M E M O R a N D U M Gold Line Grade-Separation

Total Page:16

File Type:pdf, Size:1020Kb

M E M O R a N D U M Gold Line Grade-Separation Attachment A – Nelson/Nygaard Memorandum Report M E M O R A N D U M To: Fred Dock and Bahman Janka From: Paul Moore and Steve Boland Date: February 6, 2018 Subject: City Funding Request to Metro (SR-710 Early Action Projects) This memorandum briefly describes the projects the City of Pasadena Department of Transportation is proposing to include in the City’s SR-710 Early Action Projects funding request to Metro. The projects were selected based on: . review of the SR-710 North Environmental Impact Report/Statement (EIR/EIS); . recommendations of the SR-710 Working Group; . other existing City plans, including the Mobility Element of the General Plan; . additional project development by City staff; . Nelson\Nygaard evaluation; . discussions with representatives of the Cities of South Pasadena and Alhambra; and . discussions with the Transportation Advisory Commission in its October 26 meeting. Consistent with Metro direction, many of the proposed projects are Transportation System Management/Transportation Demand Management (TSM/TDM) projects, while others are multimodal in nature. Many of the projects are in advanced stages of project development or are part of adopted policies, while others are newer concepts requiring further community discussion and project development (note that cost estimates for these projects are by necessity preliminary, based on professional judgment). The projects are presented in no particular order. Given the scale of funding available, it is our hope that most if not all projects can be funded by Metro. GOLD LINE GRADE-SEPARATION This project would consist of grade-separation of the existing at-grade Metro Rail Gold Line crossing at California Boulevard. This segment of the Gold Line intersects two arterial streets with relatively high traffic volumes – California and Del Mar Avenue – resulting in substantial delay and congestion. Moreover, because a number of other area streets terminate at the Gold Line, these at-grade crossings contribute to a lack of pedestrian and bicycle connectivity between neighborhoods east and west of the Gold Line. While providing regional connectivity and access for Pasadena residents, the Gold Line acts as a physical barrier in central Pasadena. Grade-separation of the Del Mar intersection would be challenging due to the proximity of the existing at-grade Del Mar station and adjacent transit-oriented development spanning the Gold 706 SOUTH HILL STREET, SUITE 1200 LOS ANGELES, CA 90014 213-785-5500 www.nelsonnygaard.com SR-710 Early Action Projects Funding Request to Metro [City of Pasadena] Line right-of-way. However, a very preliminary plan has been developed for grade-separation of the California intersection that would have far fewer impacts, including no interruption in Gold Line service (either space is available, or certain properties could be acquired for the purpose of providing for a shoofly on adjacent properties during the construction of the project). This project has preliminary been estimated to have a capital cost of $105 million. We understand that Metro may wish to evaluate this project in the context of other potential grade separations of existing at-grade Gold Line crossings, including intersections in South Pasadena and Los Angeles. Therefore, our initial request is for a broader study of Gold Line grade separations, with funding set aside for implementation of priority projects. 210 RAMP MODIFICATIONS This project would remove the existing I-210 “stub” on- and off-ramps north of California and make operational improvements to Del Mar and Fair Oaks to accommodate traffic shifted to those streets. The I-210 stub, while less than one mile long, currently features two pairs of on- and off-ramps: north of California, and just north of Del Mar. The northbound on-ramps at Del Mar and north of California (between Bellevue and Waverly Drives) are less than 800 feet apart. We understand that proposed projects may not interfere with eventual construction of an SR-710 North tunnel, if that is the direction Caltrans and Metro eventually decide to pursue. However, removal of the existing ramps at California should not interfere with that project, and would provide a number of benefits. Most importantly, removal of the California ramps would effectively shift north-south regional traffic (particularly southbound traffic) away from the one-way couplet of St. John and Pasadena avenues, relatively narrow residential streets, to Del Mar, Fair Oaks and Arroyo Parkway, broad commercial arteries that are designed to accommodate such traffic. This would be consistent with the City of South Pasadena’s accompanying effort to shift regional traffic from Fremont Avenue to Fair Oaks, and would enable traffic calming improvements to St. John and Pasadena (see following section). As part of this project, the City is requesting funding for a new traffic signal at Fair Oaks and Bellevue. The City has recently completed a number of throughput improvements to both Fair Oaks and Arroyo, including implementation of adaptive traffic control systems (ATCS) technology at signalized intersections. As an alternative to this project, regional traffic could be shifted from St. John and Pasadena to Fair Oaks and Arroyo Parkway using modifications to the intersection of the I-210 southbound off-ramp and California including restriping (removal of one westbound lane on California) to accommodate dual left-turn lanes and signal timing adjustments. If this direction were pursued, the City would request funding for accompanying pedestrian improvements on California, including sidewalk widening. However, the City’s strong preference is for removal of the California ramps, as this would much more effectively divert regional traffic away from Pasadena and St. John while maintaining local and regional access to and from I-210. Cost estimates have not been developed for this project, but costs for removal of two freeway ramps, along with attendant changes to roadway striping, signals and signage, could reasonably be expected to exceed $10 million. Nelson\Nygaard Consulting Associates Inc. | 2 SR-710 Early Action Projects Funding Request to Metro [City of Pasadena] TRAFFIC CALMING/COMPLETE STREET PROGRAMS A number of “complete streets” projects are proposed to: improve safety for pedestrians and bicyclists by reducing auto speeds; reduce the impacts of regional traffic diverted to local residential streets from adjacent freeways; and work toward encouraging non-auto travel throughout the City and the northern segment of the 710 North corridor. St. John Avenue/Pasadena Avenue/Orange Grove Complete Street Program Removal of the I-210 on- and off-ramps north of California (see previous section) would enable traffic calming improvements to the residential streets of St. John and Pasadena Avenue. Residents along these streets must currently bear a disproportionate share of the burden of accommodating regional traffic in the 710 North corridor. Specifically, the City proposes to restore both St. John and Pasadena to their previous configurations, before they were converted to a one-way couplet accommodating higher vehicular throughput. In addition to converting both streets to two-way traffic, this would result in restoration of removed sidewalks, and resulting narrower rights-of-way further improving pedestrian conditions by shortening street crossings. As a corollary to this project, the City is also requesting funding for traffic calming improvements to Orange Grove Boulevard, which parallels St. John and Pasadena Avenue to the west. A community process to identify desired improvements is currently underway. The preliminary cost estimate for this project is approximately $15 million. Allen Avenue Complete Street Program The City of Pasadena also wishes to enhance pedestrian walkability and bicyclist safety along the critical north-south Allen Avenue corridor, between Villa Street and Colorado Boulevard. A wide variety of travelers, including pedestrians, bicyclists, transit users and motorists, use the corridor due to its proximity to the I-210 Freeway, the Allen Gold Line Station, and Pasadena City College. Proposed improvements to improve safety and walkability may include narrowing of streets by widening sidewalks, raised landscaped medians, “road diet” lane reconfiguration, constructing curb extensions/bulb outs at some intersections, upgrading traffic signal equipment, and modifying roadway signing and striping. The preliminary cost estimate for this project is approximately $1.5 million. Hill Avenue Complete Street Program Hill Avenue between Villa Street and the northern city limit at Topeka Street was evaluated for potential safety enhancements through a City-sponsored program in 2016- 2017. This program began with the development of a working group that included residents and other stakeholders, and culminated with a list of potential enhancements to reduce vehicular speed and enhance pedestrian, bicyclist and motorist safety. The list of potential enhancements includes bulb outs at twelve intersections and traffic circles at the intersections of Hill Avenue with Topeka Street and Elizabeth Street. The I-210 freeway has both eastbound and westbound on-ramps and off-ramps at Hill Avenue, making it a heavily traveled corridor. Design is currently underway for these enhancements, but construction funding has not yet been identified. Measure R funds would be Nelson\Nygaard Consulting Associates Inc. | 3 SR-710 Early Action Projects Funding Request to Metro [City of Pasadena] used to construct
Recommended publications
  • Community Open House #1 South Gate Park January 27, 2016 Today’S Agenda
    Community Open House #1 South Gate Park January 27, 2016 Today’s Agenda 1) Gateway District Specific Plan 2) Efforts To Date 3) Specific Plan Process 4) TOD Best Practices 5) Community Feedback 27 JANUARY 2016 | page 2 Gateway District Specific Plan What is the West Santa Ana Branch? The West Santa Ana Branch (WSAB) is a transit corridor connecting southeast Los Angeles County (including South Gate) to Downtown Los Angeles via the abandoned Pacific Electric Right- of-Way (ROW). Goals for the Corridor: 1. PLACE-MAKING: Make the station the center of a new destination that is special and unique to each community. 2. CONNECTIONS: Connect residential neighborhoods, employment centers, and destinations to the station. 3. ECONOMIC DEVELOPMENT TOOL: Concentrate jobs and homes in the station area to reap the benefits that transit brings to communities. 27 JANUARY 2016 | page 4 What is light rail transit? The South Gate Transit Station will be served by light rail and bus services. Light Rail Transit (LRT) is a form of urban rail public transportation that operates at a higher capacity and higher speed compared to buses or street-running tram systems (i.e. trolleys or streetcars). LRT Benefits: • LRT is a quiet, electric system that is environmentally-friendly. • Using LRT helps reduce automobile dependence, traffic congestion, and Example of an at-grade alignment LRT, Gold Line in Pasadena, CA. pollution. • LRT is affordable and a less costly option than the automobile (where costs include parking, insurance, gasoline, maintenance, tickets, etc..). • LRT is an efficient and convenient way to get to and from destinations.
    [Show full text]
  • Academic Perspectives on Minimum Parking: Congestion Typical Commerical Lot 7,500 Sq
    setting the stage: parking policy as Los Angeles matures and the regional transit system is built Regional Context Regional Context Robin Blair (METRO) Robin Blair is something that is essential to the FTA funding Jay Kim (LADOT) Jay Kim is the security, liability, and insurance issues, there a Planning Director at Metro and the process and to the criteria we are using. So Acting Assistant General Manager could be maximum flexibility in dealing with Parking Policy Modal Lead for the far, the city of Los Angeles and the surround- for the newly re-organized Office of parking.” 2011 Call for Projects. Parking Management, Planning and ing cities have adopted fairly aggressive land Regulations with the Department of use policies which favor transit use.” Transportation. He has over 20 years of transportation planning and engi- neering experience from both private • “Currently the renaissance of rail raises and public sectors. the issue of land use, which is the most considered factor for the Federal Trans- • “Because we impose parking require- portation Agency (FTA) in evaluating any The five criteria of FTA’s ments on a project-by-project basis and In the U.S. we have built new funding. In this context, the discus- evaluation for fund- parking spaces are not designed to be three spaces per each sion of parking around transit becomes “ publically shared, we over-provide park- “ important.” ing are the existing land ing. Parking spaces should be shared.” car. In downtown in par- • “Places like MacArthur Park have well use, the containment of • Regarding shared parking, “every build- ticular, we have dedi- survived and people gravitated to these ing will probably need to have some por- areas where they could get around the sprawl, transit supporting tion of the parking dedicated for their use; cated 81% of the land for city without using automobiles.
    [Show full text]
  • Transit Service Plan
    Attachment A 1 Core Network Key spines in the network Highest investment in customer and operations infrastructure 53% of today’s bus riders use one of these top 25 corridors 2 81% of Metro’s bus riders use a Tier 1 or 2 Convenience corridor Network Completes the spontaneous-use network Focuses on network continuity High investment in customer and operations infrastructure 28% of today’s bus riders use one of the 19 Tier 2 corridors 3 Connectivity Network Completes the frequent network Moderate investment in customer and operations infrastructure 4 Community Network Focuses on community travel in areas with lower demand; also includes Expresses Minimal investment in customer and operations infrastructure 5 Full Network The full network complements Muni lines, Metro Rail, & Metrolink services 6 Attachment A NextGen Transit First Service Change Proposals by Line Existing Weekday Frequency Proposed Weekday Frequency Existing Saturday Frequency Proposed Saturday Frequency Existing Sunday Frequency Proposed Sunday Frequency Service Change ProposalLine AM PM Late AM PM Late AM PM Late AM PM Late AM PM Late AM PM Late Peak Midday Peak Evening Night Owl Peak Midday Peak Evening Night Owl Peak Midday Peak Evening Night Owl Peak Midday Peak Evening Night Owl Peak Midday Peak Evening Night Owl Peak Midday Peak Evening Night Owl R2New Line 2: Merge Lines 2 and 302 on Sunset Bl with Line 200 (Alvarado/Hoover): 15 15 15 20 30 60 7.5 12 7.5 15 30 60 12 15 15 20 30 60 12 12 12 15 30 60 20 20 20 30 30 60 12 12 12 15 30 60 •E Ğǁ >ŝŶĞϮǁ ŽƵůĚĨŽůůŽǁ ĞdžŝƐƟŶŐ>ŝŶĞƐϮΘϯϬϮƌŽƵƚĞƐŽŶ^ƵŶƐĞƚůďĞƚǁ
    [Show full text]
  • 1 Document Overview.Cdr
    Section 2. CONTEXTUAL BACKGROUND ! Local & Regional Setting ! Historical Context ! Physical Context: Land Use ! Physical Context: Mobility ! Physical Context: Urban Design ! Socio-economic Context ! Policy Context ! Community Values Section 2 CONTEXTUAL BACKGROUND 11 Local & Regional Setting Regional Setting Pasadena is situated at the foot of the San Gabriel Mountains in the western San Gabriel Valley, approximately 10 miles northeast of downtown Los Angeles. This location offers numerous advantages, including convenient freeway and airport access that will continue to provide the City a competitive advantage as a regional business hub. Moreover, few localities can match the physical beauty afforded by the backdrop of the San Gabriels. San Gabriel Mountains Local Setting Located in the heart of the City, the Central District’s approximately 960 acres essentially correspond to the area recognized by Pasadena’s residents as “Downtown.” (Downtown and Central District will be used interchangeably in this document.) Included within its boundaries are the activity centers popularly known as Old Pasadena, the Civic Center, the Playhouse District, and South Lake Avenue; each makes a special contribution to this urban setting with an active mixture of uses. The Central District’s boundaries are clearly marked to the north and west by the 210 and 710 Freeways respectively, and it’s buildings are prominent features along these highways. Approaching the campuses of the California Institute of California Institute of Technology (Caltech) and Pasadena City College (PCC), the eastern Technology boundary lies one to two blocks east of Lake Avenue. The southern limit roughly follows California Boulevard, except that the Specific Plan area includes the Arroyo Parkway corridor extending from the 110 Freeway into the midst of Downtown.
    [Show full text]
  • Metro Public Hearing Pamphlet
    Proposed Service Changes Metro will hold a series of six virtual on proposed major service changes to public hearings beginning Wednesday, Metro’s bus service. Approved changes August 19 through Thursday, August 27, will become effective December 2020 2020 to receive community input or later. How to Participate By Phone: Other Ways to Comment: Members of the public can call Comments sent via U.S Mail should be addressed to: 877.422.8614 Metro Service Planning & Development and enter the corresponding extension to listen Attn: NextGen Bus Plan Proposed to the proceedings or to submit comments by phone in their preferred language (from the time Service Changes each hearing starts until it concludes). Audio and 1 Gateway Plaza, 99-7-1 comment lines with live translations in Mandarin, Los Angeles, CA 90012-2932 Spanish, and Russian will be available as listed. Callers to the comment line will be able to listen Comments must be postmarked by midnight, to the proceedings while they wait for their turn Thursday, August 27, 2020. Only comments to submit comments via phone. Audio lines received via the comment links in the agendas are available to listen to the hearings without will be read during each hearing. being called on to provide live public comment Comments via e-mail should be addressed to: via phone. [email protected] Online: Attn: “NextGen Bus Plan Submit your comments online via the Public Proposed Service Changes” Hearing Agendas. Agendas will be posted at metro.net/about/board/agenda Facsimiles should be addressed as above and sent to: at least 72 hours in advance of each hearing.
    [Show full text]
  • Westside Cities Subregion Project List 6/23/2015
    Westside Cities Subregion Project List 6/23/2015 Non‐ Estimated Estimated Project ID Project/Program Category Jurisdiction Project Description Prioritized Minimum Cost Maximum Cost Los Angeles ‐ Westside, Santa 1WS‐119 Transit Metro Purple Line Extension Westwood/VA to City of Santa Monica $825,679,520 $1,238,519,280 Monica Los Angeles ‐ Westside, West Crenshaw Bl Corridor Extension (beyond segment funded by Measure R) all 2WS‐22 Transit $2,336,400,000 $6,365,700,000 Hollywood the way to West Hollywood/Hollywood Los Angeles ‐ Westside, Beverly 3WS‐23 Transit Metro Purple Line Extension West Hollywood Extension $2,395,760,000 $3,593,640,000 Hills, West Hollywood I‐405/Sepulveda Pass ‐ Alternative multimodal linkage from the Westside 4WS‐282 Transit Los Angeles ‐ Westside $1,294,720,318 $5,996,262,922 to the San Fernando Valley and LAX, taking pressure off of the I‐405 Los Angeles ‐ Westside, I‐405‐ Express Bus Improvements (e.g., peak period shoulder lane) on I‐ 5WS‐294 Transit Unicorporated ‐ Westside, $240,000,000 $360,000,000 405 Culver City Sepulveda Pass – Increase express bus service over Sepulveda Pass, with 6WS‐301 Transit Los Angeles ‐ Westside collector/feeder service throughout West LA and the San Fernando Valley. Los Angeles ‐ Westside, Green Line Extension on Florence Av/ BNSF Railway ‐ Build rail to connect 7WS‐316 Transit $1,276,042,367 $1,389,588,510 Unicorporated ‐ Westside Harbor and Crenshaw Corridors to LAX utilizing existing BNSF rail line Implement City of LA Transit Enhanced Network as defined in the Mobility 8WS‐3161 Transit Los Angeles ‐ Westside $60,962,660 $12,802,158,600 Plan 2035.
    [Show full text]
  • Gold Line Allen Station Connections
    Allen Connections metro.net Destinations Lines Stops IYWb[DcZJc^i/&$'B^aZ JJ;CFB;7BO;CFB; 7BO C;HH;JJIJC;HH;JJ IJ ;L;BODFB;L;BOD FB BEC7L?IJ7IJBEC7 L?IJ7 IJ Alhambra 485 B BEC7L?IJ7IJ Altadena 180, 485, 686 AJ 8EOBIJEDIJ D;BIED7BO L L L MH?=>J7L Av 64 256 K 7 7 ; BC F7BEC7IJ ? H 7L Azusa FT690 B 7 I Cal State LA Station Å 485 B J :KD>7C7BO California Bl 177, ARTS 20 BK Cal Tech 485, ARTS 10, 20 BGHL EH7D=;=HEL;8B EH7D=;=HEL;8B Å B Claremont TransCenter FT690 9H7M<EH:7BO Colorado Bl 180, 256, 686, ARTS 10 BGH ;7HB>7CIJ ; E B7IBKD7IIJ KL : D 8 H ? 7 E BGH ; Del Mar Station 177, 686, ARTS 20 B 9B?<JED7BOED 7BO 7 E 7 L A E D KL B H I7DJ787H87H7IJ 7 CEDJ;L?IJ7IJL?IJ7 IJ ; C 7 E L H B >?BB7 B >EBB?IJED Downtown Los Angeles 485 B Je=ersonsonn ; D D;MJED7BO >7C?BJED7L B B ? ? B7A;7L C?9>?=7D7L 7 9>;IJ;H7L C;DJEH7L M?BIED7L 97J7B?D77L C7HL?IJ77L 9B7HA7BO Park 887B:M?D7BO7B:M?D 7BO I?;HH78ED?J77L I I I?D7BE77L ; ;BCEB?DE7L 7 Eastern Av 256 K ; 7BB;D7L C F7BEL;H:;7L F El Sereno 256 K L?BB7IJ L?BB7IJIJ O Villa Gardens Kaiser B Encino CE549 B 7 Retirement Clinic JOB;H7BO : I Fremont Av 485 B Commmunity < M7=D;HIJM7=D;H IJ J = J >K:IED7L ; Glendale via 134 Fwy CE549 B 8;JJI7BO 8 K C7FB;MO Lake Avenue Church C7FB;IJ; IJ Highland Park 256 87HJB;JJ7BO 7bb[dIjWj_ed G C[ceh_WbFWhaIjWj_ed C7FB;IJ JPL 177 <MO '&% 7 BWa[IjWj_ed <EEJ>?BB LA County+USC 485 B IJJ 9EHIEDD L Medical Center Station @ 7 8 A 7 I L L 9EHIEDIJ > E La Verne FT690 B 7 H 7 B 7L O 7 B A L 7 BEGH BE9KIJIJIJ : 7 Memorial Park Station 180, 686, ARTS 10, 40 L J 9 7 BE9KIJIJ D D E7A
    [Show full text]
  • University of California Transportation Center UCTC-FR-2012-05
    University of California Transportation Center UCTC-FR-2012-05 A New-found Popularity for Transit-oriented Developments? Lessons from Southern California Anastasia Loukaitou-Sideris, University of California, Los Angeles April 2012 This article was downloaded by: [University of California, Los Angeles] On: 25 June 2010 Access details: Access Details: [subscription number 918974530] Publisher Routledge Informa Ltd Registered in England and Wales Registered Number: 1072954 Registered office: Mortimer House, 37- 41 Mortimer Street, London W1T 3JH, UK Journal of Urban Design Publication details, including instructions for authors and subscription information: http://www.informaworld.com/smpp/title~content=t713436528 A New-found Popularity for Transit-oriented Developments? Lessons from Southern California Anastasia Loukaitou-Siderisa a Department of Urban Planning, University of California, Los Angeles, USA Online publication date: 18 January 2010 To cite this Article Loukaitou-Sideris, Anastasia(2010) 'A New-found Popularity for Transit-oriented Developments? Lessons from Southern California', Journal of Urban Design, 15: 1, 49 — 68 To link to this Article: DOI: 10.1080/13574800903429399 URL: http://dx.doi.org/10.1080/13574800903429399 PLEASE SCROLL DOWN FOR ARTICLE Full terms and conditions of use: http://www.informaworld.com/terms-and-conditions-of-access.pdf This article may be used for research, teaching and private study purposes. Any substantial or systematic reproduction, re-distribution, re-selling, loan or sub-licensing, systematic supply or distribution in any form to anyone is expressly forbidden. The publisher does not give any warranty express or implied or make any representation that the contents will be complete or accurate or up to date. The accuracy of any instructions, formulae and drug doses should be independently verified with primary sources.
    [Show full text]
  • System Map Effective July 2013 • for Arts Schedule, Fare, and Route Information Visit Or Call (626) 398-8973
    Pasadena SyStem map effective July 2013 • For aRtS schedule, fare, and route information visit www.cityofpasadena.net/artsbus or call (626) 398-8973. • Route schedules and maps are available for downloading from the City website. • Route schedules are also available at pasadena libraries, major hotels, community centers, on our buses, arts and at our office located at 221 e. Walnut, #199. area Rapid transit System paSadeNa aRea Rapid tRaNSit SyStem map rouTe no. direcTion Frequency GeneraL hourS oF operaTion* (refer to schedules for specific times) 10 east & West 25 minutes mon-Fri 6am to 8pm; Sat 11am to 8pm 20 Clockwise mon-Fri: about 20-25 min. (average) mon-Fri 6am to 8pm; Sat 11am to 8pm Sat: 35 minutes 20 Counterclockwise mon-Fri: about 20-25 min. (average) mon-Fri 6am to 8pm; Sat 11am to 8pm Sat: 35 minutes 31 east once an hour mon-Fri 6am to 8pm; Sat 11am to 8pm mon - Fri Rush Hrs: am - 15-30 minutes; pm - 2 trips 31 West once an hour mon-Fri 6am to 8pm; Sat 11am to 8pm Rush Hrs: am - 2 trips; pm - 15-35 minutes 32 east 70 minutes mon-Fri 6am to 8pm; Sat 11am to 8pm mon - Fri Rush Hrs: am - 60-70 minutes; pm - 15-30 minutes arTS ScheduLe/rouTe inForMaTion 32 West 70 minutes mon-Fri 6am to 8pm; Sat 11am to 8pm (626) 398-8973 Rush Hrs: am - 15-35 minutes; pm - 70 minutes adMiniSTraTive oFFice 40 east & West 30 minutes mon-Fri 6am to 7:30pm; Sat 11am to 8pm mon-Fri Rush Hrs: 15-30 minutes tRaNSit diviSioN department of transportation 51 North & South once an hour (to/from art Center) mon-Fri 6am to 8pm: weekday service only City of pasadena 51 SatuRday North & South 22 minutes (memorial park/Rose bowl) Sat 7:30am to 8pm: Saturday only 221 east Walnut Street, Suite 199 SeRviCe pasadena, Ca 91101 52 mon-Fri (626) 744-4055 1 trip in the morning and 2 trips in the afternoon www.cityofpasadena.net/artsbus 60 east & West 45-50 minutes mon-Fri 6am to 10:30am & 2:45pm to 7:25pm peak hour weekday service only *Holidays: aRtS buses do not operate on New years day, memorial day, Fourth of July, Labor day, thanksgiving day, Christmas day.
    [Show full text]
  • Art Guide a Tour of Metro’S Artwork Metro Commissions Artists to Create Engaging and Thought-Provoking Artworks to Make Your Journey More Inviting and Pleasurable
    metro.net Art Guide A tour of Metro’s artwork Metro commissions artists to create engaging and thought-provoking artworks to make your journey more inviting and pleasurable. The artworks weave a multi-layered cultural tapestry that mirrors Los Angeles County’s rich contemporary and popular cultures. Established in 1989, the Metro Art program has commissioned over 250 artists for a wide variety of both temporary and permanent projects. explore Artists are selected through a peer review process with community input; all works are created especially for their transit related sites. This guide is intended to help you discover artworks throughout the Metro system. For more detailed information on the artwork and the artists, please visit metro.net/art. Artwork copyrighted, all rights reserved. Metro Lines and Transitways Metro Contents Art’s a Trip. Art’s a Trip Metro Environments Free Metro Rail Tours Tours are o=ered the >rst Saturday, > Thursdays – Meet at 7pm at Sunday and Thursday of each month. the street level entrance to the Metro Rail Metro Customer Center It’s free. It’s provocative. The tours are roundtrip and last Hollywood/Highland Metro l Metro Red Line Metro Vehicles It’s a great ride. approximately two hours. Rail Station. Union Station Bus Plaza l Metro Purple Line Tours for groups of 15 or more are > Saturdays – Meet at 10am at > Each tour is unique, visits l Metro Gold Line Metro Headquarters available by special arrangement. the street level entrance to the di=erent stations and is led Metro Division 3 Hollywood/Highland Metro by a member of the Metro Art l Metro Blue Line Call 213 .922.2738 for information Rail Station.
    [Show full text]
  • ARRIVE CORRIDOR FINAL REPORT TOC:1 Table of Contents
    A DVANCED R EGIONAL R AIL I NTEG R ATED V I S ION E A S T THE A rr IVE CO rr IDO R FINAL REPORT SEPTEMBER 11, 2015 Prepared by: Gruen Associates HR&A Advisors, Inc. HDR Funding: The preparation of this report has been financed in part through grant funds from the United States Department of Transportation and the State of California Department of Conservation. In addition, the work upon which this publication is based was funded in part through a grant awarded by the Strategic Growth Council under Grant Number 3010-541, and the San Bernardino Associated Governments. The contents of this report reflect the views of the author who is responsible for the facts and accuracy of the data presented herein. The statements and conclusions of this report are those of the Consultant and not necessarily those of the Strate- gic Growth Council or of the State of California Department of Conservation, or its employees. In addition, the contents do not necessarily reflect the views or policies of SCAG or the San Bernardino Association of Governments (SANBAG). This report does not constitute a standard, specification or regulation. The Strategic Growth Council, the California Department of Conservation, SANBAG and SCAG make no warranties, express or implied, and assume no liability for the information contained in the succeeding text. TABLE OF CONTENTS 1.0 EXECUTIVE SUMMARY.................................................................................................................... 1:1 1.1 PURPOSE AND BACKGROUND................................................................................................. 1:2 1.1.1 Metrolink Commuter Rail – San Bernardino Metrolink Line.............................................. 1:2 1.1.2 Transit/Land Use Integration and Benefits......................................................................
    [Show full text]
  • Gold Line Final Report April 9, 2007
    Final Report GOLD LINE CORRIDOR STUDY March 2007 Prepared by Ralph & Goldy Lewis Center for Regional Policy Studies University of California, Los Angeles Anastasia Loukaitou-Sideris, Principal Investigator Douglas Houston, Project Manager Ava Bromberg, Director of Fieldwork for Southern California Association of Governments 818 W. Seventh Street 12th Floor Los Angeles, CA 90017-3435 GOLD LINE CORRIDOR STUDY FINAL REPORT Prepared by Ralph & Goldy Lewis Center for Regional Policy Studies University of California, Los Angeles Anastasia Loukaitou-Sideris, Principal Investigator Douglas Houston, Project Manager Ava Bromberg, Director of Fieldwork Graduate Research Assistants Christine Aure Jane Choi Michelle Coulter John Kenyon Lily Song Paul Travis for Southern California Association of Governments 818 W. Seventh Street 12th Floor, Los Angeles, CA 90017-3435 The preparation of this report was funded in part through grants from the United States Department of Transportation – Federal Highway Administration and the Federal Transit Administration – under provisions of the Transportation Equity Act of the 21st Century. Additional financial assistance was provided by the California State Department of Transportation. Gold Line Corridor Study Final Report i Gold Line Corridor Study Final Report ii Table of Contents Acknowledgements iv Executive Summary 1 Section 1. Gold Line Corridor Baseline Profile and Trends 12 1.1 Overview of the Gold Line 12 1.2 Ridership Patterns 13 1.3 Demographic & Socioeconomic Characteristics and Trends of Station Areas 15 1.4 Housing Patterns of Station Areas 23 1.5 Commute Patterns of Station Areas 23 1.6 Jobs & Economic Base of Station Areas 27 1.7 Land Use Characteristics and Trends of Station Areas 31 1.8 Development Activity: Building Permit and Property Sale Patterns 43 1.9 Vacant Properties in Station Areas 50 1.10 Station Area Typologies Classifications 63 1.11 Development Goals & Plans 67 1.12 Overview of Development Projects 72 1.13 References 77 Section 2.
    [Show full text]