211 W Fort Street | , UP TO 88,985 SF OF CONTIGUOUS AVAILABILITY Tower at 211 The Tower at 211, located in , is a Class A environment. Additionaly, the rectangular just a short walk to the city’s focal point at Campus 18,000 RSF floor plates are extremely flexible and Martius. The walkability of the location affords Tenant’s efficiently plan for both full-floor and multi-tenant easy access to a broad array of dining, retail, and layouts. entertainment establishments throughout the Central Business District (CBD). Located at the corner of Fort St. and Washington Blvd., the Tower at 211 provides unparalleled accessibility for Comprised of 438,640 rentable square feet across 26 employees with immediate access to ‘The Lodge’ (MI- floors, the Tower at 211 is one of the few buildings in 10), an arterial thoroughfare which feeds directly into the market to offer floor-to-ceiling windows, providing Interstates 75, 94, 96 and serves as a gateway to the ample natural light and unobstructed views, all within entire Metro area.

One Campus David Scott Martius Building Westin Book Cadillac Patrick V. McNamara Penobscot Federal Building Building Millender One Detroit Center Center Buhl Building Coleman A Young Fort One Renaissance Woodward Municipal Center Washington Center Plaza Building 150 W. Jefferson Crowne Plaza

TCF Center

2 Availability

26 ccie

25 ccie

24 ccie

23 ccie

22 ccie

21 ccie

20 ccie

19 ccie

18 ccie

17 ccie 1, SF | aiae 1221 | Site 1

16 1, SF | aiae 1221 | Site 1 ,1 SF S

EXPLORE IN 3D 15 1, SF | aiae | Site 1

SF SF 14 ,11 SF | aiae aiae ccie aiae ccie ccie 2,1 SF | aiae ccie Site 1 Site 12 Site 1 Site 112

13 1, SF | aiae | Site 1

12 1, SF | aiae | Site 12

, SF 11 1, SF | aiae | Site 11 S

10 1, SF | aiae | Site 1

9 1, SF | aiae | Site

8 Mechanica Foor

, SF 1,1 SF | aiae 7 11,21 SF | aiae 1221 | Site aiae | Site ccie Site 2

,2 SF | aiae 6 ,2 SF | aiae | Site ccie Site 2

1,2 SF 2, SF | aiae , SF | aiae 1221 ,2 SF | aiae 5 ccie aiae 1221 ccie Site Site 1 Site 21 Site 1

4 1, SF | aiae | Site

1,21 SF ,2 SF | aiae 1221 3 ccie , SF | aiae 21221 | Site 1 aiae 12122 Site 1 Site 1

2 1, SF | aiae 21221 | Site 2

1,1 SF | aiae 1 ccie ,1 SF | aiae | Site 1 Site 1

3 Tower at 211 Typical Floor Plate

17,797 RSF FLOOR PLATES

FORT STREET Site Plan WASHINGTON BOULEVARD WASHINGTON

4 CONGRESS STREET Galley Group Food Theodore Levin Court/Maru Sushi U.S. Courthouse

Comerica Bank Regional HQ 201 West Fort Detroit Club Caucus Club

London Chop House 333 West Fort State Savings Bank

Adient HQ

150 W. Jefferson The Foundation Hotel Crowne Plaza TCF Center Hotel

Tower at 211 Parking Map

5 Amenities AMENITIES

W

G oodwar RETAIL 1. BLO BLOW DRY BAR rand R

2. ELEMENT HOTEL iv vRESTAURANTSe er A d A E Adamas A 3. JOHN VARVATOS ve v damas A v W A e 4. WRIGHT & CO. e 5. CAFÉ D’MONGO’S 6. LULULEMON t e 7. WEWORK v agley S B t 8. BRAKEMAN 2 ass A

C 1 9. DÉTROIT IS THE NEW BLACK 3 4 John RB S Bagley St roadwa 10. URBAN BEAN 79 80 6 7 8 9 16 5 y S 11. PURE BARRE Grand R 14 81 82 11 12 13 15 t ve 12. WARBY PARKER 83 iver A 10 19 20 22 86 ve 17 18 21 ratiot A 13. MADEWELL 84 85 G lvd 26 27 14. CORNERSTONE 87 23 24 25 30 31 29 15. AMERICAN CONEY 33 28 W State S 32 16. BOLL FAMILY YMCA oodwar ashington B t 34 ve 17. LOVERS ONLY W Gratiot A M 35 36 d A 18. BONOBOS ichigan A

C t 37 v v e 19. SHINOLA HOTEL ass A e oe S onr t 20. SAN MORELLO 3940 41 M E Layfayette S v

e 38 21. HAIR LAB BY DETROIT G

lvd S 47 48 yette B riswold S 22. PUNCH BOWL SOCIAL W Lafa helby S 46 2nd A 42 1st A 43 4445 52 53 E Fort St 23. BOOK CADILLAC HOTEL 5051 Cadillac S 54 v 49 t v e 24. CANNELLE t 58 q e 57 59 25. MOOSEJAW W Fort St 55 56 64 65 B 26. VINCENTE’S 63 t rush S 62 R 61 E Congress S 60 andolph S 27. SEVEN GREENS SALAD 73 70 t ess St 6768 W 69 28. ROAST W Congr 66 74 29 . NIKE ashington B t 77 7172 W Larned S t 30. CITIZEN YOGA 31. THE BELT 76 32. THE HUDSON CAFE 75 lvd

33. NOJO KICKS DETROIT R

enissance D 34. UNDER ARMOUR 78 35. PRIME AND PROPER 36. AVALON BAKERY 37. WEWORK 50. BON BON BON 63. JIMMY JOHNS 76. CROWN PLAZA r W 38. HOLIDAY INN EXPRESS 51. FIFTH THIRD BANK 64. BESA 77. COURTYARDAtwater St 39. LAFAYETTE CONEY 52. POTBELLY 65. ROASTING PLANT 78. MARRIOT 40. AMERICAN CONEY 53. CAMPUS MARTIUS 66. TRUST COCKTAILS 79. BOYDE AESTHETIC CENTER 41. FRESHII 54. 7-ELEVEN 67. LONDON CHOP HOUSE 80. GO! SY THAI 42. DOUBLE TREE 55. WHICH WICH 68. UPS 81. BIRD BEE 43. COMERICA BANK 56. CHASE BANK 69. BANK OF AMERICA 82. LA LANTERNA 44. MARU SUSHI 57. GRAND TRUNK 70. TOWN HOUSE 83. EATÓRI 45. DIME STORE 58. CENTRAL KITCHEN & BAR 71. FOUNDATION HOTEL 84. THE TEN NAIL BAR 46. ANYTIME FITNESS 59. SHAKE SHACK 72. APPARATUS ROOM 85. CITY BARK 47. STARBUCKS 60. BROME BURGER 73. PNC 86. DESSERT OASIS 48. PARC 61. BALENCE JUICE BAR 74. DOMINOS PIZZA COFFEE ROASTERS 49. FORT ST. GALLERY 62. CAUCUS CLUB 75. TCF CENTER 87. DETROIT BIKES

6 WATERFORD ROCHESTER Oakland County International Airport OAKLAND COUNTY INT’L AIRPORT DRIVE TIME: 50 MIN 59 3

PONTIAC

59 Regional Map 94 TROY MT CLEMENS

OAKLAND COUNTY TROY AIRPORT DRIVE TIME: 35 MIN 53 97

1 FRASER Oakland County Troy Airport 75 WARREN

ROYAL OAK ST CLAIR SHORES 96 SOUTHFIELD 695

S NOVI EASTPOINTE E A STAT FERNDALE D E 102 T I ANAD N C U

275 5 HAMTRAMCK GROSSE POINTE DRIVE TIME: 25 MIN LIVONIA 10 14 REDFORD 96

39 ANN ARBOR DRIVE TIME: 45 MIN 24 DETROIT WESTLAND DEARBORN 153 CANTON WINDSOR

12 75 LAKESHORE

94 DTW DRIVE TIME: 25 MIN LINCOLN PARK

TAYLOR

ROMULUS Detroit Metropolitan 85 Wayne County Airport

NEW CENTER

WOODBRIDGE MIDTOWN EASTERN MARKET

LAFAYETTE PARK RIVERTOWN CBD

CORKTOWN

7 Downtown Detroit by the Numbers

TOTAL FLOOR AREA BILLION $1.179 TOTAL DOLLARS INVESTED BEING DEVELOPED IN PROJECTS IN REPORT 1,815,000 SF 1,815,000 Current Projects 3,548,988 sf $1.54 billion INVESTED 1,255,988 SF 1,255,988 $245.4 MILLION

500,000 SF 500,000 21TOTAL CURRENT 168,000 SF 168,000 $56.8 MILLION $56.8 $59 MILLION DEVELOPMENTS

Regional Map Pipeline Statistics 1,041 175 24 TOTAL RESIDENTIAL UNITS AFFORDABLE HOUSING UNITS PROJECTS IN THE PIPELINE (Completed in 2018 or currently under (Reported) construction)

119% 894 2,375 ADDITIONAL RESIDENTIAL UNITS RESIDENTIAL UNITS COMPLETED THIS YEAR ESTIMATED NUMBER OF RESIDENTIAL UNITS PROJECTEDBETWEEN 2017-2022* (Projected) IN THE PIPELINE

Development Summar Development Continues To Gain Steam by Current Project Status Source: CBRE Research, Q4 2019 Throughout Greater Downtown Detroit, there are an estimated 164 projects since 2016 that have been completed, are currently under construction, or are proposed. Of these projects, 64 are considered to be new construction, 88 are conversions, 59 73 and 12 are a combination of new, ground-up construction and conversions. COMPLETED PROPOSED

Development Statistics 32 UNDER DEVELOPMENT

1.0% RETAL $9.6 B $2.5 B $3.1 B 3.6 M % TOTAL PROJECTED CAPITAL CAPITAL INVESTED IN PROJECTED CAPITAL RETAIL SQ. FT. COMPLETED 1.0 % HOTEL INVESTMENT IN ALL PROJECTS COMPLETED PROJECTS INVESTED IN PROJECTS AND UNDER CONSTRUCTION 4.3 2016-2023 2016-2019 UNDER CONSTRUCTION 2016-2023 OFFICE 18.7% MULTI-FAMILY

5,498 1,300 1.3 M % MULTI-FAMILY UNITS COMPLETED AND HOTEL UNITS COMPLETED AND UNDER OFFICE SQ. FT. COMPLETED AND UNDER CONSTRUCTION 2016-2023 CONSTRUCTION 2016-2023 UNDER CONSTRUCTION 2016-2023 74.9 MIXED-USE Total Investment by Product Type Source: CBRE Research, Q4 2019 8 CONTACT

Brendan George Senior Vice President +1 248 351 2039 [email protected]

Jasper Hanifi Associate +1 248 351 2020 [email protected]

© 2020 CBRE, Inc. All rights reserved. This information has been obtained from sources believed reliable, but has not been verified for accuracy or completeness. You should conduct a careful, independent investigation of the property and verify all information. Any reliance on this information is solely at your own risk. CBRE and the CBRE logo are service marks of CBRE, Inc. All other marks displayed on this document are the property of their respective owners, and the use of such logos does not imply any affiliation with or endorsement of CBRE. Photos herein are the property of their respective owners. Use of these images without the express written consent of the owner is prohibited. PMStudio_November2020