BURÇ JEOTERMAL YATIRIM ELEKTRİK ÜRETİM A.Ş. EFE GEOTHERMAL POWER PLANT PROJECT ENVIRONMENTAL IMPACT ASSESSMENT REPORT AYDIN PROVINCE, GERMENCIK and INCIRLIOVA DISTRICTS EIA Report Final EIA Report ANKARA-AUGUST 2012 Öveçler Huzur Mah. 1139. Sok. Çınar Apt. No: 6/3 ÇANKAYA/ANKARA Ph: 0 312 472 38 39 Fax: 0 312 472 39 33 web: cinarmuhendislik.com e-mail:
[email protected] All rights of this report are reserved. Under Law numbered 4110 and amendment law "Literary and Artistic Works Law" numbered 5846 to this law, this report, completely or as a part, cannot be duplicated, copied under any form and method, either digital and/or electronic media, its copied versions cannot be published, traded, transferred in electronic form, sold, rented, used and be used outside its purpose without written approval of Çınar Mühendislik Müşavirlik A.Ş. BURÇ JEOTERMAL YATIRIM ELEKTRİK ÜRETİM A.Ş. EFE GEOTHERMAL POWER PLANT PROJECT EIA REPORT NAME OF EMPLOYER BURÇ JEOTERMAL YATIRIM ELEKTRİK ÜRETİM A.Ş. Aşağı Öveçler 1322. Cadde No:29/6 ADDRESS OF EMPLOYER Çankaya – Ankara / TÜRKİYE TELEPHONE AND FAX Ph: 0 (312) 472 28 21 NUMBERS OF EMPLOYER Fax: 0 (312) 472 28 23 EFE GEOTHERMAL POWER PLANT (162,5 MWe) PROJECT NAME PROJECT PROJECT COST 200.000.000 TL FULL ADDRESS OF THE LOCATION SELECTED FOR Aydın Province, Germencik and İncirliova Districts THE PROJECT (PROVINCE, DISTRICT, LOCATION) Coor. Line: Dextro, Up Datum: ED-50 Coor. Line: Latitude, Longitude Type: UTM Datum: WGS-84 D.O.M.: 27 Type: Geographical COORDINATES OF THE Zone: 35 D.O.M.: - Scale Fac.: 6 degree LOCATION SELECTED FOR Zone: - Sheet Name: Aydın M19 Scale Fac.: THE PROJECT, ZONE Area: (Station:77.003.27 m2) Coordinates are Coordinates are presented presented in the in the following pages.