MANUAL FOR CONSTRUCTION AND OPERATION OF SOLAR GREENHOUSE

www.geres.eu MANUAL FOR CONSTRUCTION AND OPERATION OF SOLAR GREENHOUSE

www.agencynau.tj 3

INTRODUCTION Importance of solar greenhouse construction

Tajikistan is mountainous Lately, because of increasing prices for agricultural inputs and the growing population, country, with 93% of its terri- producing and providing the population with fresh and quality vegetables is becoming tory consisting of mountains. more and more difficult. Therefore, in order to introduce efficient ways for land use in Although only a small part of rural areas, this manual offers farmers (dehkans) methods of constructing and operating the country’s flat areas is efficient solar greenhouses . suitable for agriculture, it The manual consists of the following main sections: counts for main source of 1. Construction of solar greenhouses; income for almost 70% of 2. Operation of solar greenhouses; population. Most of the pro- 3. Contact information of promoters and artisans (engineers) for construction of solar duced agricultural crops go greenhouse in Ayni and Asht districts, Sugd province. to household tables, and This manual is developed within the frame of the project “Increasing income generation of part of it is sold at local mar- rural households and improving living condition of poor population of Sugd province” by kets, which to some degree, the European Union through GERES. Although this manual is developed mainly for contributes to food security dehkans from Ayni and Asht districts of Sugd province, dehkans from other districts with of the country. similar topography and climate as in the above mentioned districts, can also benefit from it.

www.geres.eu MANUAL FOR CONSTRUCTION AND OPERATION OF SOLAR GREENHOUSE

TABLE OF CONTENTS

1. Solar Greenhouse...... 5 2. Construction of solar greenhouse...... 6 2.1. Selecting type of greenhouse ...... 8 2.2. Planning for procurement of construction materials( Cost estimate)…………...... 9 2.3. Selecting location and drawing design ………...... 18 2.4. Building basement (foundation) of greenhouse...... 32 2.5 Building western, eastern and northern walls of greenhouse...... 34 2.6. Constructing and installing the entering doors to greenhouse...... 37 2.7. Constructing and installing ventilation windows to greenhouse………...... 38 2.8. Roofing the northern part and installing ventilation windows on the roof of greenhouse………...... 39 2.9. Covering the southern part of the roof with plastic (cellophane)...... 44 3. Operation of solar greenhouse………...... 46 4. Contact information ofmaster and promoters of solar greenhouse...... 50 www.agencynau.tj 5

1. SOLAR GREENHOUSE

Efficient technology for cultivation and production of early vegetables in autumn, winter and early spring.

A solar greenhouse is a type of greenhouse in which Solar greenhouse A greenhouse saves energy and you can grow early vegetables in autumn, winter and can be two sizes: helps the environ- early spring. Usually, people grow tomatoes, cucum- – 10m х 5m size; ment. – 20m х 5m size. bers, greens, early vegetable seedlings as well as beans for secondary crops. Greenhouses are usually built South-facing . During the day, heat from the sun is concentrated on the crop. It does not use any addi- tional heating equipment for cultivation, because at night, during the cold season, the top of it can be covered with special straw mattresses. This prevents energy waste and heat loss.

www.geres.eu MANUAL FOR CONSTRUCTION AND OPERATION OF SOLAR GREENHOUSE

2. CONSTRUCTION OF A SOLAR GREENHOUSE Following all these steps during construction guaran- tees high productivity of your greenhouse.

Principles for greenhouse operation To take ad- Step1 Step 2 Step 3 1. Sunlight energy is collected during vantage of all the day the correct prin- ciples of build- 2. The energy collected during the day ing a green- is stored in the greenhouse house, use the Select loca- 3. Heat is passed through the walls in following steps: Procure con- tion and the greenhouse Select a type struction ma- draw design of greenhouse terials ( Cost 4. Heat loss at night can be prevented of green- estimate) by covering the greenhouse with a house. felt mattress.

www.agencynau.tj 7

Step 4 Step 5 Step 6 Step 7 Step 8 Step 9

Cover the northern roof By following Build base- Build western, Prepare and Prepare and and install Cover the these steps you ment eastern and will build an effi- install enter- install ventila- ventilation southern part (foundation) northern cient solar green- ing doors to tion windows windows on with plastic of green- walls of greenhouse. to greenhouse the roof of the (cellophane). house . greenhouse. greenhouse

www.geres.eu

MANUAL FOR CONSTRUCTION AND OPERATION OF SOLAR GREENHOUSE

2.1. SELECTING WHICH TYPE OF Step 1 Step GREENHOUSE

Selecting which type of greenhouse is the first step you must make in constructing a solar greenhouse. This manual presents two types of solar greenhouses. Both types of greenhouse also have sub-types. You can se- lect the type you like best.

Option А. Option B.

Option А1. Option А2. Option 1.B Option 2.B Size: 10 m х 5 m Size: 10 m х 5 m Size: 20 m х 5 m Size: 10 m х 5 m Area (0,005 ha) Area (0,005 ha) Area (0,001 ha) Area (0,005 ha) With iron frame With wooden frame With iron frame With wooden frame With brick walls on With brick walls on With brick walls on With brick walls on east, west and north east, west and north east, west and north east, west and north Cost- 12,401.96 TJS Cost - 11,767.96 TJS Cost - 20,757.00 TJS Cost - 20,029.00 TJS www.agencynau.tj

9

2.2. PROCURING CONSTRUCTION MATE- Step 2 Step RIALS (COST ESTIMATE)

Meas- Meas- Option А1. # Expenditure items urement Quantity Price Total cost # Expenditure item urement Quantity Price Total cost unit Unit Size 10 m х 5 m 1 Preparing soil with tractor or manually 3 Wall With iron frame Labor cost m3 25 50 1250 Labor cost for laying bricks piece 3240 0.15 486 Calculation 1250 Cost of expenditure is 2 Foundation estimated in Tajik So- Labor cost for plastering ( only 2 m2 14.41 6 86.46 moni. Labor cost m 16.56 25 414 from outside) Labor cost for filling the wall m. Construction materials: above foundation off the ground 2,5 20 50 length. with soil Mud brick size piece 3240 0.3 972 Construction materials 0.25х0.12х0.065m 3 Stone м 9 70 630 Clay (mud) for plastering m3 2,5 70 175 Sand м3 3 70 210 Insulation (hay or sawdust) + Cement t 1.75 900 1575 sack 40 7 280 plaster Hydro insulation roofing material roll 1 80 80 Calculation 2959 Calculation 1999.46 www.geres.eu MANUAL FOR CONSTRUCTION AND OPERATION OF SOLAR GREENHOUSE

Option А1. Meas- Meas- # Expenditure item urement Q-ty Price Total Cost # Expenditure item urement Q-ty Price Total cost Size 10 m х 5 m unit unit With iron carcass 4 Roof 5 Front carcass person/ person/ Welding labor cost 3 100 300 Welding labor cost 3 100 300 Cost of expenditure is day day estimated in Tajik So- Labor cost for insulating with sand Construction materials: moni (soil) and with galvanized corru- m2 25 15 375 gated sheet Plastic pipe for under the column m. 3 40 120 Construction materials: Profile 4cm х 6cm for column and m.тӯл. 15 15 225 Plastic pipes filled with cement to beam m.length 3 40 120 support columns Corner brace 40mm m. 48 8 384 Iron pipe Ø76mm used as beam Crosspiece for top of window m. 17 28 476 m. 10 2,2 22 and columns in the frame 12mm Corner brace 40mm m. 62 8 496 Electrode 2-3 мм piece 100 0,2 20 Paint for wood kg 4 12 48 Disc for angle grinder piece 1 6 6 Crosspiece support bars for roof m.length 50 2,2 110 Lintel for foundation and rooftop m. 12mm . 20 5 100 to attach plastic sheet 5сm х 5сm length. Electrode for welding 2-3 mm piece 100 0,2 20 Disc for angle grinder piece 1 6 6 Plastic sheet 0,8 х 1.5 m m. 12 15 180 Straw bunch 44 3 132 Wire with 2mm diameter kg 4 8 32 Soil for making clay plaster m3 1.2 70 84 m. Twine 60 0,8 48 Wire with 2mm diameter kg 4 8 32 length Calculation 1437 Lintel 4cm х 5cm (frame under the m. 40 4,5 180 6 Night insulation galvanized corrugated sheet) person/ Labor cost for installing 0.5 100 50 Galvanized corrugated sheet day m. 12 48 576 ( 2.5m length and 0.95m width) Construction materials: Screws кг. 1 15 15 Ready made insulation materials 2 Drainage m.тӯл. 11 7 77 (with consideration of Transpor- m 45 11 495 Calculation 3047 tation cost) Calculation 545 www.agencynau.tj 11

Meas- Meas- # Expenditure item urement Q-ty Price Total cost # Expenditure item urement Q-ty price Total cost unit unit 7 Installing door and windows Ready made windows with glass- piece 1 70 70 Labor cost for installing windows person/ es of 0.5m х 0.6m size. 1 100 100 and door day Hinge pair 1 5 5 Construction materials for door: Handle piece 1 5 5 Security Bolt piece 1 2 2 Crosspiece 3сm х 10сm х 6m m.length 6 10 60 Meter Iron grate 1 5 5 length Door with 1.8m х 0.7m size m. 1 200 200 Nails for door and windows kg 1,5 8 12

Hinge pair 1 10 10 Paint for door and windows kg 2 10 20 Handle piece 2 5 10 Calculation 664.50 Security Bolt piece 1 3 3 8 Transportation cost 500 Construction materials for win-

dow Total 12401.96 Crosspiece 3сmх 10сm х 6m m.length 4.5 10 45

Lintel 5сm х 5 сm m.length 5.5 5 27,5

Insulation (Styrofoam) m2 1 15 15 Hinge pair 1 10 10

Galvanized sheet m2 1 25 25

Construction material for win-

dows

Crosspiece 3сm х 10сm х 6m to m. 4 10 40 cover the top of the window length

www.geres.eu MANUAL FOR CONSTRUCTION AND OPERATION OF SOLAR GREENHOUSE

Option А2. Meas- Meas- # Expenditure items urement Quantity Price Total cost # Expenditure items urement Quantity Price Total cost Size 10 m х 5 m unit unit With wooden frame 1 Preparing soil with tractor or manually Labor cost for insulation + soil 2 m 25 15 375 Labor cost m3 25 50 1250 +galvanized corrugated sheet Materials: Cost of expenditures are Calculation 1250 Plastic pipe filled with concrete to estimated in Tajik So- 2 Foundation m.length 2 40 80 2 stabilize columns moni Labor cost m 16,56 25 414 Wooden columns with 150mm Labor cost for filling the wall m.length 8 20 160 diameter above foundation off the ground m.length 2,5 20 50 with soil Beam with 150mm diameter m. 10 20 200 Construction materials Cross beam 120mm х 40mm х 6m piece 8 52 416 3 Lintel 40mm х 40mm. m.length 40 4 160 Stone m 9 70 630 Straw bunch 44 3 132 Sand m3 3 70 210 Soil for plastering m3 1,2 70 84 Cement t 1,75 900 1575 Wire with 2mm diameters kg 4 8 32 Hydro insulation roofing material roll 1 65 65 Nails kg 3 8 24 Calculation 2944 3 Wall Lintel 4сm х 5сm to install roof m. 40 4,5 180 Labor cost piece 3240 0.15 486 from galvanized sheet Labor cost for plastering (from 2 Galvanized corrugated sheet m 14.41 6 86,46 piece 12 48 outside only) (length 2.5м, width 0.95m) Materials: Screw kg 1 15 15 Mud brick of 0.25х0.12х0.65m m.length piece. 3240 0.3 972 Gutter for drainage 11 7 77 size . 3 Soil for making clay plaster m 2.5 90 225 Calculation 2711 Insulation (hay or sawdust) + sack 40 7 280 5 Front frame plastering Labor cost for putting up the person/ 2 100 200 Calculation 2049.40 beams day 4 Roof Materials Labor cost for putting up the person/ m.length 2 100 200 Plastic pipe 2 40 80 beams day . www.agencynau.tj 13

Meas- Meas- # Expenditure items uremen Quantity Price Total cost # Expenditure items uremen Quantity Price Total cost t unit t unit Wooden columns with 150mm m. Crosspiece 3сm х 10сm х 6m 6 10 60 diameter (you can use the lefto- length m. 0 0 0 vers remaining after measuring Ready door with 1.8m х 0.7m size. piece 1 200 200 and cutting the big columns) Hinge pair 1 10 10 m.lengt Beam with 120mm diameter 10 15 150 Handle piece 2 5 10 h Security Bolt piece 1 3 3 m.lengt Cross beam 100mm х 40 mm х 4m 10 29 290 Construction materials for window: h m. Lintel for attaching plastic from Plank 3сm х 10сm х 6m. 4,5 10 45 m.lengt length foundation to top of wooden roof 20 5 100 h Crosspiece 5сm х 5 сm m. 5,5 5 27,5 5сm х 5сm Insulation (Styrofoam) m2 1 15 15 m.lengt Plastic sheet 1mkm х 6 m 12 15 180 Hinge pair 1 10 10 h Galvanized sheet m2 1 25 25 Nail kg 3 8 24 Construction material for windows: Wire with 2mm diameter kg 4 8 32 m. m.lengt Crosspiece 3сm х 10сm х 6m 4 10 40 Twine 60 0.8 48 length h Calculation 1104 Window 0.5m х 0.6m size. piece 1 70 70 6 Night insulation Hinge pair 1 5 5 person/ Labor cost for installing 0,5 100 50 Handle piece 1 5 5 day Security Bolt piece 1 2 2 Material: m. Chicken wire to keep out birds 1 5 5 Insulation material (including length m2 45 11 495 Transportation cost) Nails for door and windows kg 1,5 8 12 Paint for door and windows kg 2 10 20 Calculation 545 Calculation 664,5 7 Installing door and windows 8 Transportation cost 500 person/ Labor cost for putting up beams 1 100 100 TOTAL 11767.96 day Construction materials for door www.geres.eu MANUAL FOR CONSTRUCTION AND OPERATION OF SOLAR GREENHOUSE

Meas- Meas- Option B1. Total Total # Expenditure item urement Q-ty Price # Expenditure item urement Q-ty Price Size 20 m х 5 m Cost Cost unit unit With iron carcass 1 Preparing soil with tractor or manually Labor cost for insulation + plas- 2 Labor cost m3 50 50 2500 tering+galvanized corrugated m 50 15 750 sheet Cost of expenditure is Calculation 2500 estimated in Tajik So- 2 Foundation Material: 2 Plastic pipe filled with cement to m. moni Labor cost m 28,56 25 714 5 40 200 stabilize columns length. Labor cost for filling the wall Iron pipe of Ø76mm diameter above foundation off the ground m.length 2,5 30 75 m. used as beams and columns in 31 28 868 with soil length. the frame Construction materials Corner brace 40mm m. 123 8 984 Stone m3 14.4 70 1008 Crosspiece Bar 12mm m. 100 2.2 220 Sand m3 5 70 350 Electrode 2-3 mm piece 200 0.2 40 Cement t 2.75 900 2475 Disc for corner grinder piece 2 6 16 Hydro insullation roofing material roll 1.5 80 120 Straw bunch 80 3 240 Calculation 4742 3 Soil (clay) for plastering m 2,4 70 168 3 Wall Wire with 2mm diameter kg 6 8 48 Labor cost piece 5040 0.15 756 Labor cost for plastering (from Lintel 4cm х 5сm to attach metal m2 26 6 156 m.length 80 4.5 360 outside only) sheet walls Materials: Galvanized corrugated sheet Mud brick of 0.25х0.12х0.65m (with 2.5m length and 0.95m piece 24 48 1152 piece 5040 0.3 1512 size width) Soil for making clay plaster m3 5 70 350 Screw kg 2 15 30 Gutter m. length 21 7 147 Insulation (hay or sawdust) + sack 55 7 385 Calculation 5719 plastering 5 Front carcass of greenhouse Calculation 3159 person/ Labor cost for welding 4 100 400 4 Roof day person/ Labor cost for welding 5 100 500 Materials: day Plastic pipe for under the column m. length 5 40 200 www.agencynau.tj 15

Meas- Meas- Total Total # Expenditure item urement Q-ty Price # Expenditure item urement Q-ty Price Cost Cost unit unit Square iron beams 4сm х 6сm for m. Ready door with size of 1.8m х 28 15 420 piece 1 200 200 column and beam length. 0.7m. m. Corner brace 40mm 96 8 768 Hinge pair 1 10 10 length. Handle piece 2 5 10 Paint for frame kg 6 12 72 Security Bolt piece 1 3 3 m. Crosspiece 12mm 20 2,2 44 Construction materials for building two windows: length. m. Plank 3сm х 10сm х 6m 9 10 90 Electrode 2-3 mm piece 100 0,2 20 length. Disc for corner grinder piece 2 6 12 Crosspiece 5сm х 5сm m. length 11 5 55 Crosspiece for the top of founda- Insulation (Styrofoam) m2 2 15 30 tion and top of roof carcass 5сm m.length. 40 5 200 Hinge pair 2 10 20 х 5сm Zinc coated tin plate m2 2 25 50 Plastic 1mkm х 6 m m. length 22 15 330 Construction materials for con- Wire with 2mm diameter kg 6 8 48 struction of windows: Twine m. length 120 0.8 96 Calculation 2210 Crosspiece 3сm х 10сm х 6m m. length 4 10 40 6 Night insulation Person/ Window Size 0.5mх 0.6m piece 1 70 70 Labor cost for installation 1 100 100 day Hinge pair 1 5 5 Materials: Handle piece 1 5 5 Ready insulation (with considera- m2 90 11 990 tion of Transportation cost) Security Bolt piece 1 2 2 m. Calculation 1090 Wire mesh to keep out birds 1 5 5 7 Installing the windows length. Person/ Nails for windows and door kg 1.5 8 12 Labor cost for timbering 1.5 100 150 day Paint for windows and door kg 2 10 20 Construction materials for door: Calculation 837 Plank 3сm х 10сm х 6m m. 8 Transportation cost 500 6 10 60 (connector) length. TOTAL 20757.00 www.geres.eu MANUAL FOR CONSTRUCTION AND OPERATION OF SOLAR GREENHOUSE

Meas- Meas- Option 2.B Total Total # Expenditure item urement Q-ty Price # Expenditure item urement Q-ty Price Size 20 m х 5 m Cost Cost With wooden car- unit unit cass 1 Preparing soil by tractor or manually Labor cost for insulation + plas- Labor cost m3 50 50 2500 tering + galvanized corrugated m2 50 15 750 Cost of expenditure is Calculation 2500 sheet estimated in Tajik So- 2 Foundation Materials Labor cost m2 28,56 25 714 Plastic pipe filled with concrete moni m. 5 40 200 for supporting columns Labor cost for filling the wall Wooden pipe with 150mm diam- m. m.length 2,5 30 75 16 20 320 above foundation with soil eter length. Bean with 150mm diameter m. length 20 20 400 Construction materials Cross beam with 120mmх 40mm piece 16 52 832 Stone m3 14.4 70 1008 х 6 m diameter. Sand m3 5 70 350 Crosspiece with 40mm х 40mm m. length 80 4 320 Cement t 2.75 900 2475 Straw bunch 80 3 240 Hydro insullation roofing material roll 1.5 80 120 Sand m3 2,4 70 168 Calculation 4742 Wire with 2mm diameter kg 6 8 48 3 Wall Nail kg 6 8 48 Labor cost piece 5040 0.15 756 Crosspiece with 4сm х 5сm diam-

2 eter (carcass under the galva- m. length 80 4,5 360 Labor cost m 26 6 156 nized corrugated sheet) Galvanized corrugated sheet piece 24 48 1152 Materials: piece 5040 0.3 1512 (length 2.5m, width 0.95m) Mud brick of 0.25х0.12х0.65m Ready made drainage pipe m. 21 7 147 m3 5 70 350 size Screw kg 2 15 30 Calculation 5315 Soil for making clay plaster sack 55 7 385 5 Wooden Frame Calculation 3159 person/ Labor cost for putting up beams 2 100 200 4 Roof day Labor cost for putting up wooden person/ Materials: 3 100 300 beams day Plastic pipes filled with cement m. length 5 40 200 for supporting columns www.agencynau.tj 17

Meas- Meas- Total Total # Expenditure item urement Q-ty Price # Expenditure item urement Q-ty Price Cost Cost unit unit Wooden columns with 150mm Crosspiece for door 3сm х 10сm х m. 6 10 60 diameter (you can use the lefto- m. 6m length. 0 0 0 vers remaining after measuring length. Door size 1.8m х 0.7m piece 1 200 200 and cutting the big columns) m. Hinge ҷpair 1 10 10 Beam with 120mm diameter 20 10 200 length. Handle piece 2 5 10 Cross beam , 100mm х 40 mm х Security Bolt piece 1 3 3 piece 20 29 580 4m Construction material for two upper windows Lintel for attaching plastic sheet m. Crosspiece for windows 3сm х m. from foundation to roof 5сm х 40 5 200 9 10 90 length. 10сmх 6m length. 5сm Lintel 5сm х 5сm m. length 11 5 55 m. Plastic1mkm х 6 m 22 15 330 Insulation (Styrofoam) m2 2 15 30 length. Hinge pair 2 10 20 Wire with 2mm diameter kg 6 8 48 Galvanized sheet m2 2 25 50 m. Construction materials for win- Twine 120 0,8 96 length. dows Nail kg 4 8 32 Windows Crosspiece 3сm х 10сm m. 4 10 40 Calculation 1886 х 6m length. 6 Night insulation Windows size 0.5m х 0.6m piece 1 70 70 Person/ Labor cost for installation 1 100 100 day Hinge pair 1 5 5 Material: Handle piece 1 5 5 Security Bolt piece 1 2 2 Night insulation materials: Trans- m2 90 11 990 Wire mesh to keep out birds m. 1 5 5 portation cost included Nails for windows kg 1,5 8 12 Calculation 1090 Paint for windows kg 2 10 20 7 Installing door and windows Calculation 837.00 Labor cost for putting up wooden Person/ 8 Transportation cost 500.00 1,5 100 150 beams day TOTAL 20029.00 Construction materials for door www.geres.eu

MANUAL FOR CONSTRUCTION AND OPERATION OF SOLAR GREENHOUSE

3 2.3. SELECTING LOCATION AND LAY- Step Step ING THE FOUNDATION

When selecting a location for solar green house con- winds. struction, consider the following: e) Positioning of green- house. a) Access to irrigation. c) Underground water The greenhouse must The land must be irri- must be low. face south. Use a com- gated and must be The land chosen must pass to determine the available for your use. be well above the wa- direction. The land must be close ter table, because to a source of water. crops must be cultivat- b) Access to sun light. ed to a depth of 1 me- The greenhouse must ter. be constructed in a d) Wind place where it can get The greenhouse must at least 6 hours of sun be constructed in a light during the day. place safe from strong www.agencynau.tj 19

As it is shown in the picture, the sun is 1. Sun movement in June. strongest in the south year-round. 2. Sun movement in March. Therefore, while selecting a location for 3. Sun movement the greenhouse try to make it face the in December. south. In special cases, greenhouses can be positioned±30° from the south.

www.geres.eu MANUAL FOR CONSTRUCTION AND OPERATION OF SOLAR GREENHOUSE GENERAL PLAN

window

Option А1. South ≈ ±30° Size 10 m х 5 m With iron frame www.agencynau.tj Option А1. CROSS SECTION А-А 21 Size 10 m х 5 m With iron frame

Layer of Straw plastering Pipe d=76mm Insulation layer Crosspiece d=12mm Corner brace 40mm +1.70m

+1.150m

0.925m Steel pipe 30x60 mm +0.80m +0.65m gutter Crosspiece d=12mm Steel bar 30x60mm Window 0.5 x 0.6m 300 1 level of roofing material 0.000m Pipe d=76mm 0.000m

-0.50m

www.geres.eu MANUAL FOR CONSTRUCTION AND OPERATION OF SOLAR GREENHOUSE CROSS SECTION В-В

Stl Pipe d=76mm

+1.70m Layer of Straw plastering Insulation layer crosspiece d=12mm +1.35m Steel bar 30x60 mm Corner brace 40mm

+0.925m +0.8m

gutter Steel bar d=12mm 300 1 level of roofing material 0.000m 0.000m

-0.25m

-0.50m

Option А1. Size 10 m х 5 m With iron frame www.agencynau.tj Option А2. GENERAL PLAN 23 Size 10 m х 5 m With wooden frame

window

South ≈ ±30°

www.geres.eu MANUAL FOR CONSTRUCTION AND OPERATION OF SOLAR GREENHOUSE CROSS SECTION А-А

Layer of Straw plastering Beam d=150mm Insulation layer Old board or tree branches Cross beam d=120mm +1.70m

+1.150m Beam d=150mm 0.925m +0.80m

+0.65m gutter

Window 0.5 x 0.6m 300 1 level of roofing material 0.000m Wood d=150mm 0.000m

-0.50m

Option А2. Size 10 m х 5 m With wooden frame www.agencynau.tj Option А2. CROSS SECTION В-В 25 Size 10 m х 5 m With wooden frame

Beam d=150mm

+1.70m Layer of Straw plastering Insulation layer Old board or tree branches +1.35m Beam d=150mm Cross beam d=120mm

+0.925m +0.8m

gutter

300 1 level of roofing material 0.000m 0.000m

-0.25m

-0.50m

www.geres.eu MANUAL FOR CONSTRUCTION AND OPERATION OF SOLAR GREENHOUSE GENERAL PLAN

А В

window window

6250 300 6300 300 6250

А В

South ≈ ±30°

Option B1. Size 20 m х 5 m With iron frame www.agencynau.tj Option B1. CROSS SECTION А-А 27 Size 20 m х 5 m With iron frame

Layer of Straw plaster Pipe d=76mm Insulation layer crosspiece d=12mm Corner brace 40mm +1.70m

+1.150m

0.925m Steel beam 30x60 mm +0.80m +0.65m gutter Metal bar d=12mm Stl beam 30x60mm Window 0.5 x 0.6m 300 1 level of roofing material 0.000m Pipe d=76mm 0.000m

-0.50m

www.geres.eu MANUAL FOR CONSTRUCTION AND OPERATION OF SOLAR GREENHOUSE CROSS SECTION В-В НАКШАИ УМУМИИ ГАРМХОНАИ ОФТОБИ

Pipe d=76mm

+1.70m Layer of Straw plaster Insulation layer Crosspiece d=12mm +1.35m Steel beam 30x60 mm Corner brace 40mm

+0.925m +0.8m

Gutter Steel bar d=12mm 300 1 level of roofing material 0.000m 0.000m

-0.25m

-0.50m

Option 1.B Size 20 m х 5 m With iron frame www.agencynau.tj Option B2. GENERAL SCHEME 29 Size 20 m х 5 m With wooden frame

А В

window window

6250 300 6300 300 6250

А В

South ≈ ±30°

www.geres.eu MANUAL FOR CONSTRUCTION AND OPERATION OF SOLAR GREENHOUSE CROSS SECTION А-А

Layer of Straw plastering Beam d=150mm Insulation layer Old board or tree branches Cross beam d=120mm +1.70m

+1.150m 0.925m Beam d=150mm +0.80m +0.65m gutter

Window 0.5 x 0.6m 300 1 level of roofing material Wood d=150mm 0.000m 0.000m

-0.50m

Option 2.B Size 20 m х 5 m With wooden frame www.agencynau.tj Option 2.B CROSS SECTION В-В 31 Size 20 m х 5 m With wooden frame

Beam d=150mm

+1.70m Layer of Straw plastering Insulation layer Old board or tree branches Cross beam d=120mm +1.35m Beam d=150mm

+0.925m +0.8m

gutter

1 level of roofing material 300 0.000m 0.000m

-0.25m

-0.50m

www.geres.eu

MANUAL FOR CONSTRUCTION AND OPERATION OF SOLAR GREENHOUSE

4. CONSTRUCTION OF FOUNDATION Step 4 Step OF GREENHOUSE

▪ The foundation is a key part of the construction. The foundation of the walls must be first drafted on the ground and then the ground must be excavated 50 cm deep. ▪ The foundation is mostly built from stone, with a mixture of sand and cement between the stone. (if stone is not available, concrete can be used). ▪ The size of the foundation for each option of solar greenhouse is shown below:

General area Option А1. Option А2. Option B1. Option B2. From east to west 10 m. 10m. 20m. 20m. From north to south 5m. 5m. 5m. 5m.

Height and thickness

Eastern, western and 0,60m. х 0,60m. 0,60m. х 0,60m. 0,60m. х 0,60m. 0,60m. х 0,60m. northern foundation

Southern foundation 0,60m. х 0,20m. 0,60m. х 0,20m. 0,60m. х 0,20m. 0,60m. х 0,20m. www.agencynau.tj 33

General view of foundation during construction of solar greenhouse.

www.geres.eu

MANUAL FOR CONSTRUCTION AND OPERATION OF SOLAR GREENHOUSE

2.5 BUILDING EASTERN, WESTERN Step 5 Step AND NORTHERN WALLS OF THE GREENHOUSE

It is important to build the walls correctly by following the requirements below.

Length of walls OptionА1. Option А2. Option B1. Option B2. Eastern and western 5m. 5m. 5m. 5m. walls Northern walls 10m. 10m. 20m. 20m.

Height and thickness Eastern and western 1,70m. from above ground / 1,70m.from above the ground / 1,70m.from above the ground / 1,70m.from above the ground / walls 0,56m. 0,56m. 0,56m. 0,56m. 0,80m. From above the ground/ 0,80m.from above the ground / 0,80m.from above the ground / 0,80m.from above the ground / Northern walls 0,56m. 0,56m. 0,56m. 0,56m.

Southern walls N/A N/A N/A N/A www.agencynau.tj 35

Greenhouse walls must be built from mud or mud-bricks. The wall must consist of three rows:

First row: Second row: Third row: Inside wall — must be 24 сm Outside wall — Insulation wall. Is laid between the space of two thick. Must be 12 сm thick. walls with 10 сm thickness.

Leaving some area between the walls makes space for insula- tion.

www.geres.eu MANUAL FOR CONSTRUCTION AND OPERATION OF SOLAR GREENHOUSE

To link the first and the second After building walls, insulate the space between the walls with hay, layers together, fasten it with wire wood sawdust, or Styrofoam. (Using tree leaves is not recommend- or wood with 6 mm diameter. ed, as it decomposes in short while.)

Walls from the outside, must be fully plastered up to 5 сm.

www.agencynau.tj

37

2.6. PREPARING AND INSTALLING THE Step 6 Step ENTERING DOOR OF GREENHOUSE

The door is mainly built for entering the green- house. For installing the door, only few princi- ples need to be considered. The size of the door (height and width ) is 160 сm х 90 сm. ▪ The door is usually made from a wooden plank. ▪ It is placed between the east walls of green- house. ▪ Also, it is recommended to place iron mesh wire inside the door. When the door is opened to let the air in, the grate will keep the livestock and birds away from entering the greenhouse.

www.geres.eu

MANUAL FOR CONSTRUCTION AND OPERATION OF SOLAR GREENHOUSE

2.7. PREPARING AND INSTALLING Step 7 Step VENTILATION WINDOWS TO THE GREENHOUSE

Windows on the walls are important for ventilation. Below are some principles of installing ventilation windows: ▪ The size of the window must be of 50 сm height х 60 сm width. ▪ The windows must be installed facing the door of the greenhouse, i.e. between Mesh wire pre- the western walls. It is important for vents birds from freshening the air of the greenhouse. flying into the greenhouse. ▪ Windows must be placed 65 cm above the ground. ▪ To prevent birds from flying into the greenhouse, it is recommended to install window bars or mesh wire to the win- dow.

www.agencynau.tj

39

2.8. COVERING THE NORTHERN PART Step 8 Step OF THE ROOF AND INSTALLING WINDOWS ON THE ROOF OF THE GREENHOUSE

Option А1. Option А2. Option B1. Option B2.

Quantity of columns made from iron pipe (170 сm) 3 - 5 -

Number of wood columns (170сm) - 2 - 5 Distance between the columns 2,20m 2,80m. 3,10сm. 3,1сm.

Number of cross iron bars for frame under the 16 - 35 - ceiling

Number of wood bars for the frame under the - 16 - 35 ceiling

Intervals between the iron and wood planks 0,50m. 0,50m. 0,50m. 0,50m.

Number of windows 1 1 2 2

Size of windows (length x widths) 1,20mх 0,90m 1,20m х 0,90m 1,20mх 0,90m 1,20m х 0,90m www.geres.eu MANUAL FOR CONSTRUCTION AND OPERATION OF SOLAR GREENHOUSE GENERAL SCHEME OF COVERING THE NORHERN PART OF THE ROOF (GALVANIZED SHEET SLATE IS USED ONLY WHEN NECESSARY)

▪ Support and roof beam are in- Galvanized corrugated stalled. sheet ▪ Distance between the supports are brought in the Lintel liner. Beam 40mm x 50mm ▪ Ventilation win- D=150mm dows are placed Straw Straw plastering on the roof for air thickness 100mm thickness 50mm circulation and to reduce humidity. ▪ The upper part of ▪ Both sides of the the window is window must be made from galva- Old board or tree painted, to pre- Cross beam Branches d=50mm nized sheet and vent the window d=120mm the inside part can from damage from be made from rain and snow. plywood.

Options А1. , B1. With iron frame www.agencynau.tj Options А2., B2. 41 With wood frame GENERAL SCHEME OF COVERING THE NORTHERN PART OF THE ROOF (GALVANIZED SHEET SLATE IS USED ONLY WHEN NECESSARY)

Galvanized corrugated sheet

Lintel Beam 40mm x 50mm D=150mm

Reed Straw plastering thickness 100mm thickness 50mm

Old board or tree Cross beam Branches d=50mm d=120mm

www.geres.eu

MANUAL FOR CONSTRUCTION AND OPERATION OF SOLAR GREENHOUSE 1. Installing columns and beam; 2. Placing iron or cross boards under the ceiling; 3. Placing twigs (sticks) in wood carcass or iron cross-pieces in an iron frame; 4. Placing straw for heat insulation; 5. Plastering the top of the straw; 6. If the roof is covered with enough plas- ter it will be water proof, and a metal sheet is not required. 7. If the roof is not sufficiently well plas- tered you may cover the roof with galva- nized sheet after plastering.

www.agencynau.tj

1. Installing columns and beam; 43 2. Placing iron or cross boards under the ceiling; 3. Placing twigs (sticks) in wood carcass or iron cross-pieces in an iron frame; 4. Placing straw for heat insulation; 5. Plastering the top of the straw; 6. If the roof is covered with enough plas- ter it will be water proof, and a metal sheet is not required. 7. If the roof is not sufficiently well plas- tered you may cover the roof with galva- nized sheet after plastering.

www.geres.eu

MANUAL FOR CONSTRUCTION AND OPERATION OF SOLAR GREENHOUSE

2.9. COVERING THE SOUTHERN PART Step 9 Step OF ROOF WITH PLASTIC

For covering the south part of the greenhouse follow these steps:

▪ Prepare greenhouse frame. condition, you can put fabric and shrinks in the cold. There- The carcass can be made from between the plastic and edges fore, the best time to cover iron, (Options А1, B1) or wood of iron or wood. the carcass is during afternoon (Options А.2., B.2.) in accord- ▪ Purchase good quality polyeth- sunlight . ance with the scheme shown ylene. (0.8 micron) ▪ To attach and keep polyeth- in this manual (Follow the ▪ Polyethylene must be tightly ylene fastened, you can place scheme). stretched over the carcass . If sacks filled with sand on the ▪ To prevent the polyethylene not to stretch it tight, it may roof. Also, you may tie the plastic from tearing, sand the get exposed to negative im- plastic with thread, to prevent edges of the wood or iron. pact of wind. it from destruction by wind. ▪ Too keep the plastic in good ▪ Polyethylene expands in heat www.agencynau.tj 45

1. View of carcass without pol- yethylene cover; 2. View of solar greenhouse covered by polyethylene; 3. View of greenhouse with iron carcass covered inside with polyethylene; 4. View of greenhouse with wood carcass inside covered with polyethylene; 5. Attaching and fastening pol- yethylene on the roof and doors.

www.geres.eu MANUAL FOR CONSTRUCTION AND OPERATION OF SOLAR GREENHOUSE

3. OPERATION OF SOLAR

GREENHOUSE

How to use solar greenhouse?

Solar greenhouse operate to collect daytime sunlight and walls keep the warmth and at night and pass it to plants.

What air temperature and humidity level must be inside the greenhouse? Temperature Relative humidity Tomato Daytime20 -25о. Night time 15-16 оС 65-75% Cucumber Day time 22-25о. Night time 16-18 оС 70-75%

> 5 C 10 C 25 C < 30 C > - 5 C www.agencynau.tj 47

When is the best time to attach the polyethylene cover? You need to cover the greenhouse with polyethylene plastic when outside temperature is around 10-15оС.

How to use the felt? The felt is used during winter season for insulation purpose, i.e. to reduce waste of energy collected inside the greenhouse. It is used when there is not enough sun light shedding to the greenhouse. Usually it is used dur- ing night time when there is no sun. Put felt over the polyethylene.

Does it mean I cannot use the felt during daytime?

Felt can be used during daytime only during cold and cloudy weather, when there is no sun light.

If the weather gets even colder and felt does not help, what else can I use?

In such case, you can use fabric. Take fabric and place it inside the greenhouse, below polyethylene layer so that air can congested between fabric and plastic and create insulation.

Additional layer from fabric placed under the polyethylene plastic, helps for insulation.

www.geres.eu MANUAL FOR CONSTRUCTION AND OPERATION OF SOLAR GREENHOUSE

How should the greenhouse be ventilated? During hot or warm weather, you can ventilate the For ventilation, you can use one of four methods: greenhouse so that the inside air is fresh. Ventilation 1. Open door; also reduces temperature when it is too hot inside. 2. Open windows; 3. Open the roof window; 4. Partly open polyethylene.

Roof ventilator Roof ventilator Door Importance of Door Window Window Polyethylene ventilator ventilation

Window Not needed closed closed closed closed ventilator Less needed open open closed closed Moderately need- open open open closed ed Needed open open open open When temperature is above 25 оС , ventilation is needed to reduce temperature and humidity level inside the greenhouse. This is done during summer spring and autumn. When temperature is below 25 оС, close door and windows. Windows must be closed one hour before sun- set.

How can I determine when ventilation is needed?

Ventilation is needed when water drops from vapor on polyethylene is increased, soil on the ground is moldy and temperature is above the average. www.agencynau.tj 49

During which months can I use the greenhouse? Schedule for planting in greenhouse Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec

greens / green green fertiliz- green fertilizer/ Crop greens cucumber greens greens cucumber fertilizer* er greenery harvest/ grow/ grow/ plant back plant/ Operation harvest harvest plant grow harvest plant harvest into ground harvest * Green fertilizer - planting greens not for growing crop but for making compost fertilizer for soil.

How much profit can I make from using greenhouse? Calculation of income, expenditure, and profit from greenhouse with 10m. х 5m size in one year. Average price** Income Quantity of harvest Measuring unit Income (TJS) Total income (TJS) (TJS) Cucumber 300 kg. 7.00 2100.00 Green fertilizer - - - - 2925.00 Greenery 825 bundle 1.00 825.00 Fertilizer Compost (TJS/ Total expenditure Expenditure Seeding (TJS) Plastic/ year (TJS) (saltpeter) TJS/ year) (TJS) year Cucumber 50.00 9.00 Life time of Green fertilizer 20.00 100.00 0.00 0.00 198.00 solar green- Greenery 10.00 9.00 house is 10 ** All cost is taken from 2012 estimates. Profit (TJS) years. 2727.00

www.geres.eu MANUAL FOR CONSTRUCTION AND OPERATION OF SOLAR GREENHOUSE

4. CONTACT INFORMATION OF

MASTERS AND PROMOTERS

Ayni district For construction of solar green- Narzulloev Barot Karimov Rustam house, please contact: Address: Hayronbed village, Address: Marhamat village, Fondaryo jamoat, Oshoba jamoat Phone: 92 848 77 60. Phone: 92 702 82 63 To purchase construction materi- Sarvoda Construction Store Uppon village market als, please go to: Address: Sarvoda town (near hospi- Address: Upponi Bolo village, tal) Oshoba jamoat. For more information and consul- Sirojiddinov Asliddin Abdulloev Faizullo tation, please contact: jamoat Fondaryo jamoat Oshoba Phone: 92-764-20-52. Phone: 92-727-06-51.

www.agencynau.tj 51

European Union French Develop- Women in German Deutsche Gesellschaft UKAID Abbé Pierre Groupe Energies Re- Agency for Support Devel- ment Agency Europe for a cooperation fuer Internationale Foundation nouvelables, Envi- opment Process Nau Common Future Zusammenarbeit (GIZ) ronnement et Solidarités GmbH

This information is made possible by the support of the European Union. The contents are the sole responsibility of GERES and do not necessarily reflect the views ofwww.geres.eu the European Union. MANUAL FOR CONSTRUCTION AND OPERATION OF SOLAR GREENHOUSE

GERES - Address: 79 Hamza Hakimzoda Street, Dushanbe, Tajikistan Phone: (+992) 37 880 65 64 E-mail: [email protected] Web: www.geres.eu Agency for Support Development Process Nau Address: 20-34 Lenin Street, , Tajikistan Phone: (+992 34) 224-53-20; 6-03-62 E-mail: [email protected] Web: www.agencynau.tj www.agencynau.tj