Ulaanbaatar Urban Services and Ger Areas Development Investment Program—Tranche 1

Total Page:16

File Type:pdf, Size:1020Kb

Ulaanbaatar Urban Services and Ger Areas Development Investment Program—Tranche 1 Environmental Monitoring Report #2 Report June 2017 Mongolia: Ulaanbaatar Urban Services and Ger Areas Development Investment Program—Tranche 1 Prepared by the Municipality of Ulaanbaatar for Mongolia and the Asian Development Bank. CURRENCY EQUIVALENTS (as of 15 June 2017) Currency unit – togrog (MNT) MNT1.00 = $0.00042 $1.00 = MNT2,367.50 ABBREVIATIONS ADB – Asian Development Bank ADF – Asian Development Fund AP – affected person C-EMP – contractor's environmental management plan CQS – consultants qualification selection CS – consulting service CSC – citizen service center CWWTP – central wastewater treatment plant DE – Department of Environment DEIA – detailed environmental impact assessment DMF – design and monitoring framework EARF – environmental assessment and review framework EGDA – Environment and Green Development Agency EIA – environmental impact assessment EMP – environmental management plan EMR – environmental monitoring report ESMS – environmental and social management system FAM – facility administration manual FFA – framework financing agreement GACAP – governance and anticorruption action plan GDP – gross domestic product GEIA – general environmental impact assessment GRC – grievant redress committee GRM – grievance redress mechanism ICB – international competitive bidding IEC – information, education, and communication IEE – initial environmental examination LAR – land acquisition and resettlement M&E – monitoring and evaluation MET – Ministry of Environment and Tourism MFF – multitranche financing facility MUB – Municipality of Ulaanbaatar NCB – national competitive bidding NGO – nongovernment organization PAI – project administration instruction P1-EMP – environmental management plan for Project 1 PC – public consultation PMO – program management office PPTA – project preparatory technical assistance PSC – program steering committee QCBS – quality- and cost-based selection REA – rapid environmental assessment RPIC – resettlement planning implementation committee RRP – report and recommendation of the President SAP – social action plan SBD – standard bidding document SES-WTPS – socioeconomic survey and willingness-to-pay for services SME – small- and medium-sized enterprises SOE – statement of expenditure SPS – Safeguard Policy Statement SPRSS – summary poverty reduction and social strategy SRA – Subcenter Development Authority USIP – Ulaanbaatar Services Improvement Project USUG – Ulaanbaatar Water Supply and Sewerage Authority UUSGDIP – Ulaanbaatar Urban Services and Ger Areas Development Investment Program WHO – World Health Organization WEIGHTS AND MEASURES cm – centimeter dB(A) – A-weighted sound pressure level in decibels ha – hectare kg – kilogram km – kilometer kWh – kilowatt-hour m – meter mm – millimeter m/s – meter per second m2 – square meter m3 – cubic meter mg/l – milligram per liter mg/m3 – milligram per cubic meter mg/Nm3 – milligram per standard cubic meter Nm3 – standard cubic meter 0C – degree Celsius NOTE In this report, "$" refers to United States dollars. This environmental monitoring report is a document of the borrower. The views expressed herein do not necessarily represent those of ADB's Board of Directors, Management, or staff, and may be preliminary in nature. In preparing any country program or strategy, financing any project, or by making any designation of or reference to a particular territory or geographic area in this document, the Asian Development Bank does not intend to make any judgments as to the legal or other status of any territory or area. CONTENTS LIST OF ABBREVIATIONS ....................................................................................................... 2 WEIGHTS AND MEASURES .................................................................................................... 3 CONTENTS .............................................................................................................................. 4 LIST OF TABLES .......................................................................................................................... 5 I. INTRODUCTION ................................................................................................................... 6 A. PURPOSE OF THE REPORT ...................................................................................................... 6 B. BACKGROUND OF THE PROJECT ............................................................................................. 6 C. PROJECT MANAGEMENT ARRANGEMENTS ............................................................................... 8 D. ENVIRONMENTAL OVERVIEW OF THE PROJECT AREA ............................................................... 9 E. PROJECT IMPLEMENTATION PROGRESS ................................................................................ 10 II. ENVIRONMENTAL MANAGEMENT ...................................................................................... 13 A. COMPLIANCE WITH ENVIRONMENT RELATED PROJECT COVENANTS ......................................... 13 B. ENVIRONMENTAL RESPONSIBILITIES ..................................................................................... 14 C. PROGRESS AGAINST ENVIRONMENTAL MANAGEMENT ........................................................... 15 III. ENVIRONMENTAL MONITORING ....................................................................................... 16 B. KEY ENVIRONMENTAL QUALITY STANDARDS ......................................................................... 17 C. SELECTED CLIMATE DATA .................................................................................................... 21 D. ENVIRONMENTAL QUALITY DATA........................................................................................... 23 E. ENVIRONMENTAL MONITORING ............................................................................................. 26 IV. ENVIRONMENTAL MITIGATION MEASURES IMPLEMENTED ......................................... 27 A. SOIL AND GROUND SURFACE QUALITY .................................................................................. 27 B. AIR POLLUTION AND DUST CONTROL .................................................................................... 27 C. WATER QUALITY ................................................................................................................. 28 D. REHABILITATION OF AFFECTED SITE ..................................................................................... 28 E. WASTE MANAGEMENT ......................................................................................................... 28 F. PROJECT MANAGEMENT AND ORGANIZATION ........................................................................ 29 V. PUBLIC CONSULTATION, GRIEVANCE REDRESS MECHANISM .................................... 30 VI. INSTITUTIONAL STRENGTHENING AND TRAINING ........................................................ 33 A. OBJECTIVES OF TRAINING UNDER ENVIRONMENT AND SOCIAL SAFEGUARD ............................ 33 B. OBJECTIVES OF THE TRAINING UNDER RESETTLEMENT REQUIREMENTS ................................. 33 VII. CONCLUSION ..................................................................................................................... 36 A. OVERALL PROGRESS OF IMPLEMENTATION OF ENVIRONMENTAL MANAGEMENT MEASURES .... 36 B. PROBLEMS IDENTIFIED AND ACTIONS RECOMMENDED ........................................................... 36 C. PLANNED TARGETS AND ACTIVITIES FOR THE NEXT REPORTING PERIOD .................................. 36 VIII. APPENDICES ..................................................................................................................... 38 APPENDIX 1. ENVIRONMENTAL MANAGEMENT PLAN DURING CONSTRUCTION AND OPERATION STAGE (ADAPTED FROM UPDATED PROJECT EMP) ..................................................................... 38 APPENDIX 2. SUMMARY OF IMPORTANT FEATURES OF THE PROJECT SUB-CENTER AREA ............. 41 APPENDIX 3. ENVIRONMENTAL MONITORING PLAN ACCORDING TO MONGOLIAN LEGISLATION ...... 43 APPENDIX 4A. MEASURES IMPLEMENTED AGAINST IMPACTS ON SOIL AND EARTH SURFACE .......... 46 APPENDIX 4B. THE PROCESS OF SOIL STRIPPING, FILLING, LEVELING AND SHAPING ACTIVITIES .... 47 APPENDIX 5. LOCATION OF SAMPLING OF AIR, SOIL, WATER QUALITY AND NOISE LEVEL DURING SEWAGE COLLECTOR SYSTEM ................................................................................................... 48 APPENDIX 6. TERMS OF REFERENCE FOR EXTERNAL ENVIRONMENTAL MONITORING ................. 49 APPENDIX 7A. AGENDA FOR PUBLIC CONSULTATION ON PROPOSED HEATING STATION IN SELBE SUB- CENTER .................................................................................................................................... 53 APPENDIX 7B. QUESTIONNAIRE FORM FOR PARTICIPANTS ........................................................... 55 4 of 56 LIST OF TABLES TABLE 1. TABLE 1: INVESTMENT PROGRAM–PROJECT 1 ($ MILLION) ............................................. 7 TABLE 2. TABLE 2. MANAGEMENT ROLES AND RESPONSIBILITIES ................................................. 8 TABLE 3. AMBIENT AIR QUALITY STANDARDS ............................................................................ 17 TABLE 4. NOISE LEVEL STANDARDS .......................................................................................... 17 TABLE 5. SURFACE WATER QUALITY STANDARDS...................................................................... 18 TABLE 6. GROUNDWATER QUALITY STANDARDS .......................................................................
Recommended publications
  • Gender Analysis for Urban Nexus Project
    GENDER ANALYSIS FOR URBAN NEXUS PROJECT Commissioned by GIZ Urban Nexus project Prepared by ErdenechimegTserendorj, Gender Consultant ErdenechimegChuluunbaatar, Water Sanitation Consultant 2015 Page 1 of 52 List of abbreviation and acronyms ADB Asian Development Bank ERC Energy Regulatory Commission GIZ German International Cooperation (the Deutsche Gesellschaft fuer Internationale Zusammenarbeit) GHG Green house gas IAO International Accreditation Agency LPGE Law on the Promotion of Gender Equality LUUSWSS Law on Utilization of Urban Settlement’s Water Supply and Sewage MCA Millennium Challenge Agency MCUD Ministry Of Construction And Urban Development MEGD Ministry of Environment and Green Development MoU Memorandum of Understanding PIU Project Implementing Unit TTR Thermo-Technical Retrofitting NCGE National Committee on Gender Equality NWC National Water Committee NWP National Water Programme UN United Nations UNDP United Nations Development Program UNICEF United Nations Children's Fund WHO World Health Organization WWTP Waste Water Treatment Plant Page 2 of 52 Content: List of abbreviation and acronyms 2 Content: 3 List of Figures: 5 List of Tables: 5 INTRODUCTION 6 Integrated Resource Management In Asian Cities: The Urban Nexus Concept 6 The Urban Nexus Project in Ulaanbaatar City 7 Objective and Methodology of the Gender Analysis 8 GENDER ISSUES IN URBAN PLANNING 11 Overall Description of Ulaanbaatar City And Selected Districts 11 INCLUSION AND PARTICIPATION IN DECISION MAKING 16 The country’s overall situation in women’s participation
    [Show full text]
  • Perceptions of Precariousness
    Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized PERCEPTIONS OF PRECARIOUSNESS A Qualitative Study of Constraints Underlying Gender Disparities in Public Disclosure Authorized Mongolia’s Labor Market Achim Schmillen Nina Weimann-Sandig © 2018 International Bank Reconstructtion and Development / The World Bank 1818 H Street NW, Washington, DC 20433 Telephone: 202-4743-1000; Internet:worldbank.org Some rights reserved This report is a product of the staff of the International Bank for Reconstruction and Development / The World Bank with external contributions. The findings, interpretations, and conclusions expressed in this report do not necessarily reflect the views of the World Bank, the Executive Directors of The World Bank or the governments they represent. The World Bank does not guarantee the accuracy of the data included in this report. Rights and Permissions The material in this publication is copyrighted. Copying and/or transmitting portions or all of this work without permission may be a violation of applicable law. The International Bank for Reconstruction and Development/ The World Bank encourages dissemination of its work and will normally grant permission to reproduce portions of the work promptly. For permission to photocopy or reprint any part of this work, please send a request with complete information to the Copyright Clearance Center, Inc., 222 Rosewood Drive, Danvers, MA 01923, USA, telephone 978-750-8400, fax 978-750-4470, http://www.copyright.com/. All other queries on rights and licenses, including subsidiary rights, should be addressed to the Office of the Publisher, The World Bank, 1818 H Street NW, Washington, DC 20433, USA, fax 202-522-2422, e-mail [email protected].
    [Show full text]
  • Narrative Report on Study Tour of Mongolian Delegates to Jaipur
    A Study Tour of Municipal Government Official from Ulaanbaatar, Mongolia to Jaipur, India Organised by CUTS International With the support of The Asia Foundation, India December 08-10, 2015 Introduction Mongolia is a landlocked country in east-central Asia. It is bordered by Russia to the north and China to the south, east and west. While they do not share a border, Mongolia is separated from Kazakhstan by only 36.76 kilometres (22.84 mi). Ulaanbaatar, the capital and largest city, is home to about 45 percent of the population. Mongolia is divided into 21 provinces (aimags), which are in turn divided into 329 districts (sums). The capital Ulaanbaatar is administrated separately as a capital city (municipality) with provincial status. Thus being a federal municipality, the city is not part of any province. Ulaanbaatar is divided into nine districts: Baganuur, Bagakhangai, Bayangol, Bayanzürkh, Chingeltei, Khan Uul, Nalaikh, Songino Khairkhan, and Sükhbaatar. Each district is subdivided into Khoroos, of which there are 121. The capital and provinces have Citizens’ Representative Meeting (Local parliament) elected every 4 years. Governors exercise executive power in the capital and provinces and are appointed by the Prime Minister as recommended by Citizens’ Representative Meetings. Local administrations provide support for Governors. CUTS International with the support of The Asia Foundation (TAF) organised a three- day study tour for the Municipal Officials from the city of Ulaanbaatar of Mongolia. A 15- member delegation along with two representatives from TAF India visited Jaipur from December 07-11, 2015. 1 Objective The purpose of the study tour was to enhance capacities of the government officials with respect to informed decision making, community participation and implementation of activities for service improvement in their respective areas through exposure to relevant areas in India.
    [Show full text]
  • Thermo-Technical Retrofitting of State-Owned Schools and Kindergartens in Ulaanbaatar, Mongolia
    Thermo-Technical Retrofitting of State-owned Schools and Kindergartens In Ulaanbaatar, Mongolia Preliminary study Main Report Ulaanbaatar, Mongolia, 2014 Contents Introduction 6 1. Rationale 6 2. Background, objectives and the methods of the study 9 2.1. Background 9 2.3 Method and approach of the study 11 2.3.1 Scope of the study 12 2.3.2 Study tools 12 3. Issues related to the education sector of Mongolia and conditions of school and kindergarten buildings in Ulaanbaatar 12 3.1. Current situation and objectives of education development 12 3.2 School and kindergarten buildings, learning environment and challenges facing 15 3.3 School and kindergarten buildings in Ulaanbaatar 17 3.4 Need for thermo-technical retrofitting of buildings, legal frame work (Building norms and regulations (BNR), other legislation) 17 3.5 Tariff system 19 3.6 Experience and results of the demonstration project GIZ/USAID 19 4. The study results and analysis 22 4.1. The study results on kindergartens in Ulaanbaatar 22 4.1.1 General information 22 4.1.2 The current physical and operational conditions of buildings 26 4.1.3 Operational conditions of buildings 27 4.1.4. Kindergarten budget, expenses for heating, maintenance and overhaul work 43 4.2. The survey results and analysis of schools 45 4.2.1 General Information 45 4.2.2. The current physical and operational conditions of buildings 48 4.2.4 Engineering infrastructure provision 53 4.2.5 School budget, expenses for heating, maintenance and overhaul work 63 5. Recommendations for selection of buildings for TTR 66 6.
    [Show full text]
  • 53249-001: First Utility-Scale Energy Storage Project
    Initial Environmental Examination (Draft) Project Number: 53249-001 November 2019 Mongolia: First Utility Scale Energy Storage Project Prepared by the Ministry of Energy for the Asian Development Bank CURRENCY EQUIVALENTS (as of 14 November 2019) Currency Unit – Mongolian Tughrik (MNT) MNT 1.00 = $0.0004 $1.00 = MNT 2,701 ABBREVIATIONS ADB Asian Development Bank AP Affected Person AQA Air Quality Agency AuES Altai-Uliastai Energy System BESS Battery Energy Storage System CEMP Construction Environmental Management Plan CES Central Energy System CITES Convention on International Trade in Endangered Species CRA Climate Risk Assessment DEIA Detailed Environmental Impact Assessment EA Executing Agency EARF Environmental Assessment and Review Framework EHS Environment, Health and Safety EIA Environmental Impact Assessment EMoP Environmental Monitoring Plan EMP Environmental Management Plan EPA Engineer-Procure-Construct FSR Feasibility Study Report GDP Gross Domestic Product GEIA General Environmental Impact Assessment GFDRR Global Facility for Disaster Reduction and Recovery GHG Greenhouse Gas GIP Good International Practice GoM Government of Mongolia GRM Grievance Redress Mechanism HDI Human Development Index IA Implementing Agency IBAT Integrated Biodiversity Assessment Tool IEC Independent Environmental Consultant (national) IEE Initial Environmental Examination ILO International Labor Organization INDC Intended Nationally Determined Contributions, Paris climate accord. IUCN International Union for the Conservation of Nature MASL Meters
    [Show full text]
  • 50% 31% 10% 9% 50%
    MONGOLIA : COVID-19 PREPAREDNESS SITREP # 19 FLOW MONITORING AT MAJOR CHECKPOINTS OF ULAANBAATAR 17-Mar-2020 (Data collected: 08:00 hrs Feb 27th - 24:00 hrs March 16th, 2020) 12:00 (GMT+8) The Mongolian Government has taken early and very active measures to prevent and stop an eventual spread of the COVID-19. Besides closing all the educational institutions starting with January 27th and imposing international travel restrictions that are expanding along with the growing number of countries affected by COVID-19 globally, on 13 February 2020 the government also declared state of high alert. To prevent a possible spread of COVID during the Mongolian Lunar New Year (February 24-26, 2020), the Emergency Commission restricted all travel between aimags (provinces), as well as incoming and outgoing flows in the capital city. Ulaanbaatar is by far the biggest urban settlement in Mongolia concentrating almost half of the country’s population. It is a major destination, transition point and origin for population movements and as such may represent a powerful source for spreading COVID-19 to the entire country. To increase its preparedness and also an eventual response to COVID-19, the Governor’s Office of the Capital City has requested the assistance of International Organization for Migration, Mission to Mongolia (IOM) to take evidence of all the incoming and outgoing flows of people by implementing its Displacement Tracking Matrix (DTM) methodology. Based on a joint agreement to implement DTM between IOM and the Governor’s Office of the Capital City, a total of over 300 health and education system personnel have been trained as data enumerators and technical assistance was provided to set up the overall data collection and analysis framework.
    [Show full text]
  • Mongolia: Ulaanbaatar Low Carbon Energy Supply Project Using a Public-Private Partnership Model (Financed by the Japan Special Fund)
    Technical Assistance Consultant’s Report Project Number: 43357 October 2011 Mongolia: Ulaanbaatar Low Carbon Energy Supply Project Using a Public-Private Partnership Model (Financed by the Japan Special Fund) Feasibility Report Appendix 4: Environmental Impact Assessment Report Prepared by: HJI Group Corporation in Association with MonEnergy Consult Co. Ltd. For: Ministry of Mineral Resources and Energy, Mongolia This report does not necessarily reflect the views of ADB or the Government concerned, and ADB and the Government cannot be held liable for its contents. (For project preparatory technical assistance: All the views expressed herein may not be incorporated into the proposed project’s design. ENVIRONMENTAL IMPACT ASSESSMENT REPORT Project Number: 7502-MON June 2011 Ulaanbaatar Low Carbon Energy Supply Project Using Public-Private Partnership Model (CHP5 Project) Ulaanbaatar Low Carbon Energy Supply Project Final Report Using Public-Private Partnership Model (TA No. 7502-MON) Appendix 4 CURRENCY EQUIVALENTS (As of 1 May 2011) Currency Unit - Togrog (MNT) 1.00 MNT = $ 0.0008 $1.00 = 1,255 MNT ABBREVIATIONS ACM – Asbestos-Containing Material ADB – Asian Development Bank BOD – Biological Oxygen Demand CBD – Convention on Biological Diversity CCPs – Coal Combustion Products CITES – Convention on International Trade in Endangered Species CES – Central Energy System CFB – Circulating Fluidized Bed CHP – Combined Heat and Power CO – Carbon Monoxide CO2 – Carbon Dioxide COD – Chemical Oxygen Demand CSCs – Construction Supervision Companies
    [Show full text]
  • Mongolia 1 5 1
    Mongolia Postcode Postcode type and position 5 digits to the right of the province or capital name. Codification 1 5 1 4 1 locality/delivery block (for the capital) DOLGOR Baldangiin Door 15, Apt 24A, Amar St 4 province / district (for the capital) 15th khoroo, Bayanzurkh Duureg ULAANBAATAR 13345 region / zone (for the capital) MONGOLIA Position of the Bottom Alignment of Left- address on the right-hand address lines aligned envelope corner Examples Home delivery in the capital: DOLGOR Baldangiin addressee Door 15, Apt 24A, Amar St 4 door, apartment , street and premises 15th khoroo, Bayanzurkh Duureg khoroo, Duureg ULAANBAATAR 13345 locality + postcode MONGOLIA country Home delivery in rural area: BATCHULUUN Erdeniin addressee Door 43, Apt 1 door and apartment 9th bagh, Herlen sum bagh, sum DORNOD 23115 province + postcode MONGOLIA country Postal services: CHULUUN Suvdiin addressee PO Box 222 PO Box number Post office 46 delivery post office ULAANBAATAR 14201 locality + postcode MONGOLIA country NINJIN Gantulgiin addressee Poste restante poste restante Post office 49 delivery post office ULAANBAATAR 13381 locality + postcode MONGOLIA country Glossary Duureg district of the capital khoroo sub-district of the capital sum sub-province bagh sub-division in a sub-province Mongolia (cont.) List of provinces Dornod Sukhbaatar (Aimag) Tuv Govi-Sumber Darkhan-Uul, Selenge Omnogovi Dornogovi Dundgovi Orkhon Ovorkhangai Bulgan Bayankhongor Khovsgol Arkhangai Zavkhan Govi-Altai Bayan-Olgii Uvs Khovd, Ulaanbaatar (capital city). Khentii Districts of the Sukhbaatar Chingeltei capital (Duureg) Bayangol Khan-Uul Songino Khairkhan Bayanzurkh Baganuur Nalaikh Bajakhangai Abbreviations DIST District, Duureg ST Street AVE Avenue SQ Square APT Apartment Contact Ministry of Road, Transport and Tourism, Mongolia Tel: (+ 976 11) 330 970 Baga toiruu, United Nation’s Street -5/2 Fax: (+ 976 11) 310 612 ULAANBAATAR 15060 E-mail: [email protected] MONGOLIA Website www.zipcode.mn/ 09/2014 © www.upu.int .
    [Show full text]
  • 50% 31% 10% 9% 50%
    MONGOLIA : COVID-19 PREPAREDNESS SITREP # 20 FLOW MONITORING AT MAJOR CHECKPOINTS OF ULAANBAATAR 18-Mar-2020 (Data collected: 08:00 hrs Feb 27th - 24:00 hrs March 17th, 2020) 12:00 (GMT+8) The Mongolian Government has taken early and very active measures to prevent and stop an eventual spread of the COVID-19. Besides closing all the educational institutions starting with January 27th and imposing international travel restrictions that are expanding along with the growing number of countries affected by COVID-19 globally, on 13 February 2020 the government also declared state of high alert. To prevent a possible spread of COVID during the Mongolian Lunar New Year (February 24-26, 2020), the Emergency Commission restricted all travel between aimags (provinces), as well as incoming and outgoing flows in the capital city. Ulaanbaatar is by far the biggest urban settlement in Mongolia concentrating almost half of the country’s population. It is a major destination, transition point and origin for population movements and as such may represent a powerful source for spreading COVID-19 to the entire country. To increase its preparedness and also an eventual response to COVID-19, the Governor’s Office of the Capital City has requested the assistance of International Organization for Migration, Mission to Mongolia (IOM) to take evidence of all the incoming and outgoing flows of people by implementing its Displacement Tracking Matrix (DTM) methodology. Based on a joint agreement to implement DTM between IOM and the Governor’s Office of the Capital City, a total of over 300 health and education system personnel have been trained as data enumerators and technical assistance was provided to set up the overall data collection and analysis framework.
    [Show full text]
  • Revitalization of Mongolia's
    REVITALIZATION OF MONGOLIA’S Public Disclosure Authorized PROTECTED AREAS THROUGH EFFECTIVE FOREST MANAGEMENT OF BOGD KHAN UUL Environmental and Social Impact Assessment Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized 1 May 27, 2010 2 Table of contents TABLE OF CONTENTS ........................................................................................................................... 3 CHAPTER 1: DESCRIPTION OF THE PROJECT .............................................................................. 9 Project development objective and key indicators ................................................................................................ 9 Project area ......................................................................................................................................................... 14 CHAPTER 2: DESCRIPTION OF THE BOGD KHAN UUL ENVIRONMENT ............................. 16 Bogd Khan Uul SPA .............................................................................................................................................. 16 Valley-by-Valley Description ................................................................................................................................ 18 Bogd Khan Uul as a Sacred Mountain .................................................................................................................. 33 Archaeology ........................................................................................................................................................
    [Show full text]
  • 3. Current Solid Waste Management the Study on Solid Waste Management Plan for Ulaanbaatar City in Mongolia JICA 3.1 Current Waste Stream KOKUSAI KOGYO CO., LTD
    3. Current Solid Waste Management The Study on Solid Waste Management Plan for Ulaanbaatar City in Mongolia JICA 3.1 Current Waste Stream KOKUSAI KOGYO CO., LTD. 3 Current Solid Waste Management 3.1 Current Waste Stream The waste stream of Ulaanbaatar in 2006 is elaborated in this Section based on the following survey results (see Chapter 2 of this report): x WACS in 2005 x Survey on medical waste management in 2005 x Survey on industrial waste management in 2005 x Study on construction waste in 2005 (estimation of generation amount is made for 2004) x Survey on final disposal amount in 2005 and 2006 3.1.1 Generation of Household Waste Based on the results of the waste amount and composition survey (WACS) in 2005, the generation rate and number of generation source (population) are estimated as described in the Section 4.1. The average generation rate (GR) in 2006 in the table below is calculated as follows: Average GR in 2006 = ((Apart area GR in 2006 x Apart area population in 2006) + (Ger area GR in 2006 x Ger area population in 2006))/Population of MUB in 2006 The table below presents household generation of Ulaanbaatar in 2006. Table 3-1: Household Waste Generation (2006) Number of Winter season Summer season Generation Source Generation Unit Generation Daily Generation Generation Daily Generation Source Rate (g//day) Amount (ton/day) Rate (g//day) Amount (ton/day) Apart 481,037 g/person/day 264 127.0 235 113.0 Household Ger 409,772 g/person/day 956 391.8 208 85.2 Waste Average 890,809 g/person/day 582 518.8 222 198.2 3.1.2 Generation of Business Waste Business wastes consist of those from commercial, office, market, school, hotel and public area cleaning.
    [Show full text]
  • 8Th Khoroo, Songino Khairkhan District
    Public Disclosure Authorized Managing Urban Expansion in Mongolia Public Disclosure Authorized Public Disclosure Authorized Best Practices Takuya Kamata James Reichert in Scenario-Based Tumentsogt Tsevegmid Yoonhee Kim Urban Planning Brett Sedgewick Public Disclosure Authorized THE WORLD BANK MANAGING URBAN EXPANSION IN MONGOLIA Managing Urban Expansion in Mongolia Best Practices in Scenario-Based Urban Planning Takuya Kamata James Reichert Tumentsogt Tsevegmid Yoonhee Kim Brett Sedgewick THE WORLD BANK Washington, D.C. © 2010 The International Bank for Reconstruction and Development / The World Bank 1818 H Street NW Washington DC 20433 Telephone: 202-473-1000 Internet: www.worldbank.org E-mail: [email protected] All rights reserved 1 2 3 4 13 12 11 10 This volume is a product of the staff of the International Bank for Reconstruction and Development / The World Bank. The fi ndings, interpretations, and conclusions expressed in this volume do not neces- sarily refl ect the views of the Executive Directors of The World Bank or the governments they represent. The World Bank does not guarantee the accuracy of the data included in this work. The boundaries, colors, denominations, and other information shown on any map in this work do not imply any judge- ment on the part of The World Bank concerning the legal status of any territory or the endorsement or acceptance of such boundaries. Rights and Permissions The material in this publication is copyrighted. Copying and/or transmitting portions or all of this work without permission may be a violation of applicable law. The International Bank for Reconstruc- tion and Development / The World Bank encourages dissemination of its work and will normally grant permission to reproduce portions of the work promptly.
    [Show full text]