Reconstruction of Webster Avenue Select Bus Service
Total Page:16
File Type:pdf, Size:1020Kb
The Bronx Fourth Quarter - 2017 Reconstruction of Webster Avenue Select Bus Service Webster Avenue- Various Locations Project # HWX100SBS The New York City Department of Design and Construction (NYCDDC) Continues to manage a capital construction project along Webster Avenue between E165th Street and E. Gun Hill Road, that includes the installation of new Water Mains, Sewer, ornamental Street Lighting & traffic work. The anticipated completion date is July 2018. Work Performed: Third Quarter, 2017 Installation of Catch Basins on Webster Ave and E.167th St. Installation of steel faced Concrete Curbs and Sidewalks on Webster Ave between E.167th St and E.168th St. Construction of Center Island at Webster Ave th th between E.166 St and E.167 St. Construction area on Webster Ave & E.166th St Anticipated Work Schedule: Fourth Quarter, 2017 between 171st St and Claremont Parkway. Installation of catch basin and sewer repair -Trash Collection: During a construction project at Webster Ave/ E.Tremont Ave can be a challenge, though manageable with a Road base and paving for Webster Ave minimum of disruption. Please dispose of your th th between E.166 St to E.170 St. trash properly. Place it in the DSNY designated Installation of steel faced Concrete Curbs areas as close to collection time as possible. If and Sidewalks on Webster Ave between you use a private carter, ensure your trash th E.170 St to Claremont Pkwy. collection occurs a timely. If you are unaware of the Work Hours: Depending upon the location designated areas, please contact the CCL. Monday-Friday Typical Hours 9:00AM-4:00PM - Baiting: Continues to be done by the contractor, Saturday Typical Hours 8:00AM-6:00PM throughout the project area on a regular basis, in Community Impacts: order to help control any rodent population. -Special Needs: Individuals with special needs Community Construction Liaison (CCL): who may be uniquely impacted by this project The DDC has assigned Essam Gawish of CES should contact the project’s Community Consultants, as the Community Construction Construction Liaison (CCL), as soon as possible, Liaison (CCL) for this project. Please contact the to make them aware of your situation. DDC will CCL for any project related inquires and/or to be work to attempt to minimize the inconvenience as added to the electronic Neighborhood Notification much as possible. Network (NNN) list. -Parking/Traffic Restrictions: “No Parking” signs Phone: 718-576-6344 Fax: 718-576-6345 will be posted in advance by the contractor. An Email: [email protected] advisory will be distributed in advance by the Field Office: 4419 Third Avenue, Bronx NY 10457 CCL. To avoid possible towing of your vehicle Newsletter Distribution: please follow all posted signage during The Quarterly Newsletter for this project is distributed by the CCL electronically through the Neighborhood Notification construction hours otherwise please follow all Network (NNN) list, as well as via hard copies throughout the NYCDOT rules and regulations. project area, and can also be found at the following locations: - Public Transportation: Bx41 North and South BX CB # 3- 1426 Boston Road, 10456 bound temporarily relocated to Webster Ave BX CB # 4- 1650 Selwyn Ave, Suite 11A 10457 BX CB # 5- BCC Campus, McCracken Hall, Room 12/13. between 166th St and 167th St. Bx35 North bound W181st st & Martin Luther King Jr blvd on Webster Ave temporarily relocated to 167th St BX CB # 6- 1932 Arthur Avenue, Rm. 403, 10457 between Clay Ave and Webster Ave. Bx41 North BX CB # 7- 229-A East 204th Street, 10458 bound temporarily relocated to Webster Ave Bill de Blasio DDC Website Mayor www.nyc.gov/ddc Ana Barrio DDC Video Acting Commissioner www.nyc.gov/webuild .