Backgrounder Improving local roads and bridges in Saskatchewan’s urban municipalities Federal Gas Tax Fund allocated towards 120 projects in 2016 The federal Gas Tax Fund (GTF) provides Canadian municipalities with a permanent, predictable and indexed source of long-term funding. The Government of Canada will be providing Saskatchewan with more than $59.1 million for community infrastructure through the federal GTF in 2016-17. Based on project planning in 2016, federal GTF funding supported the following local roads and bridges projects in Saskatchewan’s urban municipalities: Federal GTF Estimated Municipality Project Name Allocated to Total Cost Project Allan, Town of Allan Pavement Project $111,000 $55,106 Upgrade Roads including Main Aquadeo, Resort Village of $104,528 $24,814 Access Road Service Road Extension - Arcola, Town of $50,000 $34,778 North Hwy #13 Reconstruct East Avenue Asquith, Town of $107,005 $107,005 Roadway and Drainage Assiniboia, Town of Repave Two Streets $641,000 $320,000 Aylsham, Village of Reconstruct South Ave Curve $10,000 $10,000 Balcarres, Town of Pave Streets $145,000 $70,000 Bangor, Village of Replace Sidewalk $5,500 $5,448 Rebuild Gull and Grouse Big Shell, Resort Village of $3,000 $3,000 Roads Bird's Point, Resort Village of Construct Morgan Ave $38,000 $30,426 Bjorkdale, Village of Chip Seal Streets $130,000 $58,785 Blaine Lake, Town of Upgrade Streets $123,465 $88,332 Bracken, Village of Upgrade Railway Ave $6,000 $6,000 Install Sidewalk Entry into Brownlee, Village of $4,000 $4,000 Senior Citizens Hall Resurface of Main Street (2 Bulyea, Village of $100,000 $30,131 blocks Ashley St) Burstall, Town of Construct Road Approach $11,613 $11,613 Cadillac, Village of Rebuild Centre Street $36,000 $32,124 Candle Lake, Resort Village of Trail Rehabilitation $13,700 $13,700 Construct Country Cabin Lane Chitek Lake, Resort Village of $9,428 $9,428 Walkway Rebuild One Block of Railway Choiceland, Town of $19,800 $19,800 Avenue Sidewalk Christopher Lake, Village of Pave 11 Village Intersections $90,000 $87,921 Clavet, Village of Rebuild 2nd Ave E Phase I $72,141 $21,925 Cochin, Resort Village of Repave 3 Streets $100,000 $46,224 Replace 420 m of Sidewalk on Creighton, Northern Town of $183,587 $183,587 Creighton Ave Denare Beach, Northern Pave and/or Sand Seal Roads $294,122 $294,122 Village of Denare Beach, Northern Road Development to New $65,000 $65,000 Village of Industrial Area Upgrade and Chip Seal Main Dundurn, Town of $179,300 $179,300 Arterial Streets Pave Streets and Install Eastend, Town of $230,893 $122,367 Asphalt Curbs Eatonia, Town of Replace Sidewalks $254,390 $150,063 Resurface Main Street from 1st Edam, Village of $15,914 $15,914 to 2nd Ave Eyebrow, Village of Replace Sidewalks $12,000 $7,800 Install a Culvert on Queen St Fenwood, Village of $4,000 $4,000 North Upgrade Lane to an All Fleming, Town of $25,000 $24,518 Weather Road Foam Lake, Town of Pave Saskatchewan Avenue $135,000 $125,000 Fort San, Resort Village of Walking Trail Upgrade $40,000 $40,000 Fort San, Resort Village of Culvert Upgrades $35,000 $35,000 Fosston, Village of Sand Seal 800m Railway Ave $30,000 $16,247 Gainsborough, Village of John Street Paving $52,000 $41,332 Gerald, Village of Repaving Streets $304,100 $33,676 Glenside, Village of Rebuild Islay Street $3,536 $3,369 Build Up Road to Village Goodsoil, Village of $10,543 $8,494 Specifications Build Rear Alley Behind New Goodsoil, Village of $7,467 $7,467 Development on 2nd Street SW Rebuild and Upgrade Roads Goodsoil, Village of $38,176 $15,961 Washed Out Replace Bridge on Jewel Goodwater, Village of $620,000 $7,385 Creek Grand Coulee, Village of Upgrade Railway Avenue $100,000 $100,000 Grandview Beach, Resort Apply Reclaimed Asphalt to $48,000 $7,385 Village of Streets Green Lake, Northern Village Construct Road to Access 11 $60,000 $18,477 of Properties Gull Lake, Town of Repave Third Street $302,795 $58,944 Upgrade and Resurface Hafford, Town of $70,500 $70,500 Streets Sidewalk Replacement Phase Hanley, Town of $48,000 $24,000 2 Replace 84 m of Sidewalks on Hazenmore, Village of $15,000 $14,770 Main Street Humboldt, City of Roadway Rehabilitation 2015 $593,000 $322,510 Ile A La Crosse, Northern Road Pavement Resurfacing $600,000 $244,158 Village of Imperial, Town of Sand Seal Streets $45,139 $33,095 Kamsack, Town of Renew Town Roads $540,875 $479,105 Kannata Valley, Resort Village Reconstruct 40 m of $30,800 $17,359 of Lakeshore Drive Paving of Railway Ave-Main St Kelvington, Town of $185,862 $100,000 W to Hwy No. 38 Replace Sidewalks-2nd and Kelvington, Town of $30,673 $30,673 3rd Ave (2014) Upgrade 9th Street West-7th to Kindersley, Town of $305,000 $305,000 9th Avenue West Upgrade C Street East-12th to Kindersley, Town of $185,000 $185,000 14th Avenue East Kinistino, Town of Resurfacing of Town Roads $428,300 $219,482 Construct Walking Paths and Krydor, Village of $3,000 $3,000 Sidewalks La Loche, Northern Village of Street Improvements $1,107,346 $910,623 Build and Upgrade Streets and La Loche, Northern Village of $1,034,583 $771,289 Sidewalks La Ronge, Northern Town of Upgrade Streets $2,975,600 $853,267 Lafleche, Town of Replace 305 m of Sidewalk $71,600 $71,600 Reconstruct 257 m of Avenue Langenburg, Town of $183,760 $183,760 A Reconstruct and Pave Hoover Lanigan, Town of $873,300 $410,606 Street Lemberg, Town of Upgrade Chickney Avenue $30,000 $30,000 Leoville, Village of Resurface Main Street $147,000 $108,116 Construct Willow Subdivision Leroy, Town of $300,000 $191,046 roads/curb and gutter 2015 Street Improvement Lloydminster, City of $2,500,000 $556,027 Program Loreburn, Village of Replace Sidewalks $7,500 $5,000 Street Pavement-Base Repairs Lumsden, Town of $180,000 $16,055 with Hot Mix Overlay Sidewalk/Walking Trails Lumsden, Town of $140,000 $57,994 Removal and Installation Construct Road, Curbs and Luseland, Town of $478,135 $167,196 Gutters-New Subdivision Macklin, Town of Paving Project Phase II $1,830,000 $417,991 Upgrade Appleton and Macoun, Village of $79,500 $72,668 Robinson Avenues Mankota, Village of Resurface 2nd Street $10,000 $10,000 Marcelin, Village of Rebuild Streets $72,607 $37,650 Maryfield, Village of Pavement Recap $334,716 $107,821 Pave Toronto Street Melville, City of $150,000 $130,000 Subdivision Road Sand Seal 1.6 km of Road-1st Meota, Village of $64,980 $64,980 St W and 2nd Ave W Mervin, Village of Reconstruct 1.5 km of Road $15,000 $15,000 Midale, Town of Repave Main Street $300,000 $134,093 Milden, Village of Upgrade Center Street $32,000 $24,000 Minton, Village of Upgrade First Avenue $40,000 $31,480 Mossbank, Town of Repave Three Streets $300,000 $118,364 Osler, Town of Reconstruct Three Streets $2,276,728 $331,762 Replace 85 m Sidewalks on Pangman, Village of $25,000 $25,000 Mergens Street Paradise Hill, Village of Pave 880 m of Second Street $115,000 $115,000 Replace Sidewalks on Main Parkside, Village of $18,000 $18,000 Street Pelican Pointe, Resort Village Road Erosion and Restoration $15,000 $4,431 of Pennant, Village of Pave 0.3 km of Road $131,609 $35,448 Reconstruct Saskatchewan Quill Lake, Village of $48,578 $48,578 Ave Quinton, Village of Resurface Municipal Streets $100,000 $48,621 Raymore, Town of Upgrade Two Service Roads $30,000 $30,000 Upgrade Redvers Perimeter Redvers, Town of $75,000 $75,000 Road Street and Bridge Regina, City of $121,760,000 $43,551,947 Infrastructure Renewal Replace Culvert on Third Ridgedale, Village of $982 $982 Avenue Centennial Hall Culvert Ridgedale, Village of $1,010 $1,010 Replacement Upgrade Centre Street and Rose Valley, Town of $43,145 $39,000 Second Street South Saskatchewan Beach, Resort Paving Main Roads $366,178 $107,846 Village of Shaunavon, Town of Repave Roads-2015 $200,000 $200,000 Shaunavon, Town of Repave 1500 m Roads $200,000 $200,000 South Lake, Resort Village of Pave 1100 m Lakeside Drive $42,500 $20,930 Spy Hill, Village of Repave Streets $200,000 $60,262 Upgrade Road and Install Two St. Gregor, Village of $30,014 $22,814 Culverts St. Louis, Village of Resurface Streets 2015 $40,000 $38,255 St. Louis, Village of Resurface Streets 2016 $30,000 $26,132 Thode, Resort Village of Resurface 2 km of Main Road $94,082 $46,378 Vibank, Village of Construct Sidewalks $8,800 $8,800 Vonda, Town of Rebuild Buffer Avenue $50,000 $50,000 Wakaw, Town of Reconstruct Elevator Road $65,000 $65,000 Waldheim, Town of Seal Coat Streets $130,200 $130,200 Wee Too Beach, Resort Apply Reclaimed Asphalt to $42,000 $10,339 Village of Streets White City, Town of Reconstruct Gregory Ave East $1,000,000 $722,330 White City, Town of Expand Pathways and Lighting $186,172 $186,172 Access Road Upgrade-Railway Windthorst, Village of $20,000 $13,200 Avenue West Yellow Grass, Town of Street Repaving $1,700,000 $129,976 For more information on the federal Gas Tax Fund, please visit: http://www.infrastructure.gc.ca/plan/gtf-fte- eng.html .
Details
-
File Typepdf
-
Upload Time-
-
Content LanguagesEnglish
-
Upload UserAnonymous/Not logged-in
-
File Pages5 Page
-
File Size-