Nsibambi Gives Sh10m for Rebuilding Kasubi Tombs

Total Page:16

File Type:pdf, Size:1020Kb

Nsibambi Gives Sh10m for Rebuilding Kasubi Tombs 4 NATIONAL NEWS The New Vision, Wednesday, April 7, 2010 Government CORRECTIONS assures on Nsibambi gives sh10m for COLUMN fuel supply zIn our story, Feat born out of diligence: By Mary Karugaba MUK honours female and Raymond Baguma rebuilding Kasubi tombs professors published THE energy ministry has PETER BUSOMOKE on March 31, assured the public of stable By Cyprian Musoke Professor Josephine fuel supply in the country,but Namboze lived with a cautioned that the prices may PRIME Minister Apolo friend during her days remain high for some time. Nsibambi and his wife, as a student at Briefing MPs on the Esther, have contributed Makerere University Government assurance com- sh10m towards the recon- mittee yesterday, ministry struction of the Kasubi Medical School. She officials said negotiations royal tombs, gutted by fire did not live in the with the Kenyan authorities last month. wards as some of our were ongoing to ensure an Handing over the money readers may have increased supply. to the Katikkiro (Buganda interpreted the story to “Key among the issues is the prime minister), John mean. We used the need to subsidise fuel imports Baptist Walusimbi, through the Dar-es-Salaam Nsibambi said they had phrase lived in the route to make the prices equal been upset by the news of wards to reflect the to the imports through the fire. long hours she spent Kenya,” William Ruhemba, The hand-over took place in the wards. the ministry’s under secre- at Nsibambi’s residence. tary,said. The premier is still on sick He attributed the fuel short- leave after he sustained age to congestion at Mombasa injuries in a plane mishap port, transportation con- in early March. The New Vision straints on the oil pipeline “It is our prayer that the strives to make its system from the Nairobi- tombs are reconstructed in coverage accurate. If Eldoret line and increased a durable manner so that you have a question demand for petrol. such a horrible incident Nsibambi hands over a family donation of sh10m to the Katikkiro at his residence Increasing international does not reoccur,” he said. about the accuracy of prices, the depreciating local Fire gutted the traditional our stories contact currency against the dollar burial ground of Buganda’s rumours that the President Yoweri Museveni shall get there eventually. us at: and the international price of kings on March 16, sparking Government had a hand in over the incident. This is not only a Buganda [email protected] oil per barrel also contributed off an emotional outcry the inferno. The Katikkiro thanked heritage but a highly cher- o.ug or write to: to the shortage. from the Baganda. He said it was unthinkable Nsibambi for his contribu- ished national monument,” Accuracy Co-ordina- Ruhemba further noted that The place has since been for the Government to tion, saying they needed bil- he said. most fuel ships were using the sealed off as an over sh10b destroy a national monu- lions to restore the 130-year- Other bank accounts, he tor, The New Vision, Madagascar route instead of reconstruction project ment it restored. old historical monument. added, are going to be P.O. Box 9815, the usual Somalia route due kicks off. Nsibambi rapped He commiserated with the “We are still far away from opened so that there are Kampala. to piracy, hence raising trans- elements spreading Kabaka of Buganda and the targeted amount but we enough collection points. port costs, which affect the final consumer. Rev. Justaf Tukwasibwe, in charge of petroleum supply, said oil companies were tak- ing advantage of the situation to hike fuel prices. Uganda child and maternal mortality rate still high – UNICEF He said the ministry would summon the fuel dealers to explain the exorbitant price. By Conan Businge Under-five mortality rate is the Government and other non-govern- Save the Children. “When one company sells a probability a newborn baby will die ment organisations plan to launch a The report ranked Sierra Leone the litre at sh2,800 and another UGANDA is one of the countries before reaching the age of five. This campaign code named ‘EVERYONE’. worst country, with an under-five sh3,500, then there is a prob- with the highest child mortality is an internationally used indicator The campaign will be launched by mortality of 262. It is followed by lem. The acceptable differ- rates in the world, according to the children’s well-being. the First Lady and Minister for Afghanistan with 257 and Chad with ence should be in the range of latest UNICEF report. Maternal mortality also remains Karamoja Affairs, Janet Museveni, 209. sh50-sh100. When we discover According to the 2009 State of the high in Uganda at 550 per 100,000 live on May 5, at Namboole stadium. In the East African Community, that, we call them to explain World’s Children report, Uganda births. This was disclosed at a workshop Kenya is at position 121, Tanzania at the situation,” Tukwasibwe holds the 21st last slot out of 189 Women die as a result of infection organised by Save the Children. 161 and Rwanda 181. said. countries. and haemorrhage. Some have The organisation’s director, Women in the world’s least devel- Fuel prices have been rising There is an under-five mortality obstructed labour and cannot get a Luc Vanhoorickx, was flanked oped countries are 300 times more since the beginning of this rate of 130 out of 1,000 births in caesarean section. by Liliane Luwaga of the health likely to die during child birth, than month from sh2,350 to over Uganda, according to the report To reduce child and maternal mor- ministry, Twebese Mugisha of those in developed countries, says sh3,000 for petrol. which uses the 2007 estimates. tality in the country, the UNFPA and Calvin Armstrong of the UN report. EUROPEAN UNION Former UCB director’s wife accused of theft DELEGATION OF THE EUROPEAN UNION TO THE REPUBLIC OF UGANDA By Charles Ariko Asimwe resides in Police custody, much longer RE: ADVERTISMENT FOR SALE OF USED GENERATORS Kikandwa, Kakiri in Wakiso than the 48 hours provided HOPE Cove Asimwe, the district where she was for in the Constitution. The Delegation of the European Union to the republic of Uganda invites bids for the purchase of the fol- wife of the former manag- picked on April 1, by the After listening to the appli- lowing used generators;- ing director of the defunct Police. cation, the Chief Uganda Commercial Bank, The Police has been hold- Magistrate, Joyce Kavuma, Item Particulars (Type) Quantity Frank Mwine, is being ing her for the last six days ordered for her release, investigated by the Police at Kabalagala Police Station pending her production in 1. Lister Petter 07 pcs for allegedly stealing a sofa in Kampala after her hus- court to answer the criminal set worth sh 25m from her band filed theft and assault charges. Terms of sale marital home. complaints against her. Immediately after secur- i. Items are sold "as is". The bid can be considered as a one lot or separate bid for each one individually. Asimwe is also accused for Asimwe was yesterday due ing the order, Akampumuza ii. Offer will be given to the highest bidder for each lot or to highest lump sum bid. Bidders will be notified attempting to strangle her to be charged with assault whisked his client to his car by telephone. husband last week at their and theft at Makindye and drove off. Saturday 10th April 2010 from 9:00am to 5:00pm posh home in Buziga. Magistrates Court but she Minutes later, it emerged iii. The generators shall be available for viewing on at The couple has a pending left before she was formally that a criminal case file had crested towers EU Parking area. civil case in t he same court charged. also been registered to have iv. Bids enclose with a 10% banker's draft of the bid price INO "European Commission" should be submitted in in which Mwine is seeking Earlier, her lawyer, James Asimwe charged with sealed envelopes clearly "Bid for used generators" to the Delegation of the European Union reception, to divorce his estranged Akampumuza, had made an theft and assault of Mwine. 12:30pm April 16, 2010 wife. application to court to have By press time, the Police 15th floor Crested Towers for attention of Head of delegation, not later than on The couple, a few years her released unconditional- had applied for criminal v. Unsuccessful bidder will be expected to collect their drafts on April 23, 2010 at 12:00noon from the ago, had a fairy tale wedding ly on the grounds that she summons for Asimwe to be Delegation Reception. While the successful bidder(s) will be required to top up the 90% within one week at Para Lodge in Murchison had stayed too long in Police produced in court, and the of opening the bids otherwise the offer will be given to the next bidder. Falls National Park and a custody without any magistrate was yet to rule vi. You may only remove the item(s) after full payment. Non-removal within one week will be considered as grand reception at Speke charges. on the date she would Resort in Munyonyo. He argued that his client appear in court to face abandonment without any right to claim. Sources yesterday said had spent over 144 hours in charges..
Recommended publications
  • Muzibu-Azaala-Mpanga Tombs of Buganda Kings at Kasubi
    Mission report on the preparation of the reconstruction of Muzibu-Azaala-Mpanga Tombs of Buganda Kings at Kasubi A World Heritage property of Uganda April 2010 Mission undertaken from 22nd to 26th August 2011 by: Lazare Eloundou, architect, UNESCO Sébastien Moriset, architect, CRAterre-ENSAG In close collaboration with the Government of Uganda and the Buganda Kingdom August 2011 2 Mission report on the preparation of the reconstruction of Muzibu‐Azaala‐Mpanga Tombs of Buganda Kings at Kasubi A World Heritage property of Uganda (C 1022) This document is the result of the mission undertaken in Kampala from 22nd to 26th August 2011, which involved the following experts : Mr Lazare Eloundou, architect, Chief of the Africa Unit, UNESCO World Heritage Centre, Paris, France Mr Sebastien Moriset, architect, CRAterre, National Superior School of Architecture of Grenoble, France This report was prepared by Sébastien Moriset with inputs by Lazare Eloundou For more information on the reconstruction project, contact: Lazare Eloundou Chief of Africa Unit UNESCO WORLD HERITAGE CENTRE 7 Place de Fontenoy, 75352 Paris 07 SP FRANCE Tel: +33 1 45 68 19 38 email : l.eloundou‐[email protected] Sébastien Moriset CRAterre‐ENSAG International centre for earth construction, National Superior School of Architecture of Grenoble BP 2636 38036 GRENOBLE Cedex 2 FRANCE Telephone + 33 4 76 69 83 35 Cell: +33 6 46 52 74 35 email: [email protected] Rose Nkaale Mwanja, Ag. Commissioner Uganda Museums Department of Museums and monuments, Ministry of Tourism, Wildlife and Heritage P.O. Box 5718, Kampala, Uganda Telephone +256 41 232 707 Cell: +256 77 248 56 24 email : [email protected] Jonathan Nsubuga Architect, j.e.nsubuga & Associates P.O.
    [Show full text]
  • Buganda Kingdom Pictures of The: Kasubi Tombs (World Heritage Site
    Buganda Kingdom pictures of the: Kasubi Tombs (World Heritage Site), Kabaka Mutebi(King), Nabagereka(Queen), Buganda Lukiiko(Parliament), Twekobe(Kings Residence), Buganda Flag(Blue) and the Uganda Flag and Court of Arms. 1 The map of Uganda showing Buganda Kingdom in the Central around Lake Victoria, and a little girl collecting unsafe drinking water from the lake. A Japanese Expert teaching a group of farmers Irrigation and Drainage skills for growing Paddy Rice in Eastern Uganda- Doho Rice Irrigation Scheme. 2 Brief about Uganda and Buganda Kingdom The Republic of Uganda is a land locked country bordered on the east by Kenya, on the north by Sudan, on the west by the Democratic republic of Congo, on the southwest by Rwanda, and on the south by Tanzania. The southern part of the country includes a substantial portion of Lake Victoria, which is also bordered by Kenya and Tanzania. The current estimated population of Uganda is 32.4 million. Uganda has a very young population, with a median age of 15 years. It is a member of the African Union, the Commonwealth of Nations, Organisation of the Islamic Conference and East African Community. History of the people Uganda: The people of Uganda were hunter-gatherers until 1,700 to 2,300 years ago. Bantu-speaking populations, who were probably from central and western Africa, migrated to the southern parts of the country. These groups brought and developed ironworking skills and new ideas of social and political organization. The Empire of Kitara in the fourteenth and fifteenth centuries represents the earliest forms of formal organization, followed by the kingdom of Bunyoro-Kitara, and in later centuries, Buganda and Ankole.
    [Show full text]
  • Annual Report2009/2010
    ANNUAL REPORT2009/2010 R Vision Group INNOVATION AND EXCELLENCE Incorporated as New Vision PPCL Mission To inform, educate and entertain, accurately and openly, for a better world. Vision To expand as the dominant multimedia enterprise through editorial innovations and world-class practices Values • Honesty, openness and integrity • Courage backed by research and facts • Innovative, ambition and continuous improvement • Excellence in operation, people, customer care both internal and external, • Meritocracy, performance, product quality and service • Zero tolerance to corruption • Social responsibility Contents Notice of Annual General Meeting 3 Report of the Auditor General 26 Company Profile 5 Statement of Comprehensive Income 28 Board of Directors 14 Statement of Financial Position 29 Senior Management 15 Statement of Changes in Equity 30 Chairman’s Report 17 Statement of Cash Flows 31 Financial Report 23 Notes to the Financial Statements 32 Report of the Directors 24 Detailed Statement of Income 56 Statement of Director’s Responsibilities 25 Proxy Card 59 Annual Report 2009/2010 1 The newly completed factory housing the High-tech GOSS Magnum 4 Printing Press 2 Annual Report 2009/2010 Notice of Annual General Meeting NOTICE IS HEREBY GIVEN that the 9th ANNUAL GENERAL MEETING (AGM) of New Vision Printing & Publishing Company Limited will be held at the head office of the company, Plot 19/21 1st Street Industrial Area, Kampala on Thursday the 28th day of October, 2010 at 3:00 pm for the following purposes: 1. To receive and adopt the report of the directors and the financial statements of the company for the year ended June 30th, 2010 together with the report of the auditors.
    [Show full text]
  • A History of Ethnicity in the Kingdom of Buganda Since 1884
    Peripheral Identities in an African State: A History of Ethnicity in the Kingdom of Buganda Since 1884 Aidan Stonehouse Submitted in accordance with the requirements for the degree of Ph.D The University of Leeds School of History September 2012 The candidate confirms that the work submitted is his own and that appropriate credit has been given where reference has been made to the work of others. This copy has been supplied on the understanding that it is copyright material and that no quotation from the thesis may be published without proper acknowledgement. Acknowledgments First and foremost I would like to thank my supervisor Shane Doyle whose guidance and support have been integral to the completion of this project. I am extremely grateful for his invaluable insight and the hours spent reading and discussing the thesis. I am also indebted to Will Gould and many other members of the School of History who have ably assisted me throughout my time at the University of Leeds. Finally, I wish to thank the Arts and Humanities Research Council for the funding which enabled this research. I have also benefitted from the knowledge and assistance of a number of scholars. At Leeds, Nick Grant, and particularly Vincent Hiribarren whose enthusiasm and abilities with a map have enriched the text. In the wider Africanist community Christopher Prior, Rhiannon Stephens, and especially Kristopher Cote and Jon Earle have supported and encouraged me throughout the project. Kris and Jon, as well as Kisaka Robinson, Sebastian Albus, and Jens Diedrich also made Kampala an exciting and enjoyable place to be.
    [Show full text]
  • State of the Environment Report for Uganda 2006/2007
    STATE OF THE ENVIRONMENT REPORT FOR UGANDA 2006/2007 Copy right @ 2006/07 National Environment Management Authority All rights reserved. National Environment Management Authority P.O Box 22255 Kampala, Uganda http://www.nemaug.org [email protected] Publication: This publication is available both in hard copy and on the website of the National Environment Management Authority, www.nemaug.org. A charge will be levied according to the pricing policy in the authority. Suggested citation: National Environment Management Authority, 2006/07, State of Environment Report for Uganda, NEMA, Kampala. 332pp. This publication is available at the following libraries: National Environment Management Authority, Library. National Environment Management Authority Store. District Environment Offices. District Environment Resource Centers Public libraries. Makerere University library Kyambogo University library. Editor in chief: Mrs Kitutu Kimono Mary Goretti Copy editing: Dr Kiguli Susan and Mr Merit Kabugo Authors: Ema Consult Dr. Moyini Yakobo (Team leader). Review team: Dr. Aryamanya Mugisha Henry National Environment Management Authority. Mr. Telly Eugene Muramira National Environment Management Authority. Dr. Festus Bagoora National Environment Management Authority. Mrs. Mary Goretti Kitutu Kimono National Environment Management Authority. Mr. George Lubega National Environment management Authority. Mr. Francis Ogwal National Environment Management Authority. Mr. Ronald Kaggwa National Environment Management Authority. Ms. Margaret Lwanga National Environment Management Authority. Mr. Firipo Mpabulungi National Environment Management Authority. Ms. Elizabeth Mutayanjulwa National Environment Management Authority. Ms. Margaret Aanyu National Environment Management Authority. i ACKNOWLEDGEMENTS The National Environment Management Authority (NEMA) is again honored to present another edition of the State of the Environment Report for Uganda. This is the seventh report since the first one was published in 1994.
    [Show full text]
  • Rubaga Municipality
    FOREWORD This Slum Settlement Profile comes at an opportune time – a time when the city of Kampala is experiencing unprecedented growth in the history of Uganda. This growth and expansion is visible through the mushrooming of informal settlements across the different divisions of Kampala, especially in the low-lying areas of the city. This expansion has definitely exerted enormous pressure on land, with the poor occupying open spaces and the rich pushing the poor out of settlements for commercial and more formalised developments. The urban infrastructure (services and utilities) has not been spared as many residents demand for better quality water, sewer/ sanitation facilities, electricity, roads, security, and proper solid waste management systems. While the city still grapples with serving the existing communities, there are thousands that are flocking to the city in search of employment opportunities and better services. The invisible challenge for both the city and the communities has been lack of data/ information concerning the informal settlements, leading to a very wide gap between the plans and the priorities for the slum residents. The variables looked at in this Slum Profile include, among other factors, Security of Tenure, Housing, Water and Sanitation, Economic Activities, Accessibility, Drainage, and Solid Waste Management. Perhaps, the most outstanding and profound aspect is that this Slum Profile is not a collection of information from lawyers, teachers, doctors, or academicians, but rather ideas from the real slum dwellers who interface with the day-to- day challenges of slum life. KAMPALA PROFILES: RUBAGA Page 1 Table of Contents FOREWORD ........................................................................................................................................................ 1 PROFILE METHODOLOGY ................................................................................................................................ 3 A.
    [Show full text]
  • Preparatory Survey for the Project for Improvement of Traffic Control in Kampala City
    KAMPALA CAPITAL CITY AUTHORITY (KCCA) THE REPUBLIC OF UGANDA PREPARATORY SURVEY FOR THE PROJECT FOR IMPROVEMENT OF TRAFFIC CONTROL IN KAMPALA CITY FINAL REPORT FEBRUARY 2019 JAPAN INTERNATIONAL COOPERATION AGENCY (JICA) ORIENTAL CONSULTANTS GLOBAL CO., LTD. EI EIGHT-JAPAN ENGINEERING CONSULTANTS INC. JR 19-026 KAMPALA CAPITAL CITY AUTHORITY (KCCA) THE REPUBLIC OF UGANDA PREPARATORY SURVEY FOR THE PROJECT FOR IMPROVEMENT OF TRAFFIC CONTROL IN KAMPALA CITY FINAL REPORT FEBRUARY 2019 JAPAN INTERNATIONAL COOPERATION AGENCY (JICA) ORIENTAL CONSULTANTS GLOBAL CO., LTD. EIGHT-JAPAN ENGINEERING CONSULTANTS INC. PREFACE The Japan International Cooperation Agency (JICA) made the decision to conduct a preparatory survey related The Project for Improvement of Traffic Control in Kampala City, the Republic of Uganda. This survey was entrusted to Oriental Consultants Global Co., Ltd and Eight-Japan Engineering Consultants Inc. The study team held discussions with the government of Uganda and Kampala Capital City Authority officials from June 1 to July 7, 2017 and conducted field surveys in the planned area. This report was completed upon returning and finishing work domestically. JICA hopes that this report will further this project and will be useful for further developing friendship and goodwill between the two countries. Finally, JICA would like to express our sincere gratitude to everyone involved for their cooperation and support regarding the survey. May 2018 Itsu Adachi Director General of Infrastructure and Peacebuilding Department Japan International Cooperation Agency (JICA) SUMMARY 1. Overview of Kampala City The railway network in Uganda is not functioning, so 92% or more of freight and passenger transportation is carried over roads. These roads are critical in terms of Uganda’s economic development.
    [Show full text]
  • Political Theologies in Late Colonial Buganda
    POLITICAL THEOLOGIES IN LATE COLONIAL BUGANDA Jonathon L. Earle Selwyn College University of Cambridge This dissertation is submitted for the degree of Doctor of Philosophy 2012 Preface This dissertation is the result of my own work and includes nothing which is the outcome of work done in collaboration except where specifically indicated in the text. It does not exceed the limit of 80,000 words set by the Degree Committee of the Faculty of History. i Abstract This thesis is an intellectual history of political debate in colonial Buganda. It is a history of how competing actors engaged differently in polemical space informed by conflicting histories, varying religious allegiances and dissimilar texts. Methodologically, biography is used to explore three interdependent stories. First, it is employed to explore local variance within Buganda’s shifting discursive landscape throughout the longue durée. Second, it is used to investigate the ways that disparate actors and their respective communities used sacred text, theology and religious experience differently to reshape local discourse and to re-imagine Buganda on the eve of independence. Finally, by incorporating recent developments in the field of global intellectual history, biography is used to reconceptualise Buganda’s late colonial past globally. Due to its immense source base, Buganda provides an excellent case study for writing intellectual biography. From the late nineteenth century, Buganda’s increasingly literate population generated an extensive corpus of clan and kingdom histories, political treatises, religious writings and personal memoirs. As Buganda’s monarchy was renegotiated throughout decolonisation, her activists—working from different angles— engaged in heated debate and protest.
    [Show full text]
  • Kasubi Tombs
    A WORLD HERITAGE SITE UN SITE DU PATRIMOINE MONDIAL UGANDA - KAMPALA KASUBI TOMBS CRATerre Editions CRATerre Editions UGANDA - KAMPALA KASUBI TOMBS 2 KASUBI TOMBS KASUBI TOMBS 3 KASUBI TOMBS A WORLD HERITAGE SITE The preparation of this booklet was sponsored by the French Embassy in Kampala, and its conception is UN SITE DU PATRIMOINE MONDIAL the result of the cooperation between Heritage Trails Uganda, the National Department of Antiquities and Department of Antiquities and Museums Museums of Uganda, and CRATerre, research centre Kabaka Foundation of the Grenoble school of architecture in France. By Heritage Trails Uganda purchasing this booklet, the postcards or the poster, CRATerre-EAG you participate in the promotion and French Embassy in Kampala conservation of 7 Ganda sites, including the Kasubi Tombs, World Heritage Site, since part of the money you pay is invested in the regular maintenance of the thatched roofs. Ce fascicule, dont l’élaboration a été financée par l’ambassade de France en Ouganda, résulte d’un travail commun entre le Heritage Trails Uganda, le Département National des Musées et Antiquités de l’Ouganda et CRATerre, centre de recherche de l’école d’architecture de Grenoble en France. En achetant ce fascicule, les cartes postales ou le poster de la même série, vous participez à la promotion et à la conservation de 7 sites culturels du Bouganda, dont les tombes Kasubi, site du patrimoine mondial, car une partie des recettes de la vente de ces produits est investie dans l’entretien régulier des toitures de chaume. Kabata Mutesa’s Palace at Kasubi-Nabulagala (from the plan drawn by Sir Apolo Kagwa) Gate house (Bujjabukula) at the entrance of the site.
    [Show full text]
  • Tombs of Buganda Kings at Kasubi
    WHC Nomination Documentation File Name: 1022.pdf UNESCO Region: AFRICA __________________________________________________________________________________________________ SITE NAME: Tombs of Buganda Kings at Kasubi DATE OF INSCRIPTION: 16th December 2001 STATE PARTY: UGANDA CRITERIA: C (i) (iii) (iv) (vi) DECISION OF THE WORLD HERITAGE COMMITTEE: Excerpt from the Report of the 25th Session of the World Heritage Committee The Committee inscribed the Tombs of Buganda Kings at Kasubi on the World Heritage List under criteria (i), (iii), (iv), and (vi): Criterion (i): The Kasubi Tombs site is a masterpiece of human creativity both in its conception and in its execution. Criterion (iii): The Kasubi Tombs site bears eloquent witness to the living cultural traditions of the Baganda. Criterion (iv): The spatial organization of the Kasubi Tombs site represents the best extant example of a Baganda palace/architectural ensemble. Built in the finest traditions of Ganda architecture and palace design, it reflects technical achievements developed over many centuries. Criterion (vi): The built and natural elements of the Kasubi Tombs site are charged with historical, traditional, and spiritual values. It is a major spiritual centre for the Baganda and is the most active religious place in the kingdom. The Committee noted that the site combines the historical and spiritual values of a nation. BRIEF DESCRIPTIONS The Tombs of Buganda Kings at Kasubi constitute a site embracing almost 30 ha of hillside within Kampala district. Most of the site is agricultural, farmed by traditional methods. At its core on the hilltop is the former palace of the Kabakas of Buganda, built in 1882 and converted into the royal burial ground in 1884.
    [Show full text]
  • The Role of the Media in Development of Culture Case Study of Ntenjeru County in Kayunga District by Rhamula Nabatte Bmc/0818/21
    THE ROLE OF THE MEDIA IN DEVELOPMENT OF CULTURE CASE STUDY OF NTENJERU COUNTY IN KAYUNGA DISTRICT BY RHAMULA NABATTE BMC/0818/21/DU Supervised by: DR. SWAIBU , ph.d DISSERTATION SUBMITTED AS PARTIALREQUIREMENT FOR THE AWARD OF BACHELORS IN MASS COMMUNICATION AT KAMPALA IMNTERNATIONAL UNIVERSITY NOVEMBER 2005 II MOTO Suffering is not the end of life AND Allah is the medicine of every thing lJl DEDICATION This desseration is dedicated to my parents, Hajji Sekandi Sulaiman and Mrs. Nagadya Nakafeero Nuulu Sekandi, , my sisters, Nanyanzi Ruicia, Basemera Prossy, Namuleme Jane, Mutesi Sarah and Nantambi Zuhura. Also to my brothers Wagaba Ben, Sekandi Sulaiman, Kikomeko Twaha, Bukenya Abe, Kanyike George William and Kigongo Bernard. Not forgetting Mr. Buyondo Abudubast, who always gave suppo11 whenever called upon. You are thanked \'ery much. IV ACKNOWLEDGEMENT I Rhamula ~abatte, here by declare that this piece of academic work is sorely a result of personal toil and sweat, to the best of my knowledge it has never been presented to any other University or higher Institution of learning for academic purpose. The work is as a result of my creativity and struggle, with the assistance of my supervisor DR. Swaib .ph.d for his skills displayed t:or · . I they have been duly acknowledged~ ~ KAMPALA INTERNATIONAL UNIVERSITY •• NOVEMBER 2005 v ABSTRACT The purpose of this study was to investigate the role of the media in cultural deYelopment in Kayunga District, Ntenjeru County. Data was collected critically by seeking views from the population by use of an inter-dew guide. The study was guided by three objectives which focused on county and district changes.
    [Show full text]
  • Environmental and Social Impact
    SFG1757 REV ENVIRONMENTAL AND SOCIAL IMPACT ASSESSMENT FOR KAMPALA INFRASTRUCTURE AND INSTITUTIONAL DEVELOPMENT PROJECT Public Disclosure Authorized PHASE 2 (KIIDP-II) Batch 1ROADS AND JUNCTIONS Public Disclosure Authorized Public Disclosure Authorized Prepared By: MBW Consulting Ltd in association with PEC with Public Disclosure Authorized CONSULTING TEAM An interdisciplinary team of consultants under Environmental Assessment Consult (Uganda) Limited (EACL) carried out the assessment i EXECUTIVE SUMMARY Kampala Capital City Authority (KCCA) is mandated to plan, develop and maintain the city infrastructure. Good Infrastructure is fundamental in stimulating economic growth and generally, poverty reduction. For long, the City’s infrastructure has received inadequate attention due to limited funding, which has resulted into its stagnation and dilapidation. However, the population and demand for services has been steadily growing. Overall, Kampala has approximately 1,218 km of roads, of which about 38.4% are paved (bituminized) and 61.6% are unpaved (earth or gravel). A significant portion of the unpaved road network is heavily trafficked with over 500 vehicles per day. With the ever increasing traffic volumes, maintenance of unpaved roads has become very expensive and certainly unsustainable. Almost 80% of the bitumen roads and 99% of the unpaved roads are in a fair-to-poor condition due to a heavy maintenance backlog. Some roads bear potholes, surface irregularities, and cracks, that adversely impact transport system. Localized repairs have become expensive and uneconomical due to frequent break breaking down of repaired road patchworks. This ESIA report has been prepared in accordance with the guidelines for Environmental Impact Assessment (EIA) in Uganda. The guidelines require that any developer seeking to carry out a development of the nature and category described under Schedule 3 of The National Environment Act, Cap 153 carries out an Environmental and Social Impact Assessment (ESIA).
    [Show full text]