SEAC-3 Agenda for 105th SEAC-3 meeting scheduled on 28-29 February & 1st March, 2020 at Dalamal House, Nariman Point

Important Note:

1. The project proponents are requested remain present with copy of duly signed Form-1, Form-IA and conceptual/approved plan as uploaded on the portal. 2. Further, it is requested that the project proponent or his/her authorized representative should attend the presentation meeting of SEAC. They may also depute senior officers from the company (preferably not more than two representatives) who can make a presentation on their behalf on the salient features of the project, the related environmental issues, proposed Environmental Management Plan and also respond to the queries/suggestions of the Committee. 3. No consultant is permitted into the meeting who has no accreditation with Quality Council of (QCI)/National Accreditation Board of Education and Training (NABET) according to the MoEF OM dated 2nd December, 2009. 4. PP is requested to submit information (as mentioned in the Form-I / Form-1A uploaded on the portal) during the meeting, duly signed by Project Proponent and Consultant in the Consolidated Statement format placed below. PP is also requested to make available soft copy of the same in MS-word format during the meeting.

Consolidated Statement for

1. Proposal Number

2. Name of Project

3. Project category

4. Type of Institution

5. Project Proponent Name Regd. Office address Contact number e-mail 6. Consultant

7. Applied for

8. Details of previous EC

9. Location of the project

10. Latitude and Longitude

11. Total Plot Area (m2)

12. Deductions (m2)

13. Net Plot area (m2)

14. Proposed FSI area (m2)

15. Proposed non-FSI area (m2)

16. Proposed TBUA (m2) 17. TBUA (m2) approved by Planning Authority till date 18. Ground coverage (m2) & %

19. Total Project Cost (Rs.)

20. CER as per MoEF & CC circular Activity Location Cost (Rs.) Duration dated 01/05/2018

21. Details of Building Configuration : Reason for Change Previous EC / Existing Building Proposed Configuration Building Configuration Height Building Configuration Height Name (m) Name (m)

22. Total number of tenements (Existing + Proposed)

23. Water Budget Dry Season (CMD) Wet Season (CMD) Fresh Water Fresh Water Recycled Recycled Swimming Pool Swimming Pool Flushing Flushing Total Total Waste water Waste water generation generation 24. Water Storage Capacity for Firefighting / UGT 25. Source of water

26. Rainwater Level of the Ground water table: Pre-Monsoon: Harvesting Post Monsoon: (RWH) Size and no of RWH tank(s) and Quantity: Quantity and size of recharge pits: Details of UGT tanks if any: 27. Sewage and Sewage generation in CMD: Wastewater STP technology: Capacity of STP (CMD): 28. Solid Waste Type Quantity (kg/d) Treatment / disposal Management Dry waste: during Wet waste: Construction Construction waste Phase 29. Solid Waste Type Quantity (kg/d) Treatment / disposal Management Dry waste: during Wet waste: Operation Hazardous waste: Phase Biomedical waste E-Waste STP Sludge (dry) 30. Green Belt Total RG area (m2): Development Existing trees on plot: Number of trees to be planted: Number of trees to be cut: Number of trees to be transplanted: 31. Power Source of power supply: requirement: During Construction Phase (Demand Load): During Operation phase (Connected load): During Operation phase (Demand load): Transformer: DG set: Fuel used: 32. Details of Energy saving

33. Environmental Type Details Cost Management Capital plan budget O&M during Construction phase

34. Environmental Component Details Capital (Rs.) O&M (Rs./Y) Management Storm Water plan Budget Sewage treatment during Water treatment Operation RWH phase Swimming Pool Solid Waste Hazardous waste e-waste Green belt development Energy saving Environmental Monitoring Disaster Management 35. Traffic Type Required as per DCR Actual Provided Area per parking (m2) Management 4-Wheeler 2-Wheeler Bicycles 36. Details of Court cases / litigations w.r.t. the project and project location if any.

******

Agenda

Sr UID / Proposal Project Proponent Number

28.02.2020

1 P1 126342/2019 Proposed Residential & Commercial Project “Navjyot Abha” at S.No. 150, 151; Lane No. 27A, Ganesh Nagar, , Taluka Haveli, District , by Sumeru Buildcon Pvt. Ltd.

2 P2 133432/2019 Proposed Project at S.No 287/1 Near Hill View Sathi Wasti Lohegaon Pune - 411047 by R. G. DEVELOPERS.

3 P3 133587/2019 L&T -Leadership Development Academy

4 P4 134411/2019 “AADHAR NAGARI” Proposed Affordable Housing Project Under AHP Vertical PPP Model Under PMAY by M/s. Madhav Infra.

5 P5 134425/2019 Environmental clearance for Proposed Residential and Commercial Project “41 Evoke” at S.No 74(P), Ravet, Pune by M/s. Krisala Associates.

6 P6 134605/2020 Proposed Residential Group Housing project at S. no. 145/2(P), 145/3(P), Ravet, Pune by M/s. Giritirtha Associates.

7 P7 134612/2020 Proposed residential and commercial project at Gat No.41/7, Plot A2, Bhoirwadi,Taluka–Mulashi, Pune by Priyanka Builders.

8 P8 134888/2020 “Gagan Klara” proposed residential and commercial development By M/s.Gagan Housing and Landmark LLP.

9 P9 135041/2020 Proposed Commercial IT/ITES project Plot No –2, Knowledge Park, S.No. 15, Kharadi, Pune – 411014 by M/s. Techlima Air Technology Private Limited.

10 P10 135048/2020 Proposed Residential & Commercial Project at S No 4/17A/1, S No 5/3/2, Dhankawadi by Shri Taljai Mata Associates LLP.

11 P11 135106/2020 Sangameshwar.

12 P12 135412/2020 Proposed commercial building project by Azure Tree Lands Pvt. Ltd. at Nagar Road, Yerwada, Pune.

13 P13 135604/2020 Aaiji Crystal.

14 P14 136684/2020 Environment Clearance for Proposed Residential project at S.No. 24/5(P), 24/5/1(P) At- , Pune by The Construction & Development Co.

15 P15 136762/2020 Proposed New Admin Building at CTS No. 6017, 6017/1, 6017/2, 6017/3 (P), 6018, 6020/4 Village , Taluka Maval, District- Pune by Pimpri- Municipal Corporation.

16 P16 136790/2020 Happy City.

17 P17 136909/2020 Proposed Residential & Commercial project at Survey No. 10/2 Dhanori, Dist. Pune by M/s Nyati Construction Pvt. Ltd.

18 P18 137015/2020 Residential Project by M/s. Tirtha Real Estate Pvt. Ltd.

19 P19 137323/2020 Proposed Residential Group Housing project at S. no. 134/1, , Pune by M/s. Raga Developers

20 P20 137377/2020 Residential cum Commercial project – Royal Glory.

21 P21 138049/2020 Proposed IT Building.

22 P22 50310/2019 Proposed Residential Development Joyville Hinjewadi Plot – 2 (Group Housing project)

29.01.2020

23 P23 115350/2019 Proposed residential project "Splendour Greens" at S. No. 7/ 5, 7/6, 7/7, 7/8, 7/9, 7/10/1, 7/10/2/1, 7/10/2/2, 7/10/2/3, 7/11, 7/12, 7/15, Plot A, Kondhawa Bk., Pune.

24 P24 117936/2019 PRAYEJA CITY.

25 P25 124434/2019 Proposed Project at Sr. No. 211/4 & 211/11, by M/s. Vision Realtors.

26 P26 135368/2020 Proposed Residential & Commercial Project by NAMRTA KHANDGE VENTURES

27 P27 138141/2020 Proposed Residential & Commercial project at S. No. 47/1/B, 47/1/C, 47/1/D, 48/1, 48/2 & 48/3,Maan, , Dist. Pune.

28 P28 138634/2020 Parksyde Nest.

29 P29 139379/2020 Proposed Commercial project at G. No. 259,269, & 270 , Taluka Mulshi, Dist Pune by M/s Oxford Suits through partner Mr. Anirudha Uttam Seolekar

30 P30 129415/2019 Metro Jazz proposed residential and commercial development by M/S BALAJI REALTY

31 P31 138916/2020 Expansion of Proposed Residential & Commercial Project at S. no. 133(P),134(P),158(P),159(P) , Pune by M/s. Vivanta Realty

32 P32 138535/2020 Proposed Residential Project "Yashada Splendid Park" at Gat no. 113(P), 114(P), 116 at Dudulgaon, Pune by M/s Yashada Developers

33 E1 3848 Gagan Ela at S. No. 23/7/1, 23/7/2, 23/7/3, NIBM, Pune by Rahul Garg.

34 E2 Proposed Residential & Commercial Development “Shivam” at S. No. 1234 185/4,185/4B, 185/5, 185/6A, CTS No. 1509(Part), Pimple Saudagar, Dist. Pune, Maharashtra by M/s. Pooja Developers

35 E3 3711 „Pari Tower‟ Survey No. 38/2/17, 38/2/22, 38/2/23(P), Mouje-Narhe by M/s Urban Home Realty.

36 E4 TUCKER AWHO ENCLAVE(PH-2) at S. No. 16,17,18(P),Gondhale 1486 Nagar, Near Swami Samarth Math, Hadapsar by M/s Army Welfare Housing Organisation

37 E5 „Sukhwani Pacific‟ at S. No.31, Plot No. 3 , Mulshi, , by M/s 1198 Pratham Constructions .

38 E6 Residential & commercial Project at S. No. 35/1/1/A, 35/1/1/B, 48/2/A, 3394 48/2/C (Part A) , Taluka- Mulshi, Dist- Pune by M/s Mihir Homes Enterprise LLP.

39 E7 3785 Development of Hill Station Township at Village Mulshi and Velhe Talukas, Pune, by M/s Lavasa Corporation Ltd

40 E8 „Sukhwani Scarlet‟ at Gat No. 675, Keshnand Road , Haveli, Wagholi by 3810 M/s Sukhwani Infrabuild

41 E9 3846 Amendment in Proposed Residential and commercial project Tulip Infinity Planet at Gat No. 105,106, 107, 108, 113, 114, 115, Alandi BRT Road, Behind Nakshatra Island Moshi by M/s Tulip Properties.

42 E10 3857 Proposed Residential and commercial Development CTS NO 391,392 AT Mangalwar Peth, Pune by M/s Aum Cityspaces LLP.

43 E11 3860 “Casa Imperia " Sr.No.59/1/1B(P),62/1,59/1/2,59/1/1A, Wakad, Mulshi, Pune

44 E12 3868 Proposed Residential and commercial project at Sr. No.10/2/1,10/2/2P,10/1,10/3/2P, Yewalewadi, Tal-Haveli, Dist-Pune by M/s. Fortune Pride.

01.03.2020

45 E13 1276 Proposed Group Housing Scheme at Kh. no. 167/2 & 168 , Nagpur (Gramin) , Mouza Jamthaby M/s Sandesh Infrastructure Pvt. Ltd,

46 E14 Dr. D Y Patil Medical College, Hospital and Research Institute at E Ward, 3409 507/1, Kadamb Wadi, Karveer, Kolhapur

47 E15 Proposed Residential and commercial project at S. No.1, HISSA NO. 9A/3 1452 & 1/9C, Village -, Tal.-Haveli Pune, by Sai Construction Pvt Ltd 48 E16 Kingston Avenue at S. No. 70/1,70/2/1,70/3 to 8, 70 (P), CTS No. 1571 to 1289 1576, Opp. Hotel Govind Garden, Pimple Saudagar

49 E17 1206 Residential & Commercial Project at S. No. 65A/1, 65B/1, 65C/1(P) & 66/6 (P), Haveli , Kondhwa (BK) by M/s. Surana Bhansali Developers

50 E18 3359 “Osiyan County” at S. NO. 492/1, 492/2, 492/3, 493/1, 493/2, 494/1, 494/2, Haveli by M/s D R Gavhane Landmarks LLP.

51 E19 Proposed Commercial Project “The Laureate Corporate Park” at CTS No. 3350 2513 S. No. 129 Hissa No. 1C, Pune Alandi Road, , , Pune , by Sky Realty Projects LLP.

52 E20 Proposed Construction of 672 Residential Quarters For S.P. Satara, at C.S. 1029 No. 92 and 197 (286 Old) , Peth Malhar (Superintendent Of Police Head Quarters) Satara.

53 E21 Proposed Residential project “Vision City” at Gat. No. 308(P), 1265 309,336,338,339, Village Jambhul , Talegaon, Pune. By M/s. Shubban Properties.

54 E22 Residential cum Commercial project - Kumar Pinakin at S.No.53(p), 54(p) 3420 Haveli, , Pune by KUMAR & POTNIS through Rajas Vk. Jain

55 E23 Residential project Felicita at Survey No 5/2/2 of Baner Pune by Abhiraj 1230 Developers and Shree Venkatesh Builders and Developers

56 E24 2815 Building & construction project at Survey No 165/1 & 165/2 Part ,Mulshi by Vithal Amulyam Developers LLP

57 E25 1294 M/s. GIGEO Construction Co. Pvt. Ltd., Nagpur

58 P33 50153/2020 Life republic

59 P34 50419/2020 Proposed Integrated Township Project by Malnad Projects Pvt. Ltd. at S. no. 22, 39, 40, 44 to 54, 57, 58, 60 & 102, village- Manjari, Taluka- Haveli, Pune Maharashtra

60 P35 51161/2020 SMBTS Educational Complex (Education Purpose) at Mau. Ghoti Khurad (G.No. 461/A, 461/B, 469, 470, 471/1, 471/2, 499/A, 499/B) and Mau. Dhamngaon (G.No. 742, 743/A, 3/B, 744, 745, 746), Taluka Igatpuri Dist Nashik by Mr. Shriram Dattu Kurhe.

61 P36 50625/2020 Treeland By M/s. ABH Developers Pvt. Ltd.

62 P37 51112/2020 Proposed IT Park by ANP Lifespaces LLP at S.No.49/19/1,50/1,3,4,50(P), Village Balewadi, Taluka Haveli, District Pune

63 P38 51553/2020 Integrated Township “Vaarivana” at Urse and adhe village Dist Pune by M/s Sanjivani Integrated Township LLP

64 P39 51000/2020 Amendment and extension in validity of Environment Clearance for construction of proposed Township project "Nanded City" at village Nanded, Taluka Haveli, District Pune, Maharashtra ******