Mechanical Plan Review Checklist

Total Page:16

File Type:pdf, Size:1020Kb

Mechanical Plan Review Checklist CITY OF LONG BEACH Department of Development Services BUILDING AND SAFETY BUREAU MECHANICAL PLAN REVIEW CHECKLIST PROJECT NO.: BMEC DATE: STATUS: PROJECT ADDRESS: WORK DESCRIPTION: INFORMATION APPLICANT’S NAME: TEL. NO.: E-MAIL: FAX. NO.: Your application for a permit, together with plans and specifications, has been examined and you are advised that the issuance of a permit is withheld for the reasons hereinafter set forth. The approval of plans and specifications does not permit the violation of any sections of the Building Code or other local ordinances or state laws. In an effort to streamline the plan review process, please follow the steps outlined below to ensure that there is no delay in processing your application and reviewing your responses to these plan check comments. • Comments with circled item numbers apply to this plan check. • Revised plans and calculations shall incorporate or address all comments marked on the original checked set of plans, calculations, and this plan review checklist. Provide a written response to each comment and show where and how it has been addressed. Identify the sheet number and detail or reference note on the revised plans where the corrections are made. Time spent searching for the corrected items on the revised plans or calculations will delay the review and approval process. Once all comments on the plans, calculations, and this checklist have been addressed, contact the plan check staff to SCHEDULE AN APPOINTMENT to review the changes made. PLAN REVIEWER: TEL. NO.: ADDRESS: 333 W. OCEAN BLVD., 4TH FLOOR, LONG BEACH, CA 90802 EMAIL: WEBSITE: www.lbds.info INSTRUCTIONS • Should you have any questions or need clarification pertaining to the comments made on your project, you may contact the plan check staff by telephone from 7:30 AM (8:30 AM Wed.) to 4:30 PM (M T W TH F). • Bring the original checked set of plans and calculations along with this checklist, your written response to the appointment meeting. Do not schedule an appointment meeting with the plan check staff until all comments have been addressed. You may also resubmit the plans without a recheck meeting at the 4th floor Development Services Center • We will ensure that the appointment meeting or re-submittal of the plans for recheck will proceed as expeditiously as possible. If an impasse is reached during the appointment meeting, you may request that the plan check supervisor be summoned for a 2nd opinion or to attempt to resolve and/or clarify the matter. • Major revisions to the plans that necessitate additional review time may be subject to re-submittal and additional plan check fees as authorized by Section 18.05.040 of the Long Beach Municipal Code. • Reviewed plans and/or calculations not picked up within 60 days of notice will be discarded. Numbers within the parenthesis ( ) refer to the section of the applicable code. 2013 California Building Code (CBC). Table (T). 2013 California Electrical Code (CEC). 2013 California Plumbing Code (CPC). 2013 California NOTE Mechanical Code (CMC). Long Beach Municipal Code (LBMC). Health and Safety Code (HSC). Mechanical Plan Review Checklist v1 Page 1 of 10 Updated 12/20/2013 www.lbds.info City of Long Beach Department of Development Services – Building and Safety Bureau, Plan Review Division Mechanical PLAN SUBMITTAL 6. Show the occupancy of each area. 1. Each sheet of the construction documents must 7. Show the intended use of each room. bear stamp, wet signature, registration number and expiration date of the Responsible Party. The 8. Show 120 Volt electrical outlets on the plans within Responsible Party is the Registered Mechanical 25 Ft. of all outdoor Mech. Equip. (CMC 309) Engineer, or Licensed Architect, or Licensed Mechanical Contractor (C-20). FURNACES 2. The address of the project and the name/address 1. Provide calculations for the combustion air. Show of the owner are required on the first sheet of the combustion air openings or ducts and sizes on the construction documents. Include the name/address plans. (CMC 701.0) of the registered design professionals and/or consultants on the construction documents where 2. Combustion-air duct shall be of galvanized steel. applicable. (CMC 701.11) 3. Provide the scope of work to be done on cover 3. Dampers are not allowed in combustion-air ducts. sheet. (CMC 701.12) 4. Two final set(s) of construction documents will be 4. Provide an elevation of the furnace: show draft required during permit issuance. Construction hood, vent size and type (E.G. double wall type B documents must be: vent, positive pressure vent etc.), clearances and a. Quality blue or black line drawings with uniform vent termination. (CMC 802) and light background color b. All required documents, wet signed by the 5. The vent shall be double wall type B. (CMC Table Responsible Party, shall be included on the 802.4) plans c. All required documents, wet signed by the 6. The vent shall be positive pressure type. (CMC Responsible Party, in 8-1/2” x 11” format Table 802.4). d. Max. 36” x 48" size with min. 1/8" lettering size e. Provide a complete and accurate Plumbing 7. The vent shall be sized in accordance with CMC Permit application 803.0 and venting tables 803.1.3(1) through 803.1.3(15). Show vent height offsets and diameter 5. Remove all plans, details or notes that do not on the plans. (CMC 803) pertain to the project from the final set of construction documents. 8. The vent termination shall be at least 5 feet above the vent collar. (CMC 802.6.2.1) 9. Vents shall extend above the roof and shall GENERAL REQUIREMENTS HVAC terminate in a vent cap. Termination point shall be 1. Plans shall bear the wet stamp with license number at least 3 feet above any forced air inlet into the and signature of an architect, mechanical engineer building located within 10 feet. (CMC 311.3) or C-20 licensed contractor (Chap. 7, Div. 3, Business and Professional Code, Art. 2, Sec. 10. Provide manufacturer brochure showing venting 6735.4)(Chap. 7, Div. 3, Business and Professional criteria for condensing furnaces. Code, Art. 2, Sec. 6735.4) 11. Vents shall not extend into or pass through ducts or 2. Show job address on plans. plenums. (CMC 602.1) 3. Plans shall be clearly legible, and at a scale no 12. Specify on the plans according to which table of smaller than 1/8 inch per foot. CMC Table 803.1.3 (1) through 803.1.3(15) the venting system has been designed. 4. Show equipment schedule on the plans. 5. Show roof access. Mechanical Plan Review Checklist v1 Page 2 of 10 Updated 12/20/2013 www.lbds.info City of Long Beach Department of Development Services – Building and Safety Bureau, Plan Review Division Mechanical AIR CONDITIONING in the main supply air duct of each air moving system. (CMC 608.1) 1. Show primary condensate drain piping on the mechanical plans. Include piping material and sizes 8. When duct type smoke detectors are proposed on the mechanical plans. Condensate piping shall show on the plans that the duct smoke detectors be sized in accordance with CMC Table 312.3. will be supervised by the building fire detection or (CMC 312.1) alarm system when the building is equipped with such system. (CMC 608) 2. Condensate waste shall connect indirectly to the 9. Show all fire and smoke rated walls and ceilings on drainage system through an air gap or air break to plans. (CBC 705 through 711) properly trapped and vented receptors, dry wells, or the tailpiece of a plumbing fixture. (CMC 312.6) 10. Verify with the Building Plan Check approved architectural plans all requirements for fire 3. Show secondary condensate drain (watertight pan) resistance-rated assemblies on this project. Please for cooling coils installed above the ceiling or in provide with the mechanical resubmittal, one copy furred spaces. The secondary drain shall terminate of the Building Plan Check approved architectural in a readily observable location such as outdoors plans for or a copy of the architectural plans that above a door or window or indoors above a lav or include all corrections addressed that are required shower. Show secondary condensate pans, by the Building Plan Check Division. condensate piping size and termination at a location where it can be readily observed. (CMC 11. Verify the resubmitted mechanical plans thoroughly 312.2) address all required fire protection measures (if any) for mechanical duct penetrations and air 4. Where condensate waste from air conditioning coils transfer openings through fire-resistance rated discharges by direct connection to a lavatory construction as determined by the approved tailpiece or to an approved accessible inlet on a architectural plans. Where there will be any bathtub overflow, the connection shall be located in mechanical duct penetrations of, or air transfer an area controlled by the same person controlling openings through any fire resistance rated the air-conditioned space. (CMC 213.5) assemblies; including but not limited to, fire barriers, fire partitions, exterior walls, shafts, 5. Show on plan duct materials and gauges. Materials horizontal assemblies, corridors etc., indicate on and gauges shall be per ANSI SMACNA 006-2006 the mechanical plans any required fire dampers, HVAC Duct Construction Standards. (CMC 602.1) fire/smoke dampers, ceiling radiation dampers, shafts or other approved protection methods as 6. The Heating and cooling duct system should be applicable in accordance with the requirements of sized in accordance with one of the recognized CBC 717 through 717.6.2.1. Show the specific methods of ASHRAE, ACCA or other approved locations for all protection methods on the plans.
Recommended publications
  • Commercial Kitchen Ventilation Testing Requirements
    COMMERCIAL KITCHEN VENTILATION TESTING REQUIREMENTS CALL FIRE MARSHAL/FIRE SUB CODE OFFICIAL AT 908-454-6121 EXT 360 TO SCHEDULE ACCEPTANCE TESTING IMC 506.3.2.5 GREASE DUCT TEST Prior to the use or concealment of any portion of grease duct system, a leakage test shall be performed in the presence of the Fire Inspector. Ducts shall be considered to be concealed where installed in shafts or covered by coatings or wraps that prevent the ductwork from being visually inspected on ALL sides. The permit holder shall be responsible to provide the necessary equipment and perform the grease duct leakage test. A light test or approved equivalent test method shall be performed to determine that all welded and brazed joints are liquid tight. A light test shall be performed by passing a lamp having a power rating of not less than 100 watts (or 1500 lumens for energy efficient bulb types) through the entire section of duct work to be tested. The lamp shall be open so as to emit light equally in all directions perpendicular to the duct walls. At test shall be performed for the entire duct system, including the hood-to-duct connection. The ductwork shall be permitted to be testing in sections, provided that every joint is tested. IMC 507.16 PERFORMANCE TEST A performance test shall be conducted upon completion and before final approval of installation of a ventilation system serving commercial cooking appliances. The test shall verify the rate of exhaust airflow required by Section 507.13, makeup airflow required by Section 508, and proper operation as specified in this chapter the permit holder shall furnish the necessary test equipment and devices required to perform the tests.
    [Show full text]
  • Model Ipic Series 4G Grease Duct
    INSTALLATION AND WALMART MAINTENANCE APPLICATION INSTRUCTIONS 637N MODEL IPIC 7N71 SERIES 4G GREASE DUCT IT IS OF THE UTMOST IMPORTANCE THAT THIS DUCT BE INSTALLED ONLY IN ACCORDANCE WITH THESE INSTRUCTIONS. IMPORTANT: DO NOT INSTALL GREASE DUCT WITHOUT FIRST READING THESE INSTRUCTIONS VERY CAREFULLY. COMBUSTIBLE MATERIAL: Material made of or surfaced with wood, compressed paper, plant fibers, plastic or other material that will ignite and burn, whether flame proofed or not, or whether plastered or unplastered. Metal-Fab’s series 4G Grease Duct System has been fully tested, listed and classified by Underwriters Laboratories, Inc. and Underwriters Laboratories of Canada. Metal-Fab’s Series 4G Grease Duct Systems have been evaluated and accepted by BOCA, SBCCI, and ICBO as an alternative to a two hour fire rated shaft enclosure when installed in accordance with these installation instructions. Grease Duct installed in accordance with these Installation Instructions meet the requirements of NFPA96. These instructions contain complete information on details concerning dimensions, installation, clearance to combustibles, use of noncombustible enclosures, and Firestops. For any additional information, refer to the parts catalog. METAL-FAB INC., • P.O. BOX 1138, WICHITA, KANSAS 67201 • (316) 943-2351 GENERAL INFORMATION LISTINGS: Metal-Fab IPIC Series 4G Grease Duct Systems (6” thru 36” diameter) are classified by Underwriters Laboratories, Inc. (UL File No. R15388) in accordance with SBCCI acceptance criteria for Grease Duct Enclosure Systems (January 1, 1998). The IPIC Series 4G Grease Ducts for use in Grease Duct Assembly No. G-1 is Classified as an alternate to 3 hr. fire resistive rated shaft enclosure system with a minimum zero clearance to combustibles.
    [Show full text]
  • Significant Changes to the March 2017 International Mechanical Code
    Significant Changes to the March 2017 International Mechanical Code State of Connecticut Department of Administrative Services Division of Construction Services Office of Education and Data Management Office of Education and Data Management Spring 2017 Career Development Series Significant Changes to the International Mechanical Code Presented by John Tye Office of the State Building Inspector, DAS “2012” International Mechanical Code Update The following presentation contains “significant” code changes which took place in the International Mechanical Code from 2003 through 2012. Office of Education 2 and Data Management Office of Education and Data Management 1 Significant Changes to the March 2017 International Mechanical Code IMC update 2012 Many code changes have taken place in the IMC since 2003. This seminar will only be able to identify a small number of these changes. Confusion still exists between proper code use such as the IRC versus the IMC for fuel gas installations. The IMC does not address gas or gas related equipment. Office of Education 3 and Data Management IMC update (continued) The IRC uses both its Chapter 24(based on the IFGC) and the 2012 NFPA 54 document for gas piping and equipment installations. The Ct. supplement to the IRC includes the NFPA 54 document. Section 101.4.1 (Add) As I stated in the previous slide the IMC references the International Fuel Gas Code (IFGC) (member of the ICC family of codes). The State of Connecticut did not adopt the IFCG and instead references the NFPA 54 document, currently the 2012 edition for gas piping and equipment installations. Office of Education 4 and Data Management Office of Education and Data Management 2 Significant Changes to the March 2017 International Mechanical Code IMC update (continued) Any reference to the IFGC in either the IMC or IRC shall be considered a reference to NFPA 54, NFPA 2, and NFPA 58.
    [Show full text]
  • Duct Fire Protection Products
    23 07 00/THE Duct Fire Protection Products BuyLine 8880 Thermal Ceramics, a global manufacturer of high temperature insulation prod- ucts, has provided engineered solutions for heat containment problems for over 75 years, and was the first to develop flexible fire resistive duct enclosures, mar- keted under the brandname of FireMaster®, for commercial kitchen grease and air ventilation ducts. Unlike imitation wraps in today’s market, Thermal Ceramics has the widest range of duct enclosure products that are performance-tested beyond minimum laboratory listings or code requirements. This assures fire con- tainment, from the typical to the most complex duct designs, without theorizing. Thermal Ceramics innovative duct products are high temperature (2000°F) fire rated solutions that do not age, become brittle, or shrink during in-service opera- tions, like lower temperature mineral wool wraps. The duct products in the FireMaster line are resistant to mold growth in test conditions of 75-95% relative humidity (ASTM D6329). With zero flame and smoke ratings on the blanket, and only a 5 flame spread and 10 smoke rating on the foil encapsulation, Thermal Ceramics duct products do not add toxic emissions to fire conditions. With a vast number of field installations worldwide and over 20 years of successful fire con- tainment in real-world fires, the duct products in the FireMaster line have proven their worth. Typical Applications • Commercial Kitchen Grease Ducts • Air Ventilation Ducts • Chemical Exhaust Ducts • Stair Pressurization Ducts • Hazardous Exhaust Ducts • Trash and linen chutes Duct Fire Protection Products 2000°F Rigid Flexible External 2 Hr Internal 2000°F Commercial Kitchen Shaft Alternative Installation ASTM E119 & Grease Duct Fire Grease Duct Method E814 Performance Containment Air Ventilation Duct Systems Installation Experience Complies with • Wynn Hotel, Las Vegas, NV - Grease duct • Baylor University Bio-Science College, Waco, Texas - Chemical exhaust duct • M.D.
    [Show full text]
  • Grease Duct Enclosures Fire and Smoke Dampers in Grease Ducts
    506.3.11 CHANGE TYPE: Modification CHANGE SUMMARY: The code specifically prohibits the installation of Grease Duct Enclosures fire and smoke dampers in grease ducts. 2015 CODE: 506.3.11 Grease Duct Enclosures. A commercial kitchen grease duct serving a Type I hood that penetrates a ceiling, wall, floor or any concealed spaces shall be enclosed from the point of penetration to the outlet terminal. In-line exhaust fans not located outdoors shall be enclosed as required for grease ducts. A duct shall penetrate exterior walls only at locations where unprotected openings are permitted by the International Building Code. The duct enclosure shall serve a single grease duct and shall not contain other ducts, piping or wiring systems. Duct enclosures shall be either a shaft enclosure in accordance with Section 506.3.11.1, a field-ap- plied enclosure assembly in accordance with 506.3.11.2 or a factory-built enclosure assembly in accordance with Section 506.3.11.3. Duct enclosures shall have a fire-resistance rating of not less than that of the assembly pen- etrated and not less than 1 hour. Fire dampers and smoke dampers shall not be installed in grease ducts. Duct enclosures shall be as prescribed by Section 506.3.11.1, 506.3.11.2 or 506.3.11.3. 506.3.11.4 Duct enclosure not required. This excerpt is taken from Exception: A duct enclosure shall not be required for a grease duct Significant Changes to the that penetrates only a non-fire-resistance-rated roof/ceiling assembly. International Plumbing/ CHANGE SIGNIFICANCE: It has long been understood that fire and smoke dampers are not compatible with grease ducts, and the duct en- Mechanical/ closure requirements clearly account for the lack of such dampers where Fuel Gas the ducts penetrate walls, floors and ceilings.
    [Show full text]
  • Kitchen Hood Test Data Form
    CITY OF HENDERSON Department of Building & Fire Safety KITCHEN HOOD TEST DATA Date Permit No. Street Address * * * * * * * * * * * * * * General Contractor Phone Sub-Contractor Phone Address License # HOOD LOCATION PLAN SHEET NO. TESTING EQUIPMENT TYPE TYPE OF HOOD: Type I LIST ALL EQUIPMENT UNDER HOOD: ACTUAL HOOD SIZE: ft x ft = sq. ft. (Hood Width) (Hood Length) (Hood Area) REQUIRED QUANTITY OF AIR: (See UMC 2003 for appropriate formula) Ft x ft x = CFM (Hood Width) (Hood Length) (Formula) (Hood Exhaust) ACTUAL QUANTITY OF AIR AS MEASURED: CFM (Actual Volume) ACTUAL TOTAL FILTER AREA: sq. ft. (Filter Area) ACTUAL FILTER AIR FLOW RATE PER SQ. FT. OF FILTER AREA: CFM - sq. ft. = FPM (Actual Volume) (Filter Area) (Each Filter) LISTED FILTER AIRFLOW RATE: = FPM per filter (As Shown on Filter) ACTUAL DUCT SIZE: Rectangular Duct Ft x ft = sq. ft. (Front Width) (Side Length) (Duct Size) Round Duct .79 x ft = sq. ft. (Duct Diameter) (Duct Size) ACTUAL GREASE DUCT AIR VELOCITY: CFM - sq. ft. = FPM (Actual Volume) (Duct Size) (Duct Velocity) REQUIRED DUCT SYSTEM AIR VELOCITY FOR SHOP MADE HOODS: 1500 FPM (minimum) 2500 FPM (maximum) MANUFACTURERS STATED VELOCITY FOR LISTED HOODS: (Minimum) (Maximum) MAKEUP AIR SOURCE AND SIZE: (Size of source in total CFM) THE EXHAUST AND MAKEUP AIR SYSTEMS SHALL BE CONNECTED BY AN ELECTRICAL INTERLOCK SWITCH. 2000 Southern Nevada Uniform Mechanical Code Amendments - 509.11 ( Performance Test) Upon completion and before final approval of the installation of ventilation system serving commercial food heat-processing equipment, a performance test, shall be performed to verify the rate of airflow and proper operation as specified in this chapter.
    [Show full text]
  • Factory-Built Grease Duct Systems
    FACTORY-BUILT GREASE DUCT SYSTEMS For Kitchen Ventilation Systems DESCRIPTION METAL-FAB “G” SERIES Models 3G / 4G Models PIC / 1G / 2G Models PSW ALTERNATE TO FIRE REDUCED CLEARANCE SINGLE WALL RESISTIVE SHAFT ENCLOSURE TO COMBUSTIBLES STAINLESS STEEL Factory - Built Factory - Built Factory - Built INSTALLED SPACE REQUIREMENTS 20" X 20" 20"/22" X 20"/22" 50" X 50" 12" X 12" SQUARE DUCTS - 144 SQ. IN. 14" ROUND DUCT - 154 SQ. IN. CONSTRUCTION Outer Casing (Integral Shaft Encl osure) Outer Casing -Aluminized Carbon Aluminized Carbon or Stainless Steel or Stainless Steel Insulation: 3" or 4" Ceramic Fiber Insulation: Air, 1" or 2" Ceramic Fiber Grease Duct - 20 Gauge Stainless Steel Grease Duct - 20 Gauge Stainless Steel Grease Duct - 20 Gauge Stainless Steel CLEARANCES Zero Clearance to Combustibles See Chart for Reduced Clearances 18 Inches to Combustibles on Page 8 3 Inches to Limited Combustibles CURRENT CODE YES YES YES ACCEPTANCE 2021 IMC 2021 IMC 2021 IMC 2021 UMC 2021 UMC 2021 UMC 2021 NFPA 96 2021 NFPA 96 2021 NFPA 96 New York City: MEA-86-07-E New York City: MEA-245-97-M Los Angeles: RR-8441 Wisconsin: 990074-H APPLICABLE UL1978 - Standard for Grease Ducts UL1978 - Standard for Grease Ducts UL1978 - Standard for Grease Ducts UL2221 - Tests of Fire Resistive LISTINGS Duct Enclosures UL2221 - Condition B, 2G Product NFPA 96 - Requires duct and fire Only, for 6"-18" Diameters wrap to be listed together as an UL103HT 6 "-14" Diameters UL103HT - 2G Product Only, assembly for the intended application. ASTM E 814 - Standard Test Method Must be installed per the for Through Penetration for 6"-14" Diameters Firestops manufacturer’s listing and their installation instructions.
    [Show full text]
  • A31 SI: Kitchen Ventilation
    Related Commercial Resources CHAPTER 31 KITCHEN VENTILATION Cooking Effluent ...................................................................... 31.1 System Integration and Balancing ......................................... 31.18 Exhaust Hoods ......................................................................... 31.2 Energy Considerations........................................................... 31.21 Exhaust Systems....................................................................... 31.9 Fire Protection ....................................................................... 31.22 Replacement (Makeup) Air Operation and Maintenance .................................................. 31.25 Systems ............................................................................... 31.13 Residential Kitchen Ventilation.............................................. 31.27 ITCHEN ventilation is a complex application of HVAC sys- ventilation. However, heat radiated to the space from the appliance K tems. System design includes aspects of air conditioning, fire is largely unaffected by ventilation and must be addressed by the safety, ventilation, building pressurization, refrigeration, air distri- space air-conditioning system. Chapter 30 of the 2005 ASHRAE bution, and food service equipment. Kitchens are in many buildings, Handbook—Fundamentals lists typical space heat gain values for including restaurants, hotels, hospitals, retail malls, single- and many commercial kitchen appliances. multifamily dwellings, and correctional facilities.
    [Show full text]
  • OBROUND GREASE DUCT ™ Slimvent OBROUND GREASE DUCT
    TM OBROUND GREASE DUCT ™ SlimVent OBROUND GREASE DUCT SlimVent™ is a UL Classified zero-clearance grease duct system with the space saving profile of a field fabricated rectangular product. SlimVent™ is a flat oval shaped grease duct that MATERIAL THICKNESS provides all the maximum fire protection of a factory • Liners: 20 gauge (.035") fabricated round product, UL 2221 Classification, with the space savings previously only available with field- • Shells: 22 gauge (.034") aluminized or 430 SS fabricated non UL Classified rectangular systems. 20 gauge (.035") 304 or 316 SS LISTING SUPPORT LIMITS The Schebler SlimVent™ grease duct system is Underwriters Support plates and wall supports are utilized to support the weight of Laboratories Inc. UL 1978 Listed and UL 2221 Classified under the grease duct. In horizontal runs, supports should be placed adjacent file number R25748 and control number 41RE as azero clearance to fittings that are not otherwise supported. to combustibles, 2-hour fire rated grease duct. It also has the Underwriters Laboratories mark for Canada (cUL). TESTS PERFORMED The SlimVent™ system has endured rigorous tests by Underwriters SYSTEM CONCEPT Laboratories. Just a few of the test performed are: • Prefabricated, modular, double wall system • Structural Tests The support plates and wall supports • No field welding is required have been physically tested to carry a load 4 times that • 4-inch insulation (11 lbs per sq in.) zero clearance allowed by our listing. to combustibles • Wind Load Tests Loads equivalent to 110 mph wind • Easy-to-handle section lengths RapidLock have been applied to the chimney with acceptable results. connected with the RapidLock™ Connection System • Fire Barrier The system and fire stop have been Connection System subjected to temperatures up to 2000º to ensure • Pressure-tight drawbands and high-temperature sealant structural integrity of the system and effectiveness of a fire stop in preventing fire passage to multiple COMPLETE LINE OF FITTINGS AND SIZES floors of a building’s structure.
    [Show full text]
  • Mechanical Problem Codes
    MECHANICAL PROBLEM CODES DESCRIPTION COMMENTS CORRIDOR AS A RETURN PATH Corridors shall not serve as supply, return, exhaust, relief or ventilation air ducts. (Ref. VMC 601.2) EXIT ENCLOSURES AND PASSAGEWAY Please notre that Duct or pipe penetrations through rated walls or ceilings of exit enclosures or exit passageways are not permitted except for reqd, exit doors, if the duct or pipe serves or communicates with other spaces in the structure. (IBC, 1023.4 and 1023.5 ) GUARDS ON ELEVATED SURFACES Please ensure that Guards shall be provided where appliances, equipment, fans or other components that require service and roof hatch openings are located within 10 feet of a roof edge or open side of a walking surface and such edge is located more than 30 inches above the floor, roof or grade below. The guard shall extend not less than 30 inches beyond each end of such appliances,equipment,fans,components that require service and roof hatch openings and the top of the guard shall not be less than 42 inches above the elevated surface adjacent to the guard. The guard shall be constructed so as to prevent the passage of a 21 inch sphere and shall comply with the loading requirements for guards specified in the Codes.( IBC, 1013.5 and VMC,304.11 ) UL DESIGN # FOR FLOOR/CEILING Please provide a U.L listing design number, prescriptive design per VCC section 721, or calculations in accordane with section 722 for the fire rated floor/ceiling (roof/ceiling) assembly. (Ref. IBC 703.2, 703.3) FIRESTOP SYSTEM Please provide an approved through-penetration firestop system for all duct penetrations through rated assemblies which are located within the cavity of a wall.
    [Show full text]
  • Mechanical Inspection Guidelines and Checklist
    INSPECTION GUIDELINES GENERAL PROCEDURES All Inspectors shall read and become familiar with these procedures. Inspections carried over from the previous working day shall be given priority and must be performed first. Inspection cancellations must be documented on the comment line with the name and telephone number of the person that requested it and the time of the request. When a jobsite is not accessible always leave a tag and record in the comments line “Left tag at………” Before using disposition code 035 “Unable to locate” use the Property Appraiser’s web site http://www.miamidade.gov/pa/property_search.asp and/or call your supervisor. If permit holder cannot be reached place the hold code 067. Do not use Field Check Disposition 010 without obtaining approval from supervisor. The work shall be inspected for compliance with the permit plans and the applicable Code (FBC or SFBC). The permit holder (contractor or owner builder) is responsible for the job and shall inspect the work and ascertain it meets code requirements before calling for inspection. Temporary buildings and sheds used exclusively for construction purposes are exempt of a building permit (Zoning Improvement Permit required). Mobile homes used as temporary offices are required to comply with the requirements of F.S. Chapter 553, Part V relating to accessibility by individuals with disabilities. Verify that you are recording the inspection result on the correct permit card. All documents that you receive in the field from the permit holder shall contain the permit number on every page, the date and the inspector name and signature Be thorough conducting the inspection and recording the results.
    [Show full text]
  • Factory-Welded Grease Duct Systems 3
    1 XXX XXX FACTORY-WELDED GREASE DUCT SYSTEMS 3 General Information Product Overview GeneralXXX Notification Grease duct is an ETL listed, single wall construction The purpose of the NFPA 96 Standard is to reduce the potential fire hazard of cooking operations, independent made from 430 stainless steel. Duct diameters range from of the type of cooking equipment used and whether used in public or private facilities. Please refer to Chapter 7 8” to 24”, with multiple lengths and accessories available. of the NFPA 96 Standard, Exhaust Duct Systems, for Grease duct is ideal for use in kitchen ventilation applica- detailed description of duct requirements and design. tions and is available as a stand-alone system or part of All dimensions are shown in American Standard (feet and inches). a fully integrated package. Grease duct is pre-engineered for optimum performance for exhaust fans and hoods. Grease duct is ETL listed to Standard UL-1978; duct does not have to be welded in the field. Table of Contents 4 5 Table of Contents Standards & Key Words* & References 01 General Information 10 Grease Duct Components UL- 1978 Test Standard for Safety Grease Ducts. -Product Overview -Factory Installed Riser -General Notification 11 -Field Installed Riser NFPA- 96 Standard for Ventilation Control and Fire Protection of Commercial Cooking Operations. 12 -Straight Duct 02 Table of Contents 13 -Adjustable Straight Duct ETL- Edison Testing Laboratory, http://www.intertek-etlsemko.com. The ETL listed Mark is the legal equivalent of the UL Listed and 14 -Table 9- Dynamic Loss Coefficient Table CSA Listed Marks throughout the United States and Canada.
    [Show full text]