Appendix 4 Anticipated Equipment List

Total Page:16

File Type:pdf, Size:1020Kb

Appendix 4 Anticipated Equipment List APPENDIX 4 ANTICIPATED EQUIPMENT LIST Keele River Staging Area — Anticipated Equipment Inventory (DRAFT) The following equipment will be barged to the site, off-loaded and stored: River Crossing Equipment (this equipment will remain at the staging site to maintain the ice bridge) 1 Mobile shop with welding machine 3 Ice drilling and flooding machines with enclosed cabs 2 Snowmobiles with freight sleighs 4 Cases 2-cycle engine oil 3 Ice augers 4 Typhoon water pumps 8 Light plant with tower — 25KW 2 Temporary bridges Road and Lease Building Equipment (will travel with crews as access is developed). 1 Water well drilling truck (hammer drill) — Nodwell or tandem mount 4 Well equipments (casing, pumps, heated shacks (injection well shelters, or similar)) 1 38-man camp with repair shop and portable welder 4 Incinerator 2 Enviro-tank sloop (50,000L or 70,000L capacity) 10 Diesel crew truck with tidy tanks and pumps 2 D-7 LGP or equivalent winch cats 2 D-5 LGP or equivalent winch cat 2 D-8 ripper cat or equivalent with spare ripper teeth 4 140G or better grader with spare tires and chains 2 Excavators 6 Tractors 6 End dumps 1 Low-boy 3-axle winch tractor 3 Snowcats 4 Deltas 6 Water trucks; one with steam or steam jenny large enough to thaw water truck tanks 1 Steel drag Tire drag 1 Covered shop 3 Herman Nelson heaters with socks 1 Parachute 1 Portable gen-set 2 Snowmakers 1 Cellar 6'(H) x 6' or 8' diameter 30 20 pound propane bottles 2 Fuel truck (100 barrel capacity) Spill kits for fuel sloop Husky Oil Operations Ltd. NWT Drilling Program Fuel Storage The following will be stored on site: 2 Seacan spill centres Multi Spill kits for tankfarms, sloops, and along access route 30 Drums gasoline with pump 20 Drums Turbo-B for Herman Nelsons (with pump) 8 400 barrel diesel storage tanks. Portable dike and geosynthetic liner for storage tanks Total fuel stored at the Keele: 8— 400bbl tanks of diesel, 20 — 45 gallon drums aviation fuel, 30 — 45 gallon drums of gasoline. Husky Oil Operations Ltd. NWT Drilling Program 2005/2006 Drilling Equipment Inventory (Draft) Table 1 Anticipated Load List for Each Rig Load # Load Description 1 Substructure (ODS) 2 Substructure (DS) 3 Derrick (Top Section) 4 Drawworks 5 Shaker Tank 6 Suction Tank 7-9 Mud Pumps (3) 10 Premix Tank 11 Generator / Accumulator Building 12 Generator / Tool Room 13 Dog House 14 Hydraulic Room (ODS Dog house) 15 Boiler / Workshop 16 Boiler / Change Room 17 Water / Fuel Tank 18 Manifold Shack / Degasser 19 , Rig Manager's Trailer 20 Catwalk, Swivel, Kelly 21 2 Mats, Stairs, 20" Diverter 22 2 Mats, Spreaders 23 5 Mats 24 3 Mats, A-legs, Spreaders 25 4 Mats, A-legs, Stairs 26 Matting, Miscellaneous 27 Sub Shack 26-33 Drilling String 34 Flare Tank and Piping 35 Top Drive 36 Top Drive Hydraulics/Tool House 37 Weld Shack 38 Wheeled Loader 39 Equipment Storage Trailer 40-50 Miscellaneous Loads Husky Oil Operations Ltd. NWT Drilling Program Table 2 Anticipated Loads Required and Supplementary Equipment List (Per Rig) Item Quantity Description Camp 10 9.5 Loads of shacks / 0.5 load for incinerator Casing 16 Loads of tubulars Cementing 8 6 loads bulk cement /1 load for blender / 1 load for silo Drilling Fluid 10 Loads of mud products Drilling Fluid 16 Loads of liquid mud products 8-400 BBL Tanks 4 Loads of tanks Fishing / BHA 1 Loads of equipment Directional and Bits 1 Load of equipment 5 Wellsite Shacks 5 Loads of shacks Extra Boiler 1 Load of equipment 75 2-100 bbl fuel trucks Fuel _ Fuel Tank Berm I Load of equipment Additional Fuel Tank 1 Additional 400 bbl fuel storage Water 75 4-100 bbl water trucks Water Tank 1 Drill water storage - 400 bbl tank Logging 1 Load of logging tools Vacuum Trucks 75 1-80 bbl vac truck Centrifuges 2 Load of equipment Storage Tanks 3 Catch / Storage Tanks Testing Equipment 2 Loads of equipment Miscellaneous 22 Miscellaneous loads Total 330 Loads Husky Oil Operations Ltd. NWT Drilling Program Table 3 Service Rig Equipment List Item Quantity Description Rig 8 Loads of equipment Extra Boiler 1 Load of equipment Shacks 2 Loads of shacks Testing Equipment 6 Loads of equipment 400 bbl tanks 2 Loads of tanks Logging equipment 2 Loads of equipment Stimulator equipment 6 Loads of equipment Fuel 35 2-100 bbl fuel trucks Camp 10 9.5 Loads of shacks / 0.5 load for incinerator Water 30 4-100 bbl water trucks Miscellaneous 15 Miscellaneous loads Total 117 Loads Husky Oil Operations Ltd. NWT Drilling Program Table 4 Drilling Mud Additives - Estimated Material Usage (Per Well) Surface Hole Section Gel 350 sacks Caustic Soda 7 sacks Soda Ash 5 sacks Sawdust 100 sacks Intermediate Hole Section New 100 Invert 300 m3 New 100 10 drtuns Optiwet 20 drums Dyna Fibre 250 sacks Gilsonite HT 100 sacks Bentone 150 200 sacks Lime — Hydrated 200 sacks Optimul 10 drums Calcarb 250 sacks Barite 400 sacks Main Hole Section Kelzan 120 sacks Drispac 50 sacks Caustic soda 50 sacks New Lig 30 sacks Soda Ash 20 sacks Desco CF 10 sacks Biocide 10 pails Bleach 30 pails Contingency Products Barite 2000 sacks Defoamer 32 pails Drilling Detergent 5 pails SAPP 5 pails Calcium carbonate 800 sacks Sawdust 300 sacks Kwik seal 200 sacks Cellophane 100 sacks Bentonite 300 sacks Magnesium Sulfate 100 sacks Optivis RM 5 drums Zinc carbonate 20 sacks (See attached MSDS sheets for materials handling information.) Husky Oil Operations Ltd. NWT Drilling Program .
Recommended publications
  • Pennsylvania
    Spring 1991 $1.50 Pennsylvania • The Keystone States Official Boating Magazine Viewpoint Recently we received a letter suggesting that we were being contradictory in Boat Pennsylvania. According to one reader, we suggested that boaters wear personal flota- tion devices, but that the magazine photographs don't always show their use. Obtaining photographs for a magazine can be a difficult proposition. Sometimes we stage situations and take the photographs ourselves. More often, we rely on photographs submitted by contributors. Photos that depict the general boating public often do not show people wearing PFDs simply because the incidence of wearing them is so low. If we were to say that we would only use photos that showed boaters wearing PFDs, we would have a difficult time fmding acceptable photos. Generally, we try to show people wearing PFDs in small boats in situations in which devices should obviously be worn. On large boats, people most often do not wear their PFDs. Should people wear PFDs? Statistics show that wearing a PFD can save your life. Are PFDs needed all the time? Because accidents happen when they are least expected, wearing a PFD all the time is a good idea. Practically, however, as comfortable as the newest PFDs are, they can be excruciating on a hot July day. Many boaters also want to get a little sun. We accept this and our statistics show that the chances of having an accident where a PFD would have been a factor are much lower in the summer months. Ofcourse, circumstances do exist in which wearing a PFD,even on the hottest day, is warranted.
    [Show full text]
  • Commercial Fishing Guide |
    Texas Commercial Fishing regulations summary 2021 2022 SEPTEMBER 1, 2021 – AUGUST 31, 2022 Subject to updates by Texas Legislature or Texas Parks and Wildlife Commission TEXAS COMMERCIAL FISHING REGULATIONS SUMMARY This publication is a summary of current regulations that govern commercial fishing, meaning any activity involving taking or handling fresh or saltwater aquatic products for pay or for barter, sale or exchange. Recreational fishing regulations can be found at OutdoorAnnual.com or on the mobile app (download available at OutdoorAnnual.com). LIMITED-ENTRY AND BUYBACK PROGRAMS .......................................................................... 3 COMMERCIAL FISHERMAN LICENSE TYPES ........................................................................... 3 COMMERCIAL FISHING BOAT LICENSE TYPES ........................................................................ 6 BAIT DEALER LICENSE TYPES LICENCIAS PARA VENDER CARNADA .................................................................................... 7 WHOLESALE, RETAIL AND OTHER BUSINESS LICENSES AND PERMITS LICENCIAS Y PERMISOS COMERCIALES PARA NEGOCIOS MAYORISTAS Y MINORISTAS .......... 8 NONGAME FRESHWATER FISH (PERMIT) PERMISO PARA PESCADOS NO DEPORTIVOS EN AGUA DULCE ................................................ 12 BUYING AND SELLING AQUATIC PRODUCTS TAKEN FROM PUBLIC WATERS ............................. 13 FRESHWATER FISH ................................................................................................... 13 SALTWATER FISH .....................................................................................................
    [Show full text]
  • Finishing the Fore Deck Fittings... Inside of the Opposite Cap Rail
    Anchor davit Winch bits Finishing the Fore Deck Fittings... inside of the opposite cap rail. This bracket can be seen in the photo above. They will be painted black. There are only a few fittings that need to be completed before we move ahead to the next phase of this project. The winch bits are supplied as a casted piece which That will be the creation of the masts and bowsprit and finally needs to be painted. I decided to paint the bits to match the rigging of the Phantom. Start by fabricating the anchor the color of the stained wood used throughout the model. davit out of 22 gauge black wire. Simply bend the wire to It was sanded and filed first to clean it up. The elements conform to the shape of the davit as it is shown on the plans. of the winch itself were painted black. Handles were A small bead or drop of super glue was placed on the tip of added as shown on the plans. They were shaped out of the davit and allowed to dry. It formed a nice round bead 28 gauge black wire and glued into pre-drilled holes on when dry which after being painted black, finishes it off very the sides of each winch drum. The entire assembly was nicely. glued onto the deck in its proper location as taken from the plans. The bowsprit will seat into these bits as you The davit is glued into a hole that was pre-drilled in the prop- can see in the photo above.
    [Show full text]
  • Boats Built at Toledo, Ohio Including Monroe, Michigan
    Boats Built at Toledo, Ohio Including Monroe, Michigan A Comprehensive Listing of the Vessels Built from Schooners to Steamers from 1810 to the Present Written and Compiled by: Matthew J. Weisman and Paula Shorf National Museum of the Great Lakes 1701 Front Street, Toledo, Ohio 43605 Welcome, The Great Lakes are not only the most important natural resource in the world, they represent thousands of years of history. The lakes have dramatically impacted the social, economic and political history of the North American continent. The National Museum of the Great Lakes tells the incredible story of our Great Lakes through over 300 genuine artifacts, a number of powerful audiovisual displays and 40 hands-on interactive exhibits including the Col. James M. Schoonmaker Museum Ship. The tales told here span hundreds of years, from the fur traders in the 1600s to the Underground Railroad operators in the 1800s, the rum runners in the 1900s, to the sailors on the thousand-footers sailing today. The theme of the Great Lakes as a Powerful Force runs through all of these stories and will create a lifelong interest in all who visit from 5 – 95 years old. Toledo and the surrounding area are full of early American History and great places to visit. The Battle of Fallen Timbers, the War of 1812, Fort Meigs and the early shipbuilding cities of Perrysburg and Maumee promise to please those who have an interest in local history. A visit to the world-class Toledo Art Museum, the fine dining along the river, with brew pubs and the world famous Tony Packo’s restaurant, will make for a great visit.
    [Show full text]
  • Mechanical Lifting and Rigging Protocol
    Mechanical Lifting and Rigging Protocol Hierarchy Level: Procedure Document Type: Protocol Document Owner: EHS Applies to: Devon US Doc ID: 112972208 Revision Date: 12/22/2020 Review Cycle: Every 3 Years Effective 10/27/2014 ABOUT THIS PROTOCOL Purpose This protocol was established to ensure Devon implements safe work practices that meet or exceed OSHA’s mechanical lifting and rigging requirements to prevent damage or harm to equipment, facilities, or employees. Objective This protocol defines requirements for the safe use of mechanical lifting equipment and requirements for personnel responsible for lifting and rigging operations. Scope This protocol covers general lifting requirements, specific requirements for cranes, forklifts, hoists, service trucks, gin pole trucks, applies to all Devon operated equipment and facilities/sites where mechanical lifting and rigging operations are performed. Applicability Employees performing, overseeing or responsible for mechanical lifting and rigging operations. Contractors will have their own program that meets or exceeds Devon’s Mechanical Lifting and Rigging Protocol. Variances None. Superseded None. Documents Division: Business Unit Protocol No.: Page 2 Revision/Approval Corporate /Area: N/A COR 03-S17-PR Date: R2_12-22-20 Mechanical Lifting & Rigging Protocol Table of Contents 1.0 RESPONSIBILITIES .................................................................................................... 3 2.0 TERMS AND DEFINITIONS ..........................................................................................
    [Show full text]
  • Operator's Manual for Complete Instructions
    DIGGER DERRICK OPERATOR’S MANUAL This Operator’s Manual MUST BE READ prior to operating your Telescoping Material Handling DIGGER DERRICK PRINTED IN THE USA Original Instructions in English Terex South Dakota, Inc. 463280 09/2014 DIGGER DERRICK Terex South Dakota, Inc. 500 Oakwood Road Watertown, SD 57201 463280 - 09/14 Terex South Dakota, Inc. Digger Derrick DIGGER DERRICK TABLE OF CONTENTS INTRODUCTION . - I OWNERS, USERS AND OPERATORS . - I PRODUCT IDENTIFICATION . - I INTENDED USE . - I BULLETIN DISTRIBUTION AND COMPLIANCE . - II CONTACTING THE MANUFACTURER . - II TRANSFER OF MACHINE OWNERSHIP. - II SAFETY . - III HAZARD CLASSIFICATION SYSTEM . - III PROPERTY DAMAGE MESSAGES . - III GENERAL SAFETY GUIDELINES . - V BEFORE OPERATION . - VI DURING OPERATION . - VII BOOM AND LIFTING OPERATIONS . - VII DIGGING . - VIII OPERATION WITH PERSONNEL PLATFORM ATTACHED . - IX ELECTRICAL DANGERS . - X ACCESSORIES. - XI TRAVELING . - XI MAINTENANCE. - XII OVERVIEW OF POTENTIAL HAZARDS . - XIII SAFETY RELATED DECALS . - XV WHAT IS INSULATED AND NOT INSULATED . - XXVII UPPER BOOM RATING . - XXVIII VOLTAGE RATINGS. - XXVIII SECTION 1 . .1 - 1 OPERATION GUIDELINES. .1 - 1 NOMENCLATURE. .1 - 1 CAB CONTROL OPERATION. .1 - 2 MASTER CONTROL . .1 - 2 POWER TAKE-OFF (OPTIONAL). .1 - 2 CAB CONTROL FUNCTIONS. .1 - 2 OPERATOR CONTROLS AND DESCRIPTIONS. .1 - 3 MAIN DIGGER DERRICK CONTROL FUNCTIONS. .1 - 5 SINGLE STICK FUNCTIONS (IF EQUIPPED) . .1 - 9 CONTROLS BELOW ROTATION . .1 - 10 CONTROLS BELOW ROTATION FUNCTIONS . .1 - 11 PERSONNEL AND TRAINING . .1 - 12 PRE-OPERATION. .1 - 14 DAILY PRE-OPERATION CHECKS . .1 - 14 JOB SITE SURVEY . .1 - 18 OPERATING TEMPERATURE RANGE . .1 - 19 WIND SPEED . .1 - 19 JOB SITE SETUP . .1 - 20 SETTING UP ON A SLOPE . .1 - 22 SETTING UP ON A SOFT SURFACE.
    [Show full text]
  • Hoisting & Rigging Fundamentals
    Hoisting and Rigging Fundamentals for Riaaers and ODerators Pendant Control - Components TR244C, Rev. 5 December 2002 TR244C Rev . 5 TABLE OF CONTENTS INTRODUCTION ............................................................ ii HOISTING AND RIGGING OBJECTIVES ......................................... 1 WIRE ROPE SLINGS ......................................................... 2 SYNTHETIC WEBBING SLINGS ............................................... IO CHAINSLINGS ............................................................ 14 METAL MESH SLINGS ...................................................... 18 SPREADER BEAMS ........................................................ 19 RIGGING HARDWARE ...................................................... 22 INSPECTION TAG .......................................................... 39 CRITICAL LIFTS ........................................................... 40 GENERAL HOISTING AND RIGGING PRACTICES ................................ 44 HANDSIGNALS ............................................................ 64 INCIDENTAL HOISTING OPERATOR OBJECTIVES ............................... 68 HOISTS .................................................................. 69 OVERHEAD AND GANTRY CRANES ........................................... 71 MOBILECRANES .......................................................... 77 APPENDIX ................................................................ 81 TC:0007224.01 i TR244C Rev. 5 INTRODUCTION HOISTING AND RIGGING PROGRAM Safety should be the first priority when performing
    [Show full text]
  • Hawaii Stories of Change Kokua Hawaii Oral History Project
    Hawaii Stories of Change Kokua Hawaii Oral History Project Gary T. Kubota Hawaii Stories of Change Kokua Hawaii Oral History Project Gary T. Kubota Hawaii Stories of Change Kokua Hawaii Oral History Project by Gary T. Kubota Copyright © 2018, Stories of Change – Kokua Hawaii Oral History Project The Kokua Hawaii Oral History interviews are the property of the Kokua Hawaii Oral History Project, and are published with the permission of the interviewees for scholarly and educational purposes as determined by Kokua Hawaii Oral History Project. This material shall not be used for commercial purposes without the express written consent of the Kokua Hawaii Oral History Project. With brief quotations and proper attribution, and other uses as permitted under U.S. copyright law are allowed. Otherwise, all rights are reserved. For permission to reproduce any content, please contact Gary T. Kubota at [email protected] or Lawrence Kamakawiwoole at [email protected]. Cover photo: The cover photograph was taken by Ed Greevy at the Hawaii State Capitol in 1971. ISBN 978-0-9799467-2-1 Table of Contents Foreword by Larry Kamakawiwoole ................................... 3 George Cooper. 5 Gov. John Waihee. 9 Edwina Moanikeala Akaka ......................................... 18 Raymond Catania ................................................ 29 Lori Treschuk. 46 Mary Whang Choy ............................................... 52 Clyde Maurice Kalani Ohelo ........................................ 67 Wallace Fukunaga ..............................................
    [Show full text]
  • The History of the Tall Ship Regina Maris
    Linfield University DigitalCommons@Linfield Linfield Alumni Book Gallery Linfield Alumni Collections 2019 Dreamers before the Mast: The History of the Tall Ship Regina Maris John Kerr Follow this and additional works at: https://digitalcommons.linfield.edu/lca_alumni_books Part of the Cultural History Commons, and the United States History Commons Recommended Citation Kerr, John, "Dreamers before the Mast: The History of the Tall Ship Regina Maris" (2019). Linfield Alumni Book Gallery. 1. https://digitalcommons.linfield.edu/lca_alumni_books/1 This Book is protected by copyright and/or related rights. It is brought to you for free via open access, courtesy of DigitalCommons@Linfield, with permission from the rights-holder(s). Your use of this Book must comply with the Terms of Use for material posted in DigitalCommons@Linfield, or with other stated terms (such as a Creative Commons license) indicated in the record and/or on the work itself. For more information, or if you have questions about permitted uses, please contact [email protected]. Dreamers Before the Mast, The History of the Tall Ship Regina Maris By John Kerr Carol Lew Simons, Contributing Editor Cover photo by Shep Root Third Edition This work is licensed under the Creative Commons Attribution-NonCommercial-NoDerivatives 4.0 International License. To view a copy of this license, visit http://creativecommons.org/licenses/by-nc- nd/4.0/. 1 PREFACE AND A TRIBUTE TO REGINA Steven Katona Somehow wood, steel, cable, rope, and scores of other inanimate materials and parts create a living thing when they are fastened together to make a ship. I have often wondered why ships have souls but cars, trucks, and skyscrapers don’t.
    [Show full text]
  • Clyde Aikau 1 Lss 221 (Length: 26:16) First Air Date: 5/12/09
    GUEST: CLYDE AIKAU 1 LSS 221 (LENGTH: 26:16) FIRST AIR DATE: 5/12/09 Next, meet a surfing legend. He’s a man who grew up in a Chinese cemetery, won big time surfing contests, sailed on the Polynesian voyaging canoe Hokulea, and saved lives as a Waimea Bay lifeguard. He’s a surfing legend. He’s Clyde Aikau, Eddie Aikau’s younger brother. Aloha mai kakou, I’m Leslie Wilcox. Welcome to the first edition of a special two part series of “Long Story Short.” Many know of Eddie Aikau, a waterman who was the first lifeguard at Waimea Bay, a big wave surfer who was lost at sea while attempting to save the crew of the Hokulea in 1978. But in the world of surfing, his brother Clyde Aikau is also renowned. He has won at Makaha, at the old Duke event on the North Shore, and the Eddie Aikau at Waimea. The Duke Kahanamoku Foundation named him a “Waikiki surfing legend.” In the Spring of 2009, Clyde is 59, and he’s not slowing down. He stopped long enough to talk with me about big waves, family and living at the graveyard in Pauoa. When we um, first had the opportunity to um, have a house in the—in the graveyard, um, the deal was that we have to clean … clean the graveyard and cut the grass, and maintain the entire um, graveyard. And um, in 1959, we had to cut the grass with sickles it’s kinda like a wooden handle so far, with a— with a—with a half-moon blade.
    [Show full text]
  • The Art of Sail-Making
    This is a reproduction of a library book that was digitized by Google as part of an ongoing effort to preserve the information in books and make it universally accessible. https://books.google.com Theartofsail-making Art J^S. /10<f. I X 8 i I 1 6- THE ART SAIL-MAKING, AS PRACTISED IN ©De Bogal Kali!?, AND ACCORDING TO THE MOST APPROVED METHODS IN THE ACCOMPANIED WITH THE PARLIAMENTARY REGULATIONS RELATIVE TO SAILS AND SAIL-CLOTH ; €!je atrmiraltj} Instructions for MANUFACTURING CANVAS FOR HER MAJESTY'S NAVY, Form of Tender, g-c. ILLUSTRATED BY NUMEROUS FIGURES, WITH FULL AND ACCURATE TABLES. - .'"'.- ?i?> THE FOURTH EDITION, ''"?-/. CORRECTED AND IMPROVED. — {'o LONDON: PRINTED FOR CHARLES WILSON, (Late J. W. Norie and Wilson,) CHARTSELLER TO THE ADMIRALTY, THE HON. EAST INDIA COMPANY, AND CORPORATION OP TRINITY HOUSE, At tbe Navigation Warehouse and Naval Academy, No. 157, LEADENHALL STREET. 1843. Entered at Stationers' Hall. 1. Dennett, Printer, 121, Fleet Street. PREFACE. The following Treatise on Sail-making was first pub lished in " The Elements and Practice of Rigging, Seamanship, Naval Tactics," &c. &c. a work in two volumes quarto. As an object of particular convenience and advan tage to Naval Artists, the then proprietor had been solicited to separate the arts there treated of, and to pub lish them in a smaller form. In compliance with this request, the work was re-published in four volumes octavo, with a separate volume of plates. The first edition of the Art of Sail-making was pro duced in the present form, and met with a favourable reception, from the merits of its correct delineation and clear description ; by these its utility was felt, and its value justly appreciated of greater import.
    [Show full text]
  • Hoisting and Rigging Safety Manual
    IHSA.ca What you do matters Invest in safety. Make IHSA your to the health and safety first step. Manual and Rigging Safety Hoisting of your employees IHSA serves the following industries: • construction EDUCATE • electrical • utilities Educate yourself and your employees. • transportation • Take advantage of IHSA’s free training programs for members. • aggregates • Access hundreds of free products and • natural gas downloadable resources. • ready-mix concrete • Learn about your rights and responsibilities under the Occupational Health and Safety Act. You are automatically a ENGAGE member of IHSA if your Engage your workers in health company pays Ontario and safety. • Give five-minute safety talks each morning. WSIB premiums for one ihsa.ca/resources/safetytalks.aspx of the rate groups in the Hoisting and Rigging • Conduct regular health and safety meetings. • Keep a record of what happens on the industries served by IHSA. worksite. Safety Manual EVALUATE Find out what we can do for you at ihsa.ca Evaluate your current health & safety program. • Find legislative requirements and best practices based on your firm size. ihsa.ca/smallbusiness.aspx • Conduct hazard assessments and workplace inspections. 21 Voyager Court South • Help workers understand the importance of reporting gaps in M035 your health & safety system. Etobicoke, Ontario M9W 5M7 Canada Tel: 1-800-263-5024 [email protected] M035 Hoisting and Rigging Safety Manual Infrastructure Health & Safety Association 21 Voyager Court South Etobicoke, Ontario M9W 5M7 Canada 1-800-263-5024 [email protected] www.ihsa.ca Disclaimer In the past, members of the public have used printed information that was outdated by subsequent The contents contained in this publication are for general information only.
    [Show full text]