Udhampur-Srinagar-Baramulla Rail Link Project
Total Page:16
File Type:pdf, Size:1020Kb
PCDO Jan-2019 Launched portion of Viaduct Deck Structure from S-180 (KATRA- BANIHAL SECTION) Udhampur-Srinagar-Baramulla Rail Link Project Northern Railway विजय शर्मा vkbZvkj,lb Vijay Sharma IRSE No. Secy.CAO/USBRL/JAT/PCDO Dated: 07/02/2018 Sub: PCDO for the Month of Jan, 2019. 1. Highlights of the month of Jan, 2019. 1.1 During this month tunneling of 2776 m was done, which is the highest ever monthly progress . This comprises of 1395m of Main Tunnel and 1381m of Escape Tunnel and also 22520m of tunnelling has been completed in this financial year. 1.2 ESPs of Arpinchala and Sumber Station Yards has been approved on 28.12.2018. 1.3 Tender for Manufacture, Supply, Transportation and delivery of prime quality of UIC 60 Kg 1080 Grade Head Hardened Class A Rails at Banihal site for Katra-Banihal section was uploaded on 29.01.2019 and is to be opened on 26.02.2019. 1.4 Progress of tunneling work (Main tunnel) between Katra- Banihal Section S/No Agency Scope (m) Progress (m) Progress during the month (m) 1 KRCL 46101 33083 580 2 IRCON 48761 27797 815 3 NR 2456 2456 Work Completed 4 Total 97318 63336 1395 1.5 Progress of tunneling work (Escape tunnel) between Katra- Banihal Section. S/No Agency Scope (m) Progress (m) Progress during the month (m) 1 KRCL 23541 11193 620 2 IRCON 42927 24455 761 3 NR 0 0 Work Completed 4 Total 66468 35648 1381 1 1.6 Status of Bridges between Katra- Banihal Section. Agency KRCL IRCON NR Major 15 10 1 Minor 7 1 3 Total 22 11 4 Work in progress 10 6 0 Work completed 4 Major +7 Minor 3 (Major) 1 Major + 3 Minor Work yet to start 1 2 0 (Br.60) (Br. 61 & Br. 4) Total bridges in Katra-Banihal section : 37 (26 Major + 11 Minor) 2. Important achievements during the month 2.1 Earth Work: 2.1.1 Earth work and protection work is in progress in Sangaldan station yard, out of 23,60,000 Cum of total quantity 22,67,183 Cum has been done so far. 2.1.2 Earthwork for excavation of Bridges foundation is in progress for Katra Banihal section, out of 16,38,639 cum quantity (i.e. except Chenab bridge) 13,81,370 cum has been completed. 2.1.3 Earthwork for excavation of Chenab Bridge foundations & slope protection is in progress, out of 10,08,545 cum quantity 9,75,697 has been completed (i.e. 97% completed). 2.2 Tunneling i. Progress of underground excavation achieved in various tunnels are as follows. Progress of Main Tunnels (m) Progress of Escape Tunnels (m) Sr. Tunnel No. During this During this Scope Cumulative Scope Cumulative Month Month 1 T-1 3159 0 2850 - - - 2 T-2 5093 125 3010 5072 139 3108 3 T-5 5959 65 5680 5959 113 5694 4 T-13 9368 390 2163 9368 368 2391 5 T-14 3142 58 146 3142 59 399 5 T-15 9829 247 2449 9829 250 3049 6 T-48 10186 217 6452 9788 226 6163 7 T-49 12758 169 7838 12755 185 8022 8 T-74R 8600 69 7859 7413 41 6822 9 T-77D 1863 55 670 - - - 10 Total 69957 1395 39117 63326 1381 35648 2 ii. Progress of lining achieved during this month is as follows Progress of Main Tunnel Lining (m) Progress of Escape Tunnel Lining (m) Sr. No. Tunnel During this During this Scope Cumulative Scope Cumulative Month Month 1 T-1 3159 48 2380 - - - 2 T-2 5093 0 0 5072 0 0 3 T-5 5959 154 4488 5959 136 3720 4 T-13 9368 0 0 9368 0 0 5 T-14 3142 0 0 3142 0 0 5 T-15 9829 0 0 9829 0 0 6 T-48 10186 88 1238 9788 108 480 7 T-49 12758 201 1513 12755 90 180 8 T-74R 8600 0 6327 7413 174 5338 9 T-77D 1863 0 0 - - - 10 Total 69957 491 15946 63326 508 9718 iii. Progress of tunnel works/agency wise is as follows, Main Tunnel S/No Agency Scope (m) Progress (m) Balance (m) Progress (%) 1 KRCL 46101 33083 13018 72 2 IRCON 48761 27797 20964 57 3 NR 2456 2456 0 100 4 Total 97318 63336 33982 65 Escape Tunnel S/No Agency Scope (m) Progress (m) Balance (m) Progress (%) 1 KRCL 23541 11193 12348 48 2 IRCON 42927 24455 18472 57 3 NR No scope 4 Total 66468 35648 30820 54 3 iv. Month wise Tunneling progress (2018-19) Tunnel Progress (2018-19) Main Tunnel (m) Escape Tunnel (m) Month KRCL IRCON Total KRCL IRCON Total Apr-18 295 566 861 259 569 828 May-18 335 503 838 262 477 739 Jun-18 389 500 889 374 498 872 Jul-18 459 615 1074 444 646 1090 Aug-18 510 580 1090 436 550 986 Sep-18 515 669 1184 522 738 1260 Oct-18 486 740 1226 531 934 1465 Nov-18 506 709 1215 535 878 1413 Dec-18 504 802 1306 572 836 1408 Jan-19 580 815 1395 620 761 1381 Feb-19 0 0 Mar-19 0 0 Total 4579 6499 11078 4555 6887 11442 v. Linear progress of tunnel excavation (main +escape) for 2018-19 Tunnel Excavation (Main Tunnel) 2018-19 815 802 740 709 669 615 580 566 580 515 510 486 506 504 503 500 459 389 335 295 KRCL IRCON Apr-18 May-18 Jun-18 Jul-18 Aug-18 Sep-18 Oct-18 Nov-18 Dec-18 Jan-19 Feb-19 Mar-19 4 Tunnel Excavation (Escape Tunnel) 2018-19 934 878 836 761 738 646 620 572 569 522 531 535 550 477 498 444 436 374 259 262 KRCL IRCON Apr-18 May-18 Jun-18 Jul-18 Aug-18 Sep-18 Oct-18 Nov-18 Dec-18 Jan-19 Feb-19 Mar-19 Tunnel Lining Progress (2018-19) Main Tunnel Lining (m) Escape Tunnel Lining (m) Month KRCL IRCON Total KRCL IRCON Total Apr-18 324 356 680 122 165 287 May-18 269 376 645 116 111 227 Jun-18 345 337 682 181 121 302 Jul-18 238 336 574 235 293 528 Aug-18 347 300 647 223 190 413 Sep-18 295 268 563 211 244 455 Oct-18 237 223 460 151 226 377 Nov-18 115 314 429 150 358 508 Dec-18 175 274 449 164 234 398 Jan-19 202 289 491 136 372 508 Feb-19 0 0 Mar-19 0 0 Total 2547 3073 5620 1689 2314 4003 5 (Main Tunnel Lining) 2018-19 376 345 347 356 337 336 324 314 300 295 289 269 268 274 238 237 223 202 175 115 KRCL IRCON Apr-18 May-18 Jun-18 Jul-18 Aug-18 Sep-18 Oct-18 Nov-18 Dec-18 Jan-19 Feb-19 Mar-19 (Escape Tunnel Lining) 2018-19 372 358 293 235 244 223 226 234 211 181 190 164 165 151 150 136 122 116 111 121 KRCL IRCON Apr-18 May-18 Jun-18 Jul-18 Aug-18 Sep-18 Oct-18 Nov-18 Dec-18 Jan-19 Feb-19 Mar-19 6 Tunnel wise last Three Month progress (2018-19) Total S/No. Tunnel October November December January Progress (2018-19) 1 T-1 Main (m) 0 0 0 0 0 0 0 0 0 Main (m) 91 134 152 125 1590 8 T-2 218 271 301 264 Escape (m) 127 137 149 139 1622 Main (m) 139 76 66 65 1000 2 T-5 263 198 174 178 Escape (m) 124 122 108 113 997 Main (m) 258 296 286 390 1989 9 T-13 541 572 601 758 Escape (m) 283 276 315 368 1936 Main (m) 0 22 66 58 146 11 T-14 66 90 130 117 Escape (m) 66 68 64 59 397 Main (m) 218 217 261 247 1468 7 T-15 498 476 541 497 Escape (m) 280 259 280 250 2001 Main (m) 179 170 187 217 1940 3 T-48 477 453 444 443 Escape (m) 298 283 257 226 2071 Main (m) 185 146 145 169 1783 4 T-49 396 344 311 354 Escape (m) 211 198 166 185 1851 T- Main (m) 84 79 63 69 642 6 161 150 132 110 74R Escape (m) 77 71 69 41 567 T- 10 71 71 80 80 80 80 55 55 520 77D Main (m) 2691 2634 2714 2776 12 Total (MT+ET) Total (2018-19):22520m Ballast-less Track (BLT) 2.2.1 Tender for design of Broad Gauge BLT (Ballast less track) including supply, installation, testing and commissioning between Banihal - Arpinchalla (Approx. 16 Km.) was discharged on 17.01.2019. Retendering is being done. 2.2.2 Tender for design of Broad Gauge BLT (Ballast less track) including supply, installation, testing and commissioning between Km. 39.01 to Km. 42.21 and Km. 51.935 to Km. 61.817 (Approx. 12.5 Km) on Katra-Dharam Section of USBRL Project has been discharged on 10.01.2019. Retendering is under process. 2.2.3 Tender for design of Broad Gauge BLT (Ballast less track) including supply, installation, testing and commissioning between Km. 91.200 to Km. 101.632 on Katra-Dharam Section of USBRL Project has been discharged on 10.01.2019. Retendering is under process. 2.3 Bridges Progress of bridges between Katra- Banihal section has been shown in Table 3.