<<

Map 1 (Tower Hill - Blackfriars) This map shows some of the main changes proposed along the route.

New signalised cycle crossings to connect to Barclays Cycle Superhighway Route 3 see map 2

New pedestrian New bus stop New coach stop crossing bypass for cyclists

bypass for cyclists

LL STREET LL

ES PUDDLE

DOCK QUEEN VICTORIA ST.LAMBETH Monument

Tower Tower NSE Cannon A

1.6 HILL Hill Gateway

M Street MINORI Blackfriars HILL FISH ST. TRINITY 1.8 1.2 SQUARE 1.1 ARTHUR STREET 1.4 STREET STREET 1.3 ROYAL MINT 1.7 UPPER THAMES STREET UPPER THAMES STREET LOWER THAMES BYWARD TOWER HILL SHORTER

1.5 STREET STREET STREET

LANE WATER

SWAN LANE RIVER THAMES Changes to footway widths, Tower of IDGE with some areas widened R London New pedestrian but others reduced Simpler pedestrian crossing crossing

SOUTHWARK BLACKFRIARS Tower

Trafc allowed to turn LONDON B left from Puddle Dock into Upper Thames Street

TOWER BRIDGE N

East-West Cycle Superhighway Proposed trafc restrictions on East-West Cycle Superhighway (Map 1) 1.1 Shorter Street closed to all vehicles except buses and cycles Existing Barclays Cycle Superhighway 1.2 No access to Trinity Square from Tower Hill/ ● 1.3 No left turn from Fish Street Hill into Lower Thames Street * Proposed North-South Cycle Superhighway 1.4 No left turn from Lower Thames Street into Fish Street Hill ● 1.5 No right turn from Upper Thames Street to Swan Lane § 1.6 No access to Lambeth Hill from Queen Victoria Street * Segregated two-way cycle track replaces trafc lane (Lambeth Hill becomes one-way from Castle Baynard Street) 1.7 Local access only to Castle Baynard Street * Non-segregated section on quieter roads 1.8 No right turn from Puddle Dock (northbound) into Castle Baynard Street ● except cycles using cycle track * except cycles § except cycles (subject to trials of two stage right turn) Proposed trafc restrictions (see table)