Modification in existing 120 KLPD Distillery (Grain to Dual mode of operation - Grain/ Molasses based) At Village Dhudhua, Tehsil Jandaha, District , Brief Summary

Brief Summary of the Project 1. Introduction Globus Spirits Limited is presently operating 120 KLPD Grain based Distillery along with 3.5 MW Co- generation Power Plant at Village Dhudhua, Tehsil Jandaha, District Vaishali, Bihar. Environmental Clearance for the same had been obtained from MoEFCC, New Delhi vide Letter No. J- 11011/209/2011- 1A II (I) dated 10 th September, 2013. 2. Project Proposal The company is now proposing modification in existing 120 KLPD Distillery (Grain to Dual mode of operation - Grain / Molasses based) within their existing plant premises. After the modification of the distillery, the company will produce Ethanol also along with ENA & RS. With this proposed modification there will be no change in the production Capacity. 3. Screening Category As per EIA Notification dated 14 th September, 2006 and as amended from time to time; the project falls in Category ‘A’, Project or Activity - 5(g). 4. Brief Description of Pro ject Location Details:  Village : Dhudhua  Tehsil : Jandaha  District : Vaishali  State : Bihar Area Details:  Total plant area: The existing plant area is 18.35 acres (7.43 hectares). No additional land is required for modernization, as the same will be done within the existing plant premises.  Greenbelt & Plantation Area: 6.0 acres (2.43 ha) i.e. 33% of the total plant area has already been developed as greenbelt & plantation. No National Park, Wildlife Sanctuary, Biosphere Reserve, Tiger / Elephant Reserve, Wildlife Corridor, Protected Forest, etc. falls within 10 km radius of the plant site. Water Body (within 10 km radius):- Beli Tal water body (~3.0 km in South direction), Baya Nadi (~3.0 km in NE direction), Salah Chaur (~4.5 km in NW direction), Hariya Chaur (~5.1 km in NE direction) and Ghaghra Nadi (~5.5 km in West direction) are present in 10 km radius. Cost Details:  Total Cost of the Modification Project: Rs. 25.0 Crores  Cost for Environment Management Plan • Capital Cost - Rs. 20.0 Crores • Recurring Cost - Rs. 1.0 Crores / annum

Globus Spirits Limited 1 Modification in existing 120 KLPD Distillery (Grain to Dual mode of operation - Grain/ Molasses based) At Village Dhudhua, Tehsil Jandaha, District Vaishali, Bihar Brief Summary

Basic Requirements for the project  Water Requirement (KLD) : The existing water requirement is 1205 KLD. There will be no additional water requirement for proposed modification project. Source : Ground Water  Power Requirement (MW) : The existing power requirement is 3.2 MW. There will be no additional power requirement for modification project. Source : 3.5 MW Co-generation Power Plant .  Manpower Requirement: The existing manpower is 100 persons, which is sufficient after proposed modification also. Source: Unskilled/ Semi-skilled-local area; skilled- nearby areas & outside. Raw Material Requirement: The main raw material required for the project is Grain. Other chemicals required for the distillation process includes enzymes, nutrient, yeast, antifoam agent andsodium hydroxide. After modernization molasses will be used as a raw material. Fuel Requirement: The fuel requirement for the boiler will be Biomass/Rice husk or Coal which will be sourced from nearby areas/open market. Boiler Details: Capacity of existing boiler –35 TPH. After modification for molasses operation additional boiler of 35 TPH capacity shall be installed which be suitable for incineration of molasses spent wash and coal /biomasses. Environment Management Plan Various mitigation measures are being/ will be undertaken to take care of the environment in respect of air, water, noise, soil & the green cover of the plant site & nearby villages. ESP has already been installed with the existing boiler (35 TPH). The same ESP will work with the proposed incinerator boiler (35 TPH) also, because only one boiler will operate at a time. CO2 generated during the fermentation process is being/will be collected by utilizing CO2 scrubbers and sold to authorized vendor. The distillery is being / will be based on Zero Effluent Discharge. Grain Slops (Spent Wash) will be taken through Centrifuge Decanters for separation of Suspended Solids separated as Wet Cake & will then be treated in Multi Effect Evaporator followed by dryer. Solid waste from the Grain based operations generally comprises of fibers and proteins in the form of DDGS, which will be ideally used as Cattle Feed/ Poultry Feed/ Fisheries etc. During Molasses based operation spent wash will be concentrated in MEE and the concentrated spent wash will be mixed with auxiliary fuel and burnt in the incinerator boiler. The Process condensate is being / will be cooled and sent to CPU. After treatment this process condensate is being / will be recycled into process use. Ash from the boiler is being /will be given to nearby brick/Cement manufacturers or used in land application.

Globus Spirits Limited 2