2009 Green River Basin Plan II Bibliography AREA AUTHOR TITLE DATE Baggs Weston Groundwater Town of Baggs, Alluvial Well Project, Executive Summary Jan, 2000 Engineering Town of Baggs, Wyoming Alluvial Well Project, Final Report Jan, 2000 Town of Baggs, Wyoming Water Supply Project Level II, Final Report Nov, 2000 AVI Town of Baggs, Wyoming Water Supply Project Level II, Executive Summary Nov, 2000 AVI Professional Town of Baggs, Wyoming Water Master Plan Level I, Executive Summary Nov, 2002 Corporation Town of Baggs, Wyoming Water Master Plan Level I, Final Report Nov, 2002 Baggs Water & Raw Water Supply Level II Report, Executive Summary Nov, 2004 Donnell & Allred, Inc. Baggs Water & Raw Water Supply Level II Report Nov, 2004 Bairoil Hydro-Search, Inc. Bairoil, Wyoming Groundwater Development Feasibility Exploration Program Nov, 1983 Executive Summary of Final Report, Bairoil Water Supply Project Level II May, 2000 Bairoil Water Supply Project Level II, Final Report May, 2000 Bairoil Water Supply Project Level II, Phase IV, Final Report Oct, 2001 Lidstone and Associates, Executive Summary of Final Report, Bairoil Water Supply Project Level II, Phase V May, 2003 Inc. Town of Bairoil Water Supply Project Level II, Phase V Report May, 2003 Big Jorgensen Engineering Big Piney/Marbleton Level II Water Supply Project Report, Final Report Nov, 1994 Piney/Marbleton and Land Surveying Big Piney/Marbleton Level II Water Supply Project Report, Executive Summary Nov, 1994 Big Sandy River Tipton and Kalmbach, Inc. Proposed Dam and Reservoir, Big Sandy Control Project Sep, 1982

Rick Blatchley Class III Archeological Investigations Conducted for the Big Sandy River Unit Desalinization Study Sweetwater County, Wyoming, Draft Nov, 1982 Greenhorne & O'Mara, Inc. Big Sandy Salinity Control, Design Review and Alternative Investigation Dec, 1982 State of Wyoming Big Sandy River Unit, Colorado River Water Quality Improvement Program Dec, 1982

Fox Consulting Engineers Lower Big Sandy Reservoir and Dam Geotechnical and Geological Feasibility Investigation Feb, 1983 Greenhorne & O'Mara, Inc. Big Sandy Salinity Control Reservoir Planning, Final Report Mar, 1984 Big Sandy Water Supply Project Level II, Final Design Report Oct, 1993 Nelson Engineering Big Sandy Water Supply Project Level II, Final Design Report, Executive Summary Oct, 1993 Bitter Creek Rock Springs, Wyoming Flood Control Project, Bitter Creek Tributaries Level II Feasibility Study, Phase 1A Report Feb, 1989 Bitter Creek Channel Improvement Study, Executive Summary Sep, 1991 Bitter Creek Channel Improvement Study, Level II for the City of Rock Springs Sep, 1991 Supplement to Level II Report Bitter Creek Channel Improvement Study, September, 1991, and Level II, Phase II Report, Bitter Creek Tributary Flood Study Nov, 1991 Johnson-Fermelia Bitter Creek Tributary Flood Study, Rock Springs, Wyoming Level II Feasibility Study, Phase II Report Nov, 1991 Company, Inc. Bitter Creek Tributary Flood Study, Rock Springs, Wyoming Level II Feasibility Study, Phase II Report Executive Summary Nov, 1991 Black Willow Black Willow Water Supply Project, Thermopolis, Wyoming Level I Final Report Nov, 1995 BRS, Inc. Black Willow Water Supply Project, Thermopolis, Wyoming Level I Executive Summary Nov, 1995 Boulter Lake Executive Summary on the Boulter Lake Enlargement Level II Study May, 2007 Rio Verde Engineering Report on the Boulter Lake Enlargement Level II Study May, 2007 Bridger Valley Bridger Valley Water Supply Study Level I Executive Summary Nov, 1991 Bridger Valley Water Supply Study Level I Nov, 1991 Bridger Valley Water Treatment Plan Analysis, Addition of Pioneer Water and Sewer District Dec, 1993 Bridger Valley Water Supply Level II Study Aug, 1995 Forsgren Associates Bridger Valley Water Supply Level II Study Executive Summary Aug, 1995 Bridger Valley Reservoir Level II Study Jul, 2004 ECI Bridger Valley Reservoir Level II Study Executive Summary Jul, 2004 Bridger Valley Reservoir Level II Phase II Study Final Report Nov, 2006 Gannett Fleming Bridger Valley Reservoir Level II Phase II Study Executive Summary Nov, 2006 Short Elliott Hendrickson Bridger Valley Reservoir Project Level II Study, Executive Summary Sept. 2008 Inc Bridger Valley Reservoir Project Level II Study, Final Report Sept. 2008 Church Reservoir States West Water Executive Summary for the Green River ASR and Alternate Storage Project, Church Reservoir Investigation Dec, 2002 Resources Corporation Final Report for the Green River ASR and Alternate Storage Project, Church Reservoir Investigation Dec, 2002 Clearview Johnson-Fermelia Company, Inc. Domestic Water System Evaluation for Clearview Improvement and Services District, Final Report Sep, 1989 Dixon Town of Dixon Water Supply Project Level I Oct, 1991 Dixon Water Supply Project Level I Study, Final Report Nov, 1991 Town of Dixon Water Supply Project Level I, Final Report, Executive Summary Nov, 1991 Executive Summary for Dixon Water Supply Project Level II Jan, 1994 Lidstone & Anderson, Inc Final Summary for Dixon Water Supply Project Level II Jan, 1994 Farson Johnson-Fermelia Farson Water Supply Study, Level I, Final Report Oct, 1990 Company, Inc. Farson Water Supply Study, Level I, Executive Summary Oct, 1990 Fayette Fayette Irrigation District Rehabilitation Project, Final Report Oct, 1999 Rio Verde Engineering Fayette Irrigation District Rehabilitation Project, Executive Summary Nov, 1999 Fish Creek Rollins Brown and Gunnell Fish Creek Dam, Geotechnical Study and Alternative Evaluations Sep, 1984 Fish Creek Collection System Progress Report on the North Platte River Studies Apr, 1986 Stone and Webster Fish Creek Collection System, Interim Phase I Concept Design Report Nov, 1986 Engineering Fish Creek Collection System Interim Phase I Concept Design, Report, Executive Summary Nov, 1986 Fremont Lake Dam Rio Verde Engineering Rehabilitation of Fremont Lake Dam Sep, 1980 Granger Town of Granger, Wyoming Water Supply Project Level II Feasibility Study, Executive Summary May, 1990 ARIX Corporation Town of Granger, Wyoming Water Supply Project Level II Feasibility Study May, 1990 Granger Water Supply Master Plan Level I, Final Report Oct, 2000 Granger Water Supply Master Plan Level I, Executive Summary Oct. 2000 Granger Rehabilitation Project Level II, Executive Summary Dec, 2002 Forsgren Associates Granger Rehabilitation Project Level II, Final Report Dec, 2002 Green River Western Wyoming College WWC Water Quality Laboratory, Green River Basin Project Jan, 1982 Larry Pochop, Robert Burman Development of Evapotranspiration Crop Coefficients and Climatological Data and Evapotranspiration Models for the Upper Green River Mar, 1987 Final Report on the Green River Tributaries #2 Instream Flow, Book 1 of 2 Dec, 2000 JFC Engineers/Surveyors Final Report on the Green River Tributaries #2 Instream Flow, Book 2 of 2 (Maps, Exhibits, Appendices) Dec, 2000 Green River Basin Plan, Executive Summary Jan, 2001 Green River Basin Plan, Final Report Jan, 2001 Green River Basin Plan, Technical Memoranda Jan, 2001 Green River Basin Plan, Technical Memoranda--AA, Irrigation Diversion Operation and Description Jan. 2001 Executive Summary for Green River Ground Water Recharge and Alternate Storage Level I Project Dec, 2001 Final Report for Green River Ground Water Recharge and Alternate Storage Level I Project Dec, 2001 States West Water Executive Summary for the Green River ASR and Alternate Storage Project, Church Reservoir Investigation (see Church) Dec, 2002 Resources Corporation Final Report for the Green River ASR and Alternate Storage Project, Church Reservoir Investigation (see Church) Dec, 2002 Green River Supply Canal Report Phase I Nov, 2003 Green River Supply Canal Report Phase II, Conceptual Design-Rehabilitation Dec, 2004 Green River Supply Canal Report Seepage Study Report Dec, 2004 Final Report, Green River, Rock Springs, Sweetwater County, Joint Powers Water Board, Master Plan, Level I Study Jan, 2007

Executive Summary, Green River, Rock Springs, Sweetwater County Joint Powers Water Board, Water System Master Plan Phase I Jan. 2009

Executive Summary, Green River, Rock Springs, Sweetwater County Joint Powers Water Board, Water System Master Plan Phase 2 Jan, 2009 Nelson Engineering Final Report, Green River, Rock Springs, Sweetwater County, Joint Powers Water Board, Water System Master Plan Phase 2 Jan, 2009 Hams Fork Greenhorne & O'Mara, Hams Fork Basin Level II Investigations, Phase I Water Resources Analysis Nov, 1984 Inc. Hams Fork Basin Level II Investigations, Executive Summary, Phase I Water Resources Analysis Nov, 1984 Jon's Drop Jon's Drop Hydropower Level II Study, Executive Summary Oct, 2006 Dahlgren Consulting, Inc Jon's Drop Hydropower Level II Study, Final Report Oct, 2006 Kemmerer Groundwater Availability Study Town of Kemmerer, Wyoming Plates Jan, 1982 Town of Kemmerer, Wyoming Groundwater Availability Study Vicinity of Kemmerer, Wyoming Jul, 1982 MSM Consultants City of Kemmerer, Wyoming Water Supply Alternatives Level I Reconnaissance Study Dec, 1982 Greenhorne & O'Mara, Kemmerer City Reservoir Rehabilitation Project Level II Feasibility Study Nov, 1986 Inc. Kemmerer City Reservoir Rehabilitation Project Level II Feasibility Study, Executive Summary Nov, 1986 Little Snake Wyoming Water Development Commission Report to the Legislature Cheyenne Project & Little Snake River Water Management Preliminary Jan, 1980 Wyoming Game & Fish Department Quantification of Trout Habitat that could be Impacted by Stage III of the Little Snake River Water Management Project Oct, 1980 Little Snake River Water Management Project Feasibility Study Nov, 1980 Banneryg Associates, Inc Little Snake River Water Management Project Substantiating Report Nov, 1980 Development Report to the Wyoming Legislature and Governor, Little Snake River Water Management Project Jan, 1981 Commission Little Snake River Water Management Project, Examination of Alternatives Preliminary Report Oct, 1981 Little Snake River Water Management Project, Technical Summary Report Nov, 1984 Little Snake River Water Management Project, Technical Summary Report (Draft) Nov, 1984 Stone and Webster Little Snake River Water Management Project, Executive Summary Nov, 1984 Engineering Little Snake River Water Management Project, Fish Creek Collector System Yields Jun, 1985 Western Water Consultants Final Report on Little Snake River Depletions by Pot Hook, Three Forks and Powder Wash Rights Jul, 1990 Resource Consultants Sediment Transport Studies of the Little Snake, Yampa, and Green River Systems Aug, 1991

Little Snake River Basin Planning Study, Volume I, Executive Summary, Evaluation of the Baggs Water Supply, Treatment and Delivery System Oct, 1992

Little Snake River Basin Planning Study, Volume I, Final Report, Evaluation of the Baggs Water Supply, Treatment and Delivery System Oct, 1992 Little Snake River Basin Planning Study, Volume II, Executive Summary, Evaluation of Irrigation Diversion Dams and Principal Water Supply Ditches, Part A, Diversion Dams Nov, 1992 Little Snake River Basin Planning Study, Volume II, Final Report, Evaluation of Irrigation Diversion Dams and Principal Water Supply Ditches, Part A, Diversion Dams Nov, 1992 Little Snake River Basin Planning Study, Volume II, Executive Summary, Evaluation of Irrigation Diversion Dams and Principal Water Supply Ditches, Part B, Principal Ditches Nov, 1992 Little Snake River Basin Planning Study, Volume II, Final Report, Evaluation of Irrigation Diversion Dams and Principal Water Supply Ditches, Part B, Principal Ditches Nov, 1992 Western Water Little Snake River Basin Planning Study, Volume III, Executive Summary, Irrigation Reservoir Investigations Dec, 1992 Consultants Little Snake River Basin Planning Study, Volume III, Final Report, Irrigation Reservoir Investigations Dec, 1992 Little Snake River Basin Small Reservoir Development Project Level II, Final Report Oct, 1998 Lidstone and Anderson Little Snake River Basin Small Reservoir Development Project Level II, Executive Summary Dec, 1998 Final Environmental Impact Statement, Little Snake Supplemental Irrigation Water Supply, Carbon County, Wyoming Jan, 1999 Burns & McDonnell Final Environmental Impact Statement, Little Snake Supplemental Irrigation Water Supply, Carbon County, Wyoming, Appendices Jan, 1999 Little Snake River Dams Level II Studies, Executive Summary Jul, 2003 Gannett Fleming Little Snake River Dams Level II Studies, Final Report Jul, 2003 Marbleton Marbleton Municipal Water Well Number Six, Final Report of Drilling, Development and Testing Jan, 2002 JFC Engineers/Surveyors Marbleton Municipal Water Well Number Six, Executive Summary of Drilling, Development and Testing Jan, 2002 New Fork Wyoming Water Development Commission Report on the Feasibility of Providing Instream Flow in New Fork River Instream Flow Segment No. 1 Jan, 1990 North Uinta Forsgren Associates North Uinta County Improvement and Service District Water Supply Master Plan Level I, Final Report Sep, 2000 North Uinta Water Supply Project Level II Feasibility Study, Bear River, Wyoming, Executive Summary Mar, 2003 TriHydro Corporation North Uinta Water Supply Project Level II Feasibility Study, Bear River, Wyoming, Final Report Mar, 2003 Opal Opal Regional System Level II Study, Executive Summary Oct, 2000 Opal Regional System Level II Study Oct, 2000 Opal Regional System Level II, Phase II Study Sep, 2001 Sunrise Engineering Opal Regional System Level II, Phase II Study, Executive Summary Sep, 2001 Pinedale Pinedale Water Supply Project Level II, Phase II Report Sep, 1993 Johnson-Fermelia Watershed Management Control Plan, Pinedale Water Supply Project Level II Sep, 1993 Company, Inc. Pinedale Water Supply Project Level II, Phase I Report Sep, 1993 Town of Pinedale Water Supply Master Plan Level I, Phase 1 and Phase 2, Executive Summary Nov, 1995 TST Inc. Town of Pinedale Water Supply Master Plan Level I, Phase 1 and Phase 2 Nov, 1995 Pinedale Hydropower Study Level II, Final Report May, 2003 Sunrise Engineering Pinedale Hydropower Study Level II, Executive Summary May, 2003 Rock Springs Aquifer Testing of Ericson Formation for City of Rock Springs, Wyoming Mar, 1984 JFC Engineers/Surveyors Drilling and Aquifer Testing of the Ericson Formation Phase II for the City of Rock Springs, Wyoming Jan, 1986 Rock Springs Pipeline Level II Study, Phase I Report Dec, 1988 Rock Springs Pipeline Level II Study, Phase 2, Final Report Jan, 1989 Rock Springs Pipeline Level II Study, Phase 2, Final Report, Executive Summary Jan, 1989 Forsgren Associates Rock Springs Pipeline Level II Study Jan, 1989 Rock Springs East Water Supply Master Plan Level I, Executive Summary Nov, 1995 Leon Kjellgren Rock Springs East Water Supply Master Plan Level I, Final Report Nov, 1995 Westside/Rock Springs Water Supply Project Level II Study, Executive Summary Oct, 1998 Nelson Engineering Westside/Rock Springs Water Supply Project Level II Study, Final Report Oct, 1998 Stewart Creek Forsgren Associates Stewart Creek Irrigation Pipeline Level II Study, Final Report Dec, 1993 Upper Green A Report to the Wyoming Water Development Commission on the Pre-Feasibility Study of the Upper Green River Drainage Potential Reservoir ARIXyg Corporation Sites Jan, 1983 Development Status Report to the Wyoming Legislature on the Upper Green Level II Feasibility Project Jan, 1983 Commission Upper Green Level II Storage Development Project Report to the Governor and Legislative Select Water Committee Apr, 1983 Upper Green River Storage Level II Study, Executive Summary Feb, 2007 Kleinfelder Final Report for Upper Green River Storage Level II Study Feb, 2007 Short Elliott Hendrickson Upper Green River Westside Storage Study, Level II Final Report Feb, 2009 Inc Upper Green River Westside Storage Study, Level II, Executive Summary Feb, 2009 Larry Pochop, Robert Burman Development of Evapotranspiration Crop Coefficients and Climatological Data and Evapotranspiration Models for the Upper Green River Mar, 1987 Upper Savery Upper Savery Storage Project Hydrology Investigation Apr, 1983 Upper Savery Storage Project Hydrology Investigation, Phase II and III Apr, 1984 Banner Associates, Inc Upper Savery Storage Project Hydrology Investigation Jan, 1989 Viva Naughton Glenn M. Mason Geotechnical Evaluation of Viva Naughton Reservoir Dec, 1984 Viva Naughton Enlargement Level II Study, Final Report, Volume 1 of 2 Sep, 2004 Viva Naughton Enlargement Level II Study, Final Report, Volume 2 of 2 Sep, 2004 ECI Viva Naughton Enlargement Level II Study, Executive Summary Sep, 2004 Viva Naughton Enlargement Level II, Phase II Study, Interim Report Mar, 2007 Gannett Fleming Viva Naughton Enlargement Level II, Phase II Study, Executive Summary for Interim Report Mar, 2007 Wamsutter Sargent Irrigation Company Report on Wamsutter Water Well Number 8 Feb, 1984 Wamsutter Water Supply Project Level II, Final Report Nov, 1997 Weston Engineering, Inc. Wamsutter Water Supply Project Level II, Executive Summary Nov, 1997 Westside Bureau of Reclamation Special Study on the Westside Irrigation Project (Wyoming) Sep, 1983 Nelson Engineering Westside Project, Plan Formulation Working Document, Final Report Jun, 1985 Bureau of Reclamation Planning Report/Draft Environmental Statement on Westside Irrigation Project Jan, 1988 West Side Canal States West Water West Side Canal Rehabilitation of the Jon's Drop Structure and the Four Mile Flume Level II Study, Executive Summary Oct, 2002 Resources Corporation West Side Canal Rehabilitation of the Jon's Drop Structure and the Four Mile Flume Level II Study Oct, 2002 Wyoming Boyle Engineering State Water Planning Process Feasibility Report, Executive Summary Oct, 1998 Corporation State Water Planning Process Feasibility Report Oct, 1998

States West Water Resources Corporation Guidelines for Development of Basin Plans, State of Wyoming Water Basin Planning Process Feb, 2001 Wyoming Framework Water Plan, A Summary Oct, 2007 Wyoming Framework Water Plan, Volume I Oct, 2007 WWCyg Engineering Wyoming Framework Water Plan, Volume II, Planning Recommendations Oct, 2007 Development Testing of Hydrologic Models for Estimating Low Flows in Mountainous Areas of Wyoming Volume 1: User Guide Jun, 2003 Commission Testing of Hydrologic Models for Estimating Low Flows in Mountainous Areas of Wyoming Volume 2: Supplemental Information Jun, 2003 Wyoming Level II Weather Modification Feasibility Study, Executive Summary Mar, 2005 Weather Modification, Inc Wyoming Level II Weather Modification Feasibility Study Mar, 2005 Ruckelshaus Institute of Environmental & Natural Resources Impacts of Wyoming Water Development Commission Regional Water System Projects on Land Use: An Analysis of Two Case Studies Oct, 2008 University of Uria, Carlos Aliaga A Design Procedure for Low Head Side-Roll Sprinkler Systems May, 1981 Wyoming Theses Lyon, Mark L. A Hydrologic Atlas of the Green River Basin, Wyoming Jul, 1981 Williams, Linda I. A Model of the Green River Using the Wyoming Integrated River System Operation Study Dec, 1995 Holder, Davis C. A Re-Evaluation of the Inflow-Outflow Equation for the Green River in Wyomin May, 1960 Meena, Jack M. A Water Management Model for the Green River May, 1993 An Inventory and Evaluation of the Game and Fish Resources of the Upper Green River in Relation to Current Proposed Water Development Binns, Niles Allen Programs Jan, 1972

Christensen, Allen D. An Investigation of an Irrigation Project in Little Snake River Valley, Wyoming and Colorado Jun, 1929 Bell, A.A. Controls on the Distribution of Copper in Surface Waters Associated with the Ferris-Haggarty Mine, Carbon County, Wyoming May, 1996 Lewallen, Nickolas John Conveyance Loss Modeling of Two Wyoming Rivers May, 1994 Myers, Linda G. Effects of Sewage Sludge Amendments on Reclaimed Orphan Minespoils in Wyoming May, 1990 Zarlengo-Pierce, Estimating Evapotranspiration in the Green River Basin Using National Weather Service Data Estimating Monthly Temperature and Precipation Therese Normals at Ungaged Sites in the Upper Green River Basin May, 1988 Yeamans, Frank Estimation of Streamflow on Three Ungaged Streams in Wyoming May, 1978 Gao, Fang Evaluation of the Effect of Advection on Evapotranspiration in the Green River Basin of Wyoming Dec, 1987

Bush, John Douglas Investigation of Shore & Near-Shore Anomaly of Selected Water Quality Parameters in Flaming Gorge Reservoir Feb, 1975 Higley, Shawn T. Numerical Simulation and Groundwater Storage Relationships Within the Muddy Creek Aquifer System May, 1996 Middleton, Marcus Salt Content of Sediments Deposited Along Degraded and Improving Riparian Areas; Muddy Creek, Wyoming Feb, 1992 Supplemental Data for an Inventory and Evaluation of the Game and Fish Resources of the Upper Green River in Relation to Current and Binns, Niles Allen Proposed Water Development Programs 1971 Taggart, Richard J. The Economic Possibility of Adapting New Technology in Sprinkler Irrigation to the Green River Basin Oct, 1969

Peterson, Roland A. The Erodibility of the Muddy Creek Channel May, 1993 Kite, Rodney C. The Impact in Southwestern Wyoming of Spending by Recreationists Visiting Flaming Gorge Reservoir Aug, 1966 Cooke, Steven D. The Impact of Salinity-Related Water Quality Criteria and Standards on Water Development in the Green River Basin of Wyoming May, 1982 Follum, Michael Lee Upper Green River Basin Precipitation Reconstructions and Drought Analysis Jan, 2009 Barnett, Faires Anthony Upper Green River Basin Streamflow Reconstructions and Drought Variability Dec, 2007 Various Techniques for Estimation Riverine Water Quality Concentrations, and their Application to a General Loading Model for Flaming Gorge Fannin, Timothy E. Reservoir, Wyoming May, 1998 Water Research Series (WRS) Kildebeck, James C., Orman H. Paananen, and John W. Birch Projected Residential Water Requirements for the Platte and Green River Basins of Wyoming: 1965-2010 1967 Kenney, Raymond K., and John W. Birch Population Trends for the Platte and Green River Basins in Wyoming: 1890-2010 1967 Water Resource Franklin, D.R., J.J. Publications Jacobs and P.J. Water Resource Development Impacts in the Green River Drainage of Wyoming. Research Journal No. 189, Division of Agricultural Economics, (WRP) Farris Agricultural Experiment Station, University of Wyoming 1983 Franklin, D.R., J.J. Jacobs and P.J. Projected Demands and Supplies of Water Under Alternative Energy and Agricultural Development Scenarios in the Green River Drainage of Farris Wyoming. Technical Completion Report to the U.S. Department of the Interior (Agreement No. 14-34- 0001-2154, Project A-039-WYO) 1983 Schumaker, J., B. Bajusz, L. Pochop and J. Borrelli Predicting Temperature and Precipitation at Ungaged Sites in the Upper Green River Basin 1984

Pochop, L., J. Borrelli Development of Evapotranspiration Crop Coefficients, Climatological Data, and Evapotranspiration Models for the Upper Green River in and R. Burman Wyoming. Annual Progress Report to the Wyoming Water Development Commission and Wyoming Water Research Center 1984

Pochop, L., J. Borrelli Development of Evapotranspiration Crop Coefficients, Climatological Data, and Evapotranspiration Models for the Upper Green River in and R. Burman Wyoming. Annual Progress Report to the Wyoming Water Development Commission 1983 Burman, R., L. Pochop and G. Kerr Development of Evapotranspiration Crop Coefficients, Climatological Data, and Evapotranspiration Models for the Upper Green River in Wyoming 1985