Certificate Rspo
Total Page:16
File Type:pdf, Size:1020Kb
CERTIFICATE Field of attention RSPO CERTIFICATE CODE: CU-RSPO-826923 Issued to Felda Global Ventures Plantation (M) Sdn Bhd KULAI PALM OIL MILL Control Union (Malaysia) Sdn Bhd declares to have inspected the processing unit/mill and supply base(s) of the above-mentioned licensee, and have found them in accordance with the standards mentioned below. This certificate covers the processing unit/mill and supply base(s) as mentioned in the authenticated annex of this certificate. Standards The Principles and Criteria for the Production of Sustainable Palm Oil 2013- Endorsed by the RSPO Executive Board and accepted at the Extraordinary General Assembly by RSPO Members on April 25th 2013. (Including Major Indicators endorsed by RSPO Board of Governors on 15 November 2013) and RSPO Supply Chain Certification Standard Nov 2011. This certificate is in force until further notice, provided that the above-mentioned licensee continues meeting the conditions as laid down in the licensee contract with Control Union (Malaysia) Sdn Bhd. Based on the annual inspections that Control Union (Malaysia) Sdn Bhd performs, this certificate is updated and kept in force. Valid until 13/04/2019 Date of certification: Declared by: 14/04/2014 Place and date of issue: Malaysia, 29/05/2015 RSPO Membership No: 8-0025-06-000-00 Control Union (Malaysia) Sdn Bhd is accredited for ISO 66: 1999 Simon Selvaraj under accreditation number QMS 002-01 by SLAB and approved by RSPO on 12/01/2006 Certifier On behalf of the Managing Director Control Union (Malaysia) Sdn Bhd RSPO-ACC-021 Annex 1 to Certificate – RSPO (Mill) CERTIFICATE CODE: CU-RSPO-826923 Control Union (Malaysia) Sdn Bhd has performed an inspection, assigned by: Name licensee Felda Global Ventures Plantation (M) Sdn Bhd RSPO Member 1-0013-04-000-00 Address PSQM Department FGVPM, Tingkat 7, Balai Felda, Jalan Gurney 1, 54000, Kuala Lumpur Legally represented by Mr. Norazam Abdul Hameed ([email protected] ) Authorized Country of production Malaysia This certificate, referred to in the licensee contract as scope certificate, covers the following facility, Mill’s Projected production for Supply Supply Certificate the next 12 months (MT) base Name Location Chain registration (see CPO PK Model code Annex 2) OPP 1, Kilang Sawit Kulai, OPP 2, KULAI Felda Taib Andak, POM 1 16,502.26 4,590.16 OPP 3, MB PALM OIL MILL 81000, Kulai, OPP 4. Johor. OPP Page 2 of 3 Annex 2 to Certificate – RSPO (Supply Base ) CERTIFICATE CODE: CU-RSPO-826923 This certificate, referred to in the licensee contract as scope certificate, covers the following supply base(s), Certificate GPS Reference Registration Name of Unit Location Ha Longitude Latitude Code Felda Taib Pejabat Felda Taib Andak Andak, 1° 29' 14" N 103°46' 52" E OPP 1 3,202 81000 Kulaijaya, Johor. Felda Bukit Pejabat Felda Bukit Batu Batu, OPP 2 1° 42' 12" N 103°26' 21" E 1,425 81020 Kulaijaya, Johor. Felda Ulu Pejabat Felda Ulu Tebrau Tebrau, OPP 3 1° 38' 13" N 103°45' 25" E 2,784 81810 Ulu Tiram, Johor. FASSB Taib Pentadbiran Benih, Andak Stesen FASSB Bukit OPP 4 1° 29' 14" N 103°46' 52"E 120 Besar, 81000 Kulaijaya, Johor This certificate including the annexes remains property of Control Union (Malaysia) Sdn Bhd and can be withdrawn in case of terminations as mentioned in the licensee contract, or in case changes or deviations of the above mentioned data occur. The licensee is obliged to inform Control Union (Malaysia) Sdn Bhd immediately of any changes in the above mentioned data. Only an original and signed certificate is valid. Place and date of issue: Authenticated by: Malaysia, 29/05/2015 Simon Selvaraj Certifier On behalf of the Managing Director Control Union (Malaysia) Sdn Bhd Page 3 of 3 .