Urban Municipalities Backgrounder
Total Page:16
File Type:pdf, Size:1020Kb
Backgrounder Improving local roads and bridges in Saskatchewan’s urban municipalities Federal Gas Tax Fund allocated towards 120 projects in 2016 The federal Gas Tax Fund (GTF) provides Canadian municipalities with a permanent, predictable and indexed source of long-term funding. The Government of Canada will be providing Saskatchewan with more than $59.1 million for community infrastructure through the federal GTF in 2016-17. Based on project planning in 2016, federal GTF funding supported the following local roads and bridges projects in Saskatchewan’s urban municipalities: Federal GTF Estimated Municipality Project Name Allocated to Total Cost Project Allan, Town of Allan Pavement Project $111,000 $55,106 Upgrade Roads including Main Aquadeo, Resort Village of $104,528 $24,814 Access Road Service Road Extension - Arcola, Town of $50,000 $34,778 North Hwy #13 Reconstruct East Avenue Asquith, Town of $107,005 $107,005 Roadway and Drainage Assiniboia, Town of Repave Two Streets $641,000 $320,000 Aylsham, Village of Reconstruct South Ave Curve $10,000 $10,000 Balcarres, Town of Pave Streets $145,000 $70,000 Bangor, Village of Replace Sidewalk $5,500 $5,448 Rebuild Gull and Grouse Big Shell, Resort Village of $3,000 $3,000 Roads Bird's Point, Resort Village of Construct Morgan Ave $38,000 $30,426 Bjorkdale, Village of Chip Seal Streets $130,000 $58,785 Blaine Lake, Town of Upgrade Streets $123,465 $88,332 Bracken, Village of Upgrade Railway Ave $6,000 $6,000 Install Sidewalk Entry into Brownlee, Village of $4,000 $4,000 Senior Citizens Hall Resurface of Main Street (2 Bulyea, Village of $100,000 $30,131 blocks Ashley St) Burstall, Town of Construct Road Approach $11,613 $11,613 Cadillac, Village of Rebuild Centre Street $36,000 $32,124 Candle Lake, Resort Village of Trail Rehabilitation $13,700 $13,700 Construct Country Cabin Lane Chitek Lake, Resort Village of $9,428 $9,428 Walkway Rebuild One Block of Railway Choiceland, Town of $19,800 $19,800 Avenue Sidewalk Christopher Lake, Village of Pave 11 Village Intersections $90,000 $87,921 Clavet, Village of Rebuild 2nd Ave E Phase I $72,141 $21,925 Cochin, Resort Village of Repave 3 Streets $100,000 $46,224 Replace 420 m of Sidewalk on Creighton, Northern Town of $183,587 $183,587 Creighton Ave Denare Beach, Northern Pave and/or Sand Seal Roads $294,122 $294,122 Village of Denare Beach, Northern Road Development to New $65,000 $65,000 Village of Industrial Area Upgrade and Chip Seal Main Dundurn, Town of $179,300 $179,300 Arterial Streets Pave Streets and Install Eastend, Town of $230,893 $122,367 Asphalt Curbs Eatonia, Town of Replace Sidewalks $254,390 $150,063 Resurface Main Street from 1st Edam, Village of $15,914 $15,914 to 2nd Ave Eyebrow, Village of Replace Sidewalks $12,000 $7,800 Install a Culvert on Queen St Fenwood, Village of $4,000 $4,000 North Upgrade Lane to an All Fleming, Town of $25,000 $24,518 Weather Road Foam Lake, Town of Pave Saskatchewan Avenue $135,000 $125,000 Fort San, Resort Village of Walking Trail Upgrade $40,000 $40,000 Fort San, Resort Village of Culvert Upgrades $35,000 $35,000 Fosston, Village of Sand Seal 800m Railway Ave $30,000 $16,247 Gainsborough, Village of John Street Paving $52,000 $41,332 Gerald, Village of Repaving Streets $304,100 $33,676 Glenside, Village of Rebuild Islay Street $3,536 $3,369 Build Up Road to Village Goodsoil, Village of $10,543 $8,494 Specifications Build Rear Alley Behind New Goodsoil, Village of $7,467 $7,467 Development on 2nd Street SW Rebuild and Upgrade Roads Goodsoil, Village of $38,176 $15,961 Washed Out Replace Bridge on Jewel Goodwater, Village of $620,000 $7,385 Creek Grand Coulee, Village of Upgrade Railway Avenue $100,000 $100,000 Grandview Beach, Resort Apply Reclaimed Asphalt to $48,000 $7,385 Village of Streets Green Lake, Northern Village Construct Road to Access 11 $60,000 $18,477 of Properties Gull Lake, Town of Repave Third Street $302,795 $58,944 Upgrade and Resurface Hafford, Town of $70,500 $70,500 Streets Sidewalk Replacement Phase Hanley, Town of $48,000 $24,000 2 Replace 84 m of Sidewalks on Hazenmore, Village of $15,000 $14,770 Main Street Humboldt, City of Roadway Rehabilitation 2015 $593,000 $322,510 Ile A La Crosse, Northern Road Pavement Resurfacing $600,000 $244,158 Village of Imperial, Town of Sand Seal Streets $45,139 $33,095 Kamsack, Town of Renew Town Roads $540,875 $479,105 Kannata Valley, Resort Village Reconstruct 40 m of $30,800 $17,359 of Lakeshore Drive Paving of Railway Ave-Main St Kelvington, Town of $185,862 $100,000 W to Hwy No. 38 Replace Sidewalks-2nd and Kelvington, Town of $30,673 $30,673 3rd Ave (2014) Upgrade 9th Street West-7th to Kindersley, Town of $305,000 $305,000 9th Avenue West Upgrade C Street East-12th to Kindersley, Town of $185,000 $185,000 14th Avenue East Kinistino, Town of Resurfacing of Town Roads $428,300 $219,482 Construct Walking Paths and Krydor, Village of $3,000 $3,000 Sidewalks La Loche, Northern Village of Street Improvements $1,107,346 $910,623 Build and Upgrade Streets and La Loche, Northern Village of $1,034,583 $771,289 Sidewalks La Ronge, Northern Town of Upgrade Streets $2,975,600 $853,267 Lafleche, Town of Replace 305 m of Sidewalk $71,600 $71,600 Reconstruct 257 m of Avenue Langenburg, Town of $183,760 $183,760 A Reconstruct and Pave Hoover Lanigan, Town of $873,300 $410,606 Street Lemberg, Town of Upgrade Chickney Avenue $30,000 $30,000 Leoville, Village of Resurface Main Street $147,000 $108,116 Construct Willow Subdivision Leroy, Town of $300,000 $191,046 roads/curb and gutter 2015 Street Improvement Lloydminster, City of $2,500,000 $556,027 Program Loreburn, Village of Replace Sidewalks $7,500 $5,000 Street Pavement-Base Repairs Lumsden, Town of $180,000 $16,055 with Hot Mix Overlay Sidewalk/Walking Trails Lumsden, Town of $140,000 $57,994 Removal and Installation Construct Road, Curbs and Luseland, Town of $478,135 $167,196 Gutters-New Subdivision Macklin, Town of Paving Project Phase II $1,830,000 $417,991 Upgrade Appleton and Macoun, Village of $79,500 $72,668 Robinson Avenues Mankota, Village of Resurface 2nd Street $10,000 $10,000 Marcelin, Village of Rebuild Streets $72,607 $37,650 Maryfield, Village of Pavement Recap $334,716 $107,821 Pave Toronto Street Melville, City of $150,000 $130,000 Subdivision Road Sand Seal 1.6 km of Road-1st Meota, Village of $64,980 $64,980 St W and 2nd Ave W Mervin, Village of Reconstruct 1.5 km of Road $15,000 $15,000 Midale, Town of Repave Main Street $300,000 $134,093 Milden, Village of Upgrade Center Street $32,000 $24,000 Minton, Village of Upgrade First Avenue $40,000 $31,480 Mossbank, Town of Repave Three Streets $300,000 $118,364 Osler, Town of Reconstruct Three Streets $2,276,728 $331,762 Replace 85 m Sidewalks on Pangman, Village of $25,000 $25,000 Mergens Street Paradise Hill, Village of Pave 880 m of Second Street $115,000 $115,000 Replace Sidewalks on Main Parkside, Village of $18,000 $18,000 Street Pelican Pointe, Resort Village Road Erosion and Restoration $15,000 $4,431 of Pennant, Village of Pave 0.3 km of Road $131,609 $35,448 Reconstruct Saskatchewan Quill Lake, Village of $48,578 $48,578 Ave Quinton, Village of Resurface Municipal Streets $100,000 $48,621 Raymore, Town of Upgrade Two Service Roads $30,000 $30,000 Upgrade Redvers Perimeter Redvers, Town of $75,000 $75,000 Road Street and Bridge Regina, City of $121,760,000 $43,551,947 Infrastructure Renewal Replace Culvert on Third Ridgedale, Village of $982 $982 Avenue Centennial Hall Culvert Ridgedale, Village of $1,010 $1,010 Replacement Upgrade Centre Street and Rose Valley, Town of $43,145 $39,000 Second Street South Saskatchewan Beach, Resort Paving Main Roads $366,178 $107,846 Village of Shaunavon, Town of Repave Roads-2015 $200,000 $200,000 Shaunavon, Town of Repave 1500 m Roads $200,000 $200,000 South Lake, Resort Village of Pave 1100 m Lakeside Drive $42,500 $20,930 Spy Hill, Village of Repave Streets $200,000 $60,262 Upgrade Road and Install Two St. Gregor, Village of $30,014 $22,814 Culverts St. Louis, Village of Resurface Streets 2015 $40,000 $38,255 St. Louis, Village of Resurface Streets 2016 $30,000 $26,132 Thode, Resort Village of Resurface 2 km of Main Road $94,082 $46,378 Vibank, Village of Construct Sidewalks $8,800 $8,800 Vonda, Town of Rebuild Buffer Avenue $50,000 $50,000 Wakaw, Town of Reconstruct Elevator Road $65,000 $65,000 Waldheim, Town of Seal Coat Streets $130,200 $130,200 Wee Too Beach, Resort Apply Reclaimed Asphalt to $42,000 $10,339 Village of Streets White City, Town of Reconstruct Gregory Ave East $1,000,000 $722,330 White City, Town of Expand Pathways and Lighting $186,172 $186,172 Access Road Upgrade-Railway Windthorst, Village of $20,000 $13,200 Avenue West Yellow Grass, Town of Street Repaving $1,700,000 $129,976 For more information on the federal Gas Tax Fund, please visit: http://www.infrastructure.gc.ca/plan/gtf-fte- eng.html .