2009 Bibliography
Total Page:16
File Type:pdf, Size:1020Kb
2009 Green River Basin Plan II Bibliography AREA AUTHOR TITLE DATE Baggs Weston Groundwater Town of Baggs, Wyoming Alluvial Well Project, Executive Summary Jan, 2000 Engineering Town of Baggs, Wyoming Alluvial Well Project, Final Report Jan, 2000 Town of Baggs, Wyoming Water Supply Project Level II, Final Report Nov, 2000 AVI Town of Baggs, Wyoming Water Supply Project Level II, Executive Summary Nov, 2000 AVI Professional Town of Baggs, Wyoming Water Master Plan Level I, Executive Summary Nov, 2002 Corporation Town of Baggs, Wyoming Water Master Plan Level I, Final Report Nov, 2002 Baggs Water & Raw Water Supply Level II Report, Executive Summary Nov, 2004 Donnell & Allred, Inc. Baggs Water & Raw Water Supply Level II Report Nov, 2004 Bairoil Hydro-Search, Inc. Bairoil, Wyoming Groundwater Development Feasibility Exploration Program Nov, 1983 Executive Summary of Final Report, Bairoil Water Supply Project Level II May, 2000 Bairoil Water Supply Project Level II, Final Report May, 2000 Bairoil Water Supply Project Level II, Phase IV, Final Report Oct, 2001 Lidstone and Associates, Executive Summary of Final Report, Bairoil Water Supply Project Level II, Phase V May, 2003 Inc. Town of Bairoil Water Supply Project Level II, Phase V Report May, 2003 Big Jorgensen Engineering Big Piney/Marbleton Level II Water Supply Project Report, Final Report Nov, 1994 Piney/Marbleton and Land Surveying Big Piney/Marbleton Level II Water Supply Project Report, Executive Summary Nov, 1994 Big Sandy River Tipton and Kalmbach, Inc. Proposed Dam and Reservoir, Big Sandy Control Project Sep, 1982 Rick Blatchley Class III Archeological Investigations Conducted for the Big Sandy River Unit Desalinization Study Sweetwater County, Wyoming, Draft Nov, 1982 Greenhorne & O'Mara, Inc. Big Sandy Salinity Control, Design Review and Alternative Investigation Dec, 1982 State of Wyoming Big Sandy River Unit, Colorado River Water Quality Improvement Program Dec, 1982 Fox Consulting Engineers Lower Big Sandy Reservoir and Dam Geotechnical and Geological Feasibility Investigation Feb, 1983 Greenhorne & O'Mara, Inc. Big Sandy Salinity Control Reservoir Planning, Final Report Mar, 1984 Big Sandy Water Supply Project Level II, Final Design Report Oct, 1993 Nelson Engineering Big Sandy Water Supply Project Level II, Final Design Report, Executive Summary Oct, 1993 Bitter Creek Rock Springs, Wyoming Flood Control Project, Bitter Creek Tributaries Level II Feasibility Study, Phase 1A Report Feb, 1989 Bitter Creek Channel Improvement Study, Executive Summary Sep, 1991 Bitter Creek Channel Improvement Study, Level II for the City of Rock Springs Sep, 1991 Supplement to Level II Report Bitter Creek Channel Improvement Study, September, 1991, and Level II, Phase II Report, Bitter Creek Tributary Flood Study Nov, 1991 Johnson-Fermelia Bitter Creek Tributary Flood Study, Rock Springs, Wyoming Level II Feasibility Study, Phase II Report Nov, 1991 Company, Inc. Bitter Creek Tributary Flood Study, Rock Springs, Wyoming Level II Feasibility Study, Phase II Report Executive Summary Nov, 1991 Black Willow Black Willow Water Supply Project, Thermopolis, Wyoming Level I Final Report Nov, 1995 BRS, Inc. Black Willow Water Supply Project, Thermopolis, Wyoming Level I Executive Summary Nov, 1995 Boulter Lake Executive Summary on the Boulter Lake Enlargement Level II Study May, 2007 Rio Verde Engineering Report on the Boulter Lake Enlargement Level II Study May, 2007 Bridger Valley Bridger Valley Water Supply Study Level I Executive Summary Nov, 1991 Bridger Valley Water Supply Study Level I Nov, 1991 Bridger Valley Water Treatment Plan Analysis, Addition of Pioneer Water and Sewer District Dec, 1993 Bridger Valley Water Supply Level II Study Aug, 1995 Forsgren Associates Bridger Valley Water Supply Level II Study Executive Summary Aug, 1995 Bridger Valley Reservoir Level II Study Jul, 2004 ECI Bridger Valley Reservoir Level II Study Executive Summary Jul, 2004 Bridger Valley Reservoir Level II Phase II Study Final Report Nov, 2006 Gannett Fleming Bridger Valley Reservoir Level II Phase II Study Executive Summary Nov, 2006 Short Elliott Hendrickson Bridger Valley Reservoir Project Level II Study, Executive Summary Sept. 2008 Inc Bridger Valley Reservoir Project Level II Study, Final Report Sept. 2008 Church Reservoir States West Water Executive Summary for the Green River ASR and Alternate Storage Project, Church Reservoir Investigation Dec, 2002 Resources Corporation Final Report for the Green River ASR and Alternate Storage Project, Church Reservoir Investigation Dec, 2002 Clearview Johnson-Fermelia Company, Inc. Domestic Water System Evaluation for Clearview Improvement and Services District, Final Report Sep, 1989 Dixon Town of Dixon Water Supply Project Level I Oct, 1991 Dixon Water Supply Project Level I Study, Final Report Nov, 1991 Town of Dixon Water Supply Project Level I, Final Report, Executive Summary Nov, 1991 Executive Summary for Dixon Water Supply Project Level II Jan, 1994 Lidstone & Anderson, Inc Final Summary for Dixon Water Supply Project Level II Jan, 1994 Farson Johnson-Fermelia Farson Water Supply Study, Level I, Final Report Oct, 1990 Company, Inc. Farson Water Supply Study, Level I, Executive Summary Oct, 1990 Fayette Fayette Irrigation District Rehabilitation Project, Final Report Oct, 1999 Rio Verde Engineering Fayette Irrigation District Rehabilitation Project, Executive Summary Nov, 1999 Fish Creek Rollins Brown and Gunnell Fish Creek Dam, Geotechnical Study and Alternative Evaluations Sep, 1984 Fish Creek Collection System Progress Report on the North Platte River Studies Apr, 1986 Stone and Webster Fish Creek Collection System, Interim Phase I Concept Design Report Nov, 1986 Engineering Fish Creek Collection System Interim Phase I Concept Design, Report, Executive Summary Nov, 1986 Fremont Lake Dam Rio Verde Engineering Rehabilitation of Fremont Lake Dam Sep, 1980 Granger Town of Granger, Wyoming Water Supply Project Level II Feasibility Study, Executive Summary May, 1990 ARIX Corporation Town of Granger, Wyoming Water Supply Project Level II Feasibility Study May, 1990 Granger Water Supply Master Plan Level I, Final Report Oct, 2000 Granger Water Supply Master Plan Level I, Executive Summary Oct. 2000 Granger Rehabilitation Project Level II, Executive Summary Dec, 2002 Forsgren Associates Granger Rehabilitation Project Level II, Final Report Dec, 2002 Green River Western Wyoming College WWC Water Quality Laboratory, Green River Basin Project Jan, 1982 Larry Pochop, Robert Burman Development of Evapotranspiration Crop Coefficients and Climatological Data and Evapotranspiration Models for the Upper Green River Mar, 1987 Final Report on the Green River Tributaries #2 Instream Flow, Book 1 of 2 Dec, 2000 JFC Engineers/Surveyors Final Report on the Green River Tributaries #2 Instream Flow, Book 2 of 2 (Maps, Exhibits, Appendices) Dec, 2000 Green River Basin Plan, Executive Summary Jan, 2001 Green River Basin Plan, Final Report Jan, 2001 Green River Basin Plan, Technical Memoranda Jan, 2001 Green River Basin Plan, Technical Memoranda--AA, Irrigation Diversion Operation and Description Jan. 2001 Executive Summary for Green River Ground Water Recharge and Alternate Storage Level I Project Dec, 2001 Final Report for Green River Ground Water Recharge and Alternate Storage Level I Project Dec, 2001 States West Water Executive Summary for the Green River ASR and Alternate Storage Project, Church Reservoir Investigation (see Church) Dec, 2002 Resources Corporation Final Report for the Green River ASR and Alternate Storage Project, Church Reservoir Investigation (see Church) Dec, 2002 Green River Supply Canal Report Phase I Nov, 2003 Green River Supply Canal Report Phase II, Conceptual Design-Rehabilitation Dec, 2004 Green River Supply Canal Report Seepage Study Report Dec, 2004 Final Report, Green River, Rock Springs, Sweetwater County, Joint Powers Water Board, Master Plan, Level I Study Jan, 2007 Executive Summary, Green River, Rock Springs, Sweetwater County Joint Powers Water Board, Water System Master Plan Phase I Jan. 2009 Executive Summary, Green River, Rock Springs, Sweetwater County Joint Powers Water Board, Water System Master Plan Phase 2 Jan, 2009 Nelson Engineering Final Report, Green River, Rock Springs, Sweetwater County, Joint Powers Water Board, Water System Master Plan Phase 2 Jan, 2009 Hams Fork Greenhorne & O'Mara, Hams Fork Basin Level II Investigations, Phase I Water Resources Analysis Nov, 1984 Inc. Hams Fork Basin Level II Investigations, Executive Summary, Phase I Water Resources Analysis Nov, 1984 Jon's Drop Jon's Drop Hydropower Level II Study, Executive Summary Oct, 2006 Dahlgren Consulting, Inc Jon's Drop Hydropower Level II Study, Final Report Oct, 2006 Kemmerer Groundwater Availability Study Town of Kemmerer, Wyoming Plates Jan, 1982 Town of Kemmerer, Wyoming Groundwater Availability Study Vicinity of Kemmerer, Wyoming Jul, 1982 MSM Consultants City of Kemmerer, Wyoming Water Supply Alternatives Level I Reconnaissance Study Dec, 1982 Greenhorne & O'Mara, Kemmerer City Reservoir Rehabilitation Project Level II Feasibility Study Nov, 1986 Inc. Kemmerer City Reservoir Rehabilitation Project Level II Feasibility Study, Executive Summary Nov, 1986 Little Snake Wyoming Water Development Commission Report to the Legislature Cheyenne Project & Little Snake River Water Management Preliminary Jan, 1980 Wyoming Game & Fish Department Quantification of Trout Habitat that could be Impacted by Stage III of the Little Snake River Water Management