PIPING

Company presentation 2011 1. Introduction 2. Markets 3. Product range 4. Our customers 5. Quality PIPING 6. HS&E 7. Production system

8. Organization chart 9. Recently awarded major projects 10. Why choose ULMA?

Main contact Information: AITOR ALBISU – ULMA PIPING EPC PROJECT DIVISION SALES & MARKETING DIRECTOR ([email protected]) 1. Introduction COMPANY PROFILE:

• Brand/marketing name: ULMA PIPING

• Registered name: ULMA FORJA S.COOP . (Since:1996, former name: ENARA S.COOP)

• Organization : Privately owned cooperative company established in 1962 .

• Location: Manufacturing plant and headquarters located in Oñati, a town in the centre of the Basque Country, an area in northern Spain and to the west of the French border with a deeply-rooted industrial tradition. Oñati is just 1 hour´s drive from Bilbao (International Airport)

ACTIVITY / PRODUCT LINE:

Manufacture and supply of:

1- FLANGES (Full range)

2- FORGED STEEL FITTINGS (high pressure fittings ,¼” up to 4”, CS only, only for stockist)

3- OTHER PIPING PRODUCTS:

3-1 LINE BLANKS (Spectacles, Spacers, Paddles)

3-2 WELD OVERLAYED SPOOL FABRICATION

3-3 SPECIALTY FORGINGS

3-4 ENGINEERED PRODUCTs. 1. Introduction

BUSINESS – SALES CHANNELS:

Currently 2 business divisions:

1. DISTRIBUTION- STOCK BUSINESS Operating since 1970, dealing with both stockist and Stock Business EPC Project Business project oriented distributors as well). Recognized world leader in the approved stock business, largest stocks worldwide, over 70 countries.

Main products:

• FLANGES and FORGED STEEL FITTINGS • LINE BLANKS (for projects only)

2. EPC PROJECT BUSINESS Operating since 2006 ,dealing directly with EPC contractors worlwide basis, New business division created, manufactured range expanded in materials and sizes , offered products and services range extended, strong investment plan completed.

Main products:

• FLANGES • LINE BLANKS • SPOOL FABRICATION (Including weld overlay) • SPECIALTY FORGINGS • ENGINEERED PRODUCTs 1. IntroductionIntroduction (ULMA PIPING)

HISTORY Since establishment in 1962 , ULMA has left its mark on numerous projects in the field of hydrocarbons and mineral refining plants, supplying FLANGES in all over the world ( over 70 countries worldwide, 95% overseas ).

YEAR ACTIVITY: 1962 Activity starts 1970 FLANGE production starts 1980 SHELL official approval 1986 Joined ULMA Corporation 1992 ISO 9001 certification (Lloyds Register) 1996 8000 tn press, largest in the world 2002 ISO 14001 certification (Lloyds Register) 2005 Ring Roll 160/125 up to 3m OD 2006 Strategic Plan 2006-2008 Targeting EPC Projects 2008 Manufacturing facility and product line expansion completed (over 50 M USD investment) 2009 Many orders bagged from most of the world leading EPC contractors 2010 OHSAS 18001 certification (Lloyds Register) 2011 New forging company adquired, specialized in custom made forgings and exotic materials

Year-> 2006 2007 2008 2009 2010

Total Sales 55 62 67 44 54 2. ANNUAL TURNOVER (Million Euros) Workforce 182 218 230 200 215 1. Introduction ORGANIZATION:

Cooperative company. (All the workers at ULMA are shareholders of the company).

ULMA Piping is a member of ULMA Group which includes 8 cooperative companies in different sectors, all located in the area of Oñati (Basque Country, Northern Spain) .

ULMA Corporation is associated with Mondragon. Mondragon the largest association of cooperative companies in the world. Its aim is to support all associated companies providing all types of external services. The association has its own University, R&D Centers, Bank & Health System serving all associated companies . Mondragon is the leading bussines corporation in the Basque Country and the 7th largest in Spain.

Group

Year Personnel Total Sales (Millions of euro) 2005 3,094 508 2006 3,493 625 2007 4,751 723 2008 4,638 725 POLIMERO PIPING 2009 4,130 569 2010 4,060 589 AGRICOLA FORKLIFT TRUCKS

CONSTRUCTION PACKAGING CONVEYOR HANDLING COMPONENTS SYSTEMS

Year Personnel Total Sales (Millions of euro)

2005 79,273 11,776 2006 82,600 13,300 2007 100,000 15,000 ULMA 2008 101,321 15,432 Corporate video 2009 85,066 14.769 2010 83,470 15.089 2.Markets 5, MINERAL REFINING:

Aluminium Refineries Nickel Refineries 1. NATURAL GAS

(UPSTREAM /DOWNSTREAM)

1.1 Natural Gas production

1.2 Natural Gas pipelines

1.3 Natural Gas treatment plants

1.4 Gas compression stations

1.5 LNG-LPG-GTL. Complete Chain 4. POWER GENERATION

Production-processing-transportation-re-processing Power generation plants (Gas-fuel-coal-nuclear)

Onshore & Offshore

2. OIL AND PETROLEUM 3. PETROCHEMICALS & CHEMICALS (UPSTREAM / DOWNSTREAM) Ethylene plants Production-processing-transportation-re-processing Propylene plants Polymer plants Onshore & Offshore Aromatics plants Fine chemical plants 3. Product and services range

We offer a wide selection of products to meet the needs of all industry sector:

Main Business

Other Piping Product Business FO 3. Product and services range 3. Product and services range 3. Product and services range 3. Product and services range 3. Product and services range

- Material Grades for forged products -

CARBON STEEL FOR PIPING AUSTENITIC STAINLESS STEEL FOR HIGH TEMPERATURE SERVICE A182F304 A105N A182F304 H C21(German Standard) A182F304 L BF48N (French Standard) A182F316 CSA GR 248 CAT I (Canadian Standard) A182F316 H *NACE for SOUR SERVICE available. A182F316L A182F316Ti CARBON AND LOW ALLOY FOR LOW TEMPERATURE A182F321 A182F321H A350LF2 Class1& Class 2 A182F347 A350LF3 Class 1 & Class 2 A182F347H A350LF6 Class 1,2 & 3 A182F44 A707 L3 Class 3 & 4 A182F904L BF48F (French Standard) CSA GR 248 CAT II (Canadian Standard) FERRITIC AUSTENITIC STAINLESS STEEL (DUPLEX -SUPERDUPLEX) *Requiring Notch Toughness Testing A182F51 A182F53 LOW ALLOY STEEL FOR HIGH TEMPERATURE SERVICES A182F55 A182F1 A182F5 NICKEL ALLOYS AND OTHERS A182F5A ALLOY 600-600H A182F6 ALLOY 625 A182F9 ALLOY 800-800H A182F11 Class2 ALLOY 825 A182F22 Class3 MONEL 4400 A182F91 HIGH YIELD CARBON STEEL FOR HP SERVICE

A694F42 A694F46 A694F52 A694F60 A694F65 A694F70 4.Our customers (Partial list of end user approvals )

ULMA has held its approvals from the largest end users worlwide since the early 1980s 4.Our customers (Partial list of end user approvals )

Achilles UK, NL and Ireland- FPAL Achilles NORWAY - JQS Achilles SPAIN - REPRO 4.Our customers (Partial list of Engineering firm approvals) 5.Quality

ULMA Flanges are well-known worldwide, with a reputation for reliability and high quality.

The operations and processes are implemented and governed by our quality assurance system. This system is certified to ISO 9001 standards, awarded by LLOYD’S REGISTER QUALITY ASSURANCE and subjected to continuous review and audit by internal quality audits, third-party inspection agencies, major engineering companies worldwide, and end users such as : SHELL, EXXON-MOBIL, SAUDI ARAMCO, BP, REPSOL, PDVSA, PETROBRAS, etc.

We are equipped with the most modern forging and machining facilities and a highly-qualified work force, enabling us to offer the widest possible range of flanges. We combine high standards in technology, quality and productivity, as well as tradition, experience and dependability, with an unrivalled reputation for quality and service . “Management based on the strictest quality standards allows ULMA to develop the product which best satisfies our customers”. 5.Quality

Every step from purchase order receipt through procurement, raw material inspection, machining, final inspection, painting and packaging is in accordance with regulations stipulated in our QA Manuals.

• Proud of our quality: “ We use our golden rustproof varnish to highlight any possible surface defects ”

TRACEABILITY AND, INSPECTION PROCEDURE

Quality Inspection VISUAL AND MACHINING & VISUAL AND INCOMING FORGING PACKING-STORAGE INSPECTION OK ULMA’S HEAT NO. DIMENSIONAL HEAT TREATMENT MARKING DIMENSIONAL RAW MATERIAL PCA-7.3.03 PCA-7.3.15 DISPATCH PCA-7.3.07 (GREEN LABEL) INSPECTION PCA-7.3.04 INSPECTION (ORANGE LABEL) (BLUE LABEL) (YELLOW LABEL) PCA-7.3.05 PCA-7.3.10 (YELLOW LABEL) PCA-7.3.10

REJECTED Quality Quality Inspection Inspection

BACK TO SUPPLIER (RED LABEL) 6. Health , Safety & Environment (HSE)

ULMA is the first flange manufacturing company in the world being triple certified (ISO 9001 – ISO 14001 – OHSAS 18001) by Lloyds Register Quality Assurance

HSE management is accorded top priority in ULMA and Quality Occupational Health Safety and Environment Management System (QHSE MS) has been developed, implemented and certified at operating facility as per the requirements of ISO 9001 (since 1992), OHSAS 18001(since 2010) and ISO 14001 (since 2002).

To enhance credibility, the QHSE management system at operating facility is third party certified by LLOYDS REGISTER QUALITY ASSURANCE and subjected to annual surveillance audit.

HSE issues are addressed systematically, effectively and proactively as per requirements of ISO standards/ OHSAS guidelines by making specific objectives and targets to address them.

The system works on the principle of risk management / environmental aspects management by identifying, quantifying and addressing them through appropriate work instructions and management plans. 7. Production System Ring Rolling

Raw material Heating + Cutting Handling

Quality Inspection * Chemical Quality composition Inspection * Sizes Forging  -Upsetting  -Punching * Quality  - Forging  -Trimming Machining

Shipping Area Heat Treatment

Quality Inspection

 Packing  -Painting  -Marking  - Drilling  -Turning

* Storage, fully automatic Transportation warehouse

Quality Inspection 3º Party Plant Production capacity, finished flanges: over 45,000 tn / year (1/2”up to 100”, 150150--2500,2500, all kind of materials)materials) 7. Production System (Forging)

Billet heating up to 1,200 ºC.

Forging Punching and clipping Hot cutting Hot upsetting Clip

Block PrePre--formform Punching slug Flange ready to be Rough forged flange punched and burred 7. Production System (Machining)

Machining step 1 Machining step 2 Machining step 3 Countersinking

Welding Neck

Slip On

Lap Joint

Blind

: Machined surface 8. Organization Chart -Comunication Channels

ULMA is perfectly prepared to support EPC contractors /engineering firms at every stage of the project:

Feasibility / FEED PMC D and D conceptual

Once a P.O. is awarded to ULMA, a Project Team is formed which will be the focal point for every comunication between the EPC Contractor and ULMA , ensuring efficient execution of the project:

PROJECT MANAGER = AREA MANAGER

PROJECT DOCUMENTATION COORDINATOR - EPC PROJECT DIVISION - 8. Organization Chart (Worldwide Sales Network)

UK

FRANCE

HEADQUARTERS OÑATI (SPAIN) JAPAN

ITALY

ULMA Piping Korea

TAIWAN QATAR IRAN Industrias ULMA MEXICO MALAYSIA Venezolana UAE

PHILIPPINES

INDIA NIGERIA

INDONESIA

CHILE

ARGENTINA

- EPC PROJECT DIVISION - ULMA Product Worlwide Stock Availability

ULMA is the recognized world leader in the approved stock-distribution business, largest stocks worldwide, over 70 countries

- DISTRIBUTION BUSINESS DIVISION - 9. Recently awarded major projects 9. Recently awarded major projects

EPC PROJECT NAME YEAR END USEREPC CONTRACTOR COUNTRY YANBU ETHYLENE GLYCOL Toyo Engineering PLANT 2007 SABIC JAPAN Corporation (Europe) (Kingdom of Saudi Arabia) DUNG QUAT REFINERY 2007 Toyo Kanetsu KK. JAPAN () KHURSANIYAH GAS PLANT (Kingdom of Saudi Arabia) 2007 ARAMCO Bechtel & UKUK--ITALYITALY

KHURSANIYAH GAS PLANT KINGDOM OF SABCO (Bechtel Saudi (Kingdom of Saudi Arabia) 2007 ARAMCO SAUDI Arabia)Arabia)--TechnipTechnip ARABIA Petroquímica de MORON FERTILIZER PROJECT Toyo Engineering 2007 Venezuela, S.A. JAPAN (Venezuela) Corporation (Japan) (PEQUIVEN) YANBU ETHYLENE GLYCOL KINGDOM OF SATEC Saudi Toyo PLANT 2008 SABIC SAUDI Engineering Company (Kingdom of Saudi Arabia) ARABIA MITSUBISHI HEAVY SPOX PROJECT INDUSTRIES ––PlantPlant and (Polypropylene Expansion 2008 EXXON MOBIL Transportation Systems JAPAN Project) Singapore Engineering & Construction Center

SCOPE OF SUPPLY: FLANGES ( WN, BLIND,……. ), SIZE RANGE: ½” up to 60”, RATING: 150-2500 , MATERIALS: Carbon steel , Low temp, Low Alloy, High Yield, SS, DSS, SDSS 9. Recently awarded major projects

PIPING EPC PROJECT NAME YEAR END USEREPC CONTRACTOR COUNTRY QATAR SHELL PEARL GTL EPCM Project 2008 M.W. Kellogg Limited UKUK (Qatar) GTL LTD KHURSANIYAH GAS PLANT (Kingdom of Saudi Arabia) 2008 ARAMCO Bechtel & Technip UKUK--ITALYITALY

Petroquímica de MORON FERTILIZER PROJECT Toyo Engineering 2008 Venezuela, S.A. JAPAN Corporation (Japan) (Venezuela) (PEQUIVEN) BG Group DRAGON LNG 2008 UKUK (Milford Haven, Wales, UK) Whessoe Oil & Gas 4 Gas MITSUBISHI HEAVY LARGE SCALE PTA PLANT INDUSTRIES ––PlantPlant and (Poland) 2008 PKN ORLEN Transportation Systems JAPAN Engineering & Construction Center

ETHANE CRACKER PROJECTPROJECT-- PTT Toyo Engineering 1000 KMTA ETHYLENE PLANT 2008 POLYETHYLENE Corporation (Japan) JAPAN (Thailand) COMPANY

SCOPE OF SUPPLY: FLANGES ( WN, BLIND,……. ), SIZE RANGE: ½” up to 60”, RATING: 150-2500 , MATERIALS: Carbon steel , Low temp, Low Alloy, High Yield, SS, DSS, SDSS 9. Recently awarded major projects

PIPING EPC PROJECT NAME YEAR END USEREPC CONTRACTOR COUNTRY QATAR SHELL PEARL GTL EPCM Project 2008 M.W. Kellogg Limited UKUK (Qatar) GTL LTD KHURSANIYAH GAS PLANT KINGDOM OF SABCO (Bechtel Saudi (Kingdom of Saudi Arabia) 2008 ARAMCO SAUDI Arabia)Arabia)--TechnipTechnip ARABIA SAMIR Refinery Upgrading 2008 SAMIR SAIPEM SPA ITALY Project (Morocco) Petroquímica de MORON FERTILIZER PROJECT Toyo Engineering 2008 Venezuela, S.A. JAPAN Corporation (Japan) (Venezuela) (PEQUIVEN) HASDRUBAL PROJECT Gas processing plant and LPG 2008 BG Tunisia Limited PETROFAC E&C Int. UAE facility (Tunisia)

CORINTH REFINERY TECNICAS REUNIDAS Crude Oil Distillation Unit 2008 Corinth refineries (Tecnical, Heat Exchanger SPAIN (Greece) Division)

HEURTEY PETROCHEM HASSI MESSAOUD REFINERY 2008 SONATRACH SAIPEM (Global contractor) FRANCE (Algeria)

SCOPE OF SUPPLY: FLANGES ( WN, BLIND,……. ), SIZE RANGE: ½” up to 60”, RATING: 150-2500 , MATERIALS: Carbon steel , Low temp, Low Alloy, High Yield, SS, DSS, SDSS 9. Recently awarded major projects

PIPING EPC PROJECT NAME YEAR END USEREPC CONTRACTOR COUNTRY Newfoundland oil refinery North Atlantic FMC TECHNOLOGIES 2008 FRANCE (Canada) Refinery (Jetty Marine loading arms ) EDOP PIPELINE EXXON MOBIL DELTAAFRIK ENGINEERING / (Emergency Repair Project) 2008 (Mobil Producing NIGERIA WORLEY PARSONS (Nigeria) Nigeria Unlimited) Parallel Train Petrochemical Project (Jurong Island –– 2008 EXXON MOBIL SHAW ––STONESTONE & WEBSTER USA Singapore) WHESSOE Ratnagiri LNG Terminal Ratnagiri Gas and PUNJ LLOYD 2008 UKUK--INDIAINDIA (Maharashtra(Maharashtra--India)India) Power Pvt Ltd AKER KVAERNER EIL (PMC) Sonangol Angola LNG Chevron TOYO KK (supply of two large LNG tanks 2008 BP (Global contractor: JAPAN and two LPG tanks) Total BECHTEL) ENI TECNICAS REUNIDASREUNIDAS-- Aconcagua Refinery (Chile) 2008 ENAP INITEC (Tecnical, Heat SPAIN Exchanger Division)

SCOPE OF SUPPLY: FLANGES ( WN, BLIND,……. ), SIZE RANGE: ½” up to 60”, RATING: 150-2500 , MATERIALS: Carbon steel , Low temp, Low Alloy, High Yield, SS, DSS, SDSS 9. Recently awarded major projects

PIPING EPC PROJECT NAME YEAR END USEREPC CONTRACTOR COUNTRY Ras Tanura Refinery DHT Project ZEECO ––SAMSUNGSAMSUNG 2008 SAUDI ARAMCO USAUSA--KOREAKOREA (Kingdom of Saudi Arabia) ENGINEERING CO LTD.

KHURSANIYAH GAS PLANT KINGDOM OF SABCO (Bechtel Saudi (Kingdom of Saudi Arabia) 2009 ARAMCO SAUDI Arabia)Arabia)--TechnipTechnip ARABIA Petroquímica de MORON FERTILIZER PROJECT Toyo Engineering 2009 Venezuela, S.A. JAPAN Corporation (Japan) (Venezuela) (PEQUIVEN) GRTgazGRTgaz--GazGaz de France FRANCEFRANCE-- 2009 GAZ DE FRANCE SNC LAVALIN (compression stations) SPAIN Rajasthan Northern Area CAIRN ENERGY 2009 LARSEN & TOUBRO Limited INDIA Development Project (India) INDIA LIMITED New Booster Station BS160 KOC Project 2009 (Kuwait Oil SAIPEM SPA ITALYITALY--INDIAINDIA (South East Kuwait) Company) Parallel Train Petrochemical Project (Jurong Island –– 2009 EXXON MOBIL SHAW ––STONESTONE & WEBSTER USA Singapore) Isle of Grain ––(UK)(UK)2009 NATIONAL GRID CB&I UKUK

SCOPE OF SUPPLY: FLANGES ( WN, BLIND,……. ), SIZE RANGE: ½” up to 60”, RATING: 150-2500 , MATERIALS: Carbon steel , Low temp, Low Alloy, High Yield, SS, DSS, SDSS 9. Recently awarded major projects

PIPING EPC PROJECT NAME YEAR END USEREPC CONTRACTOR COUNTRY Habhsan Gas Complex Expansion (UAE) 2009 GASCO FLUOR MIDDLE EAST

Leyte Geothermal Production Field ENERGY DEVELOPMENT 2009 PNOCPNOC--EDCEDC PHILIPPINES (Philippines) CORPORATION

Bagru project 2009 BAPCO JGC Gulf KSA India Panipat Naphtha Cracker 2009 IOCL TOYO ENGINEERING JAPAN Golar Freeze FSRU 2009 GOLAR LNG MOSS MARITIME NORWAY GRTgazGRTgaz--GazGaz de France FRANCEFRANCE-- 2009 GAZ DE FRANCE SNC LAVALIN (compression stations) SPAIN Numaligarh 2009 EIL (PMC) INDIA DQUP Project Refinery Limited Acueducto 2 --QueretaroQueretaro 2009 CONS / FCC ICAICA--FLUORFLUORMEXICO BECHTEL / WORLEY Keystone Oil Pipeline Project 2009 TRANSCANADA USA PARSONS EKPE ASABO Pipeline WORLEY PARSONS 2009 EXXON MOBIL NIGERIA Replacement project (Deltaafrik)

SCOPE OF SUPPLY: FLANGES ( WN, BLIND,……. ), SIZE RANGE: ½” up to 60”, RATING: 150-2500 , MATERIALS: Carbon steel , Low temp, Low Alloy, High Yield, SS, DSS, SDSS 9. Recently awarded major projects

PIPING EPC PROJECT NAME YEAR END USEREPC CONTRACTOR COUNTRY FUJIAN LNG (China) 2009 CNOOC CB&I MIDDLE EAST SAMIR Refinery Upgrading 2009 SAMIR SAIPEM SPA ITALY Project (Morocco) ABU ALI Plant Upgrade (Saudi 2009 ARAMCO BONATTI ITALY Arabia) Domestic Pipeline Project Czech ((CzechCzech Republic) 2009 -- PLYNOSTAV Republic

SSGP PIPELINE PROJECT MALAYSIA -- 2009 PETRONAS PUNJ LLOYD (Malaysia) INDIA EKPE ASABO Pipeline WORLEY PARSONS 2010 EXXON MOBIL NIGERIA Replacement project (Nigeria) (Deltaafrik) Domestic Pipeline Project Czech ((CzechCzech Republic) 2010 -- PLYNOSTAV Republic

Geothermal Plant Compressors 2010 CFE ALSTOM MEXICO (Mexico) KXL Pipeline Project BECHTEL / WORLEY 2010 TRANSCANADA USA (Canadian Package) PARSONS JUBAIL EXPOR REFINERY SATORP (Saudi SK Engineering & SOUTH 2010 (JERP) ––SaudiSaudi Arabia Aramco ––Total)Total) Construction KOREA

SCOPE OF SUPPLY: FLANGES ( WN, BLIND,……. ), SIZE RANGE: ½” up to 60”, RATING: 150-2500 , MATERIALS: Carbon steel , Low temp, Low Alloy, High Yield, SS, DSS, SDSS 9. Recently awarded major projects

PIPING EPC PROJECT NAME YEAR END USEREPC CONTRACTOR COUNTRY CCC FLEAR GAS PROJECT 2010 GASCO (Consolidated Contractors ABU DHABI Company) KAUTHER DEPLETION 2010 PDO PETROFAC E&C Int. SHARJAH COMPRESSION PROJECT KARAN GAS 2010 SAUDI ARAMCO PETROFAC E&C Int. SHARJAH SATORP JERP (JUBAIL EXPORT (SAUDI ARAMCOARAMCO-- 2010 BIHL UKUK REFINERY) TOTAL)

IGD (INTEGRATED GAS USAUSA-- 2010 GASCO CB&I DEVELOPMENT) SHARJAH MANIFA 2010 SAUDI ARAMCO CB&I SHARJAH EL MERK 2010 SONATRACH PETROFAC E&C Int. SHARJAH SATORP JERP (JUBAIL EXPORT (SAUDI ARAMCOARAMCO-- SAUDI 2010 PUNJ LLOYD REFINERY) TOTAL) ARABIA

ASAB 3 2010 GASCO TECHNIP ABU DHABI UAE JAPAN -- RUWAIS ––IGDIGD Project 2010 GASCO TOYO KANETSU --DAEWOODAEWOO KOREA

SCOPE OF SUPPLY: FLANGES ( WN, BLIND,……. ), SIZE RANGE: ½” up to 60”, RATING: 150-2500 , MATERIALS: Carbon steel , Low temp, Low Alloy, High Yield, SS, DSS, SDSS 9. Recently awarded major projects

EPC PROJECT NAME YEAR END USEREPC CONTRACTOR COUNTRY Sahil & Shah Full Fields 2010 ADCO TECNICAS REUNIDAS/INITEC SPAIN Development Pipeline (UAE) NCP --JubailJubail Olefins Complex 2010 NCP DAELIM KOREA (KSA) Sahil & Shah Full Fields 2010 ADCO CCC ABU DHABI Development Pipeline (UAE) SCOT & SWS4 (KSA) 2010 ARAMCO--SHELL ARAMCO SHELL JGC Gulf KSA EXXON MOBIL SANTOS PNG LNG (Papua New Guinea) 2010 AGL CHIYODA --JGCJGCJAPAN NIPPON OIL MRDC ELIXIER 2 GAS PIPELINE 2010 GASCO DODSAL E&C UAE PROJECT (UAE) SATORP JERP (JUBAIL EXPORT 2010 (SAUDI ARAMCOARAMCO-- ROTARY SINGAPORE REFINERY) (KSA) TOTAL) HABSHAN V (UAE) 2010 GASCO TECNIMONT --JGCJGCITALY --JAPANJAPAN Saudi Kayan --JubailJubail Olefins 2010 SAUDI KAYAN DAELIM KOREA Complex ––LDPELDPE (KSA) Arabian Chlor EDC / CA (KSA) 2010 DAELIM KOREA Vinyl Company SCOPE OF SUPPLY: FLANGES ( WN, BLIND,……. ), SIZE RANGE: ½” up to 60”, RATING: 150-2500 , MATERIALS: Carbon steel , Low temp, Low Alloy, High Yield, SS, DSS, SDSS 9. Recently awarded major projects

EPC PROJECT NAME YEAR END USEREPC CONTRACTOR COUNTRY QUEENSLAND CURTIS LNG 2010 BG Group BECHTEL OIL & GAS USA PLANT (Australia) Gassi Touil Gas Project (Algeria) 2010 Sonatrach JGC JAPAN EPIC FOR PRODUCED WATER TREATMENT & INJECTION -- 2010 Qatar Petroleum BLACKCAT QATAR PHASEPHASE--22(Qatar)(Qatar) JAPAN -- RUWAIS ––IGDIGD Project (UAE)2010 GASCO TOYO KANETSU --DAEWOODAEWOO KOREA KXL Pipeline Project BECHTEL / WORLEY 2010 TRANSCANADA USA (Canadian Package) PARSONS Tokuyama TMP Project (Malaysia) 2010 CHIYODA Corporation JAPAN Malaysia Sdn. Bhd KOC Pipeline (Kuwait) 2011 KOC PETROFAC E&C Int. SHARJAH SAMSUNG E&C (JV BOROUGE 3 (UAE) 2011 BOROUGE KOREA Tecnimont) Rabigh Refinery and Saudi Aramco 2011 JGC JAPAN Petrochemical Complex (KSA) Sumitomo Chem. HABSHAN V (UAE) 2011 GASCO TECNIMONT --JGCJGCITALY --JAPANJAPAN Gorgon LNG ––(Australia)(Australia) 2011 CHEVRON CB&I SHARJAH

SCOPE OF SUPPLY: FLANGES ( WN, BLIND,……. ), SIZE RANGE: ½” up to 60”, RATING: 150-2500 , MATERIALS: Carbon steel , Low temp, Low Alloy, High Yield, SS, DSS, SDSS 9. Recently awarded major projects

EPC PROJECT NAME YEAR END USEREPC CONTRACTOR COUNTRY SOUTH YOLOTEN PROJECT 2011 TURKMENGAS PETROFAC E&C Int. SHARJAH EFFLUENT WATER PROJECT 2011 KOC PETROFAC E&C Int. SHARJAH PT. DONGGIDONGGI-- DONGGI SENORO 2011 JGC JAPAN SENORO LNG

SCOPE OF SUPPLY: FLANGES ( WN, BLIND,……. ), SIZE RANGE: ½” up to 60”, RATING: 150-2500 , MATERIALS: Carbon steel , Low temp, Low Alloy, High Yield, SS, DSS, SDSS 10. Why choose ULMA?

DEMONSTRATED RELIABILITY

 OVER 45 YEARS EXPERIENCE.

Serving our customers since 1962.

COMPETITIVE PRICING AND DELIVERY.

Efficiency through fully automated production.

PROJECT MANAGEMENT.

Best communication structure, attention to detail and documentation support.

APPROVALS & CERTIFICATES.

All the major End Users and Standards.

STOCKISTS IN OVER 70 COUNTRIES.

Leadership throughout the world market 10. Why choose ULMA?

SIMPLY THE BEST SERVICE

 SERVICE YOU CAN DEPEND ON THROUGHOUT YOUR PROJECT CYCLE:

--DirectDirect personal contact: your area manager is youryour project manager

--ClearClear comunication from start to finish

--FullFull--timetime staff dedicated to project documentation

 EFFICIENT CUSTOMIZATION AND FAST TURNAROUND

--AllowingAllowing us to meet tight deadlines up to your lastlast MTO

 LEADINGLEADING--EDGEEDGE MANUFACTURING

--Design,Design, forge & machine a full range of flanges atat our own plant in Spain

--PlantPlant fully automated and robotized

--UnrivalledUnrivalled capacity and lead times

--QualityQuality unbeatable 10. Why choose ULMA?

COMMENDATION LETTERS

•• YEAR: 20072007--20092009 •• YEAR: 20072007--20092009 •• EPC CONTRACTOR: •• EPC CONTRACTOR: •• PROJECT: •• PROJECTS: KHURSANIYAH GAS PLANT (Kingdom of Saudi Arabia) MORON FERTILIZER PROJECT (Venezuela)

•• END USER: ETHANE CRACKER PROJECTPROJECT--10001000 KMTA ETHYLENE PLANT (T(Thailand)hailand)

YANBU ETHYLENE GLYCOL PLANT (Kingdom of Saudi Arabia)

•• END USERS: 10. Why choose ULMA?

COMMENDATION LETTERS

•• YEAR: 20092009--20102010 •• YEAR: 20082008--20092009 •• EPC CONTRACTOR: •• EPC CONTRACTOR: •• PROJECT: •• PROJECTS: GAZ DE FRANCE COMPRESSION STATIONS MOBIL NIGERIA PIPELINE PROJECTS (Nigeria)

•• END USER: BAPCO ––BAGRUBAGRU PROJECT (Baharain)

ANGOLA LNG ––TankTank Package (Angola)

•• END USERS: THANKS FOR YOUR ATTENTION AND SEE YOU SOON IN ULMA!