E 96th St. corridor where developments have not been established yet.
MCCORDSVILLE BIKE AND PEDESTRIAN MASTER PLAN 42 EXISTING CONDITIONS
W 900 N
N 600 W Bay Bay Creek North Folk Dry Branch N 700 W Creek W McCord Rd.
Daniel’s Falling Vineyard Geist Water Montessori W 900 N
02 8 N 500 W 5 4 01 W 900 N 9 Traditions 1 7 3 2 6 Geist At Brookside N 700 W N 600 W Community Deer Church Crossing Geist Emerald Apostolic Springs Church
Legend Vicinity Map
Corridor Roadway
Intersection with crosswalks on all walkways W 900 N Intersection with partial crosswalks
Intersection with no crosswalks
Path / Trail
Sidewalk
Protected Path
Separated Path
Neighborhood xxx
Bridge N Waterway
Train Tracks
Section (refer to next spread)
On-site Photo X Topography
Narrow R.O.W.
Proposed Bike / Pedestrian Facility
43 MCCORDSVILLE BIKE AND PEDESTRIAN MASTER PLAN EXISTING CONDITIONS
1 W 900 N @ N 600 W 6 W 900 N @ N 600 W
2 W 900 N @ Residences 7 W 900 N @ Falling Water
W 900 N @ W McCord Rd.
3 W 900 N @ Traditions 8 W 900 N @ W McCord Rd.
4 W 900 N @ Deer Crossing 9 W 900 N @ Corn Fields
*Above images are oriented east.* 5 W 900 N @ Residences
*Above images are oriented west.*
MCCORDSVILLE BIKE AND PEDESTRIAN MASTER PLAN 44 EXISTING CONDITIONS
Section 01 - W 900 N R.O.W. R.O.W. 5’ 20’ 5’ Drive (Two Way)
Section 02 - W 900 N R.O.W. 9’ 9’ ~6’ 8’ Varies
Drive Drive Drainage Trail (One-Way) (One-Way) (Asphalt)
Analysis & Summary of Findings Existing Street Condition
Speed Limits: Description:
N 700 W - N 500 W: 45 MPH The conditions along W 900 N is a roughly 20’ wide, two lane road with sidewalks existing north of Traditions at Brookside and south of Falling R.O.W.: Water, with no other curbing, side walks, trails, or bike & pedestrian facilities. 80’ at Traditions at Brookside 60’ at Fallingwater 55’ between bridges of Dry Branch 30’ through rest of corridor (see sections this page).
45 MCCORDSVILLE BIKE AND PEDESTRIAN MASTER PLAN EXISTING CONDITIONS
Blank Page
MCCORDSVILLE BIKE AND PEDESTRIAN MASTER PLAN 46 EXISTING CONDITIONS
W 800 N
McCordsville Sports Park
N 600 W Dry Branch Proportion
Town Hall N 500 W Park Air N 700 W Town Stanley Hall Chevrolet W 800 N 01 W 800 N 1 5 6 3 2 4 Mt. Vernon Christ High School Presbyterian Church Future Town Center
Legend Vicinity Map
Corridor Roadway
Intersection with crosswalks on all walkways
Intersection with partial crosswalks
Intersection with no crosswalks W 800 N
Path / Trail
Sidewalk
Protected Path
Separated Path
Neighborhood xxx
Bridge N Waterway
Train Tracks
Section (refer to next page)
On-site Photo X Topography
Narrow R.O.W.
Proposed Bike / Pedestrian Facility
47 MCCORDSVILLE BIKE AND PEDESTRIAN MASTER PLAN EXISTING CONDITIONS
1 W 800 N @ N 600 W 4 W 800 N @ W Broadway
2 W 800 N @ Narrow R.O.W. 5 W 800 N @ Chevrolet Dealer
3 W 800 N @ Town Hall 6 W 800 N @ Widened Shoulder
Section 01 - W 800 N Analysis & Summary of Findings
Speed Limits:
N 700 W - N 600 W : 40 MPH W Broadway - N 500 W : 55 MPH
R.O.W.:
75’ from W Broadway - N 500 W. 30’ from N 700 W to N 600 W (see section this page).
Existing Street Condition R.O.W. R.O.W. 5’ 20’ 5’ Drive Description: (Two Way) The conditions along W 800 N is a roughly 20’ wide, two lane road with no curbing, side walks, trails, or other bike & pedestrian facilities.
MCCORDSVILLE BIKE AND PEDESTRIAN MASTER PLAN 48 EXISTING CONDITIONS
W 750 N
Future Town See Neighborhood Center N 600 W
Zoom-In Page N 500 W N 700 W 6 4 3 2 W 750 N W 750 N 5 01 Stansbury 1 Gateway Ditch Crossing Apartments
W Broadway Gateway McCordsville Crossing Elementary School
Legend Vicinity Map
Corridor Roadway
Intersection with crosswalks on all walkways
Intersection with partial crosswalks
Intersection with no crosswalks
Path / Trail W 750 N
Sidewalk
Protected Path
Separated Path
Neighborhood xxx
Bridge N Waterway
Train Tracks
Section (refer to next page)
On-site Photo X Topography
Narrow R.O.W.
Proposed Bike / Pedestrian Facility
49 MCCORDSVILLE BIKE AND PEDESTRIAN MASTER PLAN EXISTING CONDITIONS
1 W 750 N @ Corn Fields 4 W 750 N @ PNC
2 W 750 N @ Bridge 5 W 750 N @ Tracks
3 W 750 N @ Park 6 W 750 N @ Narrow R.O.W.
Section 01 - W 750 N Analysis & Summary of Findings
Speed Limits:
N 700 W - N 500 W : 30 MPH
R.O.W.:
100’ near road curve at PNC bank 70’ at specific residences 45’ at Gateway Crossing Apartments 30’ through rest of corridor (see section this page).
R.O.W. Existing Street Condition R.O.W. 5’ 20’ 5’ Drive (Two Way) Description:
The conditions along W 750 N is a roughly 20’ wide, two lane road with no curbing, side walks, trails, or other bike & pedestrian facilities.
MCCORDSVILLE BIKE AND PEDESTRIAN MASTER PLAN 50 EXISTING CONDITIONS
W 700 N
Stansbury
Ditch McCordsville Elementary School
01 4 1 2 3 Town Boundary Champion N 500 W
N 600 W Lake
Legend Vicinity Map
Corridor Roadway
Intersection with crosswalks on all walkways
Intersection with partial crosswalks
Intersection with no crosswalks
Path / Trail
Sidewalk W 700 N Protected Path
Separated Path
Neighborhood xxx
Bridge N Waterway
Train Tracks
Section (refer to next page)
On-site Photo X Topography
Narrow R.O.W.
Proposed Bike / Pedestrian Facility
51 MCCORDSVILLE BIKE AND PEDESTRIAN MASTER PLAN EXISTING CONDITIONS
1 W 700 N @ N 600 W 3 W 700 N @ East of Lake
2 W 700 N @ School Bus Exit 4 W 700 N @ Residences
Section 01 - W 700 N Analysis & Summary of Findings
Speed Limits:
N 600 W - School : 30 MPH School - N 500 W : 40 MPH
R.O.W.:
45’ at Champion Lake residences. 30’ through rest of corridor (see section this page).
Existing Street Condition R.O.W. R.O.W. 5’ 20’ 5’ Description: Drive (Two Way) The conditions along W 700 N is a roughly 20’ wide, two lane road with a sidewalk existing directly south of McCordsville Elementary School with no other curbing, side walks, trails, or bike & pedestrian facilities.
MCCORDSVILLE BIKE AND PEDESTRIAN MASTER PLAN 52 EXISTING CONDITIONS
W 650 N
Outlook Christian Future Church Development
E 65th St. 01 2 1
3 Town Boundary N 600 W N 700 W
Legend Vicinity Map
Corridor Roadway
Intersection with crosswalks on all walkways
Intersection with partial crosswalks
Intersection with no crosswalks
Path / Trail
Sidewalk
Protected Path W 650 N Separated Path
Neighborhood xxx
Bridge N Waterway
Train Tracks
Section (refer to next page)
On-site Photo X Topography
Narrow R.O.W.
Proposed Bike / Pedestrian Facility
53 MCCORDSVILLE BIKE AND PEDESTRIAN MASTER PLAN EXISTING CONDITIONS
1 W 650 N @ N 600 W 3 W 650 N @ N 700 W
2 W 650 N @ Residence
Section 01 - W 650 N Analysis & Summary of Findings
Speed Limits:
N 700 W - N 600 W : UNKNOWN (Likely 30 or 40 MPH)
R.O.W.:
30’ through entire corridor (see section this page).
Existing Street Condition R.O.W. R.O.W. 5’ 20’ 5’ Description: Drive (Two Way) The conditions along W 650 N is a roughly 20’ wide, two lane road with no curbing, side walks, trails, or other bike & pedestrian facilities.
MCCORDSVILLE BIKE AND PEDESTRIAN MASTER PLAN 54 EXISTING CONDITIONS
W 600 N Town Boundary
Sage Brook Wood Haven N 500 W Caroll Rd. 700 W Town Boundary Town N 600 W
W 600 N W 600 N 01 2 4 3 1 Round Barn / Tuttles Orchard
Stansbury N 700 W
Legend Vicinity Map
Corridor Roadway
Intersection with crosswalks on all walkways
Intersection with partial crosswalks
Intersection with no crosswalks
Path / Trail
Sidewalk
Protected Path
Separated Path W 600 N Neighborhood xxx
Bridge N Waterway
Train Tracks
Section (refer to next page)
On-site Photo X Topography
Narrow R.O.W.
Proposed Bike / Pedestrian Facility
55 MCCORDSVILLE BIKE AND PEDESTRIAN MASTER PLAN EXISTING CONDITIONS
1 W 600 N @ N 600 W 3 W 600 N @ N 600 W
2 W 600 N @ Wood Haven 4 W 600 N @ Residences
*Above images are oriented east.* *Above images are oriented west.*
Section 01 - W 600 N Analysis & Summary of Findings
Speed Limits:
N 700 W - N 600 W : 45 MPH N 600 W - N 500 W : 50 MPH
R.O.W.:
55-65’ at subdivisions. 30’ through rest of corridor (see section this page).
Existing Street Condition R.O.W. R.O.W. 5’ 20’ 5’ Drive (Two Way) Description: The conditions along W 600 N is a roughly 20’ wide, two lane road with a sidewalk existing directly south of Sage Brook, with no other curbing, side walks, trails, or bike & pedestrian facilities.
MCCORDSVILLE BIKE AND PEDESTRIAN MASTER PLAN 56 EXISTING CONDITIONS
W 500 N Town Boundary
N 600 W Pleasant Acres Town Boundary Town 1 W 500 N W 500 N 2 01 4 3 Tuttle’s Orchard Indianapolis Regional Airport
Legend Vicinity Map
Corridor Roadway
Intersection with crosswalks on all walkways
Intersection with partial crosswalks
Intersection with no crosswalks
Path / Trail
Sidewalk
Protected Path
Separated Path
Neighborhood xxx
Bridge N Waterway W 500 N
Train Tracks
Section (refer to next page)
On-site Photo X Topography
Narrow R.O.W.
Proposed Bike / Pedestrian Facility
57 MCCORDSVILLE BIKE AND PEDESTRIAN MASTER PLAN EXISTING CONDITIONS
1 W 500 N @ N 600 W 3 W 500 N @ N 600 W
*Above image is oriented north.*
2 W 500 N @ N 600 W 4 W 500 N @ Residences
*Above image is oriented west.* *Above images are oriented east.*
Section 01 - W 500 N Analysis & Summary of Findings
Speed Limits:
N 700 W - N 500 W : 50 MPH
R.O.W.:
30’ through entire corridor (see section this page).
Existing Street Condition
R.O.W. Description: R.O.W. 5’ 20’ 5’ Drive The conditions along W 500 N is a roughly 20’ wide, two lane road with no (Two Way) curbing, side walks, trails, or other bike & pedestrian facilities.
MCCORDSVILLE BIKE AND PEDESTRIAN MASTER PLAN 58
! !
EXISTINGB P M CONDITIONS P !
E D !
! !
Greenways !
! ! 2 Existing Greenway Condition
1 Description:
The “greenways” that currently exist in McCordsville are essentially drainage 3 ditches with little to no paths / trails along side them. 4 However, there are certain areas along 5 W 900 N and W 800 N where these “greenways” interact with the roads in such a way that future “pocket parks” could fit along the roads to create nodes for bikers and pedestrians to gather & socialize.
6