Sr. No. Unit Name Name of ORIGINATING Bus Stand Name Of

Total Page:16

File Type:pdf, Size:1020Kb

Sr. No. Unit Name Name of ORIGINATING Bus Stand Name Of HIMACHAL ROAD TRANSPORT CORPORATION HAMAIPUR DIVISION Sr. Unit Name Name Of Name of Route DEPARTURE No. ORIGINATING Bus TIME FROM Stand ORIGINATING BUSSTAND 1 BILASPUR BILASPUR BILASPUR-SHIMLA 6:30 AM 2 BILASPUR BILASPUR SHAHTALAI-BILASPUR-BADDI 7:00 AM 3 BILASPUR BILASPUR BILASPUR-HAMIPUR 7:30 AM 4 HAMIRPUR BILASPUR HAMIRPUR-SHIMLA 7:40 AM 5 BILASPUR BILASPUR BILASPUR-MANDI 7:45 AM 6 HAMIRPUR BILASPUR HAMIRPUR- SHIMLA 8:45 AM 7 SARKAGHAT BILASPUR SARKAGHAT-BADDI 9:30 AM 8 CHAMBA BILASPUR SHIMLA-CHAMBA 9:45 AM 9 HAMIRPUR BILASPUR HAMIRPUR -BADDI 9:45 AM 10 SOLAN BILASPUR JWALAJI-SOLAN 9:45 AM 11 UNA BILASPUR UNA - SHIMLA 10:00 AM 12 SARKAGHAT BILASPUR SANDHOL- BADDI 9:30 AM 13 PALAMPUR BILASPUR SHIMLA-CHADHIAR 10:10 AM 14 NALAGRAH BILASPUR BADDI- MANDI 10:15 AM 15 BILASPUR BILASPUR TIHRA-NALAGARH-BADDI 10:20 AM 16 SOLAN BILASPUR SOLAN-DHARAMSHALA 10:20 AM 17 SOLAN BILASPUR HAMIRPUR- ARKI- RAJGARH UPTO SOLAN 10:20 AM 18 SARKAGHAT BILASPUR SHIMLA-SARKAGHAT 11:10 AM 19 HAMIRPUR BILASPUR SOLAN-DHARAMSHALA VIA HAMIRPUR 11:30 AM 20 SOLAN BILASPUR SOLAN-JWALAJI 11:30 AM 21 SARKAGHAT BILASPUR SYOH- SHIMLA 12:00 AM 22 SOLAN BILASPUR DHARMSHALA-SOLAN 12:00 PM 23 NALAGRAH BILASPUR BADDI-LADROUR UPTO GHUMARWIN 12:15 AM 24 DEHRA BILASPUR SHIMLA-JAWALI 12:15 PM 25 DEHRA BILASPUR JAWALI DEHRA- SHIMLA 12:50 PM 26 SOLAN BILASPUR RAJGARH-HAMIRPUR 1:15 PM 27 PALAMPUR BILASPUR CHADHIAR-SHIMLA 2:10 PM 28 BILASPUR BILASPUR NAHAN-TIHRA FROM BADDI TO TIHRA 2:45 PM 29 HAMIRPUR BILASPUR SHIMLA-HAMIRPUR 3:15 PM 30 CHAMBA BILASPUR CHAMBA-SHIMLA 4:30 PM 31 NALAGRAH BILASPUR MANDI -BADDI 5:40 PM 32 HAMIRPUR BILASPUR SHIMLA-HAMIRPUR 4:30 PM 33 SARKAGHAT BILASPUR BADDI-SARKAGHAT 4:35 PM 34 BILASPUR BILASPUR BADDI-BILASPUR-SHAHTALAI 4:30 PM 35 NALAGRAH BILASPUR GHUMARWIN -NALAGHARH 4:40 PM 36 UNA BILASPUR SHIMLA -UNA 5:00 PM 37 BILASPUR BILASPUR BILASPUR-GHUMARWIN FROM DC OFFICE 5:10 PM BILASPUR 38 HAMIRPUR BILASPUR BADDI - HAMIRPUR 5:15 PM 39 BILASPUR BILASPUR SWARGHAT-JAHU 5:25 PM 40 HAMIRPUR BILASPUR DHARAMSHALA (HAMIRPUR)-SHIMLA 6:30 PM 41 DEHRA DEHRA DEHRA - JASSUR 7:00 AM 42 DEHRA DEHRA DEHRA - NANDPUR 7:20 AM 43 DEHRA DEHRA DEHRA - D/SHALA - DEHRA 7:30 AM 44 N/BAGWAN DEHRA GAGRET- JOGINDERNAGAR 8:30 AM 45 N/BAGWAN DEHRA PALAMPUR - UNA 09:00AM 46 PATHANKOT - SHIMLA STARTED FROM DEHRA DEHRA JAWALI 9:10 AM 47 N/BAGWAN DEHRA CHAMUNDA - AMRITSAR UPTO GAGRET 10:00 AM 48 DEHRA DEHRA UNA -KANGRA 10:00 AM 49 PATHANKOT DEHRA JASSUR - UNA - JASSUR 10:40 AM 50 UNA DEHRA UNA- KANGRA 11:30 AM 51 DEHRA DEHRA JOGINDERNAGAR - CHANDIGARH UPTO 11:40AM UNA 52 N/BAGWAN DEHRA GAGRET -DEHRA - CHAMUNDA 12:30 PM 53 DEHRA DEHRA UNA - JOGINDERNAGAR 12:30PM 54 JOGINDERNAGAR - LUDHIANA UPTO N/BAGWAN DEHRA GAGRET 1:45 PM 55 DEHRA DEHRA DEHRA - DHARAMSHALA - DEHRA 2:30 PM 56 PATHANKOT DEHRA UNA - JASSUR 2:50 PM 57 N/BAGWAN DEHRA UNA - PALAMPUR 03:00PM 58 DEHRA DEHRA KANGRA - UNA 3:45 PM 59 DEHRA DEHRA SHIMLA - JAWALI 4:20 PM 60 UNA DEHRA KANGRA - UNA 4:30 PM 61 DEHRA DEHRA DEHRA - HAMIRPUR - KANGRA - DEHRA 4:40 PM 62 DHARAMSHALA DEHRA UNA - DHARAMSHALA 5:20 PM 63 N/BAGWAN JAWALAJI JAWALAJEE - KANGRA 7:25 AM 64 PATHANKOT JAWALAJI NADAUN-JASSUR 7:55 AM 65 DEHRA JAWALAJI HAMIRPUR - KANGRA 8:50 AM 66 DEHRA JAWALAJI JAWALI - THEOG UP TO SHIMLA 9:40 AM 67 PATHANKOT JAWALAJI HAMIRPUR -JASSUR 10:00 AM 68 DHARAMSHALA JAWALAJI DHARAMSHALA - SHIMLA 10:40 AM 69 UNA JAWALAJI UNA - KANGRA 10:40 AM 70 DHARAMSHALA JAWALAJI DHARAMSHALA -CHD-SHIMLA UP TO UNA 11:00 AM 71 CHAMBA JAWALAJI HAMIRPUR-CHAMBA 11:50 AM 72 PATHANKOT JAWALAJI JASSUR HAMIRPUR 12:50 PM 73 CHAMBA JAWALAJI CHAMBA - SHIMLA 1:00 PM 74 CHAMBA JAWALAJI SHIMLA - CHAMBA 1:00 PM 75 UNA JAWALAJI KANGRA - KALKA UPTO UNA 1:20 PM 76 N/BAGWAN JAWALAJI JAWALAJI KANGRA 2:00 PM 77 DHARAMSHALA JAWALAJI DHARAMSHALA - SHIMLA 2:10 PM 78 PATHANKOT JAWALAJI SHIMLA - PATHANKOT 2:20 PM 79 DEHRA JAWALAJI SHIMAL- HAMIRPUR-JAWALI 3:20 PM 80 DHARAMSHALA JAWALAJI SHIMLA - DHARAMSHALA 4:30 PM 81 DEHRA JAWALAJI DEHRA - HAMIRPUR 5:30 PM 82 DHARAMSHALA JAWALAJI SHIMLA - DHARAMSHALA 7:45 PM 83 SOLAN CHINTPURNI SHIMLA - NURPUR 5:00 PM 84 SOLAN CHINTPURNI NURPUR - SHIMLA 9:15 AM 85 HAMIRPUR HAMIRPUR HAMIRPUR TO SHIMLA 6.00 AM 86 HAMIRPUR HAMIRPUR HAMIRPUR TO MANDI VIA LAMBLOO 7:00 AM 87 DEHRA HAMIRPUR HAMIRPUR TO KANGRA 7:00 AM 88 HAMIRPUR HAMIRPUR HAMIRPUR TO BADDI 7:30 AM 89 PATHANKOT HAMIRPUR JAHOO TO JASSUR 7.55 AM 90 SOLAN HAMIRPUR JAWALAJI TO SOLAN 08.00 AM 91 SARKAGHAT HAMIRPUR HAMIRPUR TO SARKAGHAT 08.05 AM 92 HAMIRPUR HAMIRPUR AWAHDEVI - HAMIRPUR - UNA VIA BHOTA 8:05 AM 93 PATHANKOT HAMIRPUR HAMIRPUR TO PATHANKOT 8:15 AM 94 HAMIRPUR HAMIRPUR HAMIRPUR -BHOTA- MANDI 8:30 AM 95 N/BAGWAN HAMIRPUR CHAMUNDA HAMIRPUR SHIMLA 10.20 AM 96 CHAMBA HAMIRPUR HAMIRPUR CHAMBA 10.15 AM 97 SOLAN HAMIRPUR DHARAMSALA HAMIRPUR SOLAN 11:00 AM 98 PATHANKOT HAMIRPUR JASSUR HAMIRPUR SHIMLA 11:00 AM 99 DEHRA HAMIRPUR JAWALI HAMIRPUR SHIMLA 11:15 AM 100 HAMIRPUR HAMIRPUR HAMIRPUR TO UNA VIA BHOTA 11.00 AM 101 CHAMBA HAMIRPUR SHIMLA HAMIPRPUR CHAMBA 11:30 AM 102 PALAMPUR HAMIRPUR HAMIRPUR CHADIYAR 12:00 AM 103 DHARAMSHALA HAMIRPUR DHARAMSHALA HAMIRPUR SHIMLA 12:15 PM 104 PALAMPUR HAMIRPUR CHADIYAR SHIMLA 12.15 PM 105 PALAMPUR HAMIRPUR SHIMLA TO CHADIYAR 12.50 PM 106 PATHANKOT HAMIRPUR SHIMLA HAMIRPUR JASSUR 1:15 PM 107 HAMIRPUR HAMIRPUR HAMIRPUR TO MANDI VIA LAMBLOO 1.30 PM 108 SOLAN HAMIRPUR SOLAN JAWALAJI 01.30 PM 109 DEHRA HAMIRPUR SHIMLA HAMIRPUR DEHRA 1:45 PM 110 SOLAN HAMIRPUR SOLAN HAMIRPUR DHARAMSALA 2:15 PM 111 CHAMBA HAMIRPUR CHAMBA HAMIRPUR SHIMLA 2:15 PM 112 UNA HAMIRPUR HAMIRPUR TO UNA 3:00 PM 113 HAMIRPUR HAMIRPUR HAMIRPUR TO SHIMLA 3.35 PM 114 N/BAGWAN HAMIRPUR SHIMLA HAMIRPUR CHAMUNDA 3.45 PM 115 DHARAMSHALA HAMIRPUR SHIMLA HAMIRPUR DHARAMSHALA 4:00 PM 116 BILASPUR HAMIRPUR HAMIRPUR BHOTA BILASPUR 5:05 PM 117 HAMIRPUR HAMIRPUR HAMIRPUR TO DHARMSHALA 6.30 PM 118 UNA UNA UNA-SHIMLA VIA BHOTA 7:00 AM 119 DEHRA UNA UNA-DEHRA-KANGRA 7:00 AM 120 UNA UNA UNA-HAMIRPUR 8:00 AM 121 UNA UNA UNA-BHAKHRA--NALAGARH-BADDI 8:00 AM 122 UNA UNA UNA-KANGRA 9:00 AM 123 DEHRA UNA CHANDIGARH-JOGINDERNAGAR 10:00 AM 124 SOLAN UNA NURPUR-SHIMLA 10:15 AM 125 NALAGRAH UNA UNA-BHAKHRA-NALAGARH-BADDI 11:00 AM 126 SARKAGHAT UNA UNA-SARKAGHAT 12:30 PM 127 NAGROTA UNA UNA-PALAMPUR 1:00 PM BAGWAN 128 PATHANKOT UNA UNA-PATHANKOT VIA CHINTPURNI 1:15 PM 129 BILASPUR UNA UNA-BILASPUR VIA SHAHTALAI 1:30 PM 130 NALAGRAH UNA UNA-NALAGARH VIA BHAKHRA 2:00 PM 131 DEHRA UNA UNA-DEHRA 2:00 PM 132 DHARAMSHALA UNA UNA-DHARAMSHALA 3:00 PM 133 HAMIRPUR UNA UNA-HAMIRPUR VIA BHOTA 3:00 PM 134 SOLAN UNA SHIMLA-NURPUR 3:45 PM 135 NALAGRAH UNA BADDI PALAMPUR VIA NADAUN-SUJANPUR 4:00 PM 136 HAMIRPUR UNA UNA-HAMIRPUR VIA BHOTA 4:30 PM 137 BILASPUR NALAGARH BADDI-BAIJNATH 6.40 AM 138 NALAGRAH NALAGARH NALAGARH -SHIMLA VIA RAM KUNIHAR 7:10 AM 139 NALAGRAH NALAGARH NALAGARH-SOLAN VIA PATTA 7:35 AM 140 NALAGRAH NALAGARH NALAGARH-BADDI-MANDI-NLG 8:00 AM 141 NALAGRAH NALAGARH BADDI-BHAKHARA UNA 8:45 AM 142 NALAGRAH NALAGARH NALAGARH-LADROUR UPTO GHUMARWIN 9:15 AM 143 NALAGRAH NALAGARH NALAGARH-SHIMLA VIA RAMSHAHER 9:15 AM 144 BILASPUR NALAGARH BILASPUR BADDI 9:30 AM 145 BILASPUR NALAGARH TIHRA BILASPUR BADDI 10:35 AM 146 BILASPUR NALAGARH BADDI BILASPUR TIHRA 11:20 AM 147 HAMIRPUR NALAGARH HAMIRPUR BADDI 11:45 AM 148 UNA NALAGARH UNA BHAKHRA BADDI 11:45 AM 149 SARKAGHAT NALAGARH SANDHOL- BADDI 12:00 AM 150 NALAGRAH NALAGARH NALAGARH-BADDI-UNA 12:45 PM 151 BILASPUR NALAGARH BADDI BILASPUR SHAHTALAI 1:40 PM 152 SARKAGHAT NALAGARH BADDI SANDHOL 2:15 PM 153 UNA NALAGARH BADDI BHAKHARA UNA 2:30 PM 154 HAMIRPUR NALAGARH BADDI HAMIRPUR 3:00 PM 155 BILASPUR NALAGARH BAIJNATH-PARWANOO UPTO BADDI 5.00 PM 156 BILASPUR BADDI BADDI-BAIJNATH 6.10 AM 157 BILASPUR BADDI BADDI BILASPUR TIHRA 10:30 AM 158 BILASPUR BADDI BADDI BILASPUR SHAHTALAI 12:45 PM 159 SARKAGHAT BADDI BADDI SANDHOL 1:30 PM 160 UNA BADDI BADDI BHAKHARA UNA 2:00 PM 161 HAMIRPUR BADDI BADDI HAMIRPUR 2:20 PM.
Recommended publications
  • Temporal Change in Tree Species Composition in Palampur Forest
    2019 Status Report Palampur Palampur Forest Division Temporal Change in Tree Species Composition in Palampur Forest Division of Dharamshala Forest Circle, Himachal Pradesh Harish Bharti, Aditi Panatu, Kiran and Dr. S. S. Randhawa H. P. State Centre on Climate Change (HIMCOSTE), Vigyan Bhawan near Udyog Bhawan, Bemloe Shimla-01 0177-2656489 Table of Contents Introduction ............................................................................................................................................ 4 Forests of Himachal Pradesh........................................................................................................................ 5 Study area and method ....................................................................................................................... 7 District Kangra A Background .................................................................................................................. 7 Location & Geographical– Area ................................................................................................................. 8 Palampur Forest Division- Forest Profile................................................................................................ 9 Name and Situation:- .................................................................................................................................. 9 Geology: ......................................................................................................................................................... 11
    [Show full text]
  • Ranking of Districts Wrt Per Capita Income
    Index Sr.No. Item Page No. 1 Ranking of Districts w.r.t. Per Capita Income (PCI) at current prices. 1 2 Yearwise Per Capita Gross District Domestic Product at current Prices 2 3 Yearwise Per Capita Gross District Domestic Product at constant (2011-12) Prices 3 4 Yearwise Per Capita Net District Domestic Product at current Prices 4 5 Yearwise Per Capita Net District Domestic Product at constant (2011-12) Prices 5 6 Yearwise Gross District Domestic Product at current Prices 6 7 Yearwise Gross District Domestic Product at constant (2011-12) Prices 7 8 Yearwise Net District Domestic Product at current Prices 8 9 Yearwise Net District Domestic Product at constant (2011-12) Prices 9 24 Sectorwise Gross District Domestic Product at current Prices year 2015-16 11.-14 25 Sectorwise Gross District Domestic Product at constant (2011-12) Prices year 2015-16 15-18 26 Sectorwise Net District Domestic Product at current Prices year 2015-16 19-22 27 Sectorwise Net District Domestic Product at constant (2011-12) Prices year 2015-16 23-26 20 Sectorwise Gross District Domestic Product at current Prices year 2014-15 27-28 21 Sectorwise Gross District Domestic Product at constant (2011-12) Prices year 2014-15 29-30 22 Sectorwise Net District Domestic Product at current Prices year 2014-15 31-32 23 Sectorwise Net District Domestic Product at constant (2011-12) Prices year 2014-15 33-34 16 Sectorwise Gross District Domestic Product at current Prices year 2013-14 35-36 17 Sectorwise Gross District Domestic Product at constant (2011-12) Prices year 2013-14 37-38
    [Show full text]
  • Dharamshala – Dalhousie -Amritsar
    REPORT ON SHANTINIKETAN- AN EXCURSION CUM LEARNING TOUR Chandigarh- Manali - Dharamshala – Dalhousie -Amritsar 07-17 FEBRUARY, 2020 The Institute organized Shantiniketan- an Excursion Cum Learning Tour to Chandigarh- Manali - Dharamshala – Dalhousie -Amritsar from 07-17 February, 2020. 57 students of various PG programs accompanied by four faculty members and one staff member. Dr. Vipin Choudhary, Dr. Sopnamayee Acharaya, Dr. Shailshri Sharma, Prof. Pranay Karnik and Mr. Devendra Sen visited the beautiful places of Manali, Amritsar and Dalhousie, India. February 7-8, 2020- Chandigarh The students gathered at Indore railway station and boarded train from Indore to Ambala at 12:30 pm. The group reached Ambala at around 8.30 am on February 8, 2020 and Proceed towards Chandigarh. After taking breakfast and rest till lunch group visited Rock Garden and Sukhna Lake. The group started for Manali from Chandigarh by Bus and traveler after dinner and reached Manali at 9 am on February 9, 2020. February 9-11, 2020 – Manali After lunch at 2:30pm the group proceeds to visit the local places of Manali by local vehicles. Everybody enjoyed the shopping at Mall road of Manali on Feb 9, 2020 evening. On Feb 10, 2020 after breakfast the group proceeds to visit Sholang Valley. Students enjoyed ice and various adventures activities in Sholang and returned back to hotel by evening. A bonfire with light music has been arranged in the resort along with dinner. After dinner, the students rested overnight in the hotel. February 11-12, 2020 – Dharamshala Reached Dharmshala through Kulu on 11 Feb, 2020. Students Visited Kulu and enjoyed river rafting and travelled by road to Dharmshala.
    [Show full text]
  • Sirmaur District, Himachal Pradesh
    Series-E For official use only Government of India Ministry of Water Resources CENTRAL GROUND WATER BOARD GROUND WATER INFORMATION BOOKLET SIRMAUR DISTRICT, HIMACHAL PRADESH NORTHERN HIMALAYAN REGION DHARAMSALA September, 2013 2013 जल संरषण व्ष 2013 जल संरण वषx 2013 Ground Water Information Booklet Sirmaur District, Himachal Pradesh CONTENTS DISTRICT AT A GLANCE Page No. 1.0 INTRODUCTION 1 2.0 CLIMATE & RAINFALL 3 3.0 GEOMORPHOLOGY & SOILS 3 4.0 GROUND WATER SCENARIO 4 4.1 Hydrogeology 4 4.2 Ground Water Resources 10 4.3 Ground Water Quality 12 4.4 Status of Ground Water Development 12 5.0 GROUND WATER MANAGEMENT STRATEGY 13 5.1 Ground Water Development 13 5.2 Water Conservation & Artificial Recharge 15 6.0 GROUND WATER RELATED ISSUES & PROBLEMS 15 7.0 AWARENESS & TRAINING ACTIVITY 16 8.0 AREAS NOTIFIED BY CGWA / SGWA 16 9.0 RECOMMENDATIONS 17 जल संरण वषx 2013 SIRMAUR DISTRICT AT A GLANCE 1. GENERAL PERTICULARS A. Location : North latitude 30022’00”- 31001”00 & East longitude 77°01’00” - 77050’00” B Area : 2,825 sq. km C. District & Tehsil Headquarter : Nahan D. Number of Tehsils : 6 E. Number of Sub-Tehsils 4 F. Number of Blocks : 5 G. Number of Towns : 3 H. Number of Villages : 968 I. Population Total : 5,29,855 persons (2011) i. Rural : 4,72,690 persons ii Urban : 57,165 persons iii Schedule Caste : 1,60,745 persons iv Scheduled tribes : 11,262 persons J. Work Force i. Cultivators : 1,15,992 persons ii. Agricultural Laborers : 5,953 persons K. Literacy : 68.44 % M.
    [Show full text]
  • Name of Teacher & Present Place
    Directorate of Elementary Education Himachal Pradesh. No:EDN-H (2) B (2)-34/2014-Regularisation(contract) Dated: Shimla-171001, the 22nd June 2015. OFFICE ORDER In pursuance and compliance to the approval conveyed by the Government vide letter No:PER(AP)C-B(2)-2/2015 dated 07.05.2015 and based on the verification by the Principals/Headmasters as well as from the Dy. Directors of Elementary Education concerned and recommendations of the screening Committee constituted at the Directorate level, the following Trained Graduate Teachers who were appointed in the stream of Arts, Non-Medical and Medical purely on contract basis and posted in GMS/GHS and GSSS in H.P. against sanctioned vacant posts as per R&P Rules for the post at their initial recruitment on contract basis and who have completed five years services as on 31.3.2015, are hereby regularized as TGTs in the pay band of Rs.10300-34800/ plus grade pay 3600/- with initial star0t Rs. 10830+3600/- plus other allowances as admissible from time to time with immediate effect:- Sr. Name of Teacher & Distt. Subject D.O.B Date of Category No. present place of posting Joining on contract 1 Sonu Kumari, GSSS Bandla Bilaspur Medical 28.03.80 25.06.09 SC 2 Desh Raj, GMS Parnali u/c Bilaspur N.M. 24.10.73 10.06.09 Gen. GSSS Bandla 3 Reena Bharti, GHS Sihra Bilaspur Medical 28.09.74 03.12.08 SC 4 Manjeet Singh, GSSS Nalti Bilaspur Arts 27.07.73 20.11.08 SC 5 Sanjeev Kumar, GHS Sihra Bilaspur Arts 14.12.75 04.03.09 Gen.
    [Show full text]
  • DISTT. BILASPUR Sr.No. Name of the Schools DISTRICT
    DISTT. BILASPUR Sr.No. Name of the Schools DISTRICT The Principal, Govt. Sr. Secondary School Bharari, Teh. Ghumarwain, P.O BILASPUR 1 Bharari, Distt. Bilaspur. H.P Pin: 174027 The Principal, Govt. Sr. Secondary School Dangar, Teh. Ghumarwain, BILASPUR 2 P.O. Dangar,Distt. Bilaspur. H.P Pin: 174025 The Principal,Govt. Senior Secondary School,Ghumarwin, Tehsil BILASPUR 3 Ghumarwin, P.O.District Bilaspur,Himachal Pradesh, Pin-174021 The Principal,Govt. Senior Secondary School,Hatwar, Tehsil Ghumarwin, BILASPUR 4 P.O. Hatwar, District Bilaspur,Himachal Pradesh, Pin-174028 The Principal,Govt. Senior Secondary School,Kuthera, Tehsil Ghumarwin, BILASPUR 5 P.O. Kuthera,District Bilaspur,Himachal Pradesh, Pin-174026 The Principal,Govt. Senior Secondary School Morsinghi, Tehsil BILASPUR 6 Ghumarwin, P.O.Morsinghi,District Bilaspur, H.P. 174026 The Principal,Govt. Senior Secondary School,Chalhli, Tehsil Ghumarwin, BILASPUR 7 P.O. Chalhli, District Bilaspur,H. P, Pin-174026 The Principal, Govt. Senior Secondary School,Talyana,,Teh Ghumarwin, BILASPUR 8 P.O. Talyana,District Bilaspur,H. P, Pin-174026 The Principal, Govt. Senior Secondary School, Berthin Tehsil Jhandutta, BILASPUR 9 P.O. Berthin District Bilaspur,H. P. Pin-174029 The Principal, Govt. Senior Secondary School, Geherwin, Teh Jhandutta, BILASPUR 10 P.O. GehrwinDistrict Bilaspur, H. P. Pin- The Principal, Govt. Senior Secondary School,Jhandutta, Tehsil Jhandutta, BILASPUR 11 P.O.Jhandutta, District Bilaspur, H. P Pin-174031 The Principal,Govt. Senior Secondary School,Jejwin, P.O.District Bilaspur, BILASPUR 12 Himachal Pradesh, Pin- The Principal, Govt. Senior Secondary School,Koserian, Tehsil Jhandutta, BILASPUR 13 P.O. Kosnria,District Bilaspur, H. P. Pin-174030 The Principal, Govt.
    [Show full text]
  • Kangra, Himachal Pradesh
    ` SURVEY DOCUMENT STUDY ON THE DRAINAGE SYSTEM, MINERAL POTENTIAL AND FEASIBILITY OF MINING IN RIVER/ STREAM BEDS OF DISTRICT KANGRA, HIMACHAL PRADESH. Prepared By: Atul Kumar Sharma. Asstt. Geologist. Geological Wing” Directorate of Industries Udyog Bhawan, Bemloe, Shimla. “ STUDY ON THE DRAINAGE SYSTEM, MINERAL POTENTIAL AND FEASIBILITY OF MINING IN RIVER/ STREAM BEDS OF DISTRICT KANGRA, HIMACHAL PRADESH. 1) INTRODUCTION: In pursuance of point 9.2 (Strategy 2) of “River/Stream Bed Mining Policy Guidelines for the State of Himachal Pradesh, 2004” was framed and notiofied vide notification No.- Ind-II (E)2-1/2001 dated 28.2.2004 and subsequently new mineral policy 2013 has been framed. Now the Minstry of Environemnt, Forest and Climate Change, Govt. of India vide notifications dated 15.1.2016, caluse 7(iii) pertains to preparation of Distt Survey report for sand mining or riverbed mining and mining of other minor minerals for regulation and control of mining operation, a survey document of existing River/Stream bed mining in each district is to be undertaken. In the said policy guidelines, it was provided that District level river/stream bed mining action plan shall be based on a survey document of the existing river/stream bed mining in each district and also to assess its direct and indirect benefits and identification of the potential threats to the individual rivers/streams in the State. This survey shall contain:- a) District wise detail of Rivers/Streams/Khallas; and b) District wise details of existing mining leases/ contracts in river/stream/khalla beds Based on this survey, the action plan shall divide the rivers/stream of the State into the following two categories;- a) Rivers/ Streams or the River/Stream sections selected for extraction of minor minerals b) Rivers/ Streams or the River/Stream sections prohibited for extraction of minor minerals.
    [Show full text]
  • Police Department District Pathankot Detail of Pending P.S Wise List Of
    Police Department District Pathankot Detail of Pending P.S Wise List of PO’s & Abs U/S 82/83 Cr.pc &299 Cr.pc UP to date S.No Name Of Police Station POs 82/83 Cr.pc Absconders 299 Cr.pc Total 1 Division No,1 22 46 68 2 Division No.2 40 29 69 3 Nagal Bhoor 06 15 21 4 Mamon Cantt 02 07 09 5 Sadar 20 14 34 6 Taragarh 03 08 11 7 N.J.Singh 06 12 18 8 Sujanpur 12 21 33 9 ShahPur Kandi 08 06 14 10 Dhar Kalan 04 02 06 Total 123 160 283 Total of PO’s U/S 82/83 CrPc= 123 Home District 82/83 CrPc 29 Other District 82/83 CrPc 40 Other State 82/83 CrPc 54 Total of Abs U/S 299 CrPc = 160 Home District 299 CrPc 28 Other District 299 CrPc 41 Other State 299 CrPc 88 Other Country (USA) 299 CrPc 01 Other Country ( Nepal ) 299 CrPc 02 Total of PO’s NDPS Act U/S 82/83 CrPc Other State = 01 Home District 82/83 CrPc - Other District 82/83 CrPc - Other State 82/83 CrPc 01 Other Country - Total of Abs of NDPS Act U/S 299 CrPc = 24 Home District 299 CrPc 03 Other District 299 CrPc 07 Other State 299 CrPc 12 Other Country ( Nepal ) 02 Police Department Distt. Pathankot PS Div No.1 Proclaimed offenders U/S 82/83 Cr.pc. in Home district = 09 Sr. Name, F.Name and Address Fir No., Date, U/S& PS Wich Belong Date of PO Name of the No.
    [Show full text]
  • List of Registered Projects in RERA Punjab
    List of Registered Real Estate Projects with RERA, Punjab as on 01st October, 2021 S. District Promoter RERA Type of Contact Details of Project Name Project Location Promoter Address No. Name Name Registration No. Project Promoter Amritsar AIPL Housing G T Road, Village Contact No: 95600- SCO (The 232-B, Okhla Industrial and Urban PBRERA-ASR02- Manawala, 84531 1. Amritsar Celebration Commercial Estate, Phase-III, South Infrastructure PC0089 Amritsar-2, Email.ID: Galleria) Delhi, New Delhi-110020 Limited Amritsar [email protected] AIPL Housing Village Manawala, Contact No: 95600- # 232-B, Okhla Industrial and Urban Dream City, PBRERA-ASR03- NH1, GT Road, 84531 2. Amritsar Residential Estate, Phase-III, South Infrastructure Amritsar - Phase 1 PR0498 Amritsar-2, Email.ID: Delhi, New Delhi-110020 Limited Punjab- 143109 [email protected] Golf View Corporate Contact No: 9915197877 Alpha Corp Village Vallah, Towers, Sector 42, Golf Model Industrial PBRERA-ASR03- Email.ID: Info@alpha- 3. Amritsar Development Mixed Mehta Link Road, Course Road, Gurugram- Park PM0143 corp.com Private Limited Amritsar, Punjab 122002 M/s. Ansal Buildwell Ltd., Village Jandiala Regd. Off: 118, Upper Contact No. 98113- Guru Ansal Buildwell Ansal City- PBRERA-ASR02- First Floor, 62681 4. Amritsar Residential (Meharbanpura) Ltd Amritsar PR0239 Prakash Deep Building, Email- Tehsil and District 7, Tolstoy Marg, New [email protected] Amritsar Delhi-110001 Contact No. 97184- 07818 606, 6th Floor, Indra Ansal Housing PBRERA-ASR02- Verka and Vallah Email Id: 5. Amritsar Ansal Town Residential Prakash, 21, Barakhamba Limited PR0104 Village, Amritsar. ashok.sharma2@ansals. Road, New Delhi-110001 com Page 1 of 220 List of Registered Real Estate Projects with RERA, Punjab as on 01st October, 2021 S.
    [Show full text]
  • REPORT of the Indian States Enquiry Committee (Financial) "1932'
    EAST INDIA (CONSTITUTIONAL REFORMS) REPORT of the Indian States Enquiry Committee (Financial) "1932' Presented by the Secretary of State for India to Parliament by Command of His Majesty July, 1932 LONDON PRINTED AND PUBLISHED BY HIS MAJESTY’S STATIONERY OFFICE To be purchased directly from H^M. STATIONERY OFFICE at the following addresses Adastral House, Kingsway, London, W.C.2; 120, George Street, Edinburgh York Street, Manchester; i, St. Andrew’s Crescent, Cardiff 15, Donegall Square West, Belfast or through any Bookseller 1932 Price od. Net Cmd. 4103 A House of Commons Parliamentary Papers Online. Copyright (c) 2006 ProQuest Information and Learning Company. All rights reserved. The total cost of the Indian States Enquiry Committee (Financial) 4 is estimated to be a,bout £10,605. The cost of printing and publishing this Report is estimated by H.M. Stationery Ofdce at £310^ House of Commons Parliamentary Papers Online. Copyright (c) 2006 ProQuest Information and Learning Company. All rights reserved. TABLE OF CONTENTS. Page,. Paras. of Members .. viii Xietter to Frim& Mmister 1-2 Chapter I.—^Introduction 3-7 1-13 Field of Enquiry .. ,. 3 1-2 States visited, or with whom discussions were held .. 3-4 3-4 Memoranda received from States.. .. .. .. 4 5-6 Method of work adopted by Conunittee .. .. 5 7-9 Official publications utilised .. .. .. .. 5. 10 Questions raised outside Terms of Reference .. .. 6 11 Division of subject-matter of Report .., ,.. .. ^7 12 Statistic^information 7 13 Chapter n.—^Historical. Survey 8-15 14-32 The d3masties of India .. .. .. .. .. 8-9 14-20 Decay of the Moghul Empire and rise of the Mahrattas.
    [Show full text]
  • Benchmarking Local Government Performance on Rural Sanitation Global Scaling up Sanitation Project
    WATER AND SANITATION PROGRAM: Learning n ote Global Scaling Up Sanitation Project Key findings • Performance benchmarking Benchmarking Local enables districts to understand their performance and motivates Government Performance on them to improve. It helps to flag areas of strength, areas that Rural Sanitation: Learning need improvement, and linkages from Himachal Pradesh, India between them. • Through performance april 2010 benchmarking, inputs, outputs and processes can be linked to outcomes in monitoring rural sanitation sector performance in INTRODUCTION Sanitation and Sanitation Marketing India. Open defecation is a traditional be- or TSSM) leverages the TSC frame- • The use of performance havior in rural India. Conventional rural work and resources. TSSM combines benchmarking weighted scoring is sanitation programs have been based Community-Led Total Sanitation (CLTS) designed to put heavier emphasis on the assumption that people def- with sanitation marketing to help local on, and therefore encourage, ecate in the open because they are too governments effectively use their funds achievement of outcomes. poor to afford the cost of constructing to end open defecation and achieve a toilet. Therefore, subsidies for upfront sustainable impact. • Benchmarking should enable policy capital costs were provided to generate makers and nodal agencies to demand for “sanitation,” interpreted PROBLEM STATEMENT monitor performance on a rational narrowly as a pour-flush toilet. These Measuring and monitoring perfor- basis and thereby channel resources programs increased the reported cov- mance on total sanitation and using and efforts on the basis of identified erage of household toilets but had a the results from these measurements strengths and weaknesses. poor record with respect to toilet usage, to build sector capacity is critical to cost-effectiveness, and sustainability.
    [Show full text]
  • World Heritage Site – Kalka Shimla Railway an Introduction
    WORLD HERITAGE SITE – KALKA SHIMLA RAILWAY AN INTRODUCTION Ambala Division is the proud custodian of “WORLD HERITAGE SITE-KALKA SHIMLA RAILWAY”. The heritage status to KSR was awarded on 7th July, 2008 by UNESCO. Shimla (then spelt Simla) was settled by the British shortly after the first Anglo- Gurkha war and is located at 7,116 feet(2,169m) in the foothills of the Himalaya. By the 1830s, Shimla had already developed as a major base for the British. It became the summer capital of British India in 1864, and also the Headquarters of the British army in India. The Kalka- Shimla Railway was built to connect Shimla, the summer capital of India during the British Raj, with the Indian rail system. “The Guinness Book of Rail facts & feats” records Kalka Shimla Railways as the greatest narrow gauge engineering in India. It is indeed true, construction of 103 tunnels (102 Existing) aggregating five miles and over 800 bridge in three years, that too in rough and hostile terrain was not an easy task. The Historic, approximate 111 years old KLK-SML Railway line which was opened for public traffic on 9th Nov.1903, became UNESCO Declared world Heritage Railway line, when it was conferred Heritage status on 10th July 2008 & listed under “Mountain Railways of India”. The idea of a Railway line to Shimla dates back to the introduction of Railways in India. It is said that in The DELHI GAZETTE, a correspondent in November, 1847 sketched the route of railway to Shimla with the estimates of the traffic returns etc in appropriate style.
    [Show full text]