FORM – I (VALLEY IRON & STEEL CO. LTD-Unit II) (I) Basic Information S.No. Items Details 1 Name of the Project: Integrated Project For Steel & Related Products 2 Serial no. in schedule 3a-c(ii) Non Toxic Capacity > 30,000 MTA 3 Proposed capacity Steel Billets & Flats- 61,800TPA, CR coils- 12,600TPA, HR coils- 36,000TPA, SS Pipes & fitings-9000TPA, Quick lime- 48,000TPA, TMT Bars- 1,20,000TPA, Ferro alloys- 18,000TPA, Portland cement – 60,000 TPA, Gases (Oxygen & Nitrogen) [12,000cubic meter per hour] 4, New/Expansion/Modernization Expansion & diversification of existing unit. 5 Existing capacity/Area Steel Billets & Flats- 61,800TPA, CR coils- 12,600TPA, HR coils- 36,000TPA, SS Pipes & fitings-9000TPA, Quick lime- 48,000TPA, TMT Bars- 1,20,000TPA, Ferro alloys- 18,000TPA, Portland cement – 60,000 TPA, Gases (Oxygen & Nitrogen) [12,000cubic meter per hour] 6 Category of project B Since the capacity is more than 30,000 TPA & Non toxic 7 Does it attract the general condition No, As it is not located within 10 km from the boundary of item (i) to (iv) of general condition. 8 Does it attract the specific No. Not applicable condition. 9 i) Location of unit On NH-72 (Nahan–Dehradun) about 20 km from Paonta Sahib. ii) Plot, Survey No, Khasra No. Khasra no. – 595/302/1, 596/302/1, 590/301/1, 589/301/1, 797/558/465/404/253 & 464/404/253 iii) Village Bharapur & Rampur majri iv) Tehsil Paonta Sahib v) District Sirmour vi) State Himachal Pradesh 10 a) Nearest Railway station Yamuna Nagar (60 km) b) Air Port Dehradun (80 km) 11 Nearest town Paonta Sahib (20 km) Nearest City Yamuna Nagar (60 km) Distt. Head Quarter Nahan (30 km) 12 Village Panchayat Rampur Bharapur Zila Prishad DPO Office, Nahan 13 Name of Applicant Sh. Naveen Aggarwal 14 Regd. Address Valley Iron & Steel Co. Ltd., (II) Village Rampur Majri, Tehsil Paonta Sahib, Distt. Sirmaur (HP). 15 Address for correspondence: Name Sh. Naveen Aggarwal Designation Director Address Village Rampur Majri, Tehsil Paonta Sahib, Distt. Sirmaur (HP). Pin Code 173025 E mail [email protected] Telephone 98166-67744 Fax No. --- 16 Detail of alternative site, if any Nil 17 Interlinked Project Nil 18 Whether separate application for N.A. In view of item No. 17 above. interlinked project has been submitted 19 If, Yes Date of Submission N.A. In view of item No. 17 above. 20 If no , reason N.A. In view of item No. 17 above. 21 Whether proposal involves approval/clearance under: if yes, details of same and status to given a) Forest (conservation) 1980 No. The unit does not fall in any notified reserved forest area b) Wild life protection Act No. The unit does not fall in any notified 1972 sanctuary area. c) CRZ notification 1991 No. The unit does not fall in any Notified coastal zone. 22 Whether there is any Govt. Yes. It is Industrial Area as per Industrial order/policy relevant/relating site Policy-2004 and Package of Incentives, H.P. 23 Forest land involved Nil 24 Whether there is any litigation There is no litigation pending against the pending against the project and / or project and land. Information required land in which is project is proposed against a, b & c is, therefore, not applicable. to be setup: a) name of court b) Case No. c) Order/direction of court if any and its relevance with proposed project (II) Activity 1. Construction, operation or decommissioning of the Project involving actions, which will cause physical changes in the locality (topography, land use, changes in water bodies, etc.) S. No. Information/Checklist Yes/ No Details thereof (with approximate Confirmation quantities/ rates, wherever possible) with source of information data 1.1 Permanent or temporary change in land Yes Land acquired with requisite permission. use, land cover or topography including increase in intensity of land use (with respect to local land use plan) 1.2 Clearance of existing land, vegetation No. building? 1.3 Creation of new land uses.? No 1.4 Pre construction investigations e.g. bore Yes Completed & compliance are being submitted. house, soil testing? 1.5 Construction works? Yes Completed & compliance are being submitted. 1.6 Demolition works? No. 1.7 Temporary sites used for construction No Since, construction work completed. works or Housing of construction workers? 1.8 Above ground building , structures or Yes. Completed & compliance are being submitted. Earthworks including linear structures, cut and fill or excavations 1.9 Underground works including mining or Yes. Completed & compliance are being tunneling? submitted. 1.10 Reclamation works? No. 1.11 Dredging? No. 1.12 Offshore structures? No. 1.13 Production and manufacturing processes? Yes Melting scrap, moulding into steel Billets & rolling into different sections/ HR/CR processing, pipe & fitting manufacturing. 1.14 Facilities for storage of goods or Yes Sheds and godowns are provided materials? for storage. 1.15 Facilities for treatment or disposal of Yes. Completed & compliance are being solid waste or liquid effluents? submitted. 1.16 Facilities for long term housing of No operational workers? 1.17 New road, rail or sea traffic during No. construction of operation? 1.18 New road, rail, air waterborne or other No. transport infrastructure including new or altered routes and stations, ports, airport etc? 1.19 Closure or diversion of existing transport No. routes or infrastructure leading to changes in traffic movements? 1.20 New or diverted transmission lines or No. pipelines? 1.21 Impoundment, damming, culver ting, No. realignment or other changes to the hydrology of watercourses or aquifers? 1.22 Stream crossings? No. 1.23 Abstraction or transfer of water from Yes. About 330 KLD water will be ground or surface waters? extracted through existing tube-well to meet consumptive use. 1.24 Changes in water bodies or the land No. surface affecting drainage or run-off? 1.25 Transport of personnel or materials for Yes Completed & compliance are being construction, operation or submitted. decommissioning? 1.26 Long-term dismantling or No decommissioning or restoration works? 1.27 Ongoing activity during No. decommissioning which could have an impact on the environment? 1.28 Influx of people to an area in either Yes Completed & compliance are being submitted. temporarily or permanently? 1.29 Introduction of alien species? No. 1.30 Loss of native species or genetic diversity? No. 1.31 Any other actions? Nil 2. Use of Natural resources for construction or operation of the Project (such as land, water, materials or energy, especially any resources which are non- renewable or in short supply): S.No. Information/Checklist Yes/No Details thereof (with confirmation approximate quantities/ rates, wherever possible) with source of information data 2.1 Land especially undeveloped or Existing Industrial land Area agricultural land (ha) No (1,15,155 sqm.). 2.2 Water (expected source & Yes. Own tube-well, 330 KLD competing users) unit: KLD 2.3 Minerals (MT) No. 2.4 Construction material – stone, Yes. Completed & compliance are being aggregates, and/soil (expected submitted. source – MT) 2.5 Forests and timber (source – MT) No. 2.6 Energy including electricity and Yes. Electricity 60 MW by HPSEB. fuels (source, competing users) Diesel 1000 liter per month from l Unit: fuel (MT), energy (MW) markets. 2.7 Any other natural resources (use Nil appropriate standard units) 3. Use, storage, transport, handling or production of substances or materials, which could be harmful to human health or the environment or raise concerns about actual or perceived risks to human health. S.No. Information/Checklist Yes/No Details thereof (with approximate confirmation quantities/ rates, wherever possible) with source of information data 3.1 Use of substance or materials, Yes Used oil- Disposal through registered which are hazardous (as per recycler. MSIHC rules) to human health Sludge from waste water treatment- or the environment (flora, fauna Disposal through TSDF site and water supplies) Sludge from wet scrubbers- Disposal through TSDF site 3.2 Changes in occurrence of No. disease or affect disease vectors (e.g. insect or water borne diseases) 3.3 Affect the welfare of people e.g. No. by changing living conditions? 3.4 Vulnerable groups of people No. who could be affected by the project e.g. hospital patients, children, the elderly etc. 3.5 Any other causes Nil 4. Production of solid wastes during construction or operation or decommissioning (MT/month). S. No. Information/Checklist Yes/No Details thereof (with approximate quantities/ rates, confirmation wherever possible) with source of information data 4.1 Spoil, overburden or mine wastes No. 4.2 Municipal Waste (Domestic and No or Commercial Wastes). 4.3 Hazardous wastes (as per Yes Used oil- Disposal through Hazardous Waste Management registered recycler. Rules) Sludge from waste water treatment- Disposal through TSDF site Sludge from wet scrubbers- Disposal through TSDF site 4.4 Other industrial process wastes Yes 26 ton per day Slag from furnaces will be sent to in-house cement plant for use. 4.5 Surplus product No. 4.6 Sewage sludge or other sludge Yes. STP in operation and Sludge about from effluent treatment 20 kg/day will be used as manure. 4.7 Construction or demolition wastes No. 4.8 Redundant machinery or No. equipment 4.9 Contaminated soils or other No. materials 4.10 Agricultural wastes No. 4.11 Other solid wastes Nil 5. Release for pollutants or any hazardous, toxic or noxious substances to air (Kg/hr). S.No. Information/Checklist Yes/No Details thereof (with approximate confirmation quantities/ rates, wherever possible) with source of information data 5.1 Emissions from combustion of No. fossil fuels from stationary or mobile sources 5.2 Emissions from production Yes Particulate Matter from Induction processes Furnace, Arc Furnace, Rolling Mill and Cement plant.