Ventura River Watershed Management Plan Final Draft: Parts 1 & 2 To be Considered for Approval by the Ventura River Watershed Council on November 20, 2014 Because the Ventura River Watershed Management Reviewing Information and Instructions: Plan will be such a large document, its approval by the Please note that this version is a low-resolution PDF, so Watershed Council is being handled in stages. At the some of the graphics are not sharp. A higher-resolution upcoming November 20 meeting of the Watershed PDF of the final version will be made available on the Council, the front sections of the plan—those that website and for print. Also, some of the graphics and comprise what is essentially “the plan” part of the plan— design elements in this version are still in flux. are scheduled for approval. This includes: The schedule and budget do not allow for significant • Executive Summary revisions at this point. Many opportunities have been • Part 1 – Introduction provided to review most of this text in draft form. New • Part 2 - Watershed Plan, Projects, and Programs sections that have not been through review include: The final draft of these sections is contained herein. Introduction, 1.1 Executive Summary, and 1.3 The Part 3 - Watershed Characterization, and Planning Process. Part 4 - References and Supporting Material, Please do your best to limit comments to the new will be approved at a future meeting. sections, or to correct important inaccuracies or errors. If you find something you feel should be corrected, contact Lorraine Walter (
[email protected] or 649-6852x4) with that information— by November 17 if possible.