DSI FLAGSHIP PROJECTS SHOWCASE

Drake & Scull International www.drakescull.com DSI Flagship Projects

DRAKE & SCULL CONSTRUCTION

DSI Flagship Projects 2 King Abdullah Petroleum Studies and Research Centre

Project: King Abdullah Petroleum Studies and Research Centre Location: Riyadh, KSA Industry: education Developer: Saudi Aramco Consultant/Architect: Zaha Hadid Value: US $ 800 million

King Abdullah Petroleum Studies and Research The Entire complex will be LEED Platinum Rated upon Centre (KAPSARC) is a future-oriented research and completion, which is the highest level achievable under policy centre committed to energy and environmental U.S. Green Building Council specifications. exploration and production and analysis. The 887,000 sq feet KAPSARC campus is located in Riyadh, Saudi Drake & Scull Construction are executing the Civil, Arabia’s capital and largest city. Headquartered in an iconic Architecture, Interior Architecture, Electromechanical, complex 8 Kms south of King Khalid International Airport External Road & Parking Facilities, Infrastructure Works, and designed by world-renowned architect Zaha Hadid, the Site Works and Landscaping. Centre is the first thing visitors see upon arriving in Riyadh and the last they will glimpse before leaving, by airplane. Drake & Scull Construction are also undertaking the construction of the following project elements: The Centre’s construction employs a variety of sustainable building techniques and advanced technologies. Arranged • Basement – connecting the 3 main buildings to temper the light and heat of the desert environment, with access tunnels and utilize wind to cool facades and outdoor spaces, • 5 Core Buildings (Research Center, Conference the design bathes interiors in carefully controlled, soft Center, Library, Musalla & IT Center) light. Building and landscaping mix with the dry-land • Structural and Façade works ecosystem and take advantage of seasonal breeze to • Interface with Novated contractors offer temperate zones and improve pedestrian comfort. • PMT Offices Energy-efficient light sources such as LEDs, powered outside the grid using photovoltaic elements, give a crystal-like identity during the night.

DSI Flagship Projects 3 Lamar Towers

Project: Lamar Towers Location: , KSA Industry: Commercial Developer: Lamar Development Company Consultant/Architect: RMJM/Saudi Diyar Value: US $ 460 million

The Word Lamar means liquid in , which DSC was invited to complete the construction of the Lamar describes the reflection of the golden glass in the waters Towers and accelerate the project to completion. DSC is of the gulf. responsible to carry out the construction, completion, commissioning handover and maintenance of Civil, The Lamar Towers are a pair of currently under Architectural, Interiors, and External Works. construction in the city of Jeddah, . Located on Jeddah Corniche, Tower 1 will be 350 m (1,150 ft) tall with 72 floors above ground, and Tower 2 will be 301 m (988 ft) tall with 62 floors above ground.

The Lamar Towers were conceptualized to house a shopping mall, office blocks, Hotels and residential apartments for complete Mixed Use. Besides these, the towers will also offer a conference center, ballrooms, a spa and other related facilities.

DSI Flagship Projects 4 Jabal Omar

Project: Jabal Omar Location: , KSA Industry: Mixed Use Developer: Jabal Omar Development Company Consultant/Architect: ARCREA Studio/ Wilson Associates Value: US $ 350 million

The Jabal Omar Development was set up to invest $3.2bn The third phase of the Jabal Omar scheme will involve the in projects located at the holy city of Mecca where it is construction of four hotel towers with a total built up area headquartered. The company was created to oversee of 400,000 square metres. The Towers will also include a 5 the construction of 40 residential towers to accommodate star and 3 star hotel. 160,000 Islamic pilgrims, and a prayer area for 200,000 worshippers. DSC will carry out the complete construction of the main Podiums, car parking levels and commercial space. DSC More than 600 properties have been seized for the project, will also install elevators, escalators and fire escape stairs which involves constructing two five-star hotels with 935 for the podium area. rooms, and six three-star hotels comprising 1,255 rooms, across an area spanning 244,800 sq m. Residential DSC’s scope of work also includes the construction of two buildings reaching 20 storeys to accommodate 100,000 5 star and one 3 star hotel towers. Both towers are multi people, 520 restaurants and 4,360 commercial and retail storied and will be able to accommodate more than 1000 units are also being built. guests at a time.

When finished, the development will have air conditioned plazas for 100,000 worshippers, open courtyards for 120,000 people and a car park that can accommodate 10,000 vehicles.

DSI Flagship Projects 5 Saraya Aqaba

Project: Saraya Aqaba Location: Aqaba, Industry: Commercial Developer: Saraya Aqaba Real Estate Development Company Consultant/Architect: Arabtec Value: US $ 208 million

The USD 1 billion “Saraya Aqaba Project” is a premier A bustling “city within a city”, uniquely designed in a culturally tourism and leisure destination, with a mixed-use themed authentic manner; Saraya Aqaba is set in the midst of a rich development. Situated on the northern tip of the Gulf of and textured environment of lush gardens and sparkling Aqaba, the construction of the Saraya Aqaba Project and waterways. its man-made lagoon will add approximately 1.5 km of beachfront to the city of Aqaba. DSC was awarded the General contracting scope of works to deliver Phase one of the Saraya Aqaba Development. The Project comprises approximately 634,000 square Phase One of the development includes four international meters of master-planned development, combining the hotels managed by Jumeirah International and Starwood splendor of an authentically styled ancient city with the Hotels and Resorts Worldwide as well as Souk Saraya, modern luxuries of a world class resort. It features a number a beach club, offices, a convention center and Wild Wadi of 5-star hotels and boutique hotels, various residential water park managed by Jumeirah International, in addition options (beach front villas, townhouses, beach club to a part of the residential units, infrastructure, utility duplexes and apartments), office space, a contemporary buildings and staff accommodation. shopping district, an old souk, a water park, a convention centre, and an amphitheater.

DSI Flagship Projects 6 Algeria Complex

Project: Algeria Complex Location: Algiers, Algeria Industry: Mixed Use Developer: Emiral Consultant/Architect: Hill International Value: US $ 111 million

The Forum El Djazair is a massive tourism redevelopment Zone 02 project being developed in the Moretti region in Western As part of its work on Zone 2, DSC is building three office Algeria. The Forum El Djazair (also referred to as Algeria buildings on 2 common basements and buildings with Complex) is expected to become a prime tourist attraction (Ground + 6 floors), (Ground + 8 floors) and (Ground + 10 post completion and a major boost to Algeria’s tourism floors) respectively. sector. Zone 03 The Forum El Djazair is envisioned as a massive complex DSC is undertaking the construction of a mega shopping hosting residential buildings, offices, shopping malls and mall comprising of 2 basements + Ground + 1 floor. The designer villas. The Forum is divided into 6 zones. shopping mall will feature a mix of both small and large outlets, as well as a massive food court area. A Joint Venture consortium led by DSC was awarded the contract to undertake complete construction work on 4 main Zone 04 zones. DSC is also building 15 ultra-modern, high end residential villas that are designed to be tastefully built and furnished Zone 01 to the highest standards. The villas will be one of the most DSC is undertaking the complete construction for Zone 1 prominent features of the Forum El Djazair. which consists of four residential high-rise buildings, each comprising of 3 basement + Ground + Mezzanine + 22 floors + saloon terrace and each high-rise building comprising of 124 apartments.

DSI Flagship Projects 7 The Royal Amwaj Resorts & Spa

Project: The Royal Amwaj Resorts & Spa Location: Dubai, UAE Industry: Mixed Use Developer: Seven Tides Limited/Asteco Development Management LLC Consultant/Architect: Seven Tides Value: US $ 107 million

The Royal Amwaj Resort and Spa features 446 upscale • Installation of the Decorative wooden pergolas in the residences and a five star 300 suites hotel and over 450 common areas condominiums besides 293 guest rooms for visitors. • Installation of a GRP tip on the roof top external works DSC managed the following aspects on site: Package on the lagoons • External finish on 3 Lagoon pools, and creation of access Structural works Package paths from each villa to the pool • Structural work on the 5 star hotel • DSC also installed a wide network of Storm water • Structural work for 18 premium Water villas drainage for the Royal Amwaj project with 110 manholes • Structural work on 42 villas located at vital points • Structural work on 15 Single villa’s • DSC also undertook the installation of External utility • Structural work on 450 Apartments (G + 10 floors) services like sewerage, water supply, cold & hot water • Structural work on 14 Penthouses (both shell and core) and sewerage pump stations • Car Parking in the Basement area to accommodate 650 vehicles Logistics works Package • Two Tennis courts spread over an area of 1300m2 DSC successfully acted as an interlocutor between the • 3 private Lagoons with an average depth 1.50 m clients and the various subcontractor teams on site. DSC efficiently coordinated with the client, engineer’s Architectural works Package representative and other contractors. As part of its project • DSC undertook the complete façade finishing works on management, DSC also provided the machinery i.e. hoisting site, which consisted of teak wood which overlapped & shifting the material within project limits. cladding with stained paint • DSC also constructed the public area finishes as per the design plan

DSI Flagship Projects 8 The Mangrove Place

Project: The Mangrove Place Location: , , UAE Industry: Commercial Developer: Luxury Real Estate Development Consultant/Architect: UPA Value: US $ 100 million

Mangrove Place is a mid-rise residential development set • High class Luxury swimming pools, steam house and in the heart of the commercial business district of Shams Jacuzzi Abu Dhabi adjacent to the prestigious Sky Tower. • World class fully equipped gym At 29 storeys height, the project offers a good mix of 1, • Private car parking for each tenant 2 and 3 bedroom apartments with well-planned interior • Environmental roof with mini landscape and foundation layouts and generous outdoor areas. The project includes • A unique Modern home automation system employed the construction of direct waterfront on two aspects in a for the first time on Reem Island cosmopolitan downtown setting. The Mangrove place offers • Water frontage cafes and restaurants fantastic terraces and balconies with uninterrupted sea and • Central reverse cycle air conditioning system canal views. Drake & Scull Construction’s UAE subsidiary, Gulf Technical GTCC assumed complete responsibility for the construction Construction Company (GTCC) was invited by Luxury Real of a Total Built Up area of 77,703.44 m2 area, a sand stone Estate Development to undertake the main contracting elevation of 21,390 m2 and the installation of fiber optic responsibilities to bring the vision driving the Mangrove technology for the data and voice management systems on project to life. the building GTCC’s work covered the entire construction cycle for the following major components of the Mangrove Project: • 465 residential apartments of 1, 2, 3 bed room types, 13 town houses and 2 pent houses spread over 29 floors

DSI Flagship Projects 9 Laguna Tower

Project: Laguna Tower Location: Dubai, UAE Industry: Mixed Use Developer: IFA Hotels Consultant/Architect: Al Gurg Consultants Value: US $ 50 million

The Laguna Tower is a mixed use high rise tower located The space from the 9th Floor to 40th Floor is dedicated in a pivotal and commanding location in the Jumeirah to residential living and consists of studio apartments; Lake Towers area. DSC were chosen to carry out the Civil one, two and three Bedrooms Residential flats. The 41st works, external landscaping and the MEP works for the Floor is exclusively devoted to the four Penthouses on top, entire Laguna Tower complex, which included 3 floors of each with dedicate Swimming Pools for their owners. The basement Parking, one Ground floor, and the 40 storey penthouses are offered in 2 and 3 bedroom options, with Hotel & Residential Tower for a Total Built up area of around furnished fittings. 70000 m2. The basement floor features an extensive kitchen area, The Hotel space consists of the Ground reception area and with separate spaces for each of the international cuisine the first eight storeys. The Laguna Hotel features 168 restaurants in the Tower. The three levels of basement car Rooms in total, spread over 7 Floors, with 28 deluxe parking can accommodated a total of around 478 cars Suites, 91King Rooms and 49 Twin Rooms. In addition to with excusive parking space for building owners and tower the guest rooms, the hotels also feature luxury Restaurant/ residents. Bars, an exclusive Health Club, Swimming Pools and Meeting Rooms for the Hotel Guests.

The Concourse and Promenade Levels of the hotel consist of the 24 hour Coffee Shop, the All Day Dining bar, a private Dining area, the main bar, the Food & Beverages outlet.

DSI Flagship Projects 10 Al Jawhara Tower

Project: Al Jawhara Tower Start Date: 2010 Completion Date: Ongoing Location: Jeddah, Kingdom of Saudi Arabia Industry: Residential Developer: Damac Consultant/Architect: Salama Structural Engineering Consultants Value: US$ 100 Million

The tower is a 48-storey structure of one-to-four-bedroom design. The luxurious apartments will boast fixtures and apartments and five-bedroom penthouse suites, along with fittings including modern kitchens and large balconies to three podium levels and one floor for parking and a health make the most of the views on offer. club. A unique aspect of the shape of the building is that The Basement floors consist of building services and car it is not uniform. The interior layouts constantly change parking while the ground floor consists of the restaurant and as the building rises, along with the façade curvature. The retail stores. There are a total of 3 parking floors, a health curvature resembles two separate curves that have been club, and 42 apartment floors. locked together, with the blue top curve cutting through and being supported by the white curve that is rooted to the Spread over 86,880 sq. M vertically, Al Jawhara is an iconic ground. landmark of sophistication, with its grand reception area designer guest lounge and concierge. The end result is a structure that is top-heavy enough to appear gravity-defying. The complexity of the tower’s Drake & Scull Construction and its subsidiary International external façade creates reflective panels which disperse Centre for Civil Contracting (ICCC) are the Main Contractors and refract light, creating an illusionary effect. The dramatic responsible for All Structural, Finishes, and Coordination exterior creates the framework for the spectacular interior with all Client Nominated Sub-Contractors on the project.

DSI Flagship Projects 11 Al Jawhara Tower

This included the Residential and Retail Towers with a total multiple smart elevators, high class Concierge services land area 7,983.49 m2, and a Built up Area of 86,876.35 and 24-hour residents’ services, sophisticated Camera m2. surveillance systems covering multiple floor parking levels, Separate male/female swimming pools and gymnasiums, The main features of the design include the Basement, the as well as segregated sauna and steam rooms for the Ground floor hosting the reception, 3 levels of Parking, a comfort of the residents. Health Club, 31 levels of Non-Versace Apartments, 10 levels of the exclusive Versace Apartments and the Roof DSC/ICCC also undertook the installation of the modern area, spanning a Total Height of 188 metres including the Vertical Conveying systems, which covered the 6 Lift Cabins, roof features. which have very high levels of Fire Resistance, enhancing it from a safety point of view. The lifts are assigned to serve The Jawhara tower is designed to be a pioneering example the building starting from the Basement Floor reaching up of modern architectural styles, and has several unique to Level 42. Designated Cabins will also be used as service aspects to it. These include the exclusive apartments with Lifts for all other general purposes. ‘Versace Home’ interiors, an ultra modern Lift lobby with

DSI Flagship Projects 12 Water Injection Pump Stations (WIPS) Facilities

Project: Water Injection Pump Stations (WIPS) Facilities Start Date: 2007 Completion Date: 2009 Location: Aindar & Hawiyah, Kingdom of Saudi Arabia Industry: Industrial Consultant and Developer: Saudi ARAMCO Consultant/Architect: SNC –Lavalin /Canada Value: $35 Million

Water injection is a relatively modern technique that is The WIPS projects required construction activity to be carried employed to ease the extraction of oil. Pumping stations out at two different locations. The scope of work on each inject pressurised jets of water into the oil wells, which site was different, catering to the unique geographical provide additional pressure support to maintain reservoir nature and production capacities of each. capacity by pushing oil to the surface. This is also known The scope of work on the Ain Dar site covered: as secondary recovery, and offers a stepwise improvement • Construction of new underground drainage for in pressure support and eases the displacement of oil from new equipment (including septic tank, manholes, the outer edges of the oil field toward the central regions to neutralizations pits, soak pits, valve boxes, catch basins, sustain oil production. leach field system, sanitary and oily water sewer system, etc.) Saudi ARAMCO wanted to construct a modern Water • Fencing, gates and Site Preparation with Final Grading Injection Pumping Station (WIPS) at the crucial oil wells at and Paving Ain Dar and Hawiyah. The Main Contractors for the project, • General Demolition a Joint Venture between Saipem & Snc- Lavalin , chose • Construction of Guard House, Prayer Shelter/Support Drake & Scull Construction’s KSA subsidiary International Buildings Centre for Civil Contracting (ICCC) to carry out the complete • Foundations for KO Drums, Pipeline Supports, Lube Oil, civil works for the massive industrial project. Potable Water Tank, Switchgear, Diesel Generators and IA Compressors

DSI Flagship Projects 13 • Construction of UPS & Battery Buildings, Maintenance • Construction of Pumping Station Foundations Buildings, Control Buildings, Steel Platforms, Pipe (including foundations for Air Cooled Heat Exchanger, Supports and Platform Supports Filter House, Control Cabin, Equipment Stack, • Pavements & Asphalt Areas Exhaust Stack, Lube Oil Evaporation Separator, Fuel • Construction of Pump Stations Foundation (including Gas Filter Skid and other Miscellaneous Foundations foundations for Air Cooler, Filter House, Control Cabin, for CGT 9001) Equipment Stack, Exhaust Stacks, Mineral Oil Mist • Construction of Instrument Air Compressors Foundations Eliminator Skid, and Fuel Gas Skid) • Construction of Lube Oil Storage Facilities & Pump • Modification of Foundations for Pumps Foundation • Construction of Substation Buildings, New Transformer/ • Construction of New Storage Buildings Switchgear, Maintenance Buildings, Construction of • Construction of Pipe Ways Foundations Water Tank Foundations • Construction of Surge Relief Skid Foundations • Construction of Electrical Duct Bank and Pullboxes, • Construction of Fuel Gas Filter Steel Structures, Cable Racks, Steel Pipe Supports , • Construction of CO2/Battery/Panel Buildings and Walkways • Construction of UPS Room (featuring an Extension The scope of works on the Hawiyah Site included: Electrical Substation) • Construction of new underground drainage system for • Construction of Support Buildings and Miscellaneous new equipment (including manholes, neutralization pits, Pipe Support Foundations catch basins, oily water system, sewage piping system, • Installation of Pressure Control Valves etc.) • Construction of Temporary Instrument Air Compressors • General Demolition • Installation of Structural Steel Works and Pipe Racks • Storage Buildings, Air Compressor Foundations, Kerosene • Construction of Instrument Air Receiver, Air Dryer and Tank Foundations Air Compressor Sheds • Pavements & Asphalt Areas, Evaporation Ponds, • Surge Relief Skid Shed Fences and Gates • Pipe Supports • Final Grading/Paving/Marl/Road

DSI Flagship Projects 14 Khursaniyah Gas Plant

Project: Khursaniyah Gas Plant Start Date: 2005 Completion Date: 2007 Location: Khursaniyah, KSA Industry: Petrochemial Developer: Saudi ARAMCO Value: US $20 Million

The Khursaniyah Gas Plant was originally envisioned ICC undertook the following elements of work for the to process 1 billion standard cubic feet per day (scfd) of Khursaniyah Gas Plant: associated gas from the Abu Hadriya, Fadhili, Khursaniyah, • Complete execution of civil construction works including Marjan, Safiniyah and Zuluf fields. The gas plant was to be supply of required materials, labour and supervision to integrated with Khursaniyah Central Oil Processing Facilities site to minimize required utilities and capture synergies. The • The general works include temporary site facilities Khursaniyah Gas Plant then underwent an expansion in • Earth works, earth (soil) improvement works and order to process gas from the offshore Karan field which backfilling was the first non-associated offshore gas field project being • Civil and Architectural construction of buildings developed by Saudi Aramco in the Kingdom. • Complete Design, Installation, testing and commissioning of HVAC, plumbing, sanitary & drainage equipment To realise the construction of this complex gas plant, of vital • Installation, testing and commissioning of fire fighting, importance to Saudi ARAMCO’s regional strategy, Drake fire protection & fire alarm systems & Scull Construction’s Saudi Arabian Civil Construction • Small power Systems subsidiary, International Centre for Civil Contracting (ICC) • Installation of outdoor foundations & trenches were contracted to undertake the complete civil works for • All other civil, building and structural works the gas plant.

DSI Flagship Projects 15 Upstream Professional Development Center

Project: Upstream Professional Development Center Start Date: 2008 Completion Date: 2011 Location: Dhahran, KSA Industry: Industrial Developer: Saudi ARAMCO Value: US $40 Million

This four story building was designed to offer a state-of- The UPDC has proved to be a major success, having the-art classroom and training facility to foster collaborative delivered a total of 297 course sessions, training 4,000 learning along with high-tech drilling, virtual-reality, and participants from eight upstream areas, including geology, hyper-dimensional simulators that enabled young Saudi geophysics, petro physics, reservoir, production, drilling Aramco professionals to equip themselves with the and facilities engineering, and upstream computing. The necessary knowledge to efficiently meet the needs of UPDC is a major milestone in ICC and DSC’s KSA history ARAMCO’s network of clients and partners. and a proof of their stellar project management skills.

ICC’s original contract scope required the construction and furnishing of the UPDC building. By design, the building was to facilitate the training of more than 550 upstream employees every day. ICC also had to undertake the civil works for 21 lecture theatres and Program Rooms, one Business Centre, eight team rooms, two display rooms, a library, 60 office spaces for staff, 94 cubicles for PDP’s, two conference rooms, and one computer room. ICC’s work was later expanded to also cover the Civil, Communication, Electrical and Mechanical works to complete the works on site.

DSI Flagship Projects 16 Prince Salman Science Oasis

Project: Prince Salman Science Oasis Start Date: 2009 Completion Date: 2013 Location: Riyadh, KSA Industry: Education Developer: High Commission for Development of Arriyadh Consultant/Architect: Arriyadh Development Authority Value: US $ 72 Million

The Prince Salman Science Oasis project site is situated within The roof was divided into three segments by movement joints the compound of the massive King Abdul Aziz city for science and along two axis to allow for thermal expansion. One of these technology (KACST) in its North - Western corner, occupying an segments had a provision to allow the solar chimney to pierce area of around 200,000 square meters. through.

Each of the permanent exhibitions is housed in Cubes that measure ICC also setup a multi-purpose Auditorium in the shape of approximately 21x21 m. Besides the permanent exhibitions, the a sphere, located at the Eastern edge of the main roof. The campus also hosts lecture rooms and auditorium located in the Auditorium had a diameter of approximately 30m and was divided main 3 storey administrative building and an optional spherical into two structural parts - a steel frame and a reinforced concrete building that will serve as a landmark for the main entrance. shell.

ICC also worked on the functional buildings, the administrative Another main feature constructed by ICC was the Impact & Issues building and the optional sphere which were covered by a Gallery, located in the internal space below the roof. This too was steel roof linking the building complex and provided a wide air created in the shape of a sphere, similar to the Auditorium, with a conditioned sheltered space between the different buildings. diameter of approximately 9m. The gallery was designed to function as a general reference area. The massive steel roof covered an area of approximately 13,000m2. A unique aspect of the roof and is the 80m high Finally, ICC also undertook the responsibilities of installing the ‘Solar Chimney’ (Power Station) which perfectly encapsulates the external works on the site. These included the exterior furnishing, utilization of ecological energy concepts for the future. installation of exterior pavements, surfacing, exterior vegetation area and horticulture. Another major work undertaken by ICC was the construction and installation of the main roof. The roof was triangular in shape, measuring 94m x 196m with a varying height between 16m at the edges to about 14.5m in the centre.

DSI Flagship Projects 17 Dhahran Techno Valley Building

Project: Dhahran Techno Valley Building Start Date: 2010 Completion Date: 2013 Location: Dhahran, KSA Industry: Commercial Developer: King Fahad University for Petroleum & Minerals (KFUPM) Consultant/Architect: Fahd Ali Reza Engineering Consultants Value: US $30 Million

The King Fahd University of Petroleum & Minerals (KFUPM) around 20,247 m² in total. Another major aspect of the is one of the most prestigious and respected educational building would be the aesthetic interior landscape design institutions in Saudi Arabia. Specialising in the oil and gas area measuring 6,484 m². sector, the KFUPM focuses on educating Saudi Arabian nationals for service in the petrochemical industry, as well The 55-hectare site is intended to create an infrastructure as encourage research for the same. to enhance cooperation and providing development, production and marketing support services. Innovation The Dhahran Technology-Valley (DTV) is a pet project originating from academic research will be combined with initiated by KFUPM. The Techno Valley project is industrial expertise to satisfy the needs of the Kingdom’s conceptualised to share space with the King Fahd University substantial presence as the global hub for the oil, gas and of Petroleum & Minerals (KFUPM) main campus, integrating petrochemical industries. it closely with the university. The techno valley will become a focused research-and-development bridge combining the The Dhahran Techno Valley project encompasses six major university’s expertise with that of national oil giant Saudi entities including King Abdullah Science Park (KASP); Aramco and the world’s leading technology companies. Sultan bin Abdul Aziz Science and Technology Center (SciTech); Innovation Center; Business Incubator; Liaison An area measuring 13,422 m² was set aside to house Office and Consultancy Services Center. the 15.0m tall, three-story structure which also includes a loading unloading facility in the building basement. Besides ICC undertook the Lump sum Turn Key scope of works at the central structure, the Techno Valley Building area spans the central building site.

DSI Flagship Projects 18 The basement of the building was equipped with big loading ICC installed 6 passenger elevators, 2 freight Elevators, 2 and unloading areas, equipment storage rooms, server service elevators and 8 staircases to connect all three floors racks and control rooms etc. ICC also elevated the ground seamlessly. floor of the building to 1.35m from the walkway at ground zero level. The massive ground floor area consists of an Besides the main building, ICC also worked on the elegant lobby (leading to offices of directors), an auditorium, construction of a utility building located close to the yard a VIP lounge, business meeting rooms and a dining area next to the project site, serving the electrical, mechanical, with restaurants. HVAC, and fire fighting needs of the building.

On the first floor, ICC constructed 12 dry labs, 88 offices, large business Incubator (to house technical and IT start- ups), mechanical, communication and electrical rooms. On the second floor, ICC constructed 19 IT labs, 3 wet labs, a Fitness centre and a VIP dining hall overlooking the atrium.

DSI Flagship Projects 19 DSI Flagship Projects

DRAKE & SCULL ENGINEERING

DSI Flagship Projects 20 Jumeirah Beach Hotel

Project: Jumeirah Beach Hotel Location: Dubai, UAE Industry: Hospitality Developer: Jumeirah Consultant/Architect: W.S. Atkins Value: USD 36 million

The Jumeirah Beach Hotel is one of the most luxurious five Drake & Scull International provided the complete design star hotels on the Jumeirah Beach shoreline of Dubai. Part development, supply, installation, testing and commissioning of the Jumeirah Beach Resort, it received the Condé Nast of Mechanical, Electrical & Public Health Services for the Traveler Award for being the ‘No.1 Hotel in the World’. 600 bedroom Tourist Hotel, Sports Complex, Laundry Building, Heating & Cooling of Pool, Automobile building This 26-storey tourist hotel, designed in the shape of a and Gate House of seven star Tower Hotel. The breaking wave, has 600 oceanfront rooms. Each room entire hotel complex is controlled by an integrated Building offers a minimum of 50 sq. meters which is larger in size Management System. The building services work for Hotel compared to most international hotels. Resort and Sports Complex was completed in 1998.

DSI Flagship Projects 21 Jumeirah Beach Residences

Project: Jumeirah Beach Residences Location: Dubai, UAE Industry: District Cooling Plant Developer: TECOM Consultant/Architect: Mace International Value: USD 74 million

DSI were appointed to undertake the design and construction The project plant has the capacity of producing a total of of District Cooling System project for Jumeirah Beach 60,000 tonnes of chilled water.DSI provided the supply Residence, a subsidiary of Dubai Technology Electronic of the distribution Energy Transfer Stations (ETS) for the Commerce and Media Free Zone Authority (TECOM) in connection of the system into numerous buildings utilizing Jumeirah, Dubai. the District Cooling System.

DSI were responsible for the design and development of engineering drawings, plant & material selections, procurement, installation, commissioning and performance, validation of mechanical & electrical chilled water process plant for the District Cooling System.

DSI Flagship Projects 22 King Abdullah University of Science and Technology

Project: King Abdullah University of Science and Technology Location: Thuwal, Saudi Arabia Industry: Education Developer: ARAMCO Consultant/Architect: Saudi Oger Value: USD 257 million

King Abdullah University of Science and Technology altered conventionally used designs and installations (KAUST) in Saudi Arabia is an international, graduate- and employed several innovative engineering techniques level research university dedicated to inspiring a new age and products including designing a system to sustain a of scientific achievement in the Kingdom that will also lifecycle of 100 years ,maximising efficiency of installed benefit the region and the world. KAUST is the realization systems and using specific special construction materials of a decades-long vision of the Custodian of the Two Holy for the laboratory buildings, adopting photovoltaic cells Mosques, King Abdullah Bin Abdulaziz Al Saud. for generating power , installing solar towers and solar water heaters, using low-emission sealants in addition KAUST’s new campus is Saudi Arabia’s first LEED-certified to minimising construction waste and using recyclable project, earning a LEED Platinum certification and is ranked materials wherever possible. as the largest LEED Platinum project in the world.

The engineering office of DSI operated of Saudi Oger’s engineering offices in Paris - France to ensure that the designs were being drafted and finalised as per the DSI team’s input and technical requirements. In order to assure that KAUST was awarded the LEED Platinum level, DSI

DSI Flagship Projects 23 Information and Technology Communications Complex

Project: Information and Technology Communications Complex Location: Riyadh, KSA Industry: Commercial Developer: Saudi Arabian Public Pensions Agency Consultant/Architect: Dar Al Riyadh Value: USD 188 million

The Information Technology and Communication Complex The success of the DCP in the ITCC premises has helped (ITCC) is a massive office project that attracts and hosts to accelerate the adoption of District Cooling in KSA. Information and communication technology companies to Previously, Utility and District Cooling were not very popular setup bases in the important Riyadh market in KSA. in KSA but is now widely being adopted for major new developments. Developed on an area of more than 800,000 m2, The ITCC project supports and promotes the development of the IT DSI’s work in ITCC was also a fine example of Drake & sector in the region. Scull’s vertical integration, as the DSI’s MEP, Civil and Water and Power teams worked in parallel in a professional The District Cooling Plant installed by DSI at the ITCC manner with efficient planning to take charge of all major site has a capacity to deliver more than 35,000 Tonnes aspects of construction. of cooling. The project was a major development from the Operations and Maintenance Perspective. DSI also undertook the construction and installation of the two TES tanks works with 40,000 TRH capacity. The complete construction includes aspects of civil, process and MEP services.

DSI Flagship Projects 24 Meydan Nad Al Sheba District Cooling Plant

Project: Meydan Nad Al Sheba District Cooling Plant Location: Dubai, UAE Industry: District Cooling Plant Developer: Meydan LLC Consultant/Architect: TEO A King Design Consultants Sdn Bhd Value: USD 54 million

Meydan is an urban development of luxury residences, The central cooling plant consists of 20,000 TR (Tonnage business blocks and facilities in Nad Al Sheba, UAE. The Refrigeration – a measurement of chiller capacity) chillers four major developments of the city are the Racecourse, and associated equipment such as cooling towers, 11 KV Horizons, Godolphin parks and the Metropolis. The Meydan and 400 V switchgears, MV/LV transformers, chilled and racecourse hosts the Dubai World Cup, which is the richest condenser water pumps, chilled and condenser water horseracing event in the world, attended by nearly 60,000 piping, associated MEP services and controls. In addition people every year. Hotels, restaurants and cinemas form a to the above, two make-up water tanks and two thermal part of the project to offer a remarkable experience for its storage tanks (capacity of 20,000 TR each) were part of visitors. plant equipment. Further, a provision for additional 20,000 TR in terms of civil, structural and architecture works DSI signed the contract agreement with M/S Meydan including associated MEP services was constructed as per LLC to design, construct, commission and to provide two the client’s request. years operation for the central cooling plant at the Nad al Sheba race course development. The project team had to handle the complete design and construction of the chilled water generation plant, the associated cooling towers and thermal storage tanks, all civil and buried works including water, drainage and firefighting provisions, and the SCADA system.

DSI Flagship Projects 25 Dohaland

Project: Dohaland Location: Doha, Qatar Industry: District Cooling Plant Developer: Mshreib Properties Consultant/Architect: Turner International Middle East Value: USD 59 million million

Heart of Doha development is a mixed used complete urban & PR2 for a total capacity of 29,250 TR per plant. redevelopment of a 35 hectare site within of Doha • An interconnected sidewide reticulation network located city. Msheirb development belongs to Dohaland which is a inside service tunnel which takes off to 59 nos. energy subsidiary of Qatar Foundation for education, science and transfer stations. community development lead by Her Highness Sheikha • Cooling tower make-up and blow down pipelines from Moza Bint Vasser. Dohaland’s vision is to lead innovation in PR1 to PR2. urban living through sustainability and heritage. Dohaland’s • Water treatment plant using TSE water for the cooling target is to build the first sustainable downtown regeneration tower make-up and development irrigation, water feature project. and toilet flushing for the development energy transfer station (ETS). DSI was appointed as the prime contractor for the • P/C control panels, instrumentations programming, district cooling system to design, construct and testing & commissioning. operate the District Cooling system. The scope of work • Operation and maintenance of the district cooling system covered: for a period of seven years. • Mechanical, electrical and support equipment and • Design life of 25 years for sea shore installation. systems for two independent central cooling plants PR1

DSI Flagship Projects 26 Kuwait State Audit Bureau Headquarters

Project: Kuwait State Audit Bureau Headquarters Location: Kuwait Industry: Government Developer: Kuwait State Audit Bureau Consultant/Architect: The Associated Engineering Partnership Value: USD 93 million

An important institution in Kuwait, the State Audit Bureau Drake & Scull undertook the Supply, Installation, commissioned a new 30,000 m2 headquarters complex Testing, and commissioning & maintenance of: with state-of-the-art office space, IT-based auditing • Central Air Conditioning & Ventilation Systems facilities, conference centre, training facilities and library • Close-control Air Conditioning Systems in 2004. The project site with an area of 10,000 m² was • Central Cooling Plants located in Shuwaikh area, adjacent to the existing buildings • Domestic Water Supply and Drainage of the Arab Organization Building and the Arab Shipping • Fire Fighting systems Company Headquarters and also included an adjacent • Electrical Power Distribution and Lighting site of 11,340 m². A car parking building for 950 cars and • Uninterruptible Power Supply and Standby Power a civil defense shelter for 300 persons was also located on • Fire Alarm and Security Systems the adjacent site. The complex comprises three ten-storey • Building Management Systems office buildings linked by full-height atria and sky gardens with the complete façade fronted by a spectacular curved glazed perimeter wall. The project was envisaged as a high-quality office space, to accommodate a total of 800 personnel who required “state of the art” IT-based Auditing Facilities, a Conference Centre together with Training Facilities, Library, and Cafeteria.

DSI Flagship Projects 27 West Bay 4 Seasons

Project: West Bay 4 Seasons Location: Doha, Qatar Industry: Hospitality Developer: H.H. Hamad Bin Jaber Al Thani Consultant/Architect: HALCRO Value: USD 38 million

The West Bay area development was overseen by the Drake & Scull were invited by the clients to undertake Government of Qatar, and includes many modern buildings, the complex MEP needs of the Four Seasons Hotel. shopping complexes, skyscrapers and luxury hotels. The DSI adopted a “Parallel Tracks” approach whereby the West Bay Complex Project initially comprised of a new five Project was divided into 6 modules or areas to facilitate star hotel in the shape of the Four Seasons Hotel, besides easy allocation of resources and personnel. The 6 housing a 700 seat ballroom, a clubhouse, 100 berth marina, modules included: 20 town houses, two fully furnished apartment towers, one • The Office tower consisting 28 floors and 20 town houses office tower and an exclusive beach. • Five star hotel premises consisting 18 floors and the 700 The crown in the jewel of the Project was the deluxe Four seat ballroom Seasons Hotel which consisted of 18 floors including Royal • Two apartment towers each spanning 22 floors and Presidential Suites. The hotel was part of a multi- • Central District Cooling Plant and 3.3kV power backup purpose complex that also featured a dedicated residential system along with the domestic water pumps and the fire complex and office complex. pumps • Club House area • 100 berth Marina complex To properly execute this unconventional division of site activities, DSI deployed a centralized Building Management System (BMS) to monitor and control equipment used for the project. This helped to monitor and plan the course of action correctly as well as lower the energy consumption and improve resource sustainability.

DSI Flagship Projects 28 St Regis Nile Corniche

Project: St Regis Nile Corniche Location: Nile Corniche, Industry: Hospitality Developer: Qatari Diar Real Estate Investment Company (CCC) Consultant/Architect: ARQUITECTONICA / Shaker Value: USD 128 million

The Nile Corniche Project is a mixed use development which o Security systems including CCTV, Access Control, Intercom, includes the construction of a Starwood Chain Hotel and Search Scanning X-ray equipment, Guard Tour, Disabled Alarm Serviced Apartments, situated on the River Nile Corniche System, Bollard Systems o Fire Detection, Alarm, Fighting, Suppression & Evacuation in Downtown Cairo. The Nile Corniche is a 197,000 m2 Systems, and Central Battery Emergency Lighting System. mixed-use development along the Corniche on the east o All Plumbing and Drainage systems bank of the Nile River in Cairo, Egypt. This Hotel marks o The building BMS (Building Management Systems) and its the ultimate expression of contemporary luxury in Egypt’s interface with other core systems thriving capital city and will be an important component of a o Complete Utility installation including connections to existing high-rise hospitality and residential complex. services o Full coordination with the mandatory LPG Local subcontractor as Drake & Scull’s active scope of works includes: per the latest codes and regulations of Egyptian authorities o The complete Heating, Ventilation and Air Conditioning o Interconnecting Cables, Cable Trays, Trunking, Pipe Work And system, including all Chillers, Heat Exchangers Cooling Engineering Coordination as required to connect to or from Towers, Boilers and Fuel systems other sub-contract systems such as Lifts, Kitchen, Car park o MV Power Supply distribution network including MV emergency management systems etc distribution network & MV generators o The Earthing system, Lighting Protection System, Navigation o Transformer substations in addition to the LV Normal Emergency Lights and containment and wiring for Façade Lighting Systems Distribution Networks o The HV, MV, LV Systems including Busbars, Wiring Devices, UPS, Lighting and Lighting Control Systems o Extra low voltage systems including Security, TV MATV and IPTV), Data & Telephone, Vehicle Management, AV and Ambient music system

DSI Flagship Projects 29 Mall of Qatar

Project: Mall of Qatar Location: Doha, Qatar Industry: Commercial Retail Developer: Urbacon Construction Company Consultant/Architect: KEO International Value: USD 98 million

The Mall of Qatar is a new 4,176,000 square foot (GBA) DSI will execute the installation of shopping center currently under construction in Qatar – a • Electromechanical works including Electrical, Plumbing, country with the highest GDP in the world. Situated adjacent Heating, Ventilation and Air Conditioning (HVAC) to a FIFA 2022 World Cup stadium, with a dedicated station • Fire Fighting on Doha’s new metro line, Mall of Qatar will have over • Fire Alarm 1,750,000 square feet of retail leasable space on 3 levels in • Photovoltaic arrays addition to underground and surface parking for 7,000 cars. • Gas Installations The 400 shops from luxury to the world’s leading • Security and Access Control powerhouse brands and an exciting array of food, beverage • Audio-Video (AV), Lighting and Sanitary Fixtures with a and entertainment will make this the premier destination in built-up area of 422,000 sq. Qatar. The three-storey mall will feature a hypermarket, a multiplex, five department stores and at least 20 restaurants.

DSI Flagship Projects 30 King Fahad Medical City

Project: King Fahad Medical City Location: Kingdom of Saudi Arabia Industry: Healthcare Developer: Al Latifah-Habtoor Leighton Consultant/Architect: RKD Architects Value: USD 70 million

The King Fahad Medical City (KFMC) consists of four DSI is providing turnkey MEP solutions for the National hospitals making up a total of 1,095 beds. Main hospitals, Institute of Neurosciences, and the Cancer & Cardiac maternity hospital, pediatric hospital, rehabilitation center. Centers. Spanning a total built-up area of 234,000 m², the In addition to the hospitals there are primary care clinics, project includes the National Institute of Neurosciences Faculty of Medicine, Medical Centers which is Prince Comprehensive Cancer Center, Cardiac Center, Salman Heart Center, Neuroscience Center, Prince Sultan Laboratories and office building, Radiology Center, Hematology &Oncology Center and Specialized Diabetes & Cardiology Center, Underground Car Parks, Central Endocrine Center. Services Building and a Services Tunnel.

KFMC is the largest medical facility in Saudi Arabia built at a cost of SR12.3 billion. According to Minister of Health Dr. Hamad ibn Abdullah Al-Manie in his inaugural address, it is expected to treat more than 50,000 in-house patients and more than 2,000,000 outpatients annually.

DSI Flagship Projects 31 Louvre Museum

Project: Louvre Museum Location: Abu Dhabi, UAE Industry: Commercial Developer: AsoLouvre JV Consultant/Architect: Buro Happold, Pascall+Watson, MERO-TSK Value: USD 58 million

The is a planned museum, to be located DSI is involved in all MEP work and incidentals within the in Abu Dhabi, UAE. This is part of a thirty-year agreement 64,000m2 complexes, which is made of a series of linked between the city of Abu Dhabi and the French government. pavilions, plazas, alleyways and canals. A vast The museum is to be located on the Cultural weighing around 7,000 tonnes and 180m in diameter will sit District, and will be approximately 24,000 square metres on top of four piers housing exhibitions. (260,000 sq ft) in size.

The permanent collection will occupy 6,000 square metres (65,000 sq ft), and the temporary exhibitions will take place over 2,000 square metres (22,000 sq ft).

DSI Flagship Projects 32 Habtoor City

Project: Habtoor City Location: Dubai, UAE Industry: Commerical Developer: Habtoor Leighton Group Consultant/Architect: Khatib & Alami Value: USD 54 million

The Al Habtoor City in Dubai is a huge residential and City will be built, along with three residential tower blocks to hospitality development under construction costing Dh11 incorporate 1,460 luxury apartments, Eleven penthouses – billion. including two VIP penthouses over a 4-storey high podium, a tennis academy and club house with eight tennis courts Al Habtoor City will incorporate more than 3,000 hotel including one covered air-conditioned court and a classical and residential units on one plot and will house three French-style landscaped garden. internationally branded hotels, operated by Starwood Hotels & Resorts: The St. Regis Dubai, W Dubai Sheikh Zayed DSI is undertaking complete turnkey MEP scope of works Road and Westin Dubai - Sheikh Zayed Road. Besides on the Habtoor City development. this, a permanent Franco Dragone Entertainment Group water-themed production exclusively choreographed for the

DSI Flagship Projects 33

Project: Cayan Tower Location: Dubai, UAE Industry: Mixed Use Developer: Cayan Investments Consultant/Architect: Khatib & Alami Value: USD 40 million

The Cayan Tower’s dynamic twisting shape challenges slabs also demanded a great degree of coordination conventional architecture and redefines standards of luxury. between all project teams and a simultaneous execution of Located at the entrance of Dubai Marina the 330 meters tall MEP and structural works. Due to the twist in the building tower consists of 73 floors, each rotated at 1.08°degree. design, the vertical and circular core of the building did The individual floor rotations sum to a total of 90° degree not provide sufficient space for fresh air and busbar risers’ over the entire height of the building, making it the tallest installation, and they had to be taken from the inner core to high rise building in the world with such structural rotation. the outer twisted portion of the building. This posed severe The Tower provides a total of 505 apartments, including problems as the risers are vertical whereas the outer part studios, one, two, three and four-bedroom duplexes and of the building has a rotation of 1.08° degree on every floor. penthouses. A total of eight circular lifts serve the building, The building’s twist below complicated each floor’s design three of which can have a speed of 8 m/s over 330 meters for openings and sleeves. of height.

The structural 1.08°degree rotation rendered the MEP service locations different on every floor and the rotating

DSI Flagship Projects 34 South Airfield Development and Rehabilitation

Project: South Airfield Development and Rehabilitation Client / Owner: Abu Dhabi Airports Company Main Contractor: Lane Mideast Contracting Principal Consultant: Jacobs International Holdings Inc Contract Value: US $25 Million Start Date: 2013 Completion Date: 2014

The project comprises the upgrading and refurbishment of ground lighting system at the South Airfield of the Abu Dhabi the existing runway 13R/31L and associated taxiways and Airport. The project comprises of 10,900m2 area of concrete aprons, including all related utilities and services. In addition, paving for the New Abu Dhabi International Airport Hardstand, a new parallel taxiway system and midfield cargo apron will Airfield Lighting, utilities storm water, domestic water. be realized. The Rehabilitation package consists of new taxiways, widening of the existing runway to 60 metres, the installation of storm drainage, the replacement of the existing

DSI Flagship Projects 35 ROSEWOOD Hotel

Project: ROSEWOOD Hotel Start Date: 2009 Location: Abu Dhabi, UAE Completion Date: 2012 Client / Owner: MUBADALA Main Contractor: Arabian Construction Company. (ACC) Principal Consultant: HANDEL ARCHITECTS , LLP Local Consultant: SEREX INTERNATIONAL (FRANCE) MEP Consultant: WSP Middle East Contract Value: $62 Million

The Rosewood Abu Dhabi is a new ultra-luxury business The inspiration for the Handel Architects-designed tower is hotel that consists of luxury penthouses, guest rooms and derived from the glistening Arabian Gulf and the vast desert serviced residences. Rosewood Abu Dhabi features 2,000 that surrounds Abu Dhabi city. sqm of meeting space, a business center and extensive The 34-story, 470 foot tall hotel is a dramatic modern amenities and retail, including a premium health and beauty structure covered with reflective glass, which was chosen spa. for its daytime shimmer and its nighttime luminescence. • 189 guest rooms • 131 serviced apartments • State of the art meeting facilities • Extensive amenities including personal butler service • Signature and all-day dining options featuring fine French Catalan fusion, Modern Lebanese and Modern Indian • Sense, A Rosewood Spa®: 1,800 sqm beauty, health and fitness retreat

DSI Flagship Projects 36 Fairmont Palm Hotel and Residences

Project: Fairmont Palm Hotel and Residences Start Date: 2008 Completion Date: Ongoing Location: Dubai Industry: Mixed Use (Hotels and Residences) Developer: IFA Hotels & Resorts Consultant/Architect: M/s.DSA, M/s.MACE, M/s.CRK,M/s.Proleed, M/s.Aurecon Value: US $54 Million

The Fairmont Palm Hotel and Residences is a 5 stars hotel isolated from the lower levels to deliver a unique ambience. project, located in the iconic Palm Jumeirah development in DSI were contracted to undertake the complete MEP works Dubai. A brainchild of the famous Fairmont group, renowned for the lower levels of the Palm Hotel and Residences for high class, luxury hotels around the world, The Fairmont development. Due to DSI’s strong performance, Fairmont Palm Hotel and Residences is synonymous with tasteful extended the scope of work to include the upper levels, aesthetics. housing the deluxe penthouses. The time span was suitably extended to take into account the additional nature of work. The projects consist of 381 rooms and suites, spread over Within two months of working on site, DSI were able 14th floors, with a basement, Entrance and Beach Level. to achieve significant progress on site. DSI completely The first 10 floors consist of the king/Queen Rooms, finished the installation of 54 AHU’s and 105 Fans, which deluxe Suites, a privileged Gold Lounge, Presidential was a significant milestone in MEP terms. Suites, Restaurants, SPA areas and Swimming Pools. The Hotel and Residences premises occupy over 460 metres of beachfront on the trunk of the famous Palm Jumeirah, offering a spectacular view of Dubai’s shoreline.

The Palm Hotel and Residences also houses exclusive penthouses and PRCs which are located in the upper levels from 11th to 14th Floor. The 3 Penthouses and 10 PRCs are

DSI Flagship Projects 37 Park Rotana

Project: Park Rotana Start Date: 2007 Completion Date: 2010 Location: Abu Dhabi, UAE Industry: Mixed Use/Hospitality Developer: Al Mada Tourism Investment Company Consultant/Architect: Al-Salaam consulting Architects, Engineers & Planners Value: US $58 Million

The Park Rotana Complex is a joint venture between TDIC of the restaurants include soft lighting and comfortable and Al Mada Tourism Investment Company and is managed seating, with modern telecommunication systems available by Rotana. on all levels for the convenience of the guests.

Sharing space with the famous Sheikh Zayed Mosque, Drake & Scull’s initial scope of work covered the the Abu Dhabi National Exhibition Centre and the Ministry provision of MEP facilities to the premises, which of Labour, The Park Rotana complex comprises of 318 included luxurious rooms and suites and 172 serviced hotel • The 5 Star Hotel Building (G+10) with 318 Guest rooms, apartments. Besides these, the Park Rotana also offers • The 5 Star Serviced apartment Building (G+10) with 172 a modern Business centre, 6 food and beverage venues, Apartments, an Outdoor swimming pool, a Bodylines Leisure & Fitness • A Rental apartment Building (G+11) with 200 Apartments centre, 6 meeting rooms for businesses, and a large • The Office Building (G+10) Ballroom. Two basement floors connected the entire area under the Located 14km from downtown Abu Dhabi on the Eastern buildings while also containing 960 car parking spaces, Ring Road, The Park Rotana has signature restaurants on the main service rooms like H.V/L.V rooms, AHU rooms, the ground floor, that offer thematic grand interiors featuring Pump rooms, boiler rooms, services operation rooms, main Venetian masks, chandeliers and velvet curtains. Highlights kitchen, laundry and the main control rooms.

DSI Flagship Projects 38 In additional to the basic MEP services, Drake & Scull The District Cooling plant had its own scope which required also had to undertake the installation of the following Drake & Scull’s extensive DCP experience to be utilized. systems on site: Since the original design proved to be inadequate to the • Steam boilers and Steam Network to service Hot water requirements, Drake & Scull undertook the complete Calorifiers and Laundry. Design, Build and installation of the DCP. • Synthetic Natural Gas (SNG) System and distribution Network to service Kitchens and Steam boilers. The DCP’s specifications were: • Guest Room Management System for Hotel building. • 5 Chillers of 1000 TR each • Hotel Inter Active system (HITV). • 3 Secondary Chilled Water Pumps • Mobile radio system for Staff paging. • 5 Primary Chilled Water Pumps • The District Cooling Plant. • 5 Condenser Water Pumps in the Basement floor • The Public Address, Intercom, SMATV, structured • H.V Switchgear, L.V switch gear, 2 Transformers and all Cabling system and CCTV system necessary electrical systems. • Access controls • Gate Barriers, • CO detection • Lighting control & Dimming

DSI Flagship Projects 39 Dubai Festival City

Project: Dubai Festival City Start Date: 2005 Completion Date: 2007 Location: Dubai Industry: District Cooling Developer: Dubai Festival City Consultant/Architect: Shankland Cox Ltd Value: US $109 Million

Dubai Festival City is a large residential, business and • Installation of 10 Cooling Towers of 5,000 TR capacity entertainment development in the heart of the city. Touted as each a “city-within-a-city”, Dubai Festival City is the Middle East’s • Build and Installation of a 6000 cubic meter water storage largest mixed-use development: all elements for work, living, tank and leisure will be contained within the project. The Festival • Laying a 28 km of 28” to 60” diameter preinsulated GRP City comprises a series of residential communities, numerous reticulation pipework hotels, malls, a golf course and other entertainment sites, • Construction and Installation of 74 Energy Transfer and a full suite of public services, including schools. Stations and individual metering and billing system to approximately 1.6 million square meters mixed used The project spans 3.8 kilometres (2.4 mi) of water frontage development. on the eastern bank of Dubai Creek and is 2 kilometers • Operation and Maintenance for eight years. (1.2 mi) from Dubai International Airport. The Festival • The 80,000 tonnes District Cooling Plant at the Dubai Waterfront Centre, is a retail power centre which includes Festival City included a chilled water generation plant, IKEA, HyperPanda supermarket (first hypermarket outside nearly 20 kms of network piping, multiple energy transfer of Saudi Arabia), Plug-ins ElectroniX and Ace Hardware (the stations, plus metering and monitoring systems. largest outside North America). • The design encompassed acoustics, thermal degradation, Drake & Scull’s scope of work included the following stress analysis, hydraulics and structural and architectural aspects: analysis. Designed, built and commissioned in a modular • Design and construct an 80,000TR District Cooling fashion, the innovative cooling plant’s capacity matched System for the entire DFC premise the load demand created by new buildings when • Supply and Installation of 10 Chiller packaged modules of commissioned within the Festival City. 5,000TR each

DSI Flagship Projects 40 St Regis hotel, Amman, Jordan

Project: St Regis hotel, Amman, Jordan Client / Owner: Al Maabar Real Estate Development Main Contractor: Arabtec Principal Consultant: Perkins Eastman Local Consultant: KEO Contract Value $43 Million Start Date: 2014 Completion Date: 2016

The St. Regis, Amman is a 16-storey tower featuring 260 The St. Regis Amman will also be comprised of 2,800 sqm luxuriously appointed guest rooms, which include 86 suites, of ultra-modern meeting and event space and a business 4 restaurants, a café, pool, fitness center, signature spa and center. This mixed-use development project will also include private parking. exclusive boutiques featuring some of the most prominent international brands and will be located on the podium level The hotel will also offer an ultra-modern meeting and event of the development. space and a business center as well as exclusive boutiques featuring some of the most prominent international brands The site area measures 18,000 sqm awith a built up area located at the podium level of the development. of 126,500 sqm.

DSI Flagship Projects 41 CCP Meydaan, Nad Al Sheba

Project: CCP Meydaan, Nad Al Sheba Start Date: November 2008 Completion Date: November 2009 Location: Nad Al Sheba, UAE Industry: District Cooling Developer: Meydaan LLC Consultant/Architect: TEO A King Design Consultants Value: US $55 million

DSE signed the contract agreement with M/S Meydan LLC In addition to the above, two make-up water tanks and two to design, construct, commission and to provide two years thermal storage tanks (capacity of 20,000 TR each) were operation for the central cooling plant at the Nad al Sheba part of plant equipment. Further, a provision for additional race course development. 20,000 TR in terms of civil, structural and architecture works including associated MEP services was constructed as per The DSE project team had to handle the complete design the client’s request. and construction of the chilled water generation plant, the associated cooling towers and thermal storage tanks, all Part of the external chilled water piping network and the civil and buried works including water, drainage and fire control of all energy transfer stations (ETS) at the Meydan fighting provisions, and the SCADA system. racecourse itself were added to the scope of works of DSWP and constructed and installed to the satisfaction of The central cooling plant consists of 20,000 TR (Tonnage M/s Meydan LLC. Refrigeration – a measurement of chiller capacity) chillers and associated equipment such as cooling towers, 11 KV and 400 V switchgears, MV/LV transformers, chilled and condenser water pumps, chilled and condenser water piping, associated MEP services and controls.

DSI Flagship Projects 42 Dubai Motor City District Cooling Plants 1&2

Project: Dubai Motor City District Cooling Plants 1&2 Project Location: Motor City, Dubai, Client: Emirates District Cooling Llc (Emicool) Consultant/Architect: Dc Pro Engineering Consultant Value: US $90.5 Millio

Plant 1 is dedicated to supply chilled water to Autodrome, The cooling of chillers are facilitated by 8 Nos. cooling tower uptown and parts of Green Community. which are located on the roof floor. The condenser pumps which circulate the water are located one floor below at the Plant 2 is dedicated to supply chilled water to show rooms, first floor, where the MCC of the same pump exists. hotels, office towers, terrace apartments and parts of Green Community. The fans of the cooling towers are variable speed type and VFD for the same is located in first floor. A thermal energy The concept of District Cooling Plant is to centralize the storage task of capacity 6,000 TR – hr (6 hours) is located in production of chilled water and distribution to individual the ground floor. The volume of the TES tank is 14,150 m³. customers. To aide this large capacity water cooled chillers, The bulk water storage (civil construction) tank of capacity each plant consists of 8 sets of chiller pairs of combine 7,000m³ is located below the TES tank. capacity 4,850 Tr. The chillers are located on the ground floor, where the MV switchgear are also positioned. One of the unique aspects of this District Cooling Plant is the TES tank (Thermal Storage Tank). The dimensions of the The primary chilled water pumps ( 8 Nos.) and secondary tank are 28 meter diameter and 23 meter height. The tank chilled water pumps (12 Nos.) which aide the circulation of is constructed out of carbon steel plates whose thickness chilled water are located at the basement floor along with varies from 24mm to 8mm and are joined by welding. their motor control centre (MCC). The PCHWP’s are fixed Approximately 80,000 m³ earth excavated for Plants 1 & 2. speed and works in tandem with the number of operational • 55,000 dia inch pipe weld for Plants 1 & 2 chillers, whereas SCHWP’s are variable speed type • 150 tons of structural steel for pipe and equipment in controlled by the load conditions of the customers. Plants 1 & 2

DSI Flagship Projects 43 Aloft Hotel Abu Dhabi

Project: Aloft Hotel Abu Dhabi Start Date: 2008 Completion Date: 2009 Location: ADNEC, Abu Dhabi, UAE Industry: Hospitality Developer: Abu Dhabi National Exhibition Centre Consultant/Architect: RMJM Value: US $ 40 Million The Aloft hotel in Abu Dhabi is a luxury hotel strategically The Supply, Installation, Testing, and Commissioning located in UAE’s capital city. Set in ADNEC (Abu Dhabi of complete MEP works for the hotel, which included: National Exhibition Centre) and located a short distance • Fresh Air Ventilation System and Extract Air Ventilation away from Abu Dhabi Airport and Abu Dhabi City’s main System highlights, the Aloft Hotel is designed to serve as the • Duct Work and AHUs, FCUs preferred choice of stay for visitors to UAE’s glittering • Chilled Water supply returns systems capital. • Chemical Dosing Systems • ETS from District Cooling System Apart from the conference stations and the lodging rooms, • Domestic Water Storage Tanks the hotel also houses a unique Splash Garden on the • Hot & Cold Water distribution System 5th floor, which measures around 1500 sqm of premium • Installation of Sanitary Fittings & Accessories dine & dance space housing a dedicated kitchen, bar and • Drainage System excluding pumps permanent stage that is able to entertain up to 1500 guests. • Fire Fighting Systems Besides these, the Aloft hotel also features a modern lounge, • BMS Systems with the latest audio equipment, soundproofing materials, • MV & LV Systems with Transformers colourful lighting, high performance acoustics. In addition to • Fuel Storage Tanks the 400 guestrooms, the hotel also houses a wedding hall, • Bus bar System a selection of restaurants, bars and meeting rooms to serve • Electrical Cable and Containment System the exhibition guests and the capital, in addition to an open • Light point wiring and Installation of luminaries swimming pool, gymnasium and spa. • Fire Alarm and Earthing Systems • Lightning Protection System DSI were chosen by ADNEC to undertake the following • Containment for ELV (Extra Low Voltage) Systems aspects of the Aloft hotel: • Aircraft Warning Light Systems

DSI Flagship Projects 44 Al Muneera Beach Development

Project: Al Muneera Al Raha Beach Consultant/Architect: Waterman International Development Main Contractor: Al Futtaim Carillion Start Date: 2009 Value: US $ 141 Million Completion Date: 2012 Location: Al Raha Beach, Abu Dhabi, UAE Industry: Residential Developer: Aldar Properties

The Al Muneera project, located in the heart of the Al Raha The development also includes 148 canal-facing, four- Beach Development is a massive project in Abu Dhabi, with bedroom townhouses, and an office tower besides six tall a total area of over 6 million m2 and 11 km of coastline, “Island Towers”. offering residents and visitors 43 km of dynamic waterfront The scope of works included the installation, testing living that includes hotels, marinas, parks, restaurants as and commissioning of the following: well as leisure facilities. It consists of 11 precincts, each with • Electrical distribution system including LV Switchgears, their own distinct personalities and appeal. capacitor banks and distributions panel boards. • Structured cabling and fire alarm system. The Al Muneera project is made up of two distinct areas, • Lighting control, Central battery and low current systems island and mainland, divided by a canal. The two sections including CCTV, Digital Intercom, and Access control have an approximate 50/50 split with respect to built area/ etc. cost, though the island is marginally larger in size. The site • Complete HVAC system including chilled water pumps, area is 146,000 m2, with a total built-up area of 594,000 pipes, air handling units, fan coil units, ducting, fans etc. m2. This is divided into 254,500 m2 of residential space, • Building management systems, water supply systems plus a 106,000 m2 of basement car parking and the island’s including transfer and booster pumps, and above ground podium level will be entirely free for pedestrian usage. drainage system. • Fire fighting systems including pumps and accessories, The bulk of the residential space is comprised of 1286 clean agent fire extinguishing system and gas distribution apartments spread over 16 residential towers. Right system. down on the beach are 11 sea-facing villas, each with five bedrooms.

DSI Flagship Projects 45 Park Place, Park Plaza

Project: Park Place, Park Plaza Start Date: 2005 Completion Date: 2007 Location: Dubai, UAE Industry: Mixed Use Developer: H.E. Humaid Bin Drai Consultant/Architect: CCD/ACC Value: US $18 Million

The Park Place is a 56-floor mixed-use tower on Sheikh • Heat Exchanger and Chilled water pumps Zayed Road in Dubai, United Arab Emirates. The tower • Fire fighting pumps & Fire fighting system has a total structural height of 234.1 m (768 ft), making it • Sewerage Lifting station pumps, Booster pumps and currently the 10th tallest building in Dubai. Irrigation pumps • Sanitaryware and Water heaters Designed to blend modern architecture style with corporate • LPG system, FAHU, AHU and FCU sensibilities, the is a prominent feature on • VAV and LV Switchgear and Control Panels Dubai’s skyline, with its unmistakable concrete Structure • D.G.Sets, Fuel Tanks, and UPS sheathed in the signature green glass facade. The curtain • BMS system and Fire Alarm & Voice evacuation system wall and exposed structure with light brown and light green • Central battery Emergency system and Lighting control hues give the 56 floors of the Park Place a modern presence system on the Sheikh Zayed road. • Video Audio Intercom system and integration with CCTV System Featuring 20 office floors, 35 Residential floors, 4 Service • Access control and Paging system levels and one Basement level, the Park Place is one of the • PA and Structured cabling system most exclusive city addresses for corporate and residential • Light Fixture & Facade Lighting system ( Cold Cathode purposes in Dubai. Each apartment has a louvered terrace, light) which can become an outdoor space in winter and an indoor • Earthing & Lightning protection system space in hotter summer months. DSI were initially contracted to undertake the supply, install, test and commissioning of the following elements on site:

DSI Flagship Projects 46 Sultan Qaboos Grand Mosque,Oman

Project: Sultan Qaboos Grand Mosque, Oman Start Date: 1995 Completion Date: 2001 Location: Muscat, Oman Industry: Government Developer: Diwan of the Royal Court, Oman Consultant/Architect: Tilney Simmons & Partners Value: US $12 Million

In 1992 Sultan Qaboos directed that his country of Oman areas and landscaping, covers 416,000 square metres. should have a Grand Mosque. A competition for its design The Mosque complex (covering 40,000 square metres) is took place in 1993 and after a site was chosen at Bausher constructed on a raised podium in keeping with the tradition construction commenced in 1995. Building work, which was of Omani mosques that were built elevated from street level. undertaken by Carillion Alawi LLC took six years and four The whole interior of the Grand Mosque is panelled with off- months. white and dark grey panelling clothed in cut tile work. The Mosque is built from 300,000 tonnes of Indian sandstone. Ceramic floral patterns adorn arch framed mural panels set The main musalla (prayer hall) is square (external dimensions in the marble forming blind niches in a variety of classical 74.4 x 74.4 metres) with a central dome rising to a height of Persian, predominantly Safavid, designs. The ceilings are fifty metres above the floor. The dome and the main inspired by those of Omani forts. The mihrab in the main (90 metres) and four flanking (45.5 metres) are prayer hall is framed by a border of Quranic verses and a the mosque’s chief visual features. The main musalla can gilded ceramic surround. The dome comprises a series of hold over 6,500 worshippers, while the women’s musalla ornate, engraved stained glass triangles within a framework can accommodate 750 worshipers. The outer paved ground of marble columns, and a Swarovski crystal chandelier with can hold 8,000 worshipers and there is additional space gold-plated metalwork hangs down for a length of 14 meters. available in the interior courtyard and the passageways, A major feature of the main prayer hall is the hand-made making a total capacity of up to 20,000 worshipers. Persian consisting of . 1,700 million knots, weighing Work began on the construction of the Sultan Qaboos Grand 21 tonnes and made in a single piece measuring 70 x 60 Mosque complex on a site by a main road between Muscat metres. From design stage it took 4 years complete and and Seeb early in 1995. It was completed six years later and 600 female weavers from province of Khurasan in were inaugurated by His Majesty the Sultan in May 2001. employed. The developed part of the site, including the fully consolidated

DSI Flagship Projects 47 King Khaled Hospital Extension

Project: King Khaled Hospital Extension Start Date: 2009 Completion Date: 2013 Location: Riyadh, KSA Industry: Healthcare Developer: King Saud University/ ABV Rock Consultant/Architect: Strategic Construction Program Value: US $50 Million

ABV Rock was invited to undertake the construction of the 200 fire fighting system) and district fire water systems expansion to the King Khalid University Hospital. The new • Public Address, SCADA and Building Management extension would encompass an 85,000 sq. meter building, (BMS)Systems consisting of 2 basements, a ground floor, 5 upper floors, a • UPS and Generator back emergency power supply roof and upper roof area. The new hospital would be a 570 system beds hospital with 32 operation rooms. DSI installed the following systems on site: In the first phase, (completed over 18 months), DSI was • District Cooling Systems able to deliver complete MEP solutions to the site. In the • Chilled Water Pumps next phase, DSI is undertaking complete integration of • Medium Voltage Switch Gear & Transformers medical equipment data into the digital data and electrical • L.V Switch gear & Control panels systems, which is essential for electrical load calculations • Booster and Circulation Pumps and for HVAC heat dissipation’s calculations. • Air Handling Units, FAHU, FCU and VAV systems DSI led the co-ordination efforts between the main contractors • Lighting, Emergency Lighting and Lighting Control and consultants to obtain basic medical equipments’ Systems information. DSI’s Mechanical and Engineering teams also • Earthing & Lightning Systems worked on expediting the approvals of recommendations • Central battery System, Access Control System and and submissions, based on their decades of experience Dimming System with healthcare projects. • Fire Alarm System • Fire fighting pumps & Fire fighting system (featuring FM-

DSI Flagship Projects 48 New Muscat Airport Expansion (MC2)

Project: New Muscat Airport Expansion (MC2) Start Date: 2010 Completion Date: 2014 Location: Muscat, Oman Industry: Airports/Aviation Developer: Ministry Of Transport and Communications, Oman Consultant/Architect: COWI – Larsen JV Value: US $44 Million

Oman’s Ministry of Transport and Communications Drake & Scull International Oman were invited initiated an ambitious expansion programme of the to develop and complete the concept design, country’s two largest airports, Muscat and Salalah, both procurement, manufacture, supervision, delivery to of which were inaugurated nearly 40 years ago site, construction of the Works, erection, inspection, Divided into several packages, Drake & Scull International testing, trial operation, commissioning, maintenance Oman were invited to undertake the major MEP works for of equipment for the MC2 package. Besides the MC2 the second package (MC2). The MC2 package centred package, DSI Oman also worked on the MEP works for: primarily on the construction of a new state-of-the-art • ATM Complex Guard House 100m tall Air Traffic Control tower, and facilities for Crash • ATM Store Fire Rescue, air traffic management centre, data centre, • Radio Station as well as other facilities and services. • Checkpoint Building The works involve construction of the following • Airport Wide Area Network (AWAN) buildings: • ATC Tower • Data Centre • Crash Fire Rescue • Air Traffic & Meteorology complex • Contingency &Training • Guard House ATM Complex • ATM Complex Utility Yard • C&T Centre Utility Yard

DSI Flagship Projects 49

Project: Ocean Heights Client: DAMAC Main Contractor: ARABTEC Consultant: Engineering Consultant Group /Ian Banham Contract Value: US $32 Million Location: Dubai Marina

Ocean Heights Tower is an 82 storey towering masterpiece Various types of luminaries are used. The parking and with 680 apartments, strategically located at the entrance of podium area has fluorescent light fittings in use, whilst in the Dubai Marina with easy access to nearby beachfront luxury lift corridor down lights are utilized. Common area lights are hotels, including the 7-star Burj Al Arab, shopping malls, controlled by a lighting control system. Exit and emergency beach clubs, golf courses, and other leisure facilities such lights are connected to a central battery emergency system. as the Wild Wadi water amusement park. Offering a choice The fire alarm system is as per the requirement of civil of one, two and three-bedroom luxury condominiums, defense authority, and is monitored by the civil defense Ocean Heights is one of the most exclusive contemporary through an auto-dialing network. The telephone network waterfront addresses in Dubai, designed for the most connection is from EITC (du), and design is as per EITC discerning individual seeking a lifestyle of luxury and design guidelines. The low current system consists of pampering. CCTV, PA, a music system access control system, and a video intercom system. The main power supply is fed from the Dubai Electricity (DEWA) network to the dedicated substation on the ground floor. There are 14 transformers rated 1500KVA each in the substation. The LV Room contains 14 2500A MDB (LV Panel), with 11 of them being connected to a bus duct to feed power to different levels. One back-up generator of 1500KVA is provided for maintaining essential power supply in case of a main power supply failure.

DSI Flagship Projects 50 District Cooling System - Residential Area Plant Industrial Area, Musafah

Project: District Cooling System - Residential Area Plant Industrial Area, Musafah Client: The General Industrial Council of Abu Dhabi (GIC) Engineering & Design: EMCOR Drake &Scull Group plc., U.K. Consultant: W. S. Atkins & Partners Overseas Project Value: US $21 Million Project Location: Mussaffah, Abu Dhabi

Drake & Scull International were responsible for engineering, Scope of Work: Drake & Scull International provided procurement and construction of the Residential Area Plant the complete engineering, procurement and to supply 7200 tons of chilled water to an 8000 person construction services including the following: accommodation area presently being constructed at • 11 KV Incomers (Standby Power) Mussaffah in Abu Dhabi. • 11 KV/3.3KV Transformers • 3.3KV/415V Transformers Distribution pipework consists of 1km of 750mm dia steel • 6 MW Gas Engine Generators (Prime Power) pre-insulated HDPE covered, 7km 500mm dia steel pre- • 1 MW of Generation (Black Start) insulated HDPE coated and 35km of various sizes of HDPE • 6 x 1200 tons 3.3KV chillers pre-insulated HDPE covered pipes. • 5.5 million litre Thermal Storage Tank

Civil works includes ground improvement (vibro stone columns), piling (12m drilled reinforced concrete), reinforced concrete, structural steel, cladding and architectural finishes, roads and plantings, along with the trenching associated with the laying of 43km of underground pipework.

DSI Flagship Projects 51 District Cooling Plant-Dubai Air Port Free Zone Authority

Project: District Cooling Plant-Dubai Air Port Free Zone Authority Client: Government of Dubai Dubai Airport Free Zone Authority (DAFZA) Consultants: Parsons Brinckerhoff (M.E) LTD Architect: Brewer Smith & Brewer Gulf Chartered Architect Project Value: US $6.5 Million

Drake and Scull International were appointed as main Drake & Scull’s scope of work included the contractor to undertake the enhancement of the Dubai following: Airport Free Zone Authorities existing central cooling plant • Installation of two new water cooled high voltage chillers and provide a new central water storage facility to be utilized 4000 TR capacity for domestic water and fire fighting requirements as well as • Installation of four new cooling tower cells irrigation. • Enhancement and modification of existing high and low voltage electrical systems The main objective while carrying out the project was to • Installation of new underground chilled water pipe work ensure minimum disruption to the end users connected • Installation of new pumped water storage facility with a to the existing utility services. The plant installed under this capacity of over two million litres of contract has a capacity of producing 4,000 tons of chilled • domestic water and a capacity of more than one million water. litres for irrigation. • Installation of new underground irrigation, domestic/ fire Drake & Scull International were responsible for the fighting and drainage services. procurement, installation, and commissioning and • Complete electrical services associated with the new performance validation of mechanical & electrical chilled water storage facility water process plant for the District Cooling Plant. • Construction of all associated civil works including services building, equipment bases, Manhole • and service trenches.

DSI Flagship Projects 52 Zayed University

Project: Zayed University Client: Dubai Municipality Architect: Hok Consultant: Shankland Cox Main Contractor: ECC Project Value: US $38 Million

Drake & Scull provided the complete mechanical, electrical • Electrical power distribution (MV & LV) and plumbing services installation to Zayed University • Lighting and Small Power building in Dubai– al-Rawyyah. The university is the • Fire alarm and detection “Women’s University” which consists of 6 College Buildings • BMS control system for a Total Built up Area of 100,000 m2. • MATV & SMATV system • Central Dimming System The services provided by Drake & Scull International • Lighting Control System included the following: • Central Emergency Lighting • District Cooling Plant of 4x 1200ton = 4800tons • UPS System • Central air conditioning and ventilation systems. • Access Control System • Domestic water services • Public Address System • Sanitary and Drainage system • Clock System • Toilet handicapped system • 500 KVA Diesel Generator. • LPG System • SCAD • Fire fighting and protection

DSI Flagship Projects 53 Royal Abjar Hotel (Renaissance Hotel)

Project: Royal Abjar Hotel (Renaissance Hotel) Client: Al Mulla Enterprises Private (Ltd) Architect: The Fraser Nag Partnership Consultant: Kennedy & Donkin (ME) Ltd Project Value: US $26 Million

Drake & Scull International provided all Mechanical, building management system which activated remote Electrical and Plumbing services for the Royal Abjar - a plant, monitors the operating of all the systems and 350 room, five star hotel in Dubai. registers running hours and maintenance schedules. The entire building is protected by a computerized analogue The services include a computerized building managements addressable fire alarm system installed in accordance with system, air conditioning, ventilation, a fire fighting and BS5839. detection system, domestic water systems, drainage, LPG, water treatment, steam and condensate, electric power, In the event of a fire the system gives the exact location standby generation, lighting, lightning protection, data/ of the activated fire sensor. Additionally, all public area communications and security systems. lighting is controlled by a programmable dimmer system. User-friendly, pre-programmed, lighting provides flexibility Additional Notes: Drake & Scull’s commitment to quality, for different functions. Complex microprocessors ensure efficiency and security remains paramount. Thus the the integrity of the whole system and provide default lighting engineering services are controlled by a sophisticated in case of a power failure.

DSI Flagship Projects 54 Wafi Residential Complex

Project: Wafi Residential Complex Client: MKM Services Architect: Holford Architects Main Contractor: Khansaheb Civil Engineering Consultant: Ewbank Preece International Project Value: US $18 Million

Drake & Scull International provided the complete Drake & Scull International provided the services mechanical and electrical building services installation to comprised the complete mechanical, Electrical and the Wafi Residential Complex, located in the heart of Dubai. plumbing installations including: • Air conditioning The development consists of the mail residential building, • Domestic water services end block, multi- storey car park, service compound and • Drainage external leisure area. The main residential building is • Fire fighting systems 11 storey high with offices, coffee shop, retail outlets, • Electrical power and lighting business centre and staff accommodation on the ground • MATV system and mezzanine floors. The 10 residential floors comprise • Fire alarm system 124 luxury apartments ranging from 1 to 4 bedrooms with • Telephone system 2 penthouses with roof gardens located on the 11th floor. • Building Management System

DSI Flagship Projects 55 Dubai Internet City- Phase I

Project: Dubai Internet City- Phase I Client: Dubai Internet City with participation by the Dubai Government Main Contractor: Al-Habtoor Engineering Enterprises Co. (LLC) Consultant: WS Atkins & Partners Overseas Project Value: US $20 Million

Dubai Internet City is the biggest Information Technology 240,000 square feet of offices, including a standalone Centre in the Middle East and has the largest new building for Microsoft and Compaq is to be built on the side generation Internet protocol telephony system in the world. of the man-made lake. It is a perfect hub for new economy industry - established IT companies, multimedia businesses, telcos, Internet The main highlights of the MEP Services provided by start-ups, service companies, remote service providers, Drake & Scull included the following: incubators, venture capitalists and professional firms etc. • Central air conditioning & Ventilation System • Chilled water system The project is a public/private joint venture, which has more • Pressurisation system than 185 IT companies in four buildings covering 180,000 • Hot and Cold water services square feet of office space. In addition to IT companies • Sewage drainage system office space, Dubai Internet City have Siemens Data Centre, • Fire protection system Conference rooms, Public services like - Dome cafe, Food • Building Management System Court, Mini Market, Bank, Police Station and Cyber Cafes. • Electrical power & lighting system These buildings are surrounded by beautiful landscaping, • Fire detection and alarm system lakes with fountains and a big car parking. • Cabling of data network system • Intelligent control system The 15-megawatt Internet City is the biggest IT building in • Dimming control system the Middle East, and has the largest new generation internet • Access control system protocol telephony system in the world. An additional • CCTV system

DSI Flagship Projects 56 Dubai Creek Golf and Yacht Club

Project: Dubai Creek Golf and Yacht Club Architect: Godwin Austen Johnson Main Contractor: Al Naboodah Laing Consultant: Robert Matthew Johnson-Marshall (RMJM) Project Value: US $17.4 Million

Drake & Scull provided services to all parts of the For the distribution of water mains, telephone conduits 180-acre Dubai creek golfing/yachting complex which and HV cables to 5 sub stations over the site was a major encompasses a floodlit driving range, 9-hole practice course, undertaking. The illumination of the driving range and 9-hole shop and golfing academy, a 45meter high clubhouse with practice course alone involved the provision of 90,000 watts 5-star dining room, gymnasium and swimming pool. The of lighting. complex also boasts a 115 berth marina that accommodates small dinghies to 80-foot Long Ocean going yachts. The central plant for all services was housed in a separate energy building connected to the main club house by The Dubai golf and yacht club is a world class golfing underground walkways. From these walkways the service facility in the heart of the city. The new course was built areas feed up into the building through risers and false as part of Dubai’s commitment to develop a tourism and ceilings. leisure infrastructure as well as to confirm its reputation as a leading international golfing destination.

Drake & Scull installed central Building Management System to control and monitor all the building services, ventilation, fire alarms, public address systems, gas leak detection and fire suppression systems, kitchen equipment, lifts and a full range of electrical services.

DSI Flagship Projects 57 Dubai Chamber of Commerce & Industry

Project: Dubai Chamber of Commerce & Industry Client: Dubai Chamber Of Commerce & Industry Main Contractor: Al Futtaim Wimpey (LLC) Architect: Hudson Lootah Buckle Consultant: Kennedy & Donkin (ME) Ltd Project Value: US $15 Million

When the Dubai chamber of commerce and industry Drake & Scull provided the complete mechanical and decided to relocate its headquarters, it was committed to electrical building services for the building including constructing a landmark building to the highest quality. This the following: they achieved in the unique design located on the creek • Air conditioning side in the heart of Dubai. • Domestic water services • Drainage The 18-storey building comprises an exhibition hall, two • Fire protection systems conference centers with multilingual translation facilities. • Power supplies Executive offices on the upper floor and general offices, all • Lighting with views of Dubai creek. • Fire alarm • Telephones The offices are air conditioned by a variable air volume • Communication systems conditioning system with the specialist areas served by • Security close control dedicated plants. The main services plant • Building management systems rooms are located in the basement and on the 3rd and 15th floor levels with central services provided from a service compound. The whole building is under the control of a Building Management System.

DSI Flagship Projects 58 Emirates Golf Club

Project: Emirates Golf Club Client: Government of Dubai Architect: Robert Matthew Johnson-Marshall (RMJM) Main Contractor: Al Naboodah Laing (llc) Consultant: Robert Matthew Johnson-Marshall (RMJM) Project Value: US $14 Million

The legendary Emirates Golf Club has hosted the European Drake & Scull International provided electrical, mechanical PGA Dubai Desert Classic tournament since its inception and plumbing services to all parts of the Emirates Golf Club. and is the only Golf Club in the emirates with two 18-hole Drake & Scull International has maintained this Golf Club Championship grass courses. for many years and provided temporary MEP services for the club during the Dubai Desert Classic golf tournament. The Emirates Golf Club consists of the main clubhouse building designed in the style of a tent which houses the main club facilities. There are also ancillary buildings for administration, maintenance and other facilities.

DSI Flagship Projects 59 The Jewels

Project: The Jewels Client: Cayan Main Contractor: Al Seif Contracting Consultant: RMJM Project Value: US $13 Million

The Jewels twin towers, located at the Dubai Marina design. This variety presented a challenge in itself due to Waterfront, rise to an imposing 20 storey, and will house the different layout of each flat. In addition, each duplex, 120 units and 5 villas. These include one, two, three villa, and penthouse has a private swimming pool and an bedroom apartments, duplexes, penthouses, lofts, retail outdoor Jacuzzi in the penthouses only. shops and luxurious villas overlooking the spectacular marina. Complementing this wide array of residences is an Through team work and close cooperation between all amazing range of amenities - high-end finishes, full home parties involved in this project including the Client himself, automation, fully fitted kitchens and bathrooms, even a Consultant, Project Manager, and the Contractor Drake Jacuzzi in the master’s bathroom. & Scull International was able to complete all thejobs successfully and deliver the project on time. The jewels Twin Towers proved to be one of DSI’s prestigious projects and remarkable triumph, as the project team faced The strong dedication and hard work of the onsite Drake a few difficulties during the execution of the project due to & Scull team delivered a project that is considered one of the towers’ unique curved design which is reflected on the Dubai Marina’s showcases. Drake & Scull International is interior of the building as well. The irregularity in the shape very proud of having worked on this project and contributed meant that none of the floors shared the same size and to its success.

DSI Flagship Projects 60 Accident and Emergency Trauma Centre, Rashid Hospital

Project: Accident and Emergency Trauma Centre, Rashid Hospital Client: Dubai Health Authority Consultant: Ian Banham & Associates Project Value: US $12 Million

The 120-bed state-of-the-art Accident and Emergency In terms of the demands on the MEP installation, hospital Trauma Centre is based in Dubai’s Oud Metha area projects are among the most complex. The amount and adjacent to Rashid Hospital. The advanced centre makes the combination of services that are required are generally use of the latest technology and the newest principles in larger than in other buildings and consideration of the trauma centre architectural design. It is the largest and the end-user plays a critical role. The products used in the most advanced freestanding trauma centre in the region. project had to be carefully specified, with many specialist items needed, as hygiene is a top priority for the client. With a detailed disaster management plan in place, the This scale and the need to maintain high levels of hygiene trauma centre is built to cope with large-scale disasters meant very close day-to-day coordination with the main and and emergencies. The facilities spread over the 20,000m civil contractors was essential. All products installed were of a two storey building, include six operation theatres, considered, from the largest plant down to manhole covers. three resuscitation departments, CT scanning facilities, an intensive care unit and two radiology departments.

Drake & Scull contract involved the supply, installation, testing, commissioning and operation of the MEP systems.

DSI Flagship Projects 61 Indigo Tower

Project: Indigo Tower Project Title: Indigo Tower Location: Jumeirah Lake Towers Client: Jumeirah Properties Investment Ltd Main Contractor: Arabtec Consultant: WS Atkins & Partners Overseas Project Value: US $12 Million

Indigo Tower, within the high-rise waterfront development Scope: DSI undertook the supply, installation, testing and of Jumeirah Lake Towers, soars an impressive 35 floors. commissioning of the complete HVCA, plumbing, drainage, Amenities include a fully equipped gymnasium, steam fire fighting, electrical and small power plant Installations in room, lap pool, Jacuzzi, juice bar, a coffee shop,shopping a contract worth AED 43 million, DSI has is quite literally boulevard, 24-hour security, covered car parking and six at the heart of one of Dubai’s most prestigious buildings – high-speed lifts: three for the residential floors and three for IndigoTower the commercial floors.

DSI Flagship Projects 62 Baynunah Hilton Tower

Project: Baynunah Hilton Tower Client: H.H. Sheikh Mohammed Bin Zayed Al Nahyan Main Contractor: Six Construct (LLC) MEP Services Consultant: Kennedy & Donkin (ME) Ltd Project Value: US $11 Million

Drake & Scull International, Abu Dhabi provided the Drake & Scull International provided the following complete Mechanical and Electrical services to the building services: Baynunah Hilton Tower located on the Abu Dhabi Corniche. • Air conditioning Panoramic views of the Arabian Gulf are provided from the • Domestic water services tallest building in this area. The project was undertaken on • Drainage the instructions of Sheikh Mohammed Bin Zayed Al Nahyan • Fire fighting systems in cooperation with the Department of Social Services and • Power & lighting Commercial buildings. • Fire alarm • Telephone The lower areas of the tower provide car parking for residents • Communication systems and a five star hotel, decorated in traditional Arab style and • Security systems operated by the Hilton hotel group. The upper levels are • Building Management Systems luxury apartments from one to four bedrooms fitted to the highest standard, all fully serviced from the hotel. Leisure facilities are provided with a swimming pool and health club located on the 27th and 28th floors. The building is 160 meters high in total, capped by the ‘Raydome’ which houses communication equipment, lift gear and water tanks.

DSI Flagship Projects 63 Emirates Aviation Training Centre

Project: Emirates Aviation Training Centre Client: Emirates Airlines Architect: The Fraser Nag Partnership Architects & Town Planning Consultants Main Contractor: Al Nekhreh Contracting Co. LLC Consultant: Ian Banham & Associates Project Value: US $ 8.44 Million

Drake & Scull International provided the complete The main highlights of the MEP services provided by mechanical, electrical and plumbing services for the Drake & Scull included the following: Emirates Aviation Training Centre for the Emirates Airlines • Central Air Conditioning & Ventilation in Dubai. The building is located at Al Garhoud area near • System Dubai Airport, which comprises three main buildings • Chilled Water System namely Administration building, Simulator building and Car • Hot and Cold Water Services Park building. • Sewage Drainage System • Fire Protection System (including Fire Hose Reel and Wet Risers) The Administration building comprises the main lobby, • Fully integrated Building Management System reception, an auditorium with a seating capacity of 400 • Electrical Power and Lighting persons, a restaurant and offices for different departments. • Fire Alarm & HSSD Systems The Simulator building consists of training Centres, class • Earthing and lightning protection system rooms, library and flight simulator training facility which • Cable containment for lighting, small power, telephone & houses 14 full motion flight simulators. The plantrooms are ELV (i.e. TV, BMS, Security). located in the Simulator building. • CCTV & PA Systems • Access Control System The Car Park building is a 12 level multi-storey building to • UPS System • Lighting Control System provide car parking for approximately 540 cars. The chillers • Compressed Air System are located on the roof of the Car Park building and the • Waste Drainage System pump rooms are in the basement. • Rainwater Drainage • Kitchen Extract System

DSI Flagship Projects 64 Wafi Shopping Complex (Wafi City) Extension

Project: Wafi Shopping Complex (Wafi City) Extension Client: MKM Services Architect: John R Harris & Partners Main Contractor: Khansaheb Civil Engineering Consultant: Kennedy & Donkin (M.E.) Ltd Project Value: US $4.5 Million

Drake & Scull provided the complete mechanical, electrical • Electrical power distribution and plumbing services installation to the Wafi Shopping • Lighting and Small Power Complex Extension building in Dubai. The Shopping • Fire alarm and detection complex located in the heart of Dubai on the road towards • BMS control system Al Gharoud bridge. It provides the highest quality facilities • MATV & CCTV system for the retail shopping outlets and other commercial spaces. • Central Dimming System The entire development is fully air conditioned and finished • Central Emergency Lighting to a very high standard. • Public Address and Music System • Power Controls for Entertainment Areas The services provided by Drake & Scull International, included the following: • Central air conditioning and ventilation systems • Domestic water services • Sanitary and Drainage system • Fire fighting and protection

DSI Flagship Projects 65 DAFZA Offices, Phase-2

Project: DAFZA Offices, Phase-2 Client: Government of Dubai, DAFZA Main Contractor: Al Nekhreh Contracting Company (LLC) Consultant: Rice Perry Ellis Consultant Project Value: US $4.3 Million

Dubai Airport Free Zone Authority Offices consists of two • Fire Fighting System five storey buildings (East & West) wings. It is located • Standby Power Generation System next to Dubai International Airport Terminal No.2. Various • UPS System systems were integrated into the existing services provided • Emergency Lighting under the Phase-I contract, such as Water Services and • CCTV System L.V. Systems. • MATV System • SMATV System Drake & Scull International installed the complete • Lighting & Small Power HVAC, Plumbing, Electrical, Fire Alarm and Fire • Structured Cabling Fighting services including: • Fire Alarm System • V.A.V. Air Conditioning System • Building Management System • Chilled Water Distribution System • Domestic Hot & Cold Water System • Sanitary and Drainage System

DSI Flagship Projects 66 American Hospital Expansion - Pre-Phase 1

Project: American Hospital Expansion - Pre-Phase 1 Client: M/s. Mohamed & Obaid AlMulla Architect: Michel Aziz / Ellerbe Becket Consultant: Turner Construction - International LLC Main Contractor: Al Nekhreh Contracting Co. L.L.C. Project Value: US $3.2 Million

Drake & Scull International provided the complete • Electrical power and lighting mechanical, electrical and plumbing services for the • Fire alarm and detection American Hospital expansion project for the Client • MATV & CCTV Mohamed & Obaid AlMulla LLC. The expansion building • Hot & Cold water distribution comprises a four storey adjacent to the existing hospital • Medical gas system building with a plant room on the third floor. • Sanitary and drainage system • Intercom system The services provided by Drake & Scull, included the • Nurse call system following: • Structured cabling • Air conditioning & ventilation systems • Voice & data system installation • Domestic water services • Fire fighting and protection

DSI Flagship Projects 67 TyCom Cable Station - Barnstaple

Project: TyCom Cable Station - Barnstaple Client: TyCom™ Value: US $ 2 Million Start Date: 2000 Completion Date: 2001 Project Manager: Parsons Brinckerhoff Constructors Ltd Building Contractor: Roger Boulivant Architect: Parsons Brinckerhoff Built Environment

DSI secured the mechanical, electrical and public health design forging good working relationships with Parsons services contract with Parsons Brinckerhoff as part of Brinckerhoff who highly commended the project team for the TyCom™ Global Network (TGN), the TelExchange™ their performance and proactive approach. centres including Point of Presence facilities and cable The scope of services included: stations throughout the UK. TyCom™ Barnstaple was a • Fire Alarm new cable station intending to operate as a satellite station • CCTV linking to a much larger station at Highbridge. • Lighting • Misting The contract was completed ahead of programme and with • Security Barriers minimal defects. Value engineering aspects included the • Sanitation replacement of sprinklers with a water misting system to • Ventilation prevent water damage to the client’s equipment, stacking • Air-conditioning of air-handling units and fans to save space and reduce • Generators building costs and also the provision of a GRP enclosure • HV/LV Distribution to obviate the need to construct a high voltage switchroom. DSI secured the contract following the successful completion of the station at Highbridge. DSI carried out the

DSI Flagship Projects 68 TyCom Cable Station - Highbridge

Project: TyCom Cable Station - Highbridge Consultant: DSI Ltd Client: TyCom™ Architect: Parsons Brinckerhoff Built Environment Value: US $ 8.1 Million Start Date: 2000 Completion Date: 2001 Project Manager: Parsons Brinckerhoff Constructors Building Contractor: Roger Boulivant

DSI secured the multi million pound contract with Parsons • Dual 2.5MVA Standby Generators, providing 100% Brinckerhoff to carry out the Mechanical Electrical & Public emergency backup in the event of total mains failure. Health services at the new cable station at Highbridge. As • Comprehensive fire protection to all areas, comprising of part of the Northern European operation this cable station 2 stage Inergen/Sprinkler systems fully integrated with was the first to be delivered as an operational unit forming the building Fire alarm system a significant part of the TyCom™ Global Network (TGN), • Fully integrated BMS system interlinked to the central thus allowing data to pass between London and America at control monitoring station within the USA. 2,700 gb per second. The scope of services included: Highbridge was the first contract between TyCom and • HV and LV distribution DSI and consisted of the complete design, build and • Small Power, Lighting and Emergency lighting commissioning of the M & E services package and was • Fire Alarms, Security, Access Control & C.C.T.V. constructed within a “fast track” 16 week programme. • Unistrut primary support network Having achieved successful handover to the client, • Above ground drainage and Sanitary Ware TyCom™ were then able to complete their fit out to achieve • Air-conditioning Units, Fresh Air and Extract Systems operational roll out for the 1st June 2001. • Building Management System (BMS) • Full Stepover perimeter grounding network Specialist engineering requirements included the following: • Dual 2.5MVA HV & LV supplies, fully interlocked, providing 100% mains backup.

DSI Flagship Projects 69 Tycom Data Centre Paris

Project: Tycom Data Centre Paris Client: TyCom™ Value: US $ 12.1 Million Start Date: 2001 Completion Date: 2001 Main Contractor: Parsons Brinckerhoff Contractors Ltd M & E Contractor: EMCOR Technologies Civil Contractor: Ballast Nedam

DSI successfully completed the Electro-Mechanical The scope of electrical services included: Services associated with a Data Centre for Tycom in Paris. • HV Switchgear and Installation The 80,000ft² complex is located within a 300,000ft² • LV Distribution telehouse building which was originally a papermill and is • Small Power and Lighting located in St. Denis close to the Stade de France, Paris. • BMS System The contract was for the design, supply, installation and • Fire Alarm System • UPS System setting to work of the associated sophisticated mechanical • Telephone/Data and Cat 5 Cabling and electrical services for the collocation areas, battery and • Intercom System and Critical Alarms transmission rooms, UPS rooms, including office facilities. • Generator and Standby Sets The plant rooms were located on the roof, mezzanine and • Lightning Protection and Clean Earthing Systems ground floors which besides the logistics of a detail design • Motor Control Centre (MCC) for N + 1, required careful co-ordination of the numerous • Power Distribution Boards (PDU) systems to ensure access for maintenance. • Trace Heating The project based on Tycom’s performance specification • 5000 amp Bus Bar System and was completed in 7 months, could only be achieved The scope of mechanical services included: with close alliance with the manufacturers for long lead • Chilled water, Chillers and associated pipework items such as 3 x Generators (2,500 kva each), 3 x Chillers • DX Cooling System and PAC Units (1,000 kw cooling each), LV Distribution Board (18 meters • Safety Showers, Ventilation and Extract • Leak Detection and Smoke Extract long), 3 x 300 amp transformers and 2 x 800 kva UPS • Gas Suppression and Domestic Water Services Systems. • Oil Storage and Distribution

DSI Flagship Projects 70 TyCOM Point of Presence, Stratford, London

Project: TyCOM Point of Presence, Stratford, London Consultant: Hulley & Kirkwood Client: TyCom™ Architect: Parsons Brinckerhoff Built Environment Value: US $ 20 Million Start Date: 2000 Completion Date: 2001 Project Manager: Parsons Brinckerhoff Constructors Ltd Building Contractor: Mowlem

DSI secured a multi-million pound contract with Parsons The construction programme of 5 months involved Brinckerhoff to carry out the Mechanical, Electrical and major installation challenges with a tight handover Public Health design and installation services to an existing deadline. The scope of services included: 1950’s retail department store located at Stratford Broadway • Stand by Generators (3No. at 2.0MVA ea) in London. • Fire Alarm, Sprinkler and Inogen Systems • 8 No. 500 kVA Static UPS Units The building is required to support telecom network • Power Wiring switching and datacom equipment within a Point of • Lighting Presence environment. A PoP is described as a self- • Air Conditioning contained network switching node and subscriber network • Hot and Cold Water access point. Over 60km of Power Cables were installed • Public Health requiring an exceptional cable management system, utilising an intricate support system designed by DSI due to the structural limitations of the existing building.

DSI Flagship Projects 71 Norwich Data Centre, England

Project: Norwich Data Centre, England Consultant: WSP Client: Norwich Union Architect: LSI Architects Value: $76 Million Start Date: 2006 Completion Date: 2007 Project Manager: AYH London Building Contractor: EMCOR

DSI partnered with WSP to convert an existing building • Transformers and Switchgears shell into a fully-fledged modern data centre to serve • Earthing and Lightning protection Norwich. DSI undertook complete development of the data • Mechanical Services Fitouts centre design post tender along with all coordination and • Refrigeration Units installation information. • RACU, BMS and Controls The entire process was completed in 14 months which was DSI also managed the pre purchased long delivery a major achievement in terms of the complexity of design equipment on behalf of Norwich Union. and conversion.

Drake & Scull’s scope of MEP activities included the installation and testing of: • Firefighting systems • Instruments and Coatings • Sanitaryware • Gas suppression and sprinkler systems • Uninterrupted Power Supplies (UPS)

DSI Flagship Projects 72 DRAKE & SCULL PASSAVANT ENERGY & ENVIRONMENT

DSI Flagship Projects 73 Wastewater Treatment Plant Braila

Project: Wastewater Treatment Plant Braila Start Date: 2010 Completion Date: 2011 Location: Braila, Romania Industry: Wastewater Treatment Developer: Compania de Utilitati Publice Dunarea Braila (Braila Municipality) Main Contractor: Passavant Energy & Environment Value: US $65 million

Passavant Energy & Enevironment, Drake & Scull and Fine Screens) to remove large particles in the water International PJSC’s specialised German water and • Aerated Grit & Grease Removal Chamber to absorb wastewater global specialist fully-owned subsidiary was oily layers and mineral particles (sand) contained in contracted by the Braila Municipality to undertake the the wastewater stream Design, Supply and Installation of a Wastewater Treatment • Aeration Tank (Plug Flow Aeration) with Fine Bubble Plant with a total capacity of 100,000 m³/day, catering to a Aeration to provide dissolved oxygen for the biomass Population Equivalent of 270,000 people. and to prevent sedimentation • Final Sedimentation Tanks and Sludge Treatment with As Main Contractor, PE&E was in charge for the Mechanical Thickening and Dewatering of sediments. mechanical, electrical and civil portions of the Braila The dewatered sludge can be re-used to generate Wastewater Treatment Plant. The wastewater treatment biogas. plant itself consists of: • Flood Pumping Station using effluent pipes to • A Main pumping station to supply the collected discharge the cleaned water into the river wastewater to the treatment plant • Rising Main section for transportation of the wastewater to the plant • Mechanical Pre-treatment Unit (using both Coarse

DSI Flagship Projects 74 Sludge Treatment Plant - Bailonggang

Project: Sludge Treatment Plant - Bailonggang Start Date: 2010 Completion Date: 2011 Location: Shanghai, Industry: Wastewater and Sludge Treatment Developer: Shanghai Municipal Sewerage Company Ltd. Main Contractor: Shanghai Municipal Engineering Design General Institute Value: US $17.5 Million

Bailonggang is a busy suburb located on the outskirts Passavant Roediger’s official scope of work covered the of Shanghai, also known as the commercial capital of following areas: China. Situated in relatively close proximity to the centre • Supply, Installation of Equipment and Civil Works for of Shanghai, the district of Bailonggang was home to a Sludge Mechanical Condensation, Digestion and Drying wastewater treatment plant that was struggling to cope System at the Bailonggang Waste Water Treatment Plant. up with the increase in population that accompanies the • Installation of the following new main process units into boom in Shanghai. Although the wastewater treatment the existing plant: plant design had included a sludge thickening line, a need • Mechanical sludge thickening units was felt to expand the capabilities and capacity of the plant • Digestion Plant to better serve the needs of one of Asia’s most populous • Sludge Transfer to Sludge Drying Plant / Sludge Silos urban agglomeration. (For comparison, The Bailonggang • Biogas Treatment Plant plant served the needs of a people equivalent of 4.3 million • Return Water Treatment Facility whereas metropolitan Shanghai houses 20 million, which • Sludge Liquor Treatment Facility. creates a huge demand for Wastewater management.) • Among the other major projects carried out by Passavant- The Wastewater Treatment plant at Bailonggang was Roediger in China are the Wastewater Treatment Plant in funded by the International Bank for Reconstruction and Beijing (Xiaohongmen with a daily flow of 600,000 m³), Develpoment (IBRD), and Passavant-Roediger were chosen the WWTP at Shijiazhuang (with a capacity of 500,000 to undertake the contract for the extension of the mechanical m³/d), Hangzhou (with a capacity of 600,000 m³/d), sludge thickening plant was well as for the construction of Sludge Treatment Plant (STP) at Wuhan (with a capacity the complete sludge digestion and drying plant. of 300,000 m³/d ), and the Sludge Treatment Plant at Yantai (with a capacity of 240,000 m³/d).

DSI Flagship Projects 75 DRAKE & SCULL OIL & GAS

DSI Flagship Projects 76 Low Density Ammonium Nitrate Plant

Project: Low Density Ammonium Nitrate Plant Start Date: 2011 Completion Date: 2015 Location: Ain Sokhna, Egypt Industry: Petrochemical Developer: Egypt Hydrocarbon Corporation S.A.E Main Contractor: ThyssenKrupp Uhde GmbH Value: US $21 Million

Egypt Hydrocarbon Corporation S.A.E, one of Egypt’s major Drake & Scull Oil and Gas has spearheaded the construction petrochemical companies, envisioned the creation of a Low activities on site, taking a leadership role in co-coordinating Density Ammonium Plant (LDANP) in Egypt. The purpose of the works between the various teams on site. Drake & Scull the LDANP was to facilitate the production of Mining Grade also undertake periodic evaluations of designs and offer their Ammonium Nitrate which is used in the production of explosives suggestions and recommendations to bolster the efficiency of for mining and other blasting applications, such as in construction. construction operations on site. The project presents an opportunity for the private sector development in Egypt, foreign exchange earnings and revenues The efficient planning and contingency measures have allowed for the government. It is expected to provide employment the project construction to progress briskly, overcoming sudden opportunities for up 2000 Egyptian staff during the construction delays in delivery of material and engineering drawings, thanks period and for up to 220 people during the facility operation. to strong resourcing of material and equipment on site as well as fast track mobilization of crucial personnel. More than 1200 DSI The Low Density Ammonium Nitrate Plant at Ain Sokhna (Egypt’s employees and laborers work round the clock to accelerate the industrial hub), consists of a nitric acid unit and ammonium pace of progress on site. nitrate unit; where the nitric acid is consumed in the production of ammonium nitrate. The ammonium nitrate unit uses a single- Drake & Scull Oil and Gas has already reached some major stage, neutralization process. milestones during its time on site. These include: • Almost 11500 m3 of concrete casted The primary portion of Drake & Scull Oil and Gas’ works is to • Almost 500 tonnes of tanks erected assume responsibility for the civil, mechanical and steel structure • Almost 1200 m of underground pipes erected works. Drake & Scull’s scope of works covers the Storage Tanks, Control Building, Piping, Steel Structure (which includes 5,000 tons of steel rebar), 6000 tonnes of mechanical erection and 40,000 m3 of concrete.

DSI Flagship Projects 77 DRAKE & SCULL RAIL

DSI Flagship Projects 78 Channel Tunnel Rail Link Line Infrastructure

Project: Channel Tunnel Rail Link Line Infrastructure Client: Union Railways (North) Value: $350 Million Start Date: 2002 Completion Date: 2006

The Channel Tunnel Rail Link (CTRL) Project was managed in single track tunnels (Thames Tunnel), emerging just to on behalf of Union Railways Network (URN) by Rail Link the east of the Queen Elizabeth II road bridge. From there Engineering (RLE) a JV comprising Bechtel, Systra, Ove it runs in the open to Barking, then in single-track tunnels Arup partners, and Halcrows. The consortium entrusted (London Tunnels) to St. Pancras. The tunnels are located Drake & Scull with the task of providing complete MEP between Barking and Stratford (London Tunnel 2) and engineering solutions for the Channel Tunnel Rail Link between Stratford and St. Pancras (London Tunnel 1). The (CTRL) which provides a high speed rail link between St. London Tunnels West portal is located approximately 1.5 Pancras Station in London and the Channel Tunnel portal km outside St. Pancras Station. near Folkestone in Kent. Overall there are 44 km of tunnel bore and 11 km of open The CTRL has been split into two major sections by design. route. There are 7 shafts and portal buildings equipped Section 2 of the CTRL consists of a new double track railway, with tunnel ventilation fans and an additional 14 remote which connects onto Section 1 of the CTRL at Southfleet technical buildings. The engineering systems are essential Junction and runs to St. Pancras Station in London. to the operation of the railway including life safety in respect fire, communications and tunnel ventilation, which provides The railway runs in the open from the Southfleet Junction a safe haven and smoke control in the event of a tunnel fire up to Swanscombe, where it passes under the river Thames incident, communications and fire systems.

DSI Flagship Projects 79 Drake & Scull’s contract involved the design, procurement, Technical Solutions installation, testing and commissioning of all engineering • Engineering Management systems required for Section 2 of the Channel Tunnel Rail • Systems Integration Link. Included within the scope was the installation of the • Engineering Assurance signaling and C&C equipment together with building works • Interface Management • Programme Scheduling and Controls associated with the shaft, portals and technical buildings.

Project Scope • Life Safety Systems • Tunnel Ventilation • Fire Detection & Protection • Lighting • Telecommunications • Containment • Signaling Installation • Cross Passage Doors • Buildings & Structures • Building Services

DSI Flagship Projects 80 St Pancras Station Redevelopment - London, UK

Project: St Pancras Station Redevelopment London, UK Client: Union Railways (North) Value: $245 Million Start Date: 2001 Completion Date: 2007

Drake & Scull Rail participated in the Redevelopment of the St. Pancras Railways station as a member of the CORBER Drake & Scull Rail’s pioneering work on the project was integrated joint venture, for the Channel Tunnel Rail Link greatly appreciated by the clients and widely lauded in the London Terminus. industry. The station was built in 1869 and is a Grade 1 listed building Project Scope rated as extremely important to the UK’s historic heritage. • Electrical & Power Distribution The existing train Shed, which was retained, was the largest • Uninterrupted Power Supply enclosed volume and largest unsupported structural span • Lighting in its time and formed the basis for many station buildings • Earthing& Bonding in the United States. • Fire Detection & Protection • Public Address & Telecommunications In addition to the existing train shed, the station had 250 m • Mechanical & Piped Services flat roof extension with 13 platforms to cater for 400 meter- • Natural Gas long Eurostar trains. • Air Conditioning The Redevelopment Construction was completed in 2 • Ventilation phases. • Automatic Controls During Phase 1 the East Deck Extension, which formed • Building Automation the Interim Station of up to 6 platforms, was developed and • Security made operational. Technical Solutions Once the Interim Station was operational, Phase 2 works • Systems Design proceeded in order to excavate and build a ‘Box’ for a new • Systems Integration Thameslink underground station and to complete the West • Engineering Assurance Deck Extension whilst refurbishing the existing train shed. • Interface Management • Programme Scheduling and Controls

DSI Flagship Projects 81 Jubilee Line Extension Project London, UK

Project: Jubilee Line Extension Project London, UK Client: London Underground Ltd Value: $416 Million Start Date: 1994 Completion Date: 1999

The Jubilee Line Extension Project (JLEP) was one of the largest were provided to vital equipment rooms and additional ventilation construction projects in Europe and comprised over 16 route to all underground spaces within the station box. kilometers serving 11 new stations, 3 overland and 8 underground. Of the 11 stations 5 were interchange stations linking the service Contract 206 comprised of the design, supply, installation and to the existing London Underground system and 3 inter connect commissioning of normal and emergency lighting, low voltage with Railtrack Stations providing easy access to the South East, power supplies, fire detection and alarm systems, fire protection South and North East of London to the expanding Docklands systems, compressed air and public health services. The contract development area. The project also incorporated 10 ventilation/ award was made in November 1993 and DSR completed the emergency access shafts and 2 traction/intake sub stations. design phase of the project late in 1995. Installation drawings for The line connects with the existing Jubilee Line at Green Park, each of the 30 work locations were completed 12 months later in passing under the River Thames four times before terminating late 1996. at Stratford. An essential part of the design process was a review of the design Drake & Scull Rail were the mechanical and electrical services of the critical life safety systems provided under the contract. contractor for Contracts 205 (Station and Tunnel Ventilation), and Contract 206 (Station and Tunnel Services). DSR’s in-house design team worked closely with London Underground’s engineers using “System Assurance” techniques Contract 205 comprised the design, supply, installation and to eliminate unnecessary complexities and enhance overall commissioning of Tunnel Ventilation, which involved the provision safety and reliability standards. of 46 large diameter fans, each having a minimum duty of 70 m³/sec. Heavy duty Public Area ventilation was provided which The use of “System Assurance” techniques on ventilation and incorporated 12 fans providing both fresh air and smoke control in service installations was a first for the rail industry, the process the stations at platform, concourse and connecting tunnel areas. normally being used in automotive, military and rolling stock In addition to the public area ventilation, air-conditioning systems industries.

DSI Flagship Projects 82 In order to ensure that the critical ventilation systems were The commissioning of the completed installation was an designed to optimum levels, Drake & Scull Rail were responsible enormous task and required to be undertaken in phases, each of for undertaking a computer modeling of the system’s performance, the systems was pre-tested, tested and commissioned, and then known as a Subway Environmental Simulation process. proved to Her Majesty’s Inspector of Railways. Smoke testing of each station was undertaken to prove the effectiveness of the Extensive testing of proposed equipment was carried out during installed systems. the design phase of the project and ventilation fans were tested to destruction at temperatures in excess of 250ºc. London Underground Ltd, as the final Client, was keen to have their staff trained in the operation of the unique systems within Fire rated ductwork formed a large part of the ventilation systems the London Underground environment. Drake & Scull Rail and after extensive deliberation and evaluation Durasteel was coordinated with the client to provide this in-depth training to their selected as the preferred ductwork of choice. The major deciding satisfaction. factor in the selection was the engineer’s requirement that all services installed in the JLEP should have a 40 year life. The completed Jubilee Line was opened in time for the millennium celebrations at theNorth Greenwich Dome and accommodated The installation phase of the project commenced in January 1995 10,000 passengers per hour, peaking at 17,000 per hour for with the fit out of the grade stations at West Ham and Canning special events. Town North London Line Platforms. These were handed over to Railtrack in August 1995. These successes were followed by the The Jubilee Extension was yet another fine showcase of Drake completion of Blue Ball Yard and West Ham Intake Stations. & Scull Rail’s extensive Rail project capabilities and a major milestone in its history of achievements. The company achieved the “Power On” milestone in line with the construction programme. The remaining installations, including Project Scope all the major stations commenced generally in line with agreed • Tunnel Ventilation construction schedules and were commissioned and handed over • Smoke Control on a progressive basis. • Fire Detection & Protection • Lighting Installation work then started on North Greenwich (the largest • Telecommunications of the 11 stations) and was successfully commissioned and accepted by Her Majesty’s Inspector of Railways in time for the • Drainage 1st phase passenger operation on 14 May 1999. • H&C Water • Air Conditioning The installation works within the tunnels called for a specialist • Power approach and the positioning of 22 kilometers of fire hydrant main • Public Health Services was a particular challenge. Specialist pipe handling equipment was mounted on works train flatbed wagons with demountable Technical Solutions pipe magazines, an installation rate averaging 120 meters per • Engineering Management shift was achieved within the tunnels from Canning Town Portal • System Design to Green Park Station, including the location of hydrants every • Systems Integration 60 meters and tunnel isolation valves every 180 meters, while • Engineering Assurance ensuring that connections were made to systems at every station. The lighting system within the tunnels also posed a challenge and • Interface Management a pre-assembled system was selected with plug in sockets every • Programme Scheduling and Controls ten meters which enabled the light fitting assemblies to be pre- wired and required only a plug to connect the light.

DSI Flagship Projects 83 DSI Flagship Projects

Siemens Traincare Facility Southampton, UK

Project: Siemens Traincare Facility Southampton, UK Client: Siemens Transportation Systems Value: $6.4 Million Start Date: 2002 Completion Date: 2003

Drake & Scull Rail were involved in the development Project Scope of a Traincare Facility in Southampton for Siemens • HV/MV Power Transportation Systems. This was designed to maintain • LV Power the new trains built by Siemens and being introduced • Lighting by Southwest Trains onto their network. The facility • Heating involved construction of a new depot and comprised a • Ventilation and Air Conditioning main maintenance shed, train wash building, Wheel lathe • Telecommunications building and enabling works for connection to the railway • Fire Detection & Protection infrastructure. • Security • Depot Protection Drake & Scull Rail were responsible for the design and • Compressed Air installation of the Electrical, Mechanical, Public Health and Telecommunication Systems. Technical Solutions • Systems Design The depot was the first to be built in partnership with Siemens • Systems Integration Transportation Systems and Fitzpatrick Contractors. Drake • Engineering Assurance & Scull Rail’s performance on the project surpassed the • Interface Management client’s expectations, who subsequently invited Drake & • Programme Scheduling and Controls Scull Rail to carry out other Rail works in the future.

DSI Flagship Projects 84 Brixton Congestion Relief, London, UK

Project: Brixton Congestion Relief, London, UK Client: Metronet BCV Value: $4 Million Start Date: 2001 Completion Date: 2003

The Brixton Congestion Relief Project was launched to within the modernised public areas of the underground address the congestion points that had been witnessed on station. the busy Rail line. The revamping operations also installed new lifts and escalators as part of the modernisation package. Drake & Scull Rail were selected to carry out the complete MEP and Health & Communication works for the Brixton Drake & Scull Rail’s stellar project execution capabilities project, over a period of more than 2 years. allowed them to complete the project on time, and the installed works were compliant with the London The project works were carried out in two different sections. Underground Section 12 standards of the day. In the First section, Drake & Scull Rail undertook the design development, installation, testing and commissioning of the Project Scope mechanical, public health, lighting, power and fire alarm • Mechanical systems within a new office building for the station staff • Electrical which had to be built on top of the existing building. The • Public Health office space had been built to current commercial standards • Communications and had to be capable of round the clock service. • Fire Detection & Protection Technical Solutions For the second section, Drake & Scull Rail had to revamp • Systems Design the works within the Brixton station area where it was • Systems Integration assigned the responsibility for design development, • Engineering Assurance installation and commissioning of the new lighting, power, • Interface Management telecommunications, security and fire detection systems • Programme Scheduling and Controls

DSI Flagship Projects 85 Bedford Depot Bedford, UK

Project: Bedford Depot Bedford, UK Client: Fitzpatrick Contractors Ltd Value: $3.5 Million Start Date: 2004 Completion Date: 2004

The Bedford Rail depot was a 6 month fast track project telecommunications systems. Drake & Scull Rail’s that was launched to support Thameslink rail passenger meticulous planning and strong engineering skills enabled services during the period of the blockade whilst St. Pancras it to meet the stiff deadline to the client’s satisfaction. station was being redeveloped. Project Scope The depot works enabled the South Central rail network • Lighting operator to maintain a fully functional service during the • LV Power main works blockade and also provided a depot for the next • Telecommunications 20 years, while ensuring that there was no disruption of the • Air Conditioning critical rail service for its numerous passengers. • Heating & Ventilation • Public Health Drake & Scull Rail worked in partnership with Fitzpatrick • Security Contractors Ltd, for a contract framework funded by HSBC Technical Solutions Rail (UK) Ltd to design and build services for the Main Train • Systems Integration Care Area and External Services at Bedford Cauldwell • Engineering Assurance Depot. • Systems Design • Interface Management Drake & Scull Rail were responsible for the complete • Programme Scheduling and Controls design and build of all mechanical, electrical and

DSI Flagship Projects 86 North Pole Depot London, UK

Project: North Pole Depot London, UK Client: British Rail Value: $17.5 Million Start Date: 1990 Completion Date: 1990

Drake & Scull carried out the mechanical and electrical Scull Rail’s integrated quality and design capabilities and services for British Rail’s Channel Tunnel rail depot located became a good example of Drake & Scull Rail’s project at Ladbroke Grove, London. capabilities. The North Pole Depot posed a few unique challenges that Project Scope Drake & Scull Rail’s engineering teams were able to resolve • Mechanical Services in a professional manner. • Building Management One of the major challenges faced during the execution of • Electrical Services the North Pole depot was the installation of high level M & • Depot Protection Systems E works. To overcome this challenge, Drake & Scull Rail • Hot Air Blowers adopted an innovative design and construction of a high • Circular Ductwork Distribution level rolling platform, mounted on specially procured flatbed • General Depot Lighting railway bogies which solved the problem efficiently and • Building Services swiftly. • Power & Gas The other challenge was to ensure that the installed Technical Solutions systems were fully compliant with the strict ISO standards, • Engineering Management a non-negotiable requirement for the client. Drake & Scull • Systems Integration Rail successfully installed all systems installed which • Engineering Assurance have been managed in accordance with ISO 9001 Quality • Interface Management Accreditation ever since. • Programme Scheduling and Controls Destined as a benchmark depot for future rolling stock maintenance, North Pole Depot benefited from Drake &

DSI Flagship Projects 87 Stratford & Ebbsfleet International Stations Kent, UK

Project: Stratford &Ebbsfleet International Stations Kent, UK Client: Rail Link Engineering Value: $24 Million Start Date: 2004 Completion Date: 2006

Drake & Scull Rail undertook the design, procurement, at St Pancras and the Channel Tunnel Rail Link Line installation; testing, systems integration, handover and Infrastructure Contract. bringing into use of all Engineering Systems for the CTRL interchange stations at Stratford and Ebbsfleet in the South- Project Scope East of London, on “Section 2” of the Channel Tunnel Rail • Mechanical Link (CTRL). • Electrical • Public Health ‘Section 2’ completed the new lines from Ebbsfleet into St. • Communications Pancras stations. • Fire Detection & Protection

Drake & Scull Rail worked closely again with the Architectural Technical Solutions design team to incorporate the latest International rail • Systems Design systems engineering standards. The design-build contract • Systems Integration included all interconnection and systems integration works • Engineering Assurance with the North Kent line at Ebbsfleet. • Interface Management • Programme Scheduling and Controls The award of this contract represented a further milestone in the ongoing successful relationship developed between Drake & Scull and RLE following the successful works

DSI Flagship Projects 88 Dubai Airport Passenger Movement

Project: Dubai Airport Passenger Movement Client: Dubai Airports/Bombardier Value: $10 Million Start Date: 2014 Completion Date: 2015

The Dubai Civil Aviation Authority commissioned the substation equipment, traction power system including the construction of Concourse 4 at the Dubai International Airport DC power rails, signaling equipment, fiber optic cabling and which will be connected to Terminal 1 via an automated connections and the entire control and signaling cabling passenger mover system (APM). This facility comprises network and terminations. All of which were to be installed of a 1.6km elevated dual track guide way, a maintenance within the new three story Concourse 4 APM building and and storage facility, alighting and boarding stations in both the associated APM rooms within the Terminal 1 building. the Concourse 4 and Terminal 1 buildings, operational and The scope of work includes the production and submission control facilities and all associated HV/LV & DC substations. of shop/fabrication drawings, supply and installation of MEP services throughout the APM-associated locations, Drake & Scull successfully tendered and won two separate and provision of railway-specific services such as signals, packages of work from Bombardier, a smaller package traction power, maintenance of area power, compressed air labelled as the “MEP package” covered the installation and communication systems as well as minor construction of typical MEP building services such as the HVAC, works. Plumbing & lighting and small power systems and a second larger package labelled as the “EI Package” covered the ALEC (Al Jaber LEGT Engineering & Contracting), is the installations of the APM systems specifically for the Airport main contractor for development of the Concourse 4 at the People Mover system that Bombardier were providing. Dubai International Airport while Bombardier Transportation Holdings USA Inc, is the prime entity responsible for rolling Under this package Drake and Scull provided the cable stock and rail technologies at the airport. management systems, all cabling and terminations,

DSI Flagship Projects 89 DSI FLAGSHIP PROJECTS SHOWCASE

For further enquiries, please visit www.drakescull.com