Operationalising the Agribusiness Infrastructure Development Investment Program- Phase II

Total Page:16

File Type:pdf, Size:1020Kb

Operationalising the Agribusiness Infrastructure Development Investment Program- Phase II FINAL REPORT Operationalising the Agribusiness Infrastructure Development Investment Program- Phase II -Bihar- March 2010 Prepared by Client: Asian Development Bank OPERATIONALISING THE AGRIBUSINESS INFRASTRUCTURE DEVELOPMENT INVESTMENT PROGRAM- PHASE II FINAL REPORT Table of Contents 1 Introduction 1 1.1 Project outline and intent 1 1.1.1 Value chain approach 1 1.1.2 Hub and spoke model 2 1.2 Integrated value Chain Regions 3 1.2.1 Agri‐Marketing and Infrastructure 3 1.2.2 Selection of Region 4 1.3 Methodology 5 1.4 Structure of the Report 9 Muzaffarpur Integrated Value Chain 10 2 FOCUS CROP: LITCHI 12 2.1.1 Post harvest infrastructure 12 2.1.2 Value chain analysis 13 2.1.3 Gaps in the value chain 18 2.1.4 Potential for intervention 19 3 FOCUS CROP: MANGO 20 3.1.1 Value chain analysis 21 3.1.2 Post harvest infrastructure 24 3.1.3 Gaps in the value chain 24 3.1.4 Potential for intervention 25 4 FOCUS CROP: BANANA 26 4.1.1 Value chain analysis 27 4.1.2 Post harvest infrastructure 31 4.1.3 Institutional Infrastructure 32 4.1.4 Gaps in the value chain 32 4.1.5 Potential for intervention 32 DPR: Muzaffarpur Integrated Value Chain Project 33 5 HUB: MUZAFFARPUR 35 5.1 Focus Crops and Estimated Throughput 36 5.2 Existing Facilities 36 5.2.1 Traders’ Shops 37 5.2.2 Open & Covered Platforms 37 5.2.3 Godowns 37 5.2.4 General Amenities and Support Infrastructure 37 5.3 Proposed Facilities 37 5.3.1 Pack House (with cold infrastructure) 37 5.3.2 Banana Ripening Facility 41 5.3.3 Potato Cold Store 41 5.3.4 Dry Warehouse 42 5.3.5 Ambient Onion Stores 42 5.3.6 Multi Fruit Processing Plant 42 5.4 Other Facilities 42 i OPERATIONALISING THE AGRIBUSINESS INFRASTRUCTURE DEVELOPMENT INVESTMENT PROGRAM- PHASE II FINAL REPORT 5.4.1 Business Centre 42 5.4.2 Knowledge Centre 42 6 SPOKE: HAJIPUR 44 6.1 Focus Crops and Estimated Throughput 45 6.2 Existing Facilities 45 6.2.1 Traders’ Shops 45 6.2.2 Open & Covered Platforms 46 6.2.3 Godowns 46 6.2.4 General Amenities and Support Infrastructure 46 6.3 Proposed Facilities 46 6.3.1 Pack House (with cold infrastructure) 46 6.3.2 Banana Ripening Facility 49 6.3.3 Dry Warehouse 49 6.4 Other Facilities 50 7 SPOKE: DARBHANGA 51 7.1 Focus Crops and Estimated Throughput 51 7.2 Existing Facilities 52 7.2.1 Traders’ Shops 52 7.2.2 Open & Covered Platforms 52 7.2.3 Godowns 52 7.2.4 General Amenities and Support Infrastructure 52 7.3 Proposed Facilities 53 7.3.1 Ambient Pack Shed 53 7.3.2 Banana Ripening Facility 53 7.3.3 Other Facilities 54 8 SPOKE: DALSINGHSARAI 55 8.1 Focus Crops and estimated Throughput 55 8.2 Existing Facilities 56 8.2.1 Traders’ Shops 56 8.2.2 Open & Covered Platforms 56 8.2.3 Godowns 56 8.2.4 General Amenities and Support Infrastructure 56 8.3 Proposed facilities 56 8.3.1 Pack house (ambient) 56 8.3.2 Banana Ripening Facility 58 8.3.3 Dry Warehouse 58 8.3.4 Ambient Onion Stores 58 8.3.5 Other Facilities 58 9 SPOKE: BEGUSARAI 60 9.1 Focus Crops and estimated Throughput 60 9.2 Existing Facilities 61 9.2.1 Traders’ Shops 61 9.2.2 Open & Covered Platforms 61 9.2.3 Godowns 61 9.2.4 General Amenities and Support Infrastructure 61 9.3 Proposed facilities 61 9.3.1 Pack house (ambient) 61 9.3.2 Ripening Facility 62 9.3.3 Dry Warehouse 63 ii OPERATIONALISING THE AGRIBUSINESS INFRASTRUCTURE DEVELOPMENT INVESTMENT PROGRAM- PHASE II FINAL REPORT 9.3.4 Ambient Onion Stores 63 9.4 Other Facilities 63 10 FINANCIAL ANALYSIS 65 10.1 IVCs in Bihar 65 10.2 Muzaffarpur IVC 65 10.2.1 Project Details 65 10.2.2 Project Cost 66 10.2.3 Means of Finance 69 10.2.4 Key Operating Assumptions 69 10.2.5 Financial Performance 72 10.2.6 Sensitivity Analysis 73 11 ECONOMIC ANALYSIS 74 11.1 Methodology and Assumptions 74 11.2 Muzaffarpur IVC 75 11.2.1 Quantification of Benefits 75 11.3 Quantification of Costs 77 11.3.1 Recurring Costs 78 11.4 Cost‐Benefit Statement 78 11.5 Calculation of Economic IRR (EIRR) 79 11.6 Economic Appraisal Results 79 11.6.1 Major Economic Indicators: 79 PATNA‐NALANDA INTEGRATED VALUE CHAIN 80 12 FOCUS CROP: POTATO 82 12.1 Value Chain Analysis 82 12.1.1 Value Chain Actors and Functions: 84 12.1.2 Post Harvest Infrastructure 86 12.1.3 Institutional Arrangements 86 12.2 Gaps in the value chain 86 12.3 Proposed Interventions 87 13 FOCUS CROP: VEGETABLES 88 13.1 Value Chain Analysis 89 13.1.1 Price Build up in the value chain of Cauliflower 92 13.1.2 Price Build up in the value Chain of Brinjal 94 13.2 Post Harvest/Marketing Infrastructure 95 13.3 Gaps in the value chain and Proposed Interventions 96 DPR: PATNA‐NALANDA INTEGRATED VALUE CHAIN PROJECT 97 14 SPOKE: MUSALLAHPUR 99 14.1 Focus Crops and estimated Throughput 99 14.2 Existing Facilities 100 14.2.1 Traders’ Shops 100 14.2.2 Open & Covered Platforms 100 14.2.3 Godowns 100 14.2.4 Cold Storage 100 14.2.5 General Amenities and Support Infrastructure 100 14.3 Proposed facilities 100 14.3.1 Pack house (ambient) 100 iii OPERATIONALISING THE AGRIBUSINESS INFRASTRUCTURE DEVELOPMENT INVESTMENT PROGRAM- PHASE II FINAL REPORT 14.3.2 Ripening Facility 102 14.3.3 Potato Cold Store 102 14.3.4 Dry Warehouse 102 14.3.5 Ambient Onion Stores 102 14.4 Other Facilities 103 15 HUB: BIHAR SHARIF 105 15.1 Focus Crops and Estimated Throughput 106 15.2 Existing Facilities 106 15.2.1 Traders’ Shops 106 15.2.2 Open & Covered Platforms 106 15.2.3 Godowns 106 15.2.4 General Amenities and Support Infrastructure 107 15.3 Proposed Facilities 107 15.3.1 Ambient Pack‐shed for vegetables 107 15.3.2 Banana Ripening Facility 108 15.3.3 Potato Cold Store 109 15.3.4 Dry Warehouse 109 15.3.5 Ambient Onion Stores 109 15.3.6 Other Facilities 109 16 SPOKE: GAYA 111 16.1 Focus Crops and estimated Throughput 111 16.2 Existing Facilities 111 16.2.1 Traders’ Shops 112 16.2.2 Open & Covered Platforms 112 16.2.3 Godowns 112 16.2.4 General Amenities and Support Infrastructure 112 16.3 Proposed facilities 112 16.3.1 Pack house (ambient) 112 16.3.2 Ripening Facility 113 16.3.3 Potato Cold Store 113 16.3.4 Dry Warehouse 114 16.3.5 Ambient Onion Stores 114 16.4 Other Facilities 114 17 SPOKE: ARRAH 116 17.1 Focus Crops and Estimated Throughput 116 17.2 Existing Facilities 116 17.2.1 Traders’ Shops 117 17.2.2 Open & Covered Platforms 117 17.2.3 Godowns 117 17.2.4 General Amenities and Support Infrastructure 117 17.3 Proposed Facilities 117 17.3.1 Pack House 117 17.3.2 Potato Cold Store 118 17.3.3 Dry Warehouse 118 17.3.4 Ambient Onion Stores 118 17.3.5 Other facilities 119 18 SPOKE: BUXAR 120 18.1 Focus Crops and Estimated Throughput 120 18.2 Existing Facilities 121 iv OPERATIONALISING THE AGRIBUSINESS INFRASTRUCTURE DEVELOPMENT INVESTMENT PROGRAM- PHASE II FINAL REPORT 18.2.1 Traders’ Shops 121 18.2.2 Open & Covered Platforms 121 18.2.3 Godowns 121 18.2.4 General Amenities and Support Infrastructure 121 18.3 Proposed Facilities 121 18.3.1 Ambient Pack House 122 18.3.2 Potato Cold Store 123 18.3.3 Dry Warehouse 123 18.3.4 Onion Store 123 18.3.5 Other Facilities 123 19 SPOKE: NOKHA 124 19.1 Focus Crops and Estimated Throughput 124 19.2 Existing Facilities 124 19.2.1 Traders’ Shops 124 19.2.2 Open & Covered Platforms 125 19.2.3 Godowns 125 19.2.4 General Amenities and Support Infrastructure 125 19.3 Proposed Facilities 125 19.3.1 Pack Shed 125 19.3.2 Potato Cold Store 126 19.3.3 Dry Warehouse 127 19.3.4 Onion Store 127 19.3.5 Other facilities 127 20 FINANCIAL ANALYSIS 129 20.1 Patna‐Nalanda IVC 129 20.1.1 Project Details 129 20.1.2 Project Cost 129 20.1.3 Means of Finance 132 20.1.4 Key Operating Assumptions 132 20.1.5 Financial Performance 135 20.1.6 Sensitivity Analysis 136 21 ECONOMIC ANALYSIS 137 21.1 Patna‐Nalanda IVC 137 21.2 Quantification of Benefits 137 21.3 Quantification of Costs 138 21.3.1 Recurring Costs 139 21.4 Cost‐Benefit Statement 139 21.5 Calculation of Economic IRR (EIRR) and NPV 139 21.6 Economic Appraisal Results 140 21.6.1 Major Economic Indicators: 140 BIHAR: INTEGRATED VALUE CHAINS 141 22 CONCEPTUAL PLANS FOR FACILITIES 142 22.1 Conceptual Plans for facilities at selected locations of the IVCs 142 22.1.1 Planning Concept 142 22.1.2 Master Plan 143 22.1.3 Buildings 143 22.1.4 Services 143 v OPERATIONALISING THE AGRIBUSINESS INFRASTRUCTURE DEVELOPMENT INVESTMENT PROGRAM- PHASE II FINAL REPORT 1 INTRODUCTION IL&FS Cluster Development Initiative Limited (IL&FS Clusters) has been appointed by Asian Development Bank (ADB) to prepare a Detailed Project Report for operationalising the Agribusiness Infrastructure Development Investment Program Phase II in the states of Bihar and Maharashtra.
Recommended publications
  • Notice Inviting Expression of Interest (Eoi) for Installation, Operationalization and Maintenance of Digital X-Ray Machines in I
    NOTICE INVITING EXPRESSION OF INTEREST (EOI) FOR INSTALLATION, OPERATIONALIZATION AND MAINTENANCE OF DIGITAL X-RAY MACHINES IN IMAGING CENTRES AT 159 LOCATIONS IN BIHAR ON PPP MODE Sealed bids are invited from reputed agencies for the installation, operationalization and maintenance of Digital X-ray machines at 159 Government facilities in Bihar under PPP mode. The installation of Digital X-ray is proposed at 7 Government Medical College, Gardiner Road Hospital, LNJP Ortho hospital, Guru Gobind Singh hospital and 149 First Referral Units in 38 districts of the state. The detailed terms and conditions may be downloaded from official website of State Health Society, Bihar (http://www.statehealthsocietybihar.org). Competent and only seriously interested agencies are requested to submit the details of their proposal to the SHSB on or before 25/06/2014 by 5.00 P.M. through speed-post or courier only. A pre-bid meeting of interested agencies is scheduled in the conference hall of State Health Society, Bihar on 16th June, 2014 at 3:00 P.M. The terms & conditions and technical specification may be revised at the time of floating the RFP. For any further clarifications, please contact Dr. A. K. Shahi, State Programme Officer on phone no: 9470003017 only during official working hours. Secretary Health -cum- Executive Director, State Health Society, Bihar EOI Imaging Centre (2014) - SHSB EXPRESSION OF INTEREST (EOI) FOR INSTALLATION, OPERATIONALIZATION AND MAINTENANCE OF DIGITAL X-RAY MACHINES IN IMAGING CENTRES AT 159 LOCATIONS IN BIHAR ON PPP MODE Table of Contents I. INTRODUCTION ............................................................................................................................................... 3 II. SCOPE OF WORK ........................................................................................................................................ 3 III. GENERAL TERMS & CONDITIONS ......................................................................................................
    [Show full text]
  • Bihar Statistical Hand Book 2012.Pdf
    ?TTfer«}?f *j>t ^ Rrf^M weNt ^ 3fhf>^ ^ ^ ^ cj>i ;3tTcW ^fn 11 ^ i i 5KT f^yc^,(^^^^ u<wyH ^ ^ tfi ^ A ftF K ^ <f>T *jcnviN ^mr I g^ arftrmi ^ tft # f?>* f^ttmcTU arr^ f^qii^cH WSJiTTTH “Statistical Hand Book 2012" ^ W‘»»'»H 2012 y T ^-^T g ^ ^ gtnfm ^ ^ (jw ?ffT # I 5 ^ w l TTq ;mfeag>1 P»^»iicHq nftt amr uprm ^ uT^ »I?T> 3fr? 3ITWT «f€l f^<f»RftT f^^N ^ 'HMMI gf^ W<H ^ ^ ifra Hfn trw? f^TS i 5^ WTVH ^ Wi iTift '5>fiWf i?7i trerfSrimfM * met ^rroRy itg 3tjT^ ^ ^ I ( ^ 1 ^ ^ n ^ ) ttm h ! v !9 fw R f^iqin. finCF J^s! Of Offu er.^U Staff £.uj.u,JX Brin^in.j C^ui TJLis j^uL/icalion. 1. Dr. Jitcndra Kumar Sinha .. Sr.Ji>int Direct! jr-cum-Offlcc 1 load 2. Dr. Nirbhay Kumar Deputy Director 3. Sri Satish Kumar Junior Statistical .Assistant 4. Sri Dincsh Kumar Mandai .. Junior Statistical Assistant 5. Sri Sunil Kumar Singh Junior Statistical Assistant 6. Sri Ranjcct Kumar Singh .. Junior Statistical Assistant 7. Sri Shiv ShankarJha Senior I jhmrian K. Sri Santcish Knmar Sah Junior Stattsctcai Assistant 9. Sri Mithilcsh Kurnar Mehta .. Junior Statistical Assistant 10. Smt. Aiuipam* Pandcy Junior Statistical Assistant 11. Sril^tnnaljil C’uttcr Binder B ihar S tatistioal Handbook 2012 OOMTHMTO R jb ^E N o . 1 A k ^ A a n d F»OF>UL.A*TllON 1.1 S t a t e m e n t s h o w i n g v a r i a t i o n b i n p o p u i _a t i o n d u r i n g 1 THE LAST HUMNIED TEARS OF BiHAR 1.2 S t a t e m e n t s h o w i n g t h e A r f a , N u m b e r o f t o w n s a w 2 VILLAGES, OCCUPIED HOUSES AND POPULATION DURING 10S1,1001,7001 AW 2011 Ce n s u s 1.3 S t a t e m e n t s h o w i n g d i s t r i c t w i s e m i d Y e a r C30™ JUTf> ESnMATED POPULATION OF BIHAR) 1.4 S t a t e m e n t s h o w i n g d i s t r i c t w i s e n u m b e r o f s u b ­ 5 T o w n s a m > v i l l a g e s OF BIHAR 1.5 S t a t e m e n t s h o w i n g d i s t r i c t w i s e A n c m a l .
    [Show full text]
  • A List of Terminated Vendors As on April 30, 2021. SR No ID Partner
    A List of Terminated Vendors as on April 30, 2021. SR No ID Partner Name Address City Reason for Termination 1 124475 Excel Associates 123 Infocity Mall 1 Infocity Gandhinagar Sarkhej Highway , Gandhinagar Ahmedabad Breach Of Contract 2 125073 Karnavati Associates 303, Jeet Complex, Nr.Girish Cold Drink, Off.C.G.Road, Navrangpura Ahmedabad Breach Of Contract 3 132097 Sam Agency 29, 1St Floor, K B Commercial Center, Lal Darwaja, Ahmedabad, Gujarat, 380001 Ahmedabad Breach Of Contract 4 124284 Raza Enterprises Shopno 2 Hira Mohan Sankul Near Bus Stand Pimpalgaon Basvant Taluka Niphad District Nashik Ahmednagar Fraud Termination 5 124306 Shri Navdurga Services Millennium Tower Bldg No. A/5 Th Flra-201 Atharva Bldg Near S.T Stand Brahmin Ali, Alibag Dist Raigad 402201. Alibag Breach Of Contract 6 131095 Sharma Associates 655,Kot Atma Singh,B/S P.O. Hide Market, Amritsar Amritsar Breach Of Contract 7 124227 Aarambh Enterprises Shop.No 24, Jethliya Towars,Gulmandi, Aurangabad Aurangabad Fraud Termination 8 124231 Majestic Enterprises Shop .No.3, Khaled Tower,Kat Kat Gate, Aurangabad Aurangabad Fraud Termination 9 125094 Chudamani Multiservices Plot No.16, """"Vijayottam Niwas"" Aurangabad Breach Of Contract 10 NA Aditya Solutions No.2239/B,9Th Main, E Block, Rajajinagar, Bangalore, Karnataka -560010 Bangalore Fraud Termination 11 125608 Sgv Associates #90/3 Mask Road,Opp.Uco Bank,Frazer Town,Bangalore Bangalore Fraud Termination 12 130755 C.S Enterprises #31, 5Th A Cross, 3Rd Block, Nandini Layout, Bangalore Bangalore Breach Of Contract 13 NA Sanforce 3/3, 66Th Cross,5Th Block, Rajajinagar,Bangalore Bangalore Breach Of Contract 14 132890 Manasa Enterprises No-237, 2Nd Floor, 5Th Main First Stage, Khb Colony, Basaveshwara Nagar, Bangalore-560079 Bangalore Breach Of Contract 15 177367 Bharat Associates 243 Shivbihar Colony Near Arjun Ki Dairy Bankhana Bareilly Bareilly Breach Of Contract 16 132878 Nuton Smarte Service 102, Yogiraj Apt, 45/B,Nutan Bharat Society,Opp.
    [Show full text]
  • Rehablitation of Mahatma Gandhi Setu in Patna
    Rehablitation of Mahatma Gandhi Setu in Patna Contractor Name:- FPCC Ind. Ltd 1. Introduction The Mahatma Gandhi Bridge was constructed about 25 years ago over the Ganges River in order to connect patna to the other side of river. Once completed it was supposed to be the part of N.H 19 and comes directly under Central Government of India. It is one of the longest bridge in india. The bridge has 46 spans each with length 120m. Each span has two cantilever beams on both sides which are free to move at the ends. It has two lanes one upstream and the other downstream each with a width of around 6m. Both the lanes are also free from each other and are not connected anywhere. It was constructed by using 3 meter pre-casted parts being joined at both ends to complete the span. The Spans are connected by using a Protrusion which is free to move longitudinally also along the river flow. In upwards and downwards direction it is such that it allows vibration to transfer smoothly to the next span while vehicular movement without much discreteness. It is shown in fig. Due to heavy traffic movement and being the only bridge to cross ganges river the bridge is used heavily now. Hence it has started vibrating with a higher amplitude than it was designed to. Also in many spans the cantilever beams were found to have sagged at ends. 2. Rehabilitation Keeping the structural health prospective in mind it was decided for immediate rehabilitation of the bridge to provide extra strength to the spans so that it bear the existing vehicular load according to the IRC.
    [Show full text]
  • Die Is Caste.Pdf
    THE DIE IS CASTE Dramatis Personae Binod Paswan Dr. Vinayan Lakhsmanpur Bathe: December1, 1997: 61 people were Dr. Vinayan set foot in Bihar in 1974 and was a close massacred by the Ranvir Sena, including 16 children and associate of Jaiprakash Narayan. He established the 27 women. dreaded Mazdoor Kisan Sangram Samiti in the '80's and Binod Paswan lost seven family members, including his featured on the list of India's "most wanted". mother, brother and sisters. His father Ram Chela Paswan Today, he is a well respected social activist. fled into the paddy fields. Today, Binod Paswan is employed in the Bihar Police and lives in fear of his life. Ravinder Chaudhury Shaibal Gupta A school teacher and principal of the Girls' School in Shaibal Gurpta is an economist and Member-Secretary village Bellaur, spiritual home of the Ranvir Sena. of the Asian Development Research Institute in Patna. He is alleged to have been involved in a few massacres and is presently General Secretary of the Ranvir Kisan Mahasangh, political arm of the Ranvir Sena. Bhola Singh Ram Naresh Ram He is the most powerful landlord in village Ekwari and a founder member of the Ranvir Sena. Bhola has lost 6 Ram Naresh is a resident of Ekwari and MLA of Sahar male family members including his father and brothers in bloc of Bhojpur district. He was a colleague of Jagdish Naxalite reprisals. Today, he is the sole male member in a Mahato and co-founder of Naxalism in Bihar. He is family with 11 unmarried girls and including five widows.
    [Show full text]
  • Clarifications to Pre-Bid Queries Sub: Preparation of DPR for Construction
    Clarifications to Pre-Bid Queries Sub: Preparation of DPR for construction of New Bridge across River Ganga with approaches parallel to Mahatma Gandhi Setu on NH-19 at Patna in Bihar. SL Clause No. Description of Queries and Comments / Clarifications Reply No. as per RFP / Modifications sought 1 RFP Considering the scope of work and requirement of No change. document project, we request you to reduce the minimum eligibility Page No- 19 requirement of Preparation of DPR/Design for at least Clause 12.1 one bridge involving minimum individual span of 120m Eligibility length to 100 m length. We request to empathise for this Requirement; particular experience to be of Cable Stay Bridge / Extradosed /Segmental Bridge. 2 RFP We request you to kindly consider any structure 1. Firm should have document (Bridge/ROB/Flyover/Elevated Structure) instead of prepared DPR for at least Page No- 19 Bridge project only as the minimum eligibility criteria. one River Bridge project Clause 12.1 of 1000m length. Eligibility Requirement; 2. Firm should have prepared DPR / Design for at least one bridge involving minimum individual span of 120m length. Refer Corrigendum - I to RFP. 3 RFP With reference to the above mentioned point we request Not accepted. document you to please consider the 1000 m bridge length as RHS Page No- 19 and LHS in total (i.e if Bridge length on RHS is 700 m Clause 12.1 and on LHS also 700 m, then take total length of bridge Eligibility as 1400 m) Requirement; 4 RFP Time period for Team Leader and Bridge Engineer is As per our assessment, total document mentioned as 8 man months but duration of project is inputs of all Key personnel Page No.74 mentioned as 9 man months.
    [Show full text]
  • Bhojpur 2019-20
    Ministry of Micro, Small & Medium Enterprises Government of India DISTRICT PROFILE BHOJPUR 2019-20 Carried out by MSME-Development Institute (Ministry of MSME, Govt. of India,) Patliputra Industrial Estate, Patna-13 Phone:- 0612-2262719, 2262208, 2263211 Fax: 06121 -2262186 e-mail: [email protected] Web- www.msmedipatna.gov.in Veer Kunwar Singh Memorial, Ara, Bhojpur Sun Temple, Tarari, Bhojpur 2 FOREWORD At the instance of the Development Commissioner, Micro, Small & Medium Enterprises, Government of India, New Delhi, District Industrial Profile containing basic information about the district of Bhojpur has been updated by MSME-DI, Patna under the Annual Plan 2019-20. It covers the information pertaining to the availability of resources, infrastructural support, existing status of industries, institutional support for MSMEs, etc. I am sure this District Industrial Profile would be highly beneficial for all the Stakeholders of MSMEs. It is full of academic essence and is expected to provide all kinds of relevant information about the District at a glance. This compilation aims to provide the user a comprehensive insight into the industrial scenario of the district. I would like to appreciate the relentless effort taken by Shri Ravi Kant, Assistant Director (EI) in preparing this informative District Industrial Profile right from the stage of data collection, compilation upto the final presentation. Any suggestion from the stakeholders for value addition in the report is welcome. Place: Patna Date: 31.03.2020 3 Brief Industrial Profile of Bhojpur District 1. General Characteristics of the District– Bhojpur district was carved out of erstwhile Shahbad district in 1992. The Kunwar Singh, the leader of the Mutineers during Sepoy Mutiny in 1857, was from district Bhojpur.
    [Show full text]
  • DISTRICT : Muzaffarpur
    District District District District District Sl. No. Name of Husband's/Father,s AddressDate of Catego Full Marks Percent Choice-1 Choice-2 Choice-3 Choice-4 Choice-5 Candidate Name Birth ry Marks Obtained age (With Rank) (With Rank) (With Rank) (With Rank) (With Rank) DISTRICT : Muzaffarpur 1 KIRAN KUMARIARVIND KUMAR kiran kumari c/o arvind 10-Dec-66 GEN 700 603 86.14 Muzaffarpur (1) Samastipur (1) Darbhanga (1) Vaishali (1) Champaran-E (1) kumar vill+po-parsara dis-muzaffarpur 2 ARCHANA SRI ARUN vill-ratanpur post- 11-Aug-85 ST 900 757 84.11 Muzaffarpur (2) KUMARI CHAUDHARY jagdishparn vhaya- kalyanapur dist- muzaffarpur pin-848302 3PREM LATA SHARI NAND LAL village raja bigha, p.s. 10-Jan-79 GEN 700 566 80.86 Saran (2) Muzaffarpur (3) Darbhanga (2) Gaya (4) Champaran-E (2) KUMARI PRASAD dhanarua. p.o barni district patna pin code 804452 4 REENA SINHASRI DINESH SINGH dinesh singh, d/o- sita 31-Dec-76 BC 900 721 80.11 Siwan (2) Begusarai (3) Muzaffarpur (4) Samastipur (4) Vaishali (5) sharan singh, vill- ruiya, post- ruiya bangra, p.s.- jiradei, distt- siwan 5NILAM SHRI GUJESHWER nilam srivastav c/o-shri 06-Jan-69 BC 700 554 79.14 Gopalganj (2) Siwan (3) Saran (3) Muzaffarpur (5) Patna (14) SRIVASTAV PRASAD akhilesh prasad vill-manichapar, po-hathua dis-gopalginj pin-841436 6 BEENA KUMARIMAHARANGHI vill-mahrana 01-Oct-75 BC 900 700 77.78 Munger (17) Lakhisarai (11) Bhagalpur (15) Muzaffarpur (6) Jamui (12) MATHO po-dahara dis-munger pin-811201 7 KANAK LATASRI ANIL KUMAR village+post- dahibhatta, 23-Dec-85 GEN 700 541 77.29 Gopalganj (5)
    [Show full text]
  • The India Toy Fair Virtual-2021 27 Feb- 2 Mar-2021
    THE INDIA TOY FAIR VIRTUAL-2021 27 FEB- 2 MAR-2021 1 THE INDIA TOY FAIR VIRTUAL-2021 27 FEB- 2 MAR-2021 PARTICIPANTS PROFILE 2Teeth Kidswear Address : 168, Arulandhanammalnagar, Pudukottai main Road, Thanjavur, Thanjavur - 613007 (TAMIL NADU) Contact Number : 8610225174, Email : [email protected] , Contact Person : Suganthan Product Category : Baby & Toddler Toys 3LININVOVATIONS Address : 448, BHARATHIYAR RD, PAPA NAICKENPALAYAM, COIMBATORE - 641037 (TAMIL NADU) Contact Number : 9791330359, Email : [email protected] , Contact Person : BALAJI Product Category : Action & Toy Figures 7 Star Toys Industrial Corportaion, Address : G1-1287, RIICO Industrial Area, Phase-V, Bhiwadi, Distt- Alwar, BHIWADI - 301019 (RAJASTHAN) Contact Number : 9873433143, Email : [email protected] , Contact Person : Mr MukulMehndiratta- Partner Product Category : Action & Toy Figures A K Enterprise Address : K 704 Maple Tree, B/s. Manichandra Bungalows, Nr. Surdhara Circle, Sal Hospital Road, Memnagar, Ahmedabad - (Gujarat) Contact Number : 9898812211, Email : [email protected], [email protected] , Contact Person : Kalpesh Bhatia Product Category : Bikes, Skates & Ride-Ons A STAR MARKETING PVT LTD Address : GALI NO 4, JAWAHAR COMPOUND 186, JAKARIA BUNDER RD, SHIWDI WEST, MUMBAI - 400015 (MAHARASHTRA) Contact Number : 9820644540, Email : [email protected] , Contact Person : DIPESH SAVLA Product Category : Action & Toy Figures A. JERALD SHOBAN Address : 29, Near Arul Theatre, Pookara Matha Kobil,Street, Tanjore- DCH - 613501 (TAMIL NADU) Contact Number : 9360936022, Email : [email protected] , Contact Person : A.Jerald Shoban Product Category : Traditional Toys 2 THE INDIA TOY FAIR VIRTUAL-2021 27 FEB- 2 MAR-2021 A2Z PAMTY DECCE PVT. LTD. Address : 25, 36 GOVIND NAGAR ,SODAULA LANE,BORAWALI EAST, MUMBAI - 400092 (MAHARASHTRA) Contact Number : 8104804075, Email : [email protected] , Contact Person : JAYESH M.
    [Show full text]
  • Geospatial Planning
    ESMAP Global Mini Grid Technical Conference Abuja, Nigeria, December 6, 2017 FRONTIER DEVELOPMENTS IN MINI GRIDS Geospatial planning Ignacio J. Pérez-Arriaga CEEPR, MIT Instituto de Investigación Tecnológica (IIT), Comillas University Florence School of Regulation, European University Institute We have to change the “top-down” perspective… … by another one with demand & generation all over the place 4 What could be the true frontier of mini grids in the developing world? 5 I do believe that mini grids must… … become integrated as one more component of a comprehensive electrification process… … led by the incumbent distributor 6 • The differentiation between grid extension, mini grids & SHS is becoming blurred • An integrated perspective is becoming increasingly necessary 7 How can geospatial planning help in the electrification planning process? 8 What’s an electrification plan? (the techno-economic answer) • An electrification plan will consist of some mix of on- & off-grid expansions providing electricity access to all consumers at minimum cost – For some prescribed demand for each consumer – Meeting minimum reliability requirements – And additional constraints (e.g. limit on the total diesel utilization) 9 The costs of the plan • The plan will consist of on- & off-grid expansions • Grid extension costs – Investment & operation costs of new grid, reinforcements of existing grid, “upstream” cost of grid-supplied electricity, cost of non served energy • Off-grid development costs – Microgrids: Investment & operation costs of generation,
    [Show full text]
  • 24X7 Power for All a Joint Initiative of Government of India and Government of Bihar
    24X7 POWER FOR ALL A JOINT INITIATIVE OF GOVERNMENT OF INDIA AND GOVERNMENT OF BIHAR DECEMBER 2015 Piyush Goyal Minister of State (Independent Charge) for Power, Coal and New & Renewable Energy Government of India Foreword Electricity consumption is one of the most important indices that decides the development level of a nation. The Government of India is committed to improving the quality of life of its citizens through higher electricity consumption. Our aim is to provide each household access to electricity, round the clock. The ‘Power for All’ programme is a major step in this direction. Bihar is one of the low power consuming states at present due to lack of infrastructure and it has to put lot of effort to provide reliable and quality power to all. This joint initiative of Government of India and Government of Bihar aims to enhance the satisfaction levels of the consumers and improve the quality of life of people through 24x7 power supply. This would lead to rapid economic development of the state in primary, secondary & tertiary sectors resulting in inclusive development. I compliment the Government of Bihar and wish them all the best for implementation of this programme. The Government of India will complement the efforts of Government of Bihar in bringing uninterrupted quality power to each household, farmer, small & medium enterprise and establishment in the state. Bijendra Prasad Yadav Energy Minister of Bihar Government of Bihar Foreword The Government of Bihar has identified Power Sector as primary sector requiring focus of effort and initiative. Our relentless endeavour in the area is bearing fruit in the form of significant qualitative and quantitative improvement in all three arms viz., Generation, Transmission and Distribution.
    [Show full text]
  • Politics of Misrepresenting the Oppressed: a Critique of Abdus Samad’S Urdu Novel Dhamak*
    mohammad sajjad Politics of Misrepresenting the Oppressed: A Critique of Abdus Samad’s Urdu Novel Dhamak* Abdus Samad (ʿAbduíṣ-Ṣamad) is known less as a teacher of political science and more as a famous Urdu fiction writer. Starting his literary career with short story writing, he later began writing novels. All five of his novels are accounts of the politics of twentieth-century Bihar. The first, Dō Gaz Zamīn (Two Yards of Land, 1988), deals with the politics of the partitions of the Indian subcontinent (first of India in 1947 and then the dismemberment of Pakistan in 1971) and depicts its impact on a declining Muslim feudal family of Bihar Shareef, roughly from the 1920s to the 1970s (Ghosh 1998, 1ñ40; Qasmi 2008, 24ñ26). It earned great praise from Urdu literary critics and in 1990 received the prestigious Sahitya Academy Award. His second novel Mahātmā (The Great Soul, 1992), the least appreciated of his novels critically, is a pessimistic account of the deep decline in the quality of higher education. His third novel, Khvābōñ kā Savērā (Dawn of Dreams, 1994), is the most critically acclaimed in terms of theme, technique, style, treatment, and so on. It deals with Muslims and their engagement with (or place in) the secular democracy of India in an increasingly communalized polity and society. In a quote appearing on the cover of his fourth novel Mahāsāgar (The Ocean, 1999), he is very explicit about why he gives primacy to the subject of politics in his writing. [Ö] in todayís life political factors have a deep impact since politics is no *I am thankful to Prof.
    [Show full text]