HS2 Current Contract Opportunities

Total Page:16

File Type:pdf, Size:1020Kb

HS2 Current Contract Opportunities For external publication HS2 Current Contract Opportunities Indicative Budget HS2 Reference No. Description Status Contract Award Date Tenderers / Suppliers with contact details Link to Contract Notice Range Framework awarded to: ‐ BAM Ritchies ‐ a division of BAM Nuttall Ltd ‐ [email protected] ‐ Environmental Scientifics Group Limited ‐ [email protected] ‐ Fugro Seacore Limited (trading as Fugro Engineering Services) ‐ [email protected] ‐ Soil Engineering Geoservices Limited ‐ ray.nix@soil‐engineering.co.uk http://ted.europa.eu/udl?uri=TED:NOTICE:51 Phase One: HS2/086 Ground Investigation Works Framework Agreement Frameworks Awarded Q1 2015 £50m ‐ £100m ‐ Structural Soils Limited ‐ [email protected] 012‐2015:TEXT:EN:HTML&src=0 ‐ Allied Exploration & Geotechnics Limited ‐ [email protected] ‐ Farmer Associates (1998) Limited ‐ [email protected] ‐ RPS Planning and Development Ltd ‐ [email protected] ‐ WYG Environment Planning Transport Limited ‐ [email protected] Awarded to: http://ted.europa.eu/udl?uri=TED:NOTICE:17 Phase One: Ref 369 Engineering Delivery Partner (EDP) Awarded Q1 2016 ‐ CH2M HILL United Kingdom , Atkins Limited and SENER ENGINEERING AND SYSTEMS Ltd ‐ [email protected] £250m ‐ £350m 4639‐2015:TEXT:EN:HTML&src=0 ITT shortlist: ‐ CEK JV (Carillion Plc, Eiffage Genie Civil, Kier Infrastructure and Overseas Limited) ‐ supplychainenquiries@cek‐ hs2.team http://ted.europa.eu/udl?uri=TED:NOTICE:93 Phase One: EWC12101 Enabling Works South ITT closed ‐ In Evaluation Q4 2016 ‐ Costain Skanska JV (Costain Group Plc, Skanska Construction UK Limited)‐ [email protected] £300m 208‐2015:TEXT:EN:HTML&src=0 ‐ LM (Laing O’Rourke Construction Limited, J. Murphy & Sons Limited) ‐ SeanO'Brien@lfm‐jv.com ‐ Fusion JV (Morgan Sindall Construction and Infrastructure Ltd, BAM Nuttall Limited, Ferrovial Agroman (UK) Limited) ‐ [email protected] ITT shortlist: ‐ BBV JV (Balfour Beatty Group Limited, Vinci Construction Grands Projets, Vinci Construction UK Limited, Vinci Construction Terrassement) ‐ [email protected] ‐ CEK JV (Carillion Plc, Eiffage Genie Civil, Kier Infrastructure and Overseas Limited) ‐ supplychainenquiries@cek‐ hs2.team http://ted.europa.eu/udl?uri=TED:NOTICE:93 Phase One: EWC12103 Enabling Works North ITT closed ‐ In Evaluation Q4 2016 £300m ‐ Momentum Infrastructure (Galliford Try Infrastructure Limited, Hochtief Infrastructure GmbH, Dragados Sociedad 208‐2015:TEXT:EN:HTML&src=0 Anonima) ‐ supplychain@momentum‐infrastructure.co.uk ‐ LM (Laing O’Rourke Construction Limited, J. Murphy & Sons Limited) ‐ SeanO'Brien@lfm‐jv.com ‐ Fusion JV (Morgan Sindall Construction and Infrastructure Ltd, BAM Nuttall Limited, Ferrovial Agroman (UK) Limited) ‐ [email protected] ITT shortlist: ‐ Align JV (Bouygues Travaux Publics, Sir Robert McAlpine Limited, Morrison Utility Services Limited, Volkerfitzpatrick Limited)‐ [email protected] ‐ BBV JV (Balfour Beatty Group Limited, Vinci Construction Grands Projets, Vinci Construction UK Limited, Vinci Construction Terrassement) ‐ [email protected] http://ted.europa.eu/udl?uri=TED:NOTICE:93 Phase One: EWC12102 Enabling Works Central ITT closed ‐ In Evaluation Q4 2016 £300m ‐ CEK JV (Carillion Plc, Eiffage Genie Civil, Kier Infrastructure and Overseas Limited) ‐ supplychainenquiries@cek‐ 208‐2015:TEXT:EN:HTML&src=0 hs2.team ‐ LM (Laing O’Rourke, J. Murphy & Sons) ‐ SeanO'Brien@lfm‐jv.com ‐ Fusion JV (Morgan Sindall plc, BAM Nuttall Limited, Ferrovial Agroman (UK) Limited) ‐ [email protected] ITT shortlist: ‐ CEK JV (Carillion Construction Limited, Eiffage Genie Civil ,Kier Infrastructure and Overseas Limited) ‐ supplychainenquiries@cek‐ hs2.team ‐ Fusion JV (Morgan Sindall Construction and Infrastructure Limited, BAM Nuttall Limited, Ferrovial Agroman (UK) Limited) ‐ [email protected] http://ted.europa.eu/udl?uri=TED:NOTICE:34 Phase One: MWCC2551/S1 Civil Engineering: Euston Tunnels & Approaches ITT Live Q2 2017 £600m ‐ £900m ‐ Momentum 3503‐2015:TEXT:EN:HTML&src=0 Infrastructure (Dragados Sociedas Anonima, HOCHTIEF Infrastructure GmbH, GallifordTry Infrastructure Limited) ‐ supplychain@momentum‐infrastructure.co.uk ‐ SCS JV (Skanska Construction (UK) Limited, Costain Limited, STRABAG AG) ‐ [email protected] ITT shortlist: ‐ Align JV (Bouygues Travaux Publics, VolkerFitzpatrick Limited, Sir Robert McAlpine Limited) ‐ contact@align‐jv.co.uk ‐ CEK JV (Carillion Construction Limited, Eiffage Genie Civil ,Kier Infrastructure and Overseas Limited) ‐ supplychainenquiries@cek‐hs2.team http://ted.europa.eu/udl?uri=TED:NOTICE:34 Phase One: MWCC2552/S2 Civil Engineering: Northolt Tunnels ITT Live Q2 2017 £850m ‐ £1400m 3503‐2015:TEXT:EN:HTML&src=0 ‐ Fusion JV (Morgan Sindall Construction and Infrastructure Limited, BAM Nuttall Limited, Ferrovial Agroman (UK) Limited) ‐ [email protected] ‐ SCS JV (Skanska Construction (UK) Limited, Costain Limited, STRABAG AG) ‐ [email protected] ITT shortlist: ‐ Align JV (Bouygues Travaux Publics, VolkerFitzpatrick Limited, Sir Robert McAlpine Limited) ‐ contact@align‐jv.co.uk ‐ BBV JV (Balfour Beatty Group Limited, VINCI Construction UK Limited, VINCI Construction Terrassement, BeMo Tunnelling GmbH) ‐ [email protected] Civil Engineering: Chiltern Tunnels and Colne Valley http://ted.europa.eu/udl?uri=TED:NOTICE:34 Phase One: MWCC2553/C1 ITT Live Q2 2017 £800m ‐ £1300m Viaduct 3503‐2015:TEXT:EN:HTML&src=0 ‐ LFM JV (Laing O’Rourke Construction Limited, FCC Construccion S.A, J. Murphy & Sons Limited) ‐ SeanO'Brien@lfm‐ jv.com ‐ SCS (Skanska Construction (UK) Limited, Costain Limited, STRABAG AG) ‐ [email protected] ITT shortlist: ‐ Align JV (Bouygues Travaux Publics, VolkerFitzpatrick Limited, Sir Robert McAlpine Limited) ‐ contact@align‐jv.co.uk ‐ BBV JV (Balfour Beatty Group Limited, VINCI Construction UK Limited, VINCI Construction Terrassement, BeMo Tunnelling GmbH) ‐ [email protected] Civil Engineering: North Portal of Chiltern Tunnels http://ted.europa.eu/udl?uri=TED:NOTICE:34 Phase One: MWCC2554/C2 ITT Live Q2 2017 £800m ‐ £1300m To Brackley ‐ CEK JV (Carillion Construction Limited, Eiffage Genie Civil ,Kier Infrastructure and Overseas Limited) ‐ 3503‐2015:TEXT:EN:HTML&src=0 supplychainenquiries@cek‐hs2.team ‐ Momentum Infrastructure (Dragados Sociedad Anonima, HOCHTIEF Infrastructure GmbH, GallifordTry Infrastructure Limited) ‐ supplychain@momentum‐infrastructure.co.uk ITT shortlist: ‐ Align JV (Bouygues Travaux Publics, VolkerFitzpatrick Limited, Sir Robert McAlpine Limited) ‐ contact@align‐jv.co.uk ‐ ASL (Acciona Infraestructuras S.A, John Sisk & Son (Holdings) Ltd, Lagan Construction Group Ltd) ‐ [email protected] Civil Engineering: Brackley to South Portal of Long Catalyst (Single Party Applicant) Bechtel Limited ‐ [email protected] http://ted.europa.eu/udl?uri=TED:NOTICE:34 Phase One: MWCC2555/C3 ITT Live Q2 2017 £600m ‐ £900m Itchington Wood Tunnel 3503‐2015:TEXT:EN:HTML&src=0 ‐ CEK JV (Carillion Construction Limited, Eiffage Genie Civil ,Kier Infrastructure and Overseas Limited) ‐ supplychainenquiries@cek‐hs2.team ‐ Momentum Infrastructure (Dragados Sociedad Anonima, HOCHTIEF Infrastructure GmbH, GallifordTry Infrastructure Limited) ‐ supplychain@momentum‐infrastructure.co.uk ITT shortlist: ‐ BBV JV (Balfour Beatty Group Limited, VINCI Construction UK Limited, VINCI Construction Terrassement, BeMo Tunnelling GmbH) ‐ [email protected] ‐ Fusion JV (Morgan Sindall Construction & Infrastructure Ltd, BAM Nuttall Limited, Ferrovial Agroman (UK) Limited) ‐ Civil Engineering: Long Itchington Wood Tunnel [email protected] http://ted.europa.eu/udl?uri=TED:NOTICE:34 Phase One: MWCC2556/N1 ITT Live Q2 2017 £900m ‐ 1500m South Portal to Delta Junction and Birmingham Spur 3503‐2015:TEXT:EN:HTML&src=0 ‐ LFM JV (Laing O’Rourke Construction Limited, FCC Construccion S.A, J. Murphy & Sons Limited) ‐ SeanO'Brien@lfm‐ jv.com ‐ SCS (Skanska Construction (UK) Limited, Costain Limited, STRABAG AG) ‐ [email protected] ITT shortlist: ‐ BBV JV (Balfour Beatty Group Limited, VINCI Construction UK Limited, VINCI Construction Terrassement, BeMo Tunnelling GmbH) ‐ [email protected] ‐ Fusion JV (Morgan Sindall Construction & Infrastructure Ltd, BAM Nuttall Limited, Ferrovial Agroman (UK) Limited) ‐ [email protected] Civil Engineering: Delta Junction to West Coast Main http://ted.europa.eu/udl?uri=TED:NOTICE:34 Phase One: MWCC2557/N2 ITT Live Q2 2017 £800m ‐ £1300m Line Tie ‐In 3503‐2015:TEXT:EN:HTML&src=0 ‐ LFM JV (Laing O’Rourke Construction Limited, FCC Construccion S.A, J. Murphy & Sons Limited) ‐ SeanO'Brien@lfm‐ jv.com ‐ Momentum Infrastructure (Dragados Sociedad Anonima, HOCHTIEF Infrastructure GmbH, GallifordTry Infrastructure Limited) ‐ supplychain@momentum‐infrastructure.co.uk Awarded to: http://ted.europa.eu/udl?uri=TED:NOTICE:40 Phase One: GIP12541 Ground Investigation Core & Sample Storage Facility Award Approvals/Governance Q1 2016 ‐ ALS Petrophysics Ltd <£5m 7094‐2015:TEXT:EN:HTML&src=0 Framework awarded to: ‐ Aecom ‐ Arup ‐ Atkins On‐going call offs http://ted.europa.eu/udl?uri=TED:NOTICE:32 Phase One: Ref#TBC Lot 1 ‐ Civils Preliminary Design Framework Awarded ‐ Capita/Ineco TBC from PSF 2957‐2011:TEXT:EN:HTML&src=0 ‐ Jacobs ‐ Mott MacDonald ‐ WSP Parsons Brinckerhoff Framework awarded to: ‐ Arup On‐going call offs http://ted.europa.eu/udl?uri=TED:NOTICE:32 Phase One: Ref#TBC Lot 2 ‐ Systems Preliminary Design Framework Awarded ‐ Jacobs
Recommended publications
  • STAND out Theodore Jemmott from the CROWD University of Bristol
    UEST UEST APPLY ONLINE For QUEST Undergraduate Applications open in early March, Scholarship at exact dates vary each year. Please ice.org.uk/questundergrad see website for more information. QUEST QUEST Having the QUEST Undergraduate Scholarship on my CV shows employers that I have the drive to excel as a civil engineer and has contributed to my success in achieving internships – even in my first year. STAND OUT Theodore Jemmott FROM THE CROWD University of Bristol Undergraduate Scholarships Undergraduate Scholarships WITH A QUEST UNDERGRADUATE SCHOLARSHIP Contact QUEST at: Plus, sign up for FREE t +44 (0)20 7665 2193 ICE Student Membership at e [email protected] ice.org.uk/students Adam Glew ice.org.uk/questundergrad ice.org.uk/questundergrad Registered charity number 210252 Charity registered in Scotland number SC038629 Printed on paper made from sustainable sources STAND OUT STAND OUT FROM THE FROM THE CROWD CROWD QUEST UNDERGRADUATE SCHOLARSHIPS Get help to move your career forward and stand out from the crowd by applying for a scholarship from ICE’s flagship fund - The Queen’s The opportunities I’ve gained Jubilee Scholarship Trust (QUEST). from the QUEST scholarship placements have been brilliant – If you’re planning to begin a civil engineering degree you can apply getting to work on the Northern for this prestigious award in the spring before you start your course. Line Extension and being part of the transformation of the site. QUEST scholarships have supported thousands of people through It’s given me a great grounding their studies and are recognised by employers as a sign of excellence.
    [Show full text]
  • 02 the Use of Lean Processes Swansea University's Bay
    THE VINCI CONSTRUCTION UK MAGAZINE SHARING EXPERIENCE, INNOVATION AND SUCCESS ISSUE 47 / JUNE 2014 02 DELIVERING ESSENTIAL SERVICES THE USE OF LEAN PROCESSES 04 FOCUS PROJECT SWANSEA UNIVERSITY’S BAY CAMPUS MANAGING DIRECTOR’S WELCOME CONTENTS 04 WELCOME TO THE CONTENTS FOCUS PROJECT LATEST EDITION OF 01 MANAGING DIRECTOR’S WELCOME SWANSEA UNIVERSITY’S 02 DELIVERING ESSENTIAL SERVICES — BAY CAMPUS THE USE OF LEAN PROCESSES 04 FOCUS PROJECT — SWANSEA UNIVERSITY’S BAY CAMPUS 08 CHALLENGES — ENERGY RECOVERY IN CORNWALL There are positive signs that the construction industry 12 EXPERTISE — ON BOARD WITH BIM has finally reached the end of the recession. As the 14 BEYOND CONSTRUCTION - INNOVATION DISSEMINATION market picks up, this will present its own challenges, but with challenges come opportunities, and at the company’s 16 NEWS ROUND-UP annual road show events held recently in London, 20 COMMUNITY INVOLVEMENT Manchester and Nottingham, it gave me great pleasure to 23 AWARDS AND ACCREDITATIONS share with our teams what these look like, both for VINCI 26 CONSIDERATE CONSTRUCTORS SCHEME on a global scale and closer to home in the UK. 27 OUR PEOPLE For VINCI this means increasing its international presence outside Europe, bringing exciting opportunities for both individuals and the business. In January this year we set up a Highways Sector within Taylor Woodrow Civil Engineering to pool our vast knowledge and expertise in preparation for the investment and resulting growth in the highways sector during the next parliament. In the Nine Elms area of central London, we are involved in the New Covent Garden Market project as part of a 50:50 joint venture with developer St Modwen.
    [Show full text]
  • Bird Island Biosecurity Plan
    BIRD ISLAND STATION REDEVELOPMENT ENVIRONMENTAL IMPACT ASSESSMENT BAS Environment Office October 2017 (revision 2) British Antarctic Survey High Cross, Madingley Road Cambridge, CB3 0ET. Cover Photo: View of Freshwater Bay and Bird Island Research Station by Adam Bradley Contents NON-TECHNICAL SUMMARY .......................................................................................................... 7 1. INTRODUCTION ................................................................................................................... 11 Background to Development ..................................................................................................................... 11 Proposed Development ............................................................................................................................. 11 Statutory Requirements ............................................................................................................................ 12 Purpose and Scope of Document .............................................................................................................. 13 2. APPROACH TO ENVIRONMENTAL IMPACT ASSESSMENT ................................................. 14 Introduction ............................................................................................................................................... 14 Methodology ............................................................................................................................................. 14 Consultation
    [Show full text]
  • British Construction Industry Awards 2018 Celebrating the Very Best in Construction and Engineering
    British Construction Industry Awards 2018 Celebrating the very best in construction and engineering The BCI Awards are Brought to you by the longest standing, most rigorously judged and highly prized in the United Kingdom construction sector 2018 Judges Initiative Chief technical Peter Molyneux Keith Waller ICE officer, Mott Major roads director, Senior advisor, Steve Fox category MacDonald and Transport for the Infrastructure & Chief executive, judges Project 13 North Projects Authority Bam Nuttall Hugh Ferguson Chris Newsome Briony Wickenden Mark Hansford Hero Bennett Former deputy Executive director, Head of training, Editor, NCE Sustainability director general, Anglian Water Ceca Keith Howells consultant, ICE Alison Nicholl Chairman, Max Fordman Steve Fink Director, Mott MacDonald Kelly Bradley Project Phase 1 health, safety Constructing category Darren James Legacy and & security director, Excellence Infrastructure community HS2 Ltd Jerry Pullinger judges managing director, investment manager, Bill Hewlett Principal engineer, Costain Tideway Technical director, Kier Professional Ken Allison Isabel Liu Fay Bull Costain Group Services Director allocation & Board member, Regional director Katherine Ibbotson Alasdair Reisner asset management, Transport Focus – water, UK&I, Carbon planning Chief executive, Environment Agency John Lorimer Aecom manager, Civil Engineering Emily Ashwell Chairman, BIM Volker Buscher Environment Contractors Associate Editor, Academy Director, global Agency Association (Ceca) New Civil Engineer Kate Mavor &
    [Show full text]
  • 2 Chris Broadbent How Does CEEQUAL Assist in Designing And
    Quality and Performance in Construction Delivered by Building sustainably World-leading, high performing sustainability solutions “ you can build on ” Trusted expertise for the property sector @BRE_Group #buildsustainably www.ceequal.com CEEQUAL and BREEAM Infrastructure Part of the BRE Trust this line this line What is CEEQUAL? ‒ Civil Engineering Environmental Quality Award scheme ‒ First UK and international scheme for civil engineering, infrastructure, landscaping and public realm ‒ Launched in 2004, 690+ projects since then, over £40bn construction value ‒ Originally owned by Institution of Civil Engineers and 13 other shareholders, acquired by BRE in 2015 ‒ Strong reputation including Crossrail and the London 2012 Olympics ‒ UK and international (Sweden, Hong Kong, Norway, Finland, Malaysia, Dubai and Qatar) Projects and Term Contracts schemes ‒ Focus on team process to deliver sustainability this line this line What is CEEQUAL; who uses it? UK; Sweden; Norway, Hong Kong; Middle East, Malaysia In the UK: Rating system Clients: Influencing tool … Crossrail ; NI Department of Rural Development; Environment Agency; Highways Agency; Network Improving sustainability Rail; Port of Dover through best practice Team-based self- Designers: assessment Aecom/URS; Arup; Atkins; Capita Symonds; CH2M; Jacobs Engineering; Mouchel; Mott Evidence-based Macdonald; WSPParsons Brinckerhoff; Ramboll Independent verification Contractors: + Award Amey; Balfour Beatty; BAM Nuttall; Carillion; Costain; Kier Group; Laing O’Rourke; Morrison; NCC; Skanska; Volker
    [Show full text]
  • HS2 Current Contract Opportunities
    HS2 Current Contract Opportunities Indicative Budget HS2 Reference No. Description Status Contract Award Date Tenderers / Suppliers with contact details Link to Contract Notice Range Framework awarded to: ‐ BAM Ritchies ‐ a division of BAM Nuttall Ltd ‐ [email protected] ‐ Environmental Scientifics Group Limited ‐ [email protected] ‐ Fugro Seacore Limited (trading as Fugro Engineering Services) ‐ [email protected] ‐ Soil Engineering Geoservices Limited ‐ ray.nix@soil‐engineering.co.uk http://ted.europa.eu/udl?uri=TED:NOTICE:51 Phase One: HS2/086 Ground Investigation Works Framework Agreement Frameworks Awarded Q1 2015 £50m ‐ £100m ‐ Structural Soils Limited ‐ [email protected] 012‐2015:TEXT:EN:HTML&src=0 ‐ Allied Exploration & Geotechnics Limited ‐ [email protected] ‐ Farmer Associates (1998) Limited ‐ [email protected] ‐ RPS Planning and Development Ltd ‐ [email protected] ‐ WYG Environment Planning Transport Limited ‐ [email protected] Awarded to: ‐ CH2M HILL, Atkins Limited and SENER ENGINEERING AND SYSTEMS Ltd ‐ http://ted.europa.eu/udl?uri=TED:NOTICE:17 Phase One: Ref 369 Engineering Delivery Partner (EDP) Awarded Q1 2016 £250m ‐ £350m [email protected] 4639‐2015:TEXT:EN:HTML&src=0 ITT shortlist: ‐ CEK JV (Carillion Construction Limited, Eiffage Travaux Publics, Kier Infrastructure and Overseas) ‐ loftus.buhagiar@carillionplc ‐ Costain Skanska JV (Costain Limited, Skanska Construction Limited)‐ http://ted.europa.eu/udl?uri=TED:NOTICE:93 Phase One: EWC12101 Enabling Works South ITT issued on 14th March 2016 Q3 2016 £300m
    [Show full text]
  • Course Guide for UCAS Applicants Civil & Environmental Engineering
    2019 entry Course Guide For UCAS Applicants Civil & Environmental Engineering THE SCHOOL of ENGINEERING at The University of Edinburgh Course Guide For UCAS Applicants Civil & Environmental Engineering 2 THE SCHOOL of ENGINEERING at The University of Edinburgh Course Guide For UCAS Applicants Civil & Environmental Engineering 3 Degree Choices Civil Engineering (BEng) Degree Type: Single Honours UCAS Code: H200. Duration: 4 years, Full-time Civil Engineering (MEng) Degree Type: Integrated Masters Single Honours UCAS Code: H203 Duration: 5 years, Full-time Years 1, 2 & 3 are the same as Civil Engineering H200 Structural and Fire Safety Engineering (BEng) Degree Type: Single Honours UCAS Code: HH21 Duration: 4 years, Full-time Years 1 & 2 are the same as Civil Engineering H200 Structural and Fire Safety Engineering (MEng) Degree Type: Integrated Masters Single Honours with Subsidiary Subject UCAS Code: HHF1. Duration: 5 years, Full-time Years 1 & 2 are the same as Civil Engineering H200 Year 3 is the same as Structural and Fire Safety Engineering (BEng) HH21 Structural Engineering with Architecture (BEng) Degree Type: Single Honours UCAS Code: H2K1 Duration: 4 years, Full-time Structural Engineering with Architecture (MEng) Degree Type: Integrated Masters Single Honours with Subsidiary Subject UCAS Code: H2KC Duration: 5 years, Full-time Years 1, 2 & 3 are the same as Structural Engineering with Architecture (BEng) H2K1. Course Structure For more detailed information about the these courses and their structure please use the degree proramme tables at: http://www.drps.ed.ac.uk/18-19/dpt/drps_eng.htm THE SCHOOL of ENGINEERING at The University of Edinburgh Course Guide For UCAS Applicants Civil & Environmental Engineering 4 Civil and Environmental Engineering What is Civil and Environmental Engineering? Civil and Environmental Engineering encompasses a wide range of topics, all of which in some way relate to the provision of the essential services and facilities.
    [Show full text]
  • Media Briefing Note: Crossrail Platform Model
    MEDIA BRIEFING NOTE: CROSSRAIL MOCK-UP PLATFORM MODEL Introduction: New Crossrail stations, costing in the region of £2bn, will be constructed along the central route at Paddington, Tottenham Court Road, Bond Street, Farringdon, Liverpool Street, Whitechapel and Canary Wharf. Main construction of the central London Crossrail stations will get underway in late 2011. Around 200 million passengers will travel on Crossrail each year. The new stations need to cope with large numbers of passengers throughout their life, be easy to navigate and have fixtures and fittings that look good, are easy to clean and are able to endure wear and tear. To create this transport legacy for London it is essential to ensure every fixture and component is fit for purpose, cost effective and built to last. To develop and test designs for the station platforms, a life-size ‘mock-up’ of a below ground Crossrail platform has been created. The mock-up has been built to help Crossrail understand how the new designs for new below ground platforms will look in real life and to determine from a practical perspective whether any design modification needs to be made ahead of station construction commencing. The mock-up will help inform final design decisions about the below ground station environment. It is critical that Crossrail gets the internal design of stations right as the new stations have been designed to last for the next one hundred years. It will also assist Crossrail to make the right decisions concerning inclusive design features to improve services for Crossrail passengers with restricted mobility or those with visual and hearing impairments.
    [Show full text]
  • Standards for Future Games and Industry to Follow
    The construction of the venues and staging of the London 2012 Games have raised the bar in areas from diversity and health and safety, to sustainability and employment and skills. London 2012 has set new standards for future Games and industry to follow. Setting new standards for construction 84 85 Accessibility Diversity Facts Facts Accessibility has been The London 2012 Women improved at railway stations into Construction project was and public transport established to help women facilities, with £200 million get work placements in invested in Stratford Station construction, an industry in alone, providing new lifts, which they are traditionally Inclusive and accessible clearer platforms and The opportunity provided underrepresented. Since the design has been at the heart enhanced services. by the Games and the large project began in 2008, 270 women were recruited and of the Games. The parklands have been investment in this part of east placed directly into jobs on designed with shallow London is helping to reduce London 2012 wanted to set the Olympic Park through gradients and seating at historic and long-standing an excellent standard of this project, exceeding its regular intervals so that they inequalities. accessibility for disabled original target of 50. people, older people and are accessible to everyone, London 2012 developed families with children, which including older people, employment and training 1,713 women worked on would set a benchmark disabled people and those programmes with partner the major construction phase and act as an inspiration with pushchairs. organisations and of the Olympic Park and Olympic and Paralympic to others. A new network of accessible contractors to encourage women, black, Asian and Village and 5,092 of the The Olympic and Paralympic transport was devised and minority ethnic (BAME) Park and Village workers Village, sporting venues, publicised to encourage people, disabled people, declared that they were from new transport services, people with accessibility and those who were a BAME background.
    [Show full text]
  • I and R Awards Winners 2014
    THE CHARTERED YEAR 2014 INSTITUTE OF BUILDING INNOVATION AND RESEARCH AWARDS Y E AR 2 0 1 4 W I NN E R S I and R awards ` Year 2014 Winners Contents INNOVATION ACHEIVERS AWARD .......................................................................................................... 5 Highly Commended Winner 2014 ........................................................................................................... 5 Q-Bot: Significantly Reducing the Cost of Insulating Buildings Using Robotic Solutions .................... 5 Research Abstract ........................................................................................................................... 5 Winner's Bios .................................................................................................................................. 5 Mathew Holloway ........................................................................................................................... 5 Thomas Lipinski ............................................................................................................................... 5 Merit Award Winner 2014 ...................................................................................................................... 6 Improving Energy Efficiency of Traditionally Built Constructions ....................................................... 6 Research Abstract ........................................................................................................................... 6 Winner's Bios .................................................................................................................................
    [Show full text]
  • A Jewel for Berlin 6 | a Treasure Trove of Learning 7 | BIM Model for Tech Hotel 9 7 a Treasure Trove of Learning Turning the Sod
    Magazine of Royal BAM Group nv, volume 14, number 4, Winter 2017 Striking V&A Museum of Design BAM Construction has completed the exterior of the striking V&A Museum of Design Dundee in Scotland. The final stage of the exterior construction programme involved removing a temporary cofferdam which had enabled the front of the building to be built over the River Tay. Work continues on the interior. The museum will open in 2018. Philip Long, Director of V&A Dundee, said: ‘Everyone working on the design and construction should be incredibly proud of what they have achieved.’ | A jewel for Berlin 6 | A treasure trove of learning 7 | BIM model for tech hotel 9 7 A treasure trove of learning Turning the sod 10 Bridge push at Connolly Hospital From brewery 5 to building site Minister for Health, 6 A jewel for Berlin Simon Harris TD, Mayor of Fingal 10 On your marks! – Cllr. Mary McCamley, An Taoiseach Leo 9 9 Varadkar TD, Breakthrough in BIM model for 8 World’s firsts the Stuttgart tunnel Chairperson National tech hotel for BAM Infra Paediatric Hospital Development Board, Tom Costello and BAM Ireland Chief Executive, Theo Cullinane (pictured from left) at the official sod 12 turning ceremony at Connolly Hospital in Dublin where a new paediatric To live by the river outpatients and urgent care centre is to be constructed by BAM Ireland. 7 One project, two milestones The new centre at Connolly is due to be operational from February 2019.• Lively discussions during Worldwide BAM Safety Day From the Danish town of Søborg to Sint-Truiden in Belgium, and from Costa Rica to Indonesia: BAM sites and offices across the globe took part in Worldwide BAM Safety Day 2017 on 10 October.
    [Show full text]
  • Integrated Report 2020 Royal BAM Group Nv, Runnenburg 9, 3981 AZ Bunnik, P.O
    Integrated Report 2020 Royal BAM Group nv, Runnenburg 9, 3981 AZ Bunnik, P.O. Box 20, 3980 CA Bunnik, the Netherlands, +31 (0)30 659 89 88, [email protected], www. bam.com, established at Bunnik, the Netherlands, Trade register number 30058019 Layout Boulogne Jonkers Design, Zoetermeer, the Netherlands Printing Veenman+, Rotterdam, the Netherlands Illustrations Ossip van Duivenbode - MVRDV (cover), Rob Glastra - MVRDV (2,3), Mark Prins – Phenster (6), Trevor Palin (8), Marcel Steinback (15), Thames Tideway Tunnel – John Zammit (18), JL Deru, photo-daylight. com (23), Dries Van den Brande (28), JL Deru, photo-daylight.com (33) Studio Hoge Heren (35), Serge Brison (43), Michael Boulogne (44), Crossrail (51), Michel Kievits fotografie (52), Brian Lougheed Photography (55), Mark Prins – Phenster (61), Evgeni Fabisuk (62), Mix Architectuur (80), Topview (184), Jochen Strüber (196), Neil Warner Photography (200), Trevor Palin (206), Philippe van Gelooven (209), Marcel van Kerckhoven (217). 17-02 BAM is subject to the structure regime as intended in Part 4, Book 2 of the Dutch Civil Code. The Executive Board Report as intended in Part 9 of Book 2 of the Dutch Civil Code consists of chapters 1-5, 8.4, 9.1 and 9.7. Integrated Report 2020 2 Royal BAM Group nv Contents 1 Message from the CEO 6 2 Value creation 8 2.1 Business model 9 2.2 Strategy 2016-2020 11 2.3 Strategy 2021-2023 12 2.4 Stakeholder engagement and material themes 14 3 Business performance 18 3.1 Financial performance 19 3.2 Social performance 26 3.3 Environmental performance 36 3.4 Outlook
    [Show full text]