NASHUA REGIONAL PLANNING COMMISSION Metropolitan Planning Organization Transportation Improvement Program 2013-2016

Surface Transportation Projects in the Nashua Metropolitan Planning Area through Amendment 2

Nashua Regional Planning Commission ADOPTED October 17, 2012 9 Executive Park Drive Suite 201 AMENDMENT #1 APPROVED March 20, 2013 Merrimack, NH 03054 (603) 424-2240 AMENDMENT #2 APPROVED June 19, 2013 www.nashuarpc.org

Amended 2013 - 2016 Transportation Improvement Program Projects updated through June 19, 2013 Surface Transportation Projects in the Nashua Metropolitan Planning Area Page 1 of 8 BOSTON EXPRESS NASHUA Project Overall Reg CAA ID Project Cost Sig Status Route/Road: FE Everett Turnpike 68060 $131,000 No E-21 Scope: Manchester - Nashua (FE Everett Turnpike) Operating Subsidy Phase FY Federal $ NH DOT $ Other $ Total $ Funding Source T 2013 $ 104,000 $ 0 $ 0 $ 104,000 FTA Section 5307 Urban Transit Operating T 2014 $ 27,864 $ 0 $ 0 $ 27,864 FTA Section 5307 Urban Transit Operating Total TIP $: $ 131,864 $ 0 $ 0 $ 131,864 BROOKLINE Project Overall Reg CAA ID Project Cost Sig Status Route/Road: NH 130 20830 $466,000 No E-33 Scope: Construct sidewalks in two locations Phase FY Federal $ NH DOT $ Other $ Total $ Funding Source P 2012 $ 63,200 $ 0 $ 15,800 $ 79,000 STP - Transportation Enhancement P 2013 $ 800 $ 0 $ 200 $ 1,000 STP - Transportation Enhancement R 2012 $ 8,000 $ 0 $ 2,000 $ 10,000 STP - Transportation Enhancement R 2013 $ 16,000 $ 0 $ 4,000 $ 20,000 STP - Transportation Enhancement C 2013 $ 285,600 $ 0 $ 71,400 $ 357,000 STP - Transportation Enhancement Total TIP $: $ 302,400 $ 0 $ 75,600 $ 378,000 HUDSON Project Overall Reg CAA ID Project Cost Sig Status Route/Road: NH 111/Library Street 20245 $220,896 No N/E (2022) Scope: Upgrade three sets of traffic lights that control traffic at the convergence of three main corridors in Hudson: NH 111, NH 3A, and NH 102 Phase FY Federal $ NH DOT $ Other $ Total $ Funding Source P 2012 $ 23,117 $ 0 $ 5,779 $ 28,896 Congestion Mitigation & Air Quality Program R 2014 $ 800 $ 0 $ 200 $ 1,000 Congestion Mitigation & Air Quality Program C 2014 $ 152,800 $ 0 $ 38,200 $ 191,000 Congestion Mitigation & Air Quality Program Total TIP $: $ 153,600 $ 0 $ 38,400 $ 192,000 HUDSON Project Overall Reg CAA ID Project Cost Sig Status Route/Road: Train Depot 14408 $359,572 No E-28 Scope: Relocation and restoration of the former Hudson Center train depot. Part of the Worcester, Nashua, & Portland Railroad built in 1873. Phase FY Federal $ NH DOT $ Other $ Total $ Funding Source P 2014 $ 8,700 $ 0 $ 2,900 $ 11,600 STP - Transportation Enhancement C 2014 $ 231,800 $ 0 $ 77,300 $ 309,100 STP - Transportation Enhancement Total TIP $: $ 240,500 $ 0 $ 80,200 $ 320,700

Phase Codes: P = Preliminary Engineering; R = RIght-of-Way; C = Construction Funding: Italics: FY2012; Bold: FYs of TIP; No Emphasis: Ten Year Plan funding beyond FY2016 Amended 2013 - 2016 Transportation Improvement Program Projects updated through June 19, 2013 Surface Transportation Projects in the Nashua Metropolitan Planning Area Page 2 of 8 MILFORD Project Overall Reg CAA ID Project Cost Sig Status Route/Road: NH 101 13692B $3,514,000 No E-51 Scope: Safety improvements from Wilton Road to the NH 101/Elm Street intersection. Phase FY Federal $ NH DOT $ Other $ Total $ Funding Source C 2015 $ 1,361,000 $ 340,000 $ 0 $ 1,701,000 National Highway System C 2016 $ 1,451,000 $ 363,000 $ 0 $ 1,814,000 National Highway System Total TIP $: $ 2,812,000 $ 703,000 $ 0 $ 3,515,000 MILFORD Project Overall Reg CAA ID Project Cost Sig Status Route/Road: NH 101A/NH 13 14492 $2,643,229 No E-10 Scope: Improvements in the area known as the "Oval" to improve traffic flow based on ongoing traffic studies with the Town. Comment: Earmarked funding. Phase FY Federal $ NH DOT $ Other $ Total $ Funding Source R 2013 $ 92,880 $ 0 $ 22,704 $ 115,584 High Priority Proj Sec 1702 C 2013 $ 1,981,440 $ 0 $ 495,360 $ 2,476,800 High Priority Proj Sec 1702 Total TIP $: $ 2,074,320 $ 0 $ 518,064 $ 2,592,384 MILFORD Project Overall Reg CAA ID Project Cost Sig Status Route/Road: NH 13/Emerson Road/Armory Rd 20253 $464,000 No N/E (2022) Scope: Signal modification and additional turning lanes to address congestion and air quality related impacts Phase FY Federal $ NH DOT $ Other $ Total $ Funding Source P 2012 $ 39,629 $ 0 $ 9,907 $ 49,536 Congestion Mitigation & Air Quality Improvement P 2013 $ 8,000 $ 0 $ 2,000 $ 10,000 Congestion Mitigation & Air Quality Improvement R 2012 $ 14,861 $ 0 $ 3,715 $ 18,576 Congestion Mitigation & Air Quality Improvement R 2013 $ 800 $ 0 $ 200 $ 1,000 Congestion Mitigation & Air Quality Improvement C 2013 $ 317,030 $ 0 $ 79,258 $ 396,288 Congestion Mitigation & Air Quality Program Total TIP $: $ 325,830 $ 0 $ 81,458 $ 407,288 MILFORD Project Overall Reg CAA ID Project Cost Sig Status Route/Road: South Street 14837 $1,386,360 No E-45 Scope: South Street Improvement Project: Construct the Phase 2 portion of the downtown revitalization plan to improve overall safety, physical/ADA accessibility, functionality, design and general aesthetic of the intersection. Comment: Specific project from Statewide program, Local Administration. Phase FY Federal $ NH DOT $ Other $ Total $ Funding Source R 2012 $ 81,488 $ 0 $ 20,372 $ 101,860 High Priority Proj Sec 1702 R 2013 $ 826 $ 0 $ 206 $ 1,032 STP - Transportation Enhancement C 2013 $ 433,440 $ 0 $ 108,360 $ 541,800 High Priority Proj Sec 1702 C 2013 $ 426,010 $ 0 $ 106,502 $ 532,512 STP - Transportation Enhancement Total TIP $: $ 860,275 $ 0 $ 215,069 $ 1,075,344

Phase Codes: P = Preliminary Engineering; R = RIght-of-Way; C = Construction Funding: Italics: FY2012; Bold: FYs of TIP; No Emphasis: Ten Year Plan funding beyond FY2016 Amended 2013 - 2016 Transportation Improvement Program Projects updated through June 19, 2013 Surface Transportation Projects in the Nashua Metropolitan Planning Area Page 3 of 8 MILFORD TO NASHUA Project Overall Reg CAA ID Project Cost Sig Status Route/Road: NH 101A 10136 $3,436,227 No E-53 Scope: Intersection improvements at several locations between NH 101 and FEE Turnpike (7.5 miles) as determined by corridor study. Comment: Parent Project for PE & ROW. Specific Safety & Capacity improvements at 3 intersections as determined by corridor study, programmed as separate construction projects. Phase FY Federal $ NH DOT $ Other $ Total $ Funding Source R 2013 $ 247,000 $ 0 $ 0 $ 247,000 National Highway System S-LU Ext R 2014 $ 454,080 $ 113,520 $ 0 $ 567,600 National Highway System S-LU Ext Total TIP $: $ 701,080 $ 113,520 $ 0 $ 814,600 NASHUA Project Overall Reg CAA ID Project Cost Sig Status Route/Road: Broad Street Parkway 10040A $29,052,599 Yes N/E (2022) Scope: Broad Street Parkway (PE/ROW project only): 1.8 miles of new 2-lane road from NH 130 (Broad Street) to NH 111 (West Hollis Street). PE and ROW include appraisals, acquisitions and demolition. Comment: Original overall project for PE and ROW. Earmark funding (partial), project being re-scoped by City. Local Administration. Phase FY Federal $ NH DOT $ Other $ Total $ Funding Source P 2012 $ 600,000 $ 0 $ 150,000 $ 750,000 High Priority Proj Sec 1602 P 2012 $ 0 $ 0 $ 500,000 $ 500,000 Other Non Participating P 2012 $ 1,635,631 $ 0 $ 0 $ 1,635,631 Earmark Funds, Broad Street Parkway R 2013 $ 274,512 $ 0 $ 0 $ 274,512 Earmark Funds, Broad Street Parkway R 2014 $ 106,502 $ 0 $ 0 $ 106,502 Earmark Funds, Broad Street Parkway Total TIP $: $ 381,014 $ 0 $ 0 $ 381,014 NASHUA Project Overall Reg CAA ID Project Cost Sig Status Route/Road: Broad Street Parkway 16110 $7,183,000 Yes N/E (2022) Scope: Broad Street Parkway (Parent Construction): 1.8 miles of new 2-lane road from NH 130 (Broad Street) to NH 111 (West Hollis Street). (Parent Construction Project) Comment: Local Administration. Rescoped from Nashua 10040 Series projects. Phase FY Federal $ NH DOT $ Other $ Total $ Funding Source C 2013 $ 0 $ 0 $ 5,000,000 $ 5,000,000 City of Nashua C 2014 $ 0 $ 0 $ 2,252,546 $ 2,252,546 City of Nashua Total TIP $: $ 0 $ 0 $ 7,252,546 $ 7,252,546 NASHUA Project Overall Reg CAA ID Project Cost Sig Status Route/Road: Broad Street Parkway 10040W $103,000 Yes Scope: BUILDING DEMOLITION (Parent = Nashua 10040A) [Section 1602 - Designated Project; Demo Id NH003] Comment: Local Administration. Phase FY Federal $ NH DOT $ Other $ Total $ Funding Source R 2013 $ 147,000 $ 0 $ 0 $ 147,000 Earmark Funds, Broad Street Parkway Total TIP $: $ 147,000 $ 0 $ 0 $ 147,000

Phase Codes: P = Preliminary Engineering; R = RIght-of-Way; C = Construction Funding: Italics: FY2012; Bold: FYs of TIP; No Emphasis: Ten Year Plan funding beyond FY2016 Amended 2013 - 2016 Transportation Improvement Program Projects updated through June 19, 2013 Surface Transportation Projects in the Nashua Metropolitan Planning Area Page 4 of 8 NASHUA Project Overall Reg CAA ID Project Cost Sig Status Route/Road: Broad Street Parkway 16110B $14,700,000 Yes Scope: Construction of the north section, including replacement of Fairmont Street and Baldwin Street Bridges (Parent Project 16110*7781) Comment: Earmarked funding (partial). Responsible Agency: Municipally Managed/City of Nashua Phase FY Federal $ NH DOT $ Other $ Total $ Funding Source C 2013 $ 3,600,000 $ 0 $ 900,000 $ 4,500,000 High Priority Proj Sec 1602 C 2013 $ 0 $ 0 $ 700,000 $ 700,000 City of Nashua C 2013 $ 7,600,000 $ 0 $ 1,900,000 $ 9,500,000 STP - State Flexible In Any Area S-LU Ext Total TIP $: $ 11,200,000 $ 0 $ 3,500,000 $ 14,700,000 NASHUA Project Overall Reg CAA ID Project Cost Sig Status Route/Road: Broad Street Parkway 16110C $9,700,000 Yes Scope: Construction of the new bridge over the Nashua River (Parent Project 16110*7781) Comment: Earmarked funding (partial). Responsible Agency: Municipally Managed/City of Nashua Phase FY Federal $ NH DOT $ Other $ Total $ Funding Source C 2013 $ 487,000 $ 0 $ 0 $ 487,000 Surface Transportation Priorities C 2013 $ 2,400,000 $ 0 $ 600,000 $ 3,000,000 STP - Flexible C 2013 $ 1,882,000 $ 0 $ 470,000 $ High Priority Proj Sec 1602 C 2013 $ 0 $ 0 $ 3,861,000 $ 3,861,000 City of Nashua Total TIP $: $ 4,769,000 $ 0 $ 4,931,000 $ 7,348,000 NASHUA Project Overall Reg CAA ID Project Cost Sig Status Route/Road: Broad Street Parkway 16110D $8,359,000 Yes Scope: Construction of the southern section (Parent Project 16110*7781) Comment: Earmarked funding (partial). Responsible Agency: Municipally Managed/City of Nashua Phase FY Federal $ NH DOT $ Other $ Total $ Funding Source C 2014 $ 0 $ 0 $ 8,626,488 $ 8,626,488 City of Nashua Total TIP $: $ 0 $ 0 $ 8,626,488 $ 8,626,488 NASHUA Project Overall Reg CAA ID Project Cost Sig Status Route/Road: Broad Street Parkway 16110E $5,300,000 Yes Scope: Fairmont Street Bridge reconstruction (Bridge ID 118/118) Comment: Earmarked funding (partial). Responsible Agency: Municipally Managed/City of Nashua Phase FY Federal $ NH DOT $ Other $ Total $ Funding Source C 2013 $ 0 $ 0 $ 5,300,000 $ 5,300,000 Other Non Participating Total TIP $: $ 0 $ 0 $ 5,300,000 $ 5,300,000

Phase Codes: P = Preliminary Engineering; R = RIght-of-Way; C = Construction Funding: Italics: FY2012; Bold: FYs of TIP; No Emphasis: Ten Year Plan funding beyond FY2016 Amended 2013 - 2016 Transportation Improvement Program Projects updated through June 19, 2013 Surface Transportation Projects in the Nashua Metropolitan Planning Area Page 5 of 8 NASHUA Project Overall Reg CAA ID Project Cost Sig Status Route/Road: East Hollis Street 16314 $3,661,000 No E-51 Scope: Reconstruction of East Hollis Street from Main Street to Hudson town line to improve capacity. Comment: Local Administration, 20% City Match. Phase FY Federal $ NH DOT $ Other $ Total $ Funding Source P 2013 $ 320,000 $ 80,000 $ 0 $ 400,000 STP - Areas Less Than 200,000 R 2013 $ 160,000 $ 40,000 $ 0 $ 200,000 STP - Areas Less Than 200,000 C 2014 $ 852,432 $ 212,592 $ 0 $ 1,065,024 STP - Areas Less Than 200,000 C 2015 $ 1,728,534 $ 432,400 $ 0 $ 2,160,934 STP - Areas Less Than 200,000 Total TIP $: $ 3,060,966 $ 764,992 $ 0 $ 3,825,958 NASHUA Project Overall Reg CAA ID Project Cost Sig Status Route/Road: Heritage Rail Trail Corridor 16050 $350,130 No E-45 Scope: Purchase rail corridor at various locations east of Main Street. Comment: Transportation Enhancement project (09-32TE). Responsible Agency: Municipally Managed/City of Nashua Phase FY Federal $ NH DOT $ Other $ Total $ Funding Source P 2014 $ 800 $ 0 $ 200 $ 1,000 STP - Transportation Enhancement S-LU Ext R 2014 $ 279,304 $ 0 $ 69,826 $ 349,130 STP - Transportation Enhancement S-LU Ext Total TIP $: $ 280,104 $ 0 $ 70,026 $ 350,130 NASHUA Project Overall Reg CAA ID Project Cost Sig Status Route/Road: Nashua Transit System 14815 $913,000 No N/E (2022) Scope: Purchase two new CNG buses (CMAQ Program) [06-13CM] Comment: Partially funded by Nashua. Specific project from Statewide program. Municipal managed. Phase FY Federal $ NH DOT $ Other $ Total $ Funding Source C 2013 $ 730,000 $ 0 $ 183,000 $ 913,000 FTA Section 5309 Capital Funds Total TIP $: $ 730,000 $ 0 $ 183,000 $ 913,000 NASHUA Project Overall Reg CAA ID Project Cost Sig Status Route/Road: NH 111 13117 $4,292,000 Yes N/E (2022) Scope: Construct park and ride and accessory facilities at up to two Nashua locations. (CMAQ Program) [98-13 CM] Phase FY Federal $ NH DOT $ Other $ Total $ Funding Source P 2013 $ 100,000 $ 0 $ 0 $ 100,000 Congestion Mitigation & Air Quality Improvement P 2014 $ 134,160 $ 0 $ 0 $ 134,160 Congestion Mitigation & Air Quality Improvement R 2013 $ 1,500,000 $ 0 $ 0 $ 1,500,000 Congestion Mitigation & Air Quality Improvement C 2016 $ 2,692,807 $ 0 $ 0 $ 2,692,807 Congestion Mitigation & Air Quality Improvement Total TIP $: $ 4,426,967 $ 0 $ 0 $ 4,426,967

Phase Codes: P = Preliminary Engineering; R = RIght-of-Way; C = Construction Funding: Italics: FY2012; Bold: FYs of TIP; No Emphasis: Ten Year Plan funding beyond FY2016 Amended 2013 - 2016 Transportation Improvement Program Projects updated through June 19, 2013 Surface Transportation Projects in the Nashua Metropolitan Planning Area Page 6 of 8 NASHUA TRANSIT SYSTEM Project Overall Reg CAA ID Project Cost Sig Status Route/Road: Nashua Transit System 608 $883,344 No E-21 Scope: Capital planning program Comment: FTA. Provides intermodal planning using local match. Annual program funding; overall project cost reflects TIP years only. Phase FY Federal $ NH DOT $ Other $ Total $ Funding Source T 2012 $ 165,212 $ 0 $ 41,303 $ 206,515 FTA Section 5307 Urban Transit Capital and Plan. T 2013 $ 169,673 $ 0 $ 42,418 $ 212,091 FTA Section 5307 Urban Transit Capital and Plan. T 2014 $ 174,254 $ 0 $ 43,563 $ 217,817 FTA Section 5307 Urban Transit Capital and Plan. T 2015 $ 178,959 $ 0 $ 44,740 $ 223,698 FTA Section 5307 Urban Transit Capital and Plan. T 2016 $ 183,791 $ 0 $ 45,948 $ 229,738 FTA Section 5307 Urban Transit Capital and Plan. Total TIP $: $ 706,676 $ 0 $ 176,669 $ 883,344 NASHUA TRANSIT SYSTEM Project Overall Reg CAA ID Project Cost Sig Status Route/Road: Nashua Transit System 609 $4,801,749 No E-21 Scope: Operating assistance Comment: FTA. Maintains transit service using local match. Annual program funding; overall project cost reflects TIP years only. Phase FY Federal $ NH DOT $ Other $ Total $ Funding Source T 2012 $ 563,908 $ 0 $ 563,908 $ 1,127,817 FTA Section 5307 Urban Transit Operating T 2013 $ 574,516 $ 0 $ 574,516 $ 1,149,033 FTA Section 5307 Urban Transit Operating T 2014 $ 587,117 $ 0 $ 587,117 $ 1,174,234 FTA Section 5307 Urban Transit Operating T 2015 $ 611,367 $ 0 $ 611,367 $ 1,222,734 FTA Section 5307 Urban Transit Operating T 2016 $ 627,874 $ 0 $ 627,874 $ 1,255,748 FTA Section 5307 Urban Transit Operating Total TIP $: $ 2,400,875 $ 0 $ 2,400,875 $ 4,801,749 NASHUA TRANSIT SYSTEM Project Overall Reg CAA ID Project Cost Sig Status Route/Road: Nashua Transit System 3797 $90,230 No E-30 Scope: Capital equipment Comment: FTA. Replaces outdated equipment using local match. Annual program funding; overall project cost reflects TIP years only. Phase FY Federal $ NH DOT $ Other $ Total $ Funding Source T 2012 $ 16,876 $ 0 $ 4,219 $ 21,095 FTA Section 5307 Urban Transit Capital and Plan. T 2013 $ 17,331 $ 0 $ 4,333 $ 21,664 FTA Section 5307 Urban Transit Capital and Plan. T 2014 $ 17,799 $ 0 $ 4,450 $ 22,249 FTA Section 5307 Urban Transit Capital and Plan. T 2015 $ 18,280 $ 0 $ 4,570 $ 22,850 FTA Section 5307 Urban Transit Capital and Plan. T 2016 $ 18,773 $ 0 $ 4,693 $ 23,467 FTA Section 5307 Urban Transit Capital and Plan. Total TIP $: $ 72,184 $ 0 $ 18,046 $ 90,230

Phase Codes: P = Preliminary Engineering; R = RIght-of-Way; C = Construction Funding: Italics: FY2012; Bold: FYs of TIP; No Emphasis: Ten Year Plan funding beyond FY2016 Amended 2013 - 2016 Transportation Improvement Program Projects updated through June 19, 2013 Surface Transportation Projects in the Nashua Metropolitan Planning Area Page 7 of 8 NASHUA TRANSIT SYSTEM Project Overall Reg CAA ID Project Cost Sig Status Route/Road: Nashua Transit System 3799 $1,804,594 No E-21 Scope: Preventative maintenance Comment: FTA. Maintains transit service using local match. Annual program funding; overall project cost reflects TIP years only. Phase FY Federal $ NH DOT $ Other $ Total $ Funding Source T 2012 $ 337,513 $ 0 $ 84,378 $ 421,892 FTA Section 5307 Urban Transit Capital and Plan. T 2013 $ 346,626 $ 0 $ 86,657 $ 433,283 FTA Section 5307 Urban Transit Capital and Plan. T 2014 $ 355,985 $ 0 $ 88,996 $ 444,981 FTA Section 5307 Urban Transit Capital and Plan. T 2015 $ 365,597 $ 0 $ 91,399 $ 456,996 FTA Section 5307 Urban Transit Capital and Plan. T 2016 $ 375,468 $ 0 $ 93,867 $ 469,335 FTA Section 5307 Urban Transit Capital and Plan. Total TIP $: $ 1,443,676 $ 0 $ 360,919 $ 1,804,594 NASHUA TRANSIT SYSTEM Project Overall Reg CAA ID Project Cost Sig Status Route/Road: Nashua Transit System 7927 $1,082,757 No E-21 Scope: ADA Operations Comment: FTA. Maintains transit service using local match. Annual program funding; overall project cost reflects TIP years only. Phase FY Federal $ NH DOT $ Other $ Total $ Funding Source T 2012 $ 202,508 $ 0 $ 50,627 $ 253,135 FTA Section 5307 Urban Transit Capital and Plan. T 2013 $ 207,976 $ 0 $ 51,994 $ 259,970 FTA Section 5307 Urban Transit Capital and Plan. T 2014 $ 213,591 $ 0 $ 53,398 $ 266,989 FTA Section 5307 Urban Transit Capital and Plan. T 2015 $ 219,358 $ 0 $ 54,839 $ 274,197 FTA Section 5307 Urban Transit Capital and Plan. T 2016 $ 225,281 $ 0 $ 56,320 $ 281,601 FTA Section 5307 Urban Transit Capital and Plan. Total TIP $: $ 866,205 $ 0 $ 216,551 $ 1,082,757 PELHAM Project Overall Reg CAA ID Project Cost Sig Status Route/Road: Main Street 16145 $2,496,080 No E-19 Scope: Bridge Replacement over Beaver Brook (Bridge ID 110/090 and 111/090) {Both Red List} Comment: 2011 Bridge Priority #25 & 122 Phase FY Federal $ NH DOT $ Other $ Total $ Funding Source P 2012 $ 66,000 $ 0 $ 0 $ 66,000 Bridge Program - On/Off System S-LU Ext P 2013 $ 57,200 $ 0 $ 0 $ 57,200 Bridge Program - On/Off System S-LU Ext R 2013 $ 19,250 $ 0 $ 0 $ 19,250 Bridge Program - On/Off System S-LU Ext Total TIP $: $ 76,450 $ 0 $ 0 $ 76,450 WILTON Project Overall Reg CAA ID Project Cost Sig Status Route/Road: NH 31 16128 $2,923,680 No E-19 Scope: Bridge deck replacement over Souhegan River (Bridge ID 129/126) {Red List} Comment: 2011 Bridge Priority #36 Phase FY Federal $ NH DOT $ Other $ Total $ Funding Source P 2013 $ 56,032 $ 0 $ 0 $ 56,032 Bridge Program - On/Off System R 2013 $ 10 $ 0 $ 0 $ 10 Bridge Program - On/Off System Total TIP $: $ 56,042 $ 0 $ 0 $ 56,042

Phase Codes: P = Preliminary Engineering; R = RIght-of-Way; C = Construction Funding: Italics: FY2012; Bold: FYs of TIP; No Emphasis: Ten Year Plan funding beyond FY2016 Amended 2013 - 2016 Transportation Improvement Program Projects updated through June 19, 2013 Surface Transportation Projects in the Nashua Metropolitan Planning Area Page 8 of 8 WILTON - MILFORD - AMHERST - BEDFORD Project Overall Reg CAA ID Project Cost Sig Status Route/Road: NH 101 13692 $13,635,866 No E-51 Scope: Safety improvements at various locations from Wilton to Wallace Road in Bedford as determined by corridor study. Comment: Interim safety improvements Phase FY Federal $ NH DOT $ Other $ Total $ Funding Source R 2012 $ 11,000 $ 0 $ 0 $ 11,000 National Highway System S-LU Ext R 2013 $ 22,000 $ 0 $ 0 $ 22,000 National Highway System S-LU Ext R 2014 $ 23,426 $ 0 $ 0 $ 23,426 National Highway System S-LU Ext R 2016 $ 39,898 $ 0 $ 0 $ 39,898 National Highway System S-LU Ext Total TIP $: $ 85,324 $ 0 $ 0 $ 85,324

Phase Codes: P = Preliminary Engineering; R = RIght-of-Way; C = Construction Funding: Italics: FY2012; Bold: FYs of TIP; No Emphasis: Ten Year Plan funding beyond FY2016 Amendment Documents

NASHUA REGIONAL PLANNING COMMISSION

July 3, 2013

Bill Watson NH Department of Transportation 7 Hazen Drive, P.O. Box 483 Concord, NH 03302

RE: 2013 – 2016 S/TIP Amendment #2

Dear Bill:

The purpose of this letter is to inform you that the Nashua Regional Planning Commission (NRPC) has considered the proposed adjustments listed in State Transportation Improvement Program (STIP) Amendment #2 and voted to amend the NRPC 2013-2016 Transportation Improvement Program (TIP).

The proposed adjustments to STIP projects are as follows:

Projects in the Nashua Region:

Location: Wilton-Milford-Amherst-Bedford – NH 101 Project ID: 13692 Description: Safety Improvements at various locations from Wilton to Wallace Road in Bedford as determined by corridor study. Proposed Amendment: Add Preliminary Engineering phase with $114,000 in FY2014 funds; increase FY2016 Right of Way funds from $36,000 to $121,000. Reason: Updated estimate

Total proposed 2013 – 2016 TIP funding: $279,000

Reason: Updated project schedule delays construction until 2017. Total proposed 2013 – 2016 TIP funding: $76,000

Statewide Projects:

Location: Statewide – Hazmat Project ID: HAZMAT Description: Programmatic project for post construction hazmat obligations Proposed Amendment: Add to the 2013 – 2015 TIP with $27,000 in FY2013 Right of Way funds. Reason: New project Total proposed 2013 – 2016 TIP funding: $27,000

AMHERST | BROOKLINE | HOLLIS | HUDSON | LITCHFIELD | LYNDEBOROUGH | MASON | MERRIMACK | MILFORD | MONT VERNON | NASHUA | PELHAM | WILTON (603) 424-2240 9 Executive Park Drive Suite 201 Merrimack, NH 03054-4058 www.nashuarpc.org Nashua Metropolitan Planning Organization 2013 – 2016 TIP Amendment 2

Location: Statewide – Preservation Project ID: FBRPI Description: Bridge Rehabilitation, Painting, Preservation & Improvement Projects (Annual Federal Program) Proposed Amendment: Increase FY2013 Construction funds from $7,880,000 to $12,000,000 Reason: Increase in cost estimate Total proposed 2013 – 2016 TIP funding: $36,270,000

NRPC, in consultation with the NH DOT, NH Department of Environmental Services (NH DES), US Environmental Protection Agency (US EPA), Federal Highway Administration (FHWA), Federal Transit Administration (FTA), and the other NH Metropolitan Planning Organizations (MPOs), has confirmed that the proposed changes made by S/TIP Amendment 2 trigger a new conformity determination of the SE NH 8-hour Ozone Nonattainment Area and the City of Nashua Carbon Monoxide Maintenance Area, and that the Nashua Metropolitan Area Air Quality Conformity Analysis (2013 – 2040), adopted October 17, 2012, continues to be valid.

Consistent with the Nashua MPO Public Involvement Procedures, and Federal and State regulations, NRPC held a public comment period which closed Wednesday, June 5, 2013; no comments were received. A Public Hearing was held on Wednesday, June 19, 2013. The Nashua Regional Planning Commission voted to approve the proposed S/TIP Amendment, recognizing that the results of the Nashua Metropolitan Area Air Quality Conformity Analysis (2013 – 2040) conform to the specified emission budget in the State Implementation Plan and that the Department of Transportation has maintained fiscal constraint of the STIP.

If you have any questions or comments regarding the proposed amendment I can be reached at [email protected] or 424-2240 x 28.

Sincerely,

NASHUA REGIONAL PLANNING COMMISSION

Tim Roache Assistant Director

cc: Karla Kemp, - NHDOT Linda Dusenberry – NHDOT Paul Lockwood – NHDES Leigh Levine – FHWA Don Cooke – EPA

#300ZZ-451

July 1, 2013 Page 2 of 2 2013-2016 STIP REVISION REPORT May 2013

Overall Project CAA Comments NameState# Rte/Street:Cost $(M) Location/Scope of Work Code Open Analysis FY MPO Adv Const Fiscal Regionally Significant Grouped / Parent Payback Phase Year Fed$ DOT$ Other$ Tot$ Funding Category Full Amendments

ALBANY BEAR NOTCH ROAD3.311 DECK REPLACEMENT AND BRIDGE REHABILITATION OF BRIDGE OVER SWIFT ATT 24182 RIVER - 080/148 (Redlist Bridge #117) Proposed P 2013 .275 .000 .000 .275 STP-Non Urban Areas Under 5K R 2013 .022 .000 .000 .022 8598 Totals .297 .000 .000 .297

ASHLAND - US 3 19.414 BRIDGE REHAB AND SCOUR COUNTERMEASURES OVER PEMIGEWASSET RIVER - ATT BRIDGEWATER 076/080 24904 Proposed P 2013 .055 .000 .000 .055 Bridge On/Off System 2014 .091 .023 .000 .114 2015 .094 .023 .000 .117 2016 .193 .048 .000 .242 R 2013 .028 .000 .000 .028 8625 Totals .460 .094 .000 .555

BATH US 302 / NH 10.070 BUILDING DEMOLITION PARCEL 58 ATT 10425J Proposed R 2015 .056 .014 .000 .070 STP-Non Urban Areas Under 5K 8734 Totals .056 .014 .000 .070

Phase: P - Preliminary Engineering R - Right of Way C - Construction STIP Revision 02 "Existing" = Information as it appears in latest Approved STIP (13-16) STIPBeginYr: 2013 Print Date: 15-May-13 Page 1 of 15

13-16_STIP.mdb: rpt_20100_SA_vs_STIP_MASTER_Rpt_New_Format_Inflated Overall Project CAA Comments NameState# Rte/Street:Cost $(M) Location/Scope of Work Code Open Analysis FY MPO Adv Const Fiscal Regionally Significant Grouped / Parent Payback Phase Year Fed$ DOT$ Other$ Tot$ Funding Category

BELMONT - LACONIA NH 106 3.600 RECONSTRUCT FROM 0.4 MILES NORTH OF US 3 / NH 11 BYPASS SOUTHERLY INTO ATT 10672L BELMONT SOUTH OF OPECHEE PLAZA Existing P 2013 .100 .000 .000 .100 National Highway (NHPP) 2014 .100 .000 .000 .100 2015 .080 .020 .000 .100 R 2013 .050 .000 .000 .050 2015 .540 .135 .000 .675 2787 Totals .870 .155 .000 1.025

BERLIN NH 110 .413 CONSTRUCTION OF SCENIC VISTAS INTERPRETIVE PANELS AND OTHER APPROVED ATT 12958H MITIGATION MEASURES Proposed P 2013 .044 .000 .011 .055 STP-Flexible 2014 .045 .000 .011 .057 8713 Totals .089 .000 .022 .112

CENTER HARBOR WAUKEWAN ROAD1.845 BRIDGE REPLACEMENT OVER LAKE WAUKEWAN OUTLET - 080/040 {Redlist Bridge} ATT 24579 Proposed P 2013 .110 .000 .000 .110 STP-Flexible 2014 .091 .023 .000 .114 2015 .047 .012 .000 .059 R 2013 .028 .000 .000 .028 2014 .023 .006 .000 .028 8605 Totals .298 .040 .000 .338

Phase: P - Preliminary Engineering R - Right of Way C - Construction STIP Revision 02 "Existing" = Information as it appears in latest Approved STIP (13-16) STIPBeginYr: 2013 Print Date: 15-May-13 Page 2 of 15

13-16_STIP.mdb: rpt_20100_SA_vs_STIP_MASTER_Rpt_New_Format_Inflated Overall Project CAA Comments NameState# Rte/Street:Cost $(M) Location/Scope of Work Code Open Analysis FY MPO Adv Const Fiscal Regionally Significant Grouped / Parent Payback Phase Year Fed$ DOT$ Other$ Tot$ Funding Category

CONWAY US 302 / NH16.667 DESIGN & ROW ACQUISITIONS OF THE US 302 / NH 16 CONWAY BYPASS PHASES TO ATT 11339Z PROVIDE CONGESTION RELIEF (PE&ROW ONLY) CONTINUATION OF 11339B PROJECT. Proposed P 2013 .220 .000 .000 .220 National Highway (NHPP) 2014 .114 .000 .000 .114 R 2013 .220 .000 .000 .220 2014 .114 .000 .000 .114 8759 Totals .667 .000 .000 .667

CONWAY EAST SIDE ROAD1.033 SACO RIVER BRIDGE SCOUR PROTECTION EFFORT [FBRPI*6601] {Statewide Federal ATT 25103 Bridge Program} Proposed P 2013 .024 .000 .000 .024 National Historic Covered Bridge Preservation (NHCBP) 2014 .055 .000 .000 .055 Bridge On/Off System R 2014 .017 .000 .000 .017 C 2015 .085 .000 .000 .085 2015 .852 .000 .000 .852 National Historic Covered Bridge Preservation (NHCBP) 8666 Totals 1.033 .000 .000 1.033

CORNISH, NH - CORNISH TOLL BRIDGE 2.978 PROVIDE SCOUR PROTECTION FOR THE CORNISH WINDSOR COVERED BRIDGE ATT WINDSOR, VT ROAD OVER THE RIVER - 064/108 [FBRPI*6601] {Statewide Federal Bridge 25067 Program} {Covered Bridge Program} Proposed P 2013 .024 .000 .000 .024 National Historic Covered Bridge Preservation (NHCBP) 2013 .002 .000 .000 .002 STP-Non Urban Areas Under 5K 2014 .000 .000 .019 .019 Non Participating 2014 .041 .000 .000 .041 STP-Non Urban Areas Under 5K R 2014 .017 .000 .000 .017 C 2015 1.065 .000 .000 1.065 National Historic Covered Bridge Preservation (NHCBP) 2015 .000 .000 .533 .533 Non Participating 2015 1.278 .000 .000 1.278 STP-Non Urban Areas Under 5K 8632 Totals 2.427 .000 .551 2.978

Phase: P - Preliminary Engineering R - Right of Way C - Construction STIP Revision 02 "Existing" = Information as it appears in latest Approved STIP (13-16) STIPBeginYr: 2013 Print Date: 15-May-13 Page 3 of 15

13-16_STIP.mdb: rpt_20100_SA_vs_STIP_MASTER_Rpt_New_Format_Inflated Overall Project CAA Comments NameState# Rte/Street:Cost $(M) Location/Scope of Work Code Open Analysis FY MPO Adv Const Fiscal Regionally Significant Grouped / Parent Payback Phase Year Fed$ DOT$ Other$ Tot$ Funding Category

DURHAM US 4 6.291 BRIDGE REPLACEMENT & APPROACHES OVER BUNKER CREEK - 145/116. BRIDGE IS E-19 16236 40 ON THE BRIDGE PRIORITY LIST Existing P 2013 .055 .000 .000 .055 National Highway (NHPP) 2014 .057 .000 .000 .057 2015 .047 .012 .000 .059 2016 .193 .048 .000 .242 R 2013 .011 .000 .000 .011 4059 Totals .363 .060 .000 .423

DURHAM US 4 6.917 BRIDGE REPLACEMENT & APPROACHES OVER BUNKER CREEK - 145/116. BRIDGE IS E-19 16236 40 ON THE BRIDGE PRIORITY LIST Proposed P 2013 .055 .000 .000 .055 National Highway (NHPP) 2014 .470 .103 .000 .573 2015 .047 .012 .000 .059 2016 .281 .070 .000 .352 R 2013 .011 .000 .000 .011 4059 Totals .864 .185 .000 1.049

FARMINGTON NH 153 2.528 REPLACE BRIDGE OVER COCHECO RIVER - 096/140 {Red List} ATT 16146 Existing P 2013 .110 .000 .000 .110 Bridge On/Off System 2014 .227 .000 .000 .227 R 2015 .234 .000 .000 .234 C 2016 1.648 .000 .000 1.648 6778 Totals 2.219 .000 .000 2.219

FARMINGTON NH 153 4.507 REPLACE BRIDGE OVER COCHECO RIVER - 096/140 {Red List} ATT 16146 Proposed P 2013 .110 .000 .000 .110 Bridge Off System 2014 .227 .000 .000 .227 R 2015 .234 .000 .000 .234 C 2016 3.627 .000 .000 3.627 STP-Off System Bridge 6778 Totals 4.198 .000 .000 4.198

Phase: P - Preliminary Engineering R - Right of Way C - Construction STIP Revision 02 "Existing" = Information as it appears in latest Approved STIP (13-16) STIPBeginYr: 2013 Print Date: 15-May-13 Page 4 of 15

13-16_STIP.mdb: rpt_20100_SA_vs_STIP_MASTER_Rpt_New_Format_Inflated Overall Project CAA Comments NameState# Rte/Street:Cost $(M) Location/Scope of Work Code Open Analysis FY MPO Adv Const Fiscal Regionally Significant Grouped / Parent Payback Phase Year Fed$ DOT$ Other$ Tot$ Funding Category

FRANCONIA NH 18 4.278 BRIDGE SUPERSTRUCTURE REPLACEMENT OVER LAFAYETTE BROOK - 089/099 ATT 24497 Proposed P 2013 .110 .000 .000 .110 Bridge On/Off System 2014 .182 .045 .000 .227 2015 .094 .023 .000 .117 R 2013 .022 .006 .000 .028 2014 .023 .006 .000 .028 8600 Totals .430 .080 .000 .510

GILFORD US 3 BYP & NH 111.819 BRIDGE REHABILITATION / DECK REPLACEMENT OVER NH 11A - 160/053 {Red List} ATT 15903 [Highways for Life Grant] Existing C 2014 1.703 .000 .000 1.703 Bridge On/Off System 7494 Totals 1.703 .000 .000 1.703

GILFORD US 3 BYP & NH 112.976 BRIDGE REHABILITATION / DECK REPLACEMENT OVER NH 11A - 160/053 {Red List} ATT 15903 [Highways for Life Grant] Proposed P 2013 .055 .000 .000 .055 Bridge On/Off System 2013 .000 .000 .017 .017 Non Participating 7494 Totals .055 .000 .017 .072

GILFORD US 3 & NH 11 BYPASS2.689 DECK REPLACEMENT OF REDLIST BRIDGE 114/066 OVER US 3 AND NH 11 ATT 26005 Proposed P 2013 .055 .000 .000 .055 Equity Bonus (Flexible) 2014 .170 .000 .000 .170 STP-Areas Less Than 200K 2015 .176 .000 .000 .176 R 2013 .028 .000 .000 .028 8724 Totals .429 .000 .000 .429

Phase: P - Preliminary Engineering R - Right of Way C - Construction STIP Revision 02 "Existing" = Information as it appears in latest Approved STIP (13-16) STIPBeginYr: 2013 Print Date: 15-May-13 Page 5 of 15

13-16_STIP.mdb: rpt_20100_SA_vs_STIP_MASTER_Rpt_New_Format_Inflated Overall Project CAA Comments NameState# Rte/Street:Cost $(M) Location/Scope of Work Code Open Analysis FY MPO Adv Const Fiscal Regionally Significant Grouped / Parent Payback Phase Year Fed$ DOT$ Other$ Tot$ Funding Category

HAMPTON NH 1A / OCEAN BLVD / .375 UPDATE TO TRANSPORTATION ELEMENT OF THE HAMPTON BEACH AREA MASTER E-34 23821 ASHWORTH AVE PLAN {TCSP} Proposed P 2013 .300 .000 .075 .375 Transportation & Community & System Preservation 8515 Totals .300 .000 .075 .375

HAMPTON - HAMPTON BRANCH RAIL 5.702 PURCAHSE RAIL CORRIDOR FROM HAMPTON TO PORTSMOUTH APPROXIMATLY 9.7 E-45 PORTSMOUTH CORRIDOR MILES TO IMPROVE TRAIL SURFACE [13-01CM] 26485 Proposed P 2013 .110 .000 .000 .110 Congestion Mitigation and Air Quality Program R 2013 .110 .000 .000 .110 2014 4.427 .000 .000 4.427 C 2015 1.054 .000 .000 1.054 8744 Totals 5.702 .000 .000 5.702

HAVERHILL MILL STREET.703 BRIDGE REMOVAL OVER ABANDONED RAILROAD - 215/158 {Red List} ATT 16238 Existing P 2013 .020 .000 .000 .020 Bridge On/Off System 7815 Totals .020 .000 .000 .020

HAVERHILL MILL STREET1.572 BRIDGE REPLACEMENT OVER ABANDONED RAILROAD - 215/158 {Red List} ATT 16238 Proposed P 2013 .055 .000 .000 .055 Bridge On/Off System 2013 .001 .000 .000 .001 Equity Bonus (Flexible) 2013 .018 .000 .000 .018 STP-Flexible 2014 .170 .000 .000 .170 Bridge Off System 7815 Totals .245 .000 .000 .245

Phase: P - Preliminary Engineering R - Right of Way C - Construction STIP Revision 02 "Existing" = Information as it appears in latest Approved STIP (13-16) STIPBeginYr: 2013 Print Date: 15-May-13 Page 6 of 15

13-16_STIP.mdb: rpt_20100_SA_vs_STIP_MASTER_Rpt_New_Format_Inflated Overall Project CAA Comments NameState# Rte/Street:Cost $(M) Location/Scope of Work Code Open Analysis FY MPO Adv Const Fiscal Regionally Significant Grouped / Parent Payback Phase Year Fed$ DOT$ Other$ Tot$ Funding Category

HAZMAT VARIOUS .027 PROGRAMMATIC PROJECT FOR POST CONSTRUCTION HAZMAT OBLIGATIONS E-0 HAZMAT Proposed R 2013 .027 .000 .000 .027 STP-Flexible 8671 Totals .027 .000 .000 .027

LACONIA CENTENARY AVENUE4.722 BRIDGE REPLACEMENT OR REMOVAL - 126/163 {Redlist} ATT 24181 Proposed P 2013 .550 .000 .000 .550 Bridge Off System R 2013 .028 .000 .000 .028 8597 Totals .578 .000 .000 .578

LANCASTER, NH - US 2 13.476 BRIDGE REHABILITAION AND PAINTING OVER - 111/129 ATT GUILDHALL, VT (ROGER'S RANGER'S BRIDGE) 16155 Proposed P 2015 .337 .084 .000 .422 Bridge On/Off System 2015 .000 .000 .043 .043 Non Participating R 2014 .023 .000 .000 .023 Bridge On/Off System 2014 .000 .000 .021 .021 Non Participating 3524 Totals .360 .084 .063 .508

LEBANON I-89 6.718 DECK REPLACEMENT AND BRIDGE REHABILITATION ON TWO REDLISTED BRIDGES ATT 25784 CARRYING I-89 NB & SB OVER HARDY HILL ROAD Proposed P 2013 .055 .000 .000 .055 Equity Bonus (Flexible) 2014 .284 .000 .000 .284 STP-Areas Less Than 200K 2015 .293 .000 .000 .293 R 2014 .028 .000 .000 .028 2015 .029 .000 .000 .029 8720 Totals .689 .000 .000 .689

Phase: P - Preliminary Engineering R - Right of Way C - Construction STIP Revision 02 "Existing" = Information as it appears in latest Approved STIP (13-16) STIPBeginYr: 2013 Print Date: 15-May-13 Page 7 of 15

13-16_STIP.mdb: rpt_20100_SA_vs_STIP_MASTER_Rpt_New_Format_Inflated Overall Project CAA Comments NameState# Rte/Street:Cost $(M) Location/Scope of Work Code Open Analysis FY MPO Adv Const Fiscal Regionally Significant Grouped / Parent Payback Phase Year Fed$ DOT$ Other$ Tot$ Funding Category

LEBANON MASCOMA STREET6.845 BRIDGE REHABILITATION AND DECK REPLACEMENT OVER I-89 - 103/116 {REDLIST} ATT 25821 Proposed P 2013 .055 .000 .000 .055 Equity Bonus (Flexible) 2014 .227 .000 .000 .227 STP-Areas Less Than 200K 2015 .234 .000 .000 .234 2016 .242 .000 .000 .242 R 2014 .028 .000 .000 .028 2015 .029 .000 .000 .029 8721 Totals .816 .000 .000 .816

LEBANON, NH - US 4 13.202 REPLACE BRIDGE OVER CONNECTICUT RIVER - 058/127 {Red List} ATT HARTFORD, VT 14957 Existing P 2013 .132 .000 .000 .132 Bridge On/Off System C 2013 2.350 .000 .000 2.350 2013 .000 .000 .648 .648 Non Participating 2014 3.911 .000 .000 3.911 Bridge On/Off System 2014 .000 .000 .714 .714 Non Participating 2015 2.130 .533 .000 2.663 Bridge On/Off System 2016 1.319 .330 .000 1.649 2753 Totals 9.842 .862 1.362 12.067

LEBANON, NH - US 4 14.960 REPLACE BRIDGE OVER CONNECTICUT RIVER - 058/127 {Red List} ATT HARTFORD, VT 14957 Proposed P 2013 .132 .000 .000 .132 STP-Flexible C 2013 5.353 .000 .000 5.353 Bridge On/Off System 2013 .000 .000 .648 .648 Non Participating 2014 5.328 .000 .000 5.328 Bridge On/Off System 2014 .000 .000 .714 .714 Non Participating 2016 1.319 .330 .000 1.649 Bridge On/Off System 2753 Totals 12.132 .330 1.362 13.824

Phase: P - Preliminary Engineering R - Right of Way C - Construction STIP Revision 02 "Existing" = Information as it appears in latest Approved STIP (13-16) STIPBeginYr: 2013 Print Date: 15-May-13 Page 8 of 15

13-16_STIP.mdb: rpt_20100_SA_vs_STIP_MASTER_Rpt_New_Format_Inflated Overall Project CAA Comments NameState# Rte/Street:Cost $(M) Location/Scope of Work Code Open Analysis FY MPO Adv Const Fiscal Regionally Significant Grouped / Parent Payback Phase Year Fed$ DOT$ Other$ Tot$ Funding Category

MANCHESTER PISCATAQUOG TRAILWAYS.466 PHASE III-A, REHAB OR REPLACE WOOD TRESTLE BRIDGE OVER PISCATAQUOG 14412A RIVER FOR MULTI-USE ACCESS AND CONST 1/2 MILE OF MULTI-USE TRAIL (TE Program) [Part of 04-33TE & 09-26TE] Existing P 2013 .007 .000 .002 .008 STP-Enhancement C 2013 .269 .000 .067 .337 7255 Totals .276 .000 .069 .345

MANCHESTER PISCATAQUOG TRAILWAYS.741 PHASE III-A, REHAB OR REPLACE WOOD TRESTLE BRIDGE OVER PISCATAQUOG E-45 14412A RIVER FOR MULTI-USE ACCESS AND CONST 1/2 MILE OF MULTI-USE TRAIL (TE Program) [Part of 04-33TE & 09-26TE] Proposed P 2013 .007 .000 .002 .008 STP-Enhancement C 2013 .220 .000 .055 .275 STP-Areas Less Than 200K 2013 .269 .000 .067 .337 STP-Enhancement 7255 Totals .496 .000 .124 .620

NEW HAMPTON SMITH CROSSING.897 REMOVE BRIDGE OVER NH RAILROAD - 240/104 ATT 25365 Proposed P 2013 .028 .000 .000 .028 Bridge Off System 2014 .028 .000 .000 .028 2015 .023 .006 .000 .029 2016 .024 .006 .000 .030 R 2013 .028 .000 .000 .028 8668 Totals .131 .012 .000 .143

NORTH HAMPTON US 1 5.351 REPLACE BRIDGE OVER BOSTON & MAINE RAILROAD - 148/132 {Redlist Bridge} E-19 24457 Proposed P 2013 .088 .022 .000 .110 Bridge On/Off System 2014 .182 .045 .000 .227 2015 .187 .047 .000 .234 R 2013 .022 .006 .000 .028 2014 .091 .023 .000 .114 2015 .094 .023 .000 .117 8601 Totals .664 .166 .000 .830

Phase: P - Preliminary Engineering R - Right of Way C - Construction STIP Revision 02 "Existing" = Information as it appears in latest Approved STIP (13-16) STIPBeginYr: 2013 Print Date: 15-May-13 Page 9 of 15

13-16_STIP.mdb: rpt_20100_SA_vs_STIP_MASTER_Rpt_New_Format_Inflated Overall Project CAA Comments NameState# Rte/Street:Cost $(M) Location/Scope of Work Code Open Analysis FY MPO Adv Const Fiscal Regionally Significant Grouped / Parent Payback Phase Year Fed$ DOT$ Other$ Tot$ Funding Category

OSSIPEE NUDD ROAD .804 BRIDGE REHABILITATION, WHITTIER COVERED BRIDGE OVER BEARCAMP RIVER - ATT 15296A 108/333 {Federal Grant} [National Historic Covered Bridge Preservation Program] Proposed P 2013 .078 .000 .000 .078 National Historic Covered Bridge Preservation (NHCBP) C 2013 .090 .000 .023 .113 6878 Totals .168 .000 .023 .191

PETERBOROUGH NH 136 1.900 BRIDGE REPLACEMENT - 110/115 {Redlist Bridge} ATT 24500 Proposed P 2013 .110 .000 .000 .110 STP-Flexible 2014 .182 .045 .000 .227 R 2013 .028 .000 .000 .028 2014 .023 .006 .000 .028 8604 Totals .342 .051 .000 .393

PLAISTOW - NH 125 3.387 RECONSTRUCTION EAST ROAD, PLAISTOW NORTHERLY APPROXIMATELY 6.0 MILES N/E KINGSTON TO MAIN STREET KINGSTON 10044K Proposed P 2013 .704 .000 .000 .704 National Highway (NHPP) 2014 .114 .000 .000 .114 R 2013 2.456 .000 .000 2.456 2014 .114 .000 .000 .114 Regionally Significant Totals 3.387 .000 .000 3.387 8763

PORTSMOUTH GRAFTON DRIVE1.400 TRADE PORT MULTI-USE PATH - CONSTRUCT A MULTI USE PATH ALONG GRAFTON E-33 14417 DR BETWEEN NH AVENUE AND PORTSMOUTH TRANSPORTATION CENTER, AND BETWEEN PEASE GOLF COURSE AND AIRPORT RD (TE Program) [04-54TE] Proposed C 2013 .332 .000 .000 .332 STP-Flexible 5655 Totals .332 .000 .000 .332

Phase: P - Preliminary Engineering R - Right of Way C - Construction STIP Revision 02 "Existing" = Information as it appears in latest Approved STIP (13-16) STIPBeginYr: 2013 Print Date: 15-May-13 Page 10 of 15

13-16_STIP.mdb: rpt_20100_SA_vs_STIP_MASTER_Rpt_New_Format_Inflated Overall Project CAA Comments NameState# Rte/Street:Cost $(M) Location/Scope of Work Code Open Analysis FY MPO Adv Const Fiscal Regionally Significant Grouped / Parent Payback Phase Year Fed$ DOT$ Other$ Tot$ Funding Category

SALEM MANCHESTER & 1.251 MULTI-USE TRAIL IMPROVEMENTS IN SALEM & WINDHAM [09-47TE] E-45 16031 LAWRENCE RAIL CORRIDOR Existing P 2013 .001 .000 .000 .001 STP-Enhancement R 2013 .001 .000 .000 .001 7636 Totals .002 .000 .000 .002

SALEM MANCHESTER & 1.407 MULTI-USE TRAIL IMPROVEMENTS IN SALEM & WINDHAM [09-47TE] E-45 16031 LAWRENCE RAIL CORRIDOR Proposed P 2014 .126 .000 .031 .157 STP-Enhancement R 2014 .001 .000 .000 .001 7636 Totals .127 .000 .032 .158

STARK NORTHSIDE ROAD1.215 BRIDGE REHABILITATION OVER UPPER - 115/091 {Red List} - ATT 20224 STARK COVERED BRIDGE. NHCBP(NH COVERED BRIDGE PRESERVATION) [SAB*4216] {State Aid Bridge Program} Existing C 2013 .832 .000 .000 .832 National Historic Covered Bridge Preservation (NHCBP) 2013 .000 .166 .042 .208 State Aid Bridge 7908 Totals .832 .166 .042 1.040

STARK NORTHSIDE ROAD1.601 BRIDGE REHABILITATION OVER - 115/091 {Red List} - ATT 20224 STARK COVERED BRIDGE. NHCBP(NH COVERED BRIDGE PRESERVATION) [SAB*4216] {State Aid Bridge Program} Proposed P 2013 .000 .024 .006 .030 State Aid Bridge R 2014 .000 .001 .000 .001 C 2013 .832 .000 .000 .832 National Historic Covered Bridge Preservation (NHCBP) 2013 .000 .450 .113 .563 State Aid Bridge 7908 Totals .832 .475 .119 1.426

Phase: P - Preliminary Engineering R - Right of Way C - Construction STIP Revision 02 "Existing" = Information as it appears in latest Approved STIP (13-16) STIPBeginYr: 2013 Print Date: 15-May-13 Page 11 of 15

13-16_STIP.mdb: rpt_20100_SA_vs_STIP_MASTER_Rpt_New_Format_Inflated Overall Project CAA Comments NameState# Rte/Street:Cost $(M) Location/Scope of Work Code Open Analysis FY MPO Adv Const Fiscal Regionally Significant Grouped / Parent Payback Phase Year Fed$ DOT$ Other$ Tot$ Funding Category

STATEWIDE PRESERVATION(Annual) BRIDGE REHABILITATION, PAINTING, PRESERVATION & IMPROVEMENT PROJECTS E-19 FBRPI (Federal Program) Existing P 2013 .250 .000 .000 .250 Bridge On/Off System 2014 .080 .020 .000 .100 2015 .080 .020 .000 .100 2016 .080 .020 .000 .100 R 2013 .020 .000 .000 .020 2014 .016 .004 .000 .020 2015 .016 .004 .000 .020 2016 .016 .004 .000 .020 C 2013 7.880 .000 .000 7.880 2014 6.304 1.576 .000 7.880 2015 6.304 1.576 .000 7.880 2016 6.304 1.576 .000 7.880 Totals 27.350 4.800 .000 32.150 6601 Grouped

STATEWIDE PRESERVATION(Annual) BRIDGE REHABILITATION, PAINTING, PRESERVATION & IMPROVEMENT PROJECTS E-19 FBRPI (Federal Program) Proposed P 2013 .250 .000 .000 .250 Bridge On/Off System 2014 .080 .020 .000 .100 2015 .080 .020 .000 .100 2016 .080 .020 .000 .100 R 2013 .020 .000 .000 .020 2014 .016 .004 .000 .020 2015 .016 .004 .000 .020 2016 .016 .004 .000 .020 C 2013 12.000 .000 .000 12.000 2014 6.304 1.576 .000 7.880 2015 6.304 1.576 .000 7.880 2016 6.304 1.576 .000 7.880 Totals 31.470 4.800 .000 36.270 6601 Grouped

Phase: P - Preliminary Engineering R - Right of Way C - Construction STIP Revision 02 "Existing" = Information as it appears in latest Approved STIP (13-16) STIPBeginYr: 2013 Print Date: 15-May-13 Page 12 of 15

13-16_STIP.mdb: rpt_20100_SA_vs_STIP_MASTER_Rpt_New_Format_Inflated Overall Project CAA Comments NameState# Rte/Street:Cost $(M) Location/Scope of Work Code Open Analysis FY MPO Adv Const Fiscal Regionally Significant Grouped / Parent Payback Phase Year Fed$ DOT$ Other$ Tot$ Funding Category

WHITEFIELD US 3 .118 PROJECT INVOLVES IMPROVING PEDESTRIAN ACCESS TO TOWN CENTER VIA ATT 14425 POTENTIAL SIDEWALKS, LIGHTING AND ADA RELATED UPGRADES (TE Program) [04- 66TE] & [09-50TE] Proposed P 2013 .016 .000 .004 .020 STP-Enhancement R 2013 .001 .000 .000 .001 C 2013 .078 .000 .019 .097 5663 Totals .094 .000 .024 .118

WILTON - MILFORD - NH 101 10.176 SAFETY IMPROVEMENTS @ VARIOUS LOCATIONS FROM WILTON TO WALLACE RD N/E AMHERST - BEDFORD IN BEDFORD AS DETERMINED BY CORRIDOR STUDY 13692 Existing R 2013 .022 .000 .000 .022 National Highway (NHPP) 2014 .023 .000 .000 .023 2016 .036 .000 .000 .036 2739 Totals .081 .000 .000 .081

WILTON - MILFORD - NH 101 10.696 SAFETY IMPROVEMENTS @ VARIOUS LOCATIONS FROM WILTON TO WALLACE RD N/E AMHERST - BEDFORD IN BEDFORD AS DETERMINED BY CORRIDOR STUDY 13692 Proposed P 2014 .114 .000 .000 .114 National Highway (NHPP) R 2013 .022 .000 .000 .022 STP-Flexible 2014 .023 .000 .000 .023 National Highway (NHPP) 2016 .121 .000 .000 .121 2739 Totals .279 .000 .000 .279

Phase: P - Preliminary Engineering R - Right of Way C - Construction STIP Revision 02 "Existing" = Information as it appears in latest Approved STIP (13-16) STIPBeginYr: 2013 Print Date: 15-May-13 Page 13 of 15

13-16_STIP.mdb: rpt_20100_SA_vs_STIP_MASTER_Rpt_New_Format_Inflated Overall Project CAA Comments NameState# Rte/Street:Cost $(M) Location/Scope of Work Code Open Analysis FY MPO Adv Const Fiscal Regionally Significant Grouped / Parent Payback Phase Year Fed$ DOT$ Other$ Tot$ Funding Category

WINCHESTER NH 10 1.209 REHABILITATION OR REPLACEMENT OF 12' CONCRETE BOX OVER FOREST LAKE ATT 20819 OUTLET - 137/121 Existing P 2013 .046 .000 .000 .046 Equity Bonus (Flexible) 2014 .040 .010 .000 .050 STP-Non Urban Areas Under 5K 2015 .042 .010 .000 .052 2016 .010 .002 .000 .012 R 2013 .005 .000 .000 .005 Equity Bonus (Flexible) 2014 .004 .001 .000 .005 STP-Non Urban Areas Under 5K 2015 .009 .002 .000 .012 2016 .005 .001 .000 .007 C 2016 .817 .204 .000 1.021 7994 Totals .978 .232 .000 1.209

WINCHESTER NH 10 1.385 REHABILITATION OR REPLACEMENT OF 12' CONCRETE BOX OVER FOREST LAKE ATT 20819 OUTLET - 137/121 Proposed P 2013 .046 .000 .000 .046 Equity Bonus (Flexible) 2014 .040 .010 .000 .050 STP-Non Urban Areas Under 5K 2015 .042 .010 .000 .052 2016 .010 .002 .000 .012 R 2013 .005 .000 .000 .005 Equity Bonus (Flexible) 2014 .004 .001 .000 .005 STP-Non Urban Areas Under 5K 2015 .009 .002 .000 .012 7994 Totals .156 .026 .000 .182

Phase: P - Preliminary Engineering R - Right of Way C - Construction STIP Revision 02 "Existing" = Information as it appears in latest Approved STIP (13-16) STIPBeginYr: 2013 Print Date: 15-May-13 Page 14 of 15

13-16_STIP.mdb: rpt_20100_SA_vs_STIP_MASTER_Rpt_New_Format_Inflated Overall Project CAA Comments NameState# Rte/Street:Cost $(M) Location/Scope of Work Code Open Analysis FY MPO Adv Const Fiscal Regionally Significant Grouped / Parent Payback Phase Year Fed$ DOT$ Other$ Tot$ Funding Category

Phase: P - Preliminary Engineering R - Right of Way C - Construction STIP Revision 02 "Existing" = Information as it appears in latest Approved STIP (13-16) STIPBeginYr: 2013 Print Date: 15-May-13 Page 15 of 15

13-16_STIP.mdb: rpt_20100_SA_vs_STIP_MASTER_Rpt_New_Format_Inflated Statewide Transportation Improvement Program (STIP) 2013 to 2016

Financial Constraint Summary

June 6, 2013

Prepared by the New Hampshire Department of Transportation NH STIP 2013-2016 Financial Constraint Documentation FISCAL CONSTRAINT - ANTICIPATED REVENUES WITH MATCH VERSUS PROGRAMMED FUNDING FOR PROJECTS WITHIN THE STIP Dollars in Millions

2013 2014 Improvement Program Improvement Program

Federal State Local/Other Total Total Federal State Local/Other Total Total Resources Resources Resources Resources Programmed Resources Resources Resources Resources Programmed

Available Available Available Available Programmed Available Available Available Available Programmed

FHWA - Federal-aid w/ Match Bridge Off System $ - $ - $ 1,135,000 $ 1,135,000 $ 6,701,780 $ - $ - $ 840,000 $ 840,000 $ 5,419,428 Bridge On/Off System $ - $ - $ 61,800 $ 61,800 $ 38,041,677 $ - $ - $ 1,032,000 $ 1,032,000 $ 33,587,323 Congestion Mitigation and Air Quality Program $ 10,330,459 $ - $ 611,281 $ 10,941,740 $ 5,494,729 $ 10,661,034 $ - $ 2,491,915 $ 13,152,949 $ 12,795,816 Emergency Relief $ 78,582 $ - $ - $ 78,582 $ 78,582 $ - $ - $ - Equity Bonus (Flexible) $ 335,019 $ - $ - $ 335,019 $ 699,850 $ 345,740 $ - $ - $ 345,740 $ 170,280 Forest Highways $ 850,000 $ - $ - $ 850,000 $ 850,000 $ 877,200 $ - $ - $ 877,200 $ 850,000 Highway Safety Improvement Program (HSIP) $ 9,225,126 $ - $ - $ 9,225,126 $ 5,620,000 $ 9,520,330 $ - $ - $ 9,520,330 $ 3,615,000 Homeland Security Grant $ - $ - $ 387,178 $ 387,178 $ 387,178 $ - $ - $ - Interstate Maintenance $ - $ - $ - $ - $ 26,956,626 $ - $ - $ - $ - $ 31,275,967 National Highway (NHPP) $ 93,944,041 $ - $ - $ 93,944,041 $ 14,299,580 $ 96,950,250 $ - $ - $ 96,950,250 $ 16,257,283 National Historic Covered Bridge Preservation (NHCBP) $ 1,136,434 $ - $ 44,609 $ 1,181,043 $ 1,181,043 $ - $ - $ 130,032 $ 130,032 $ 650,160 National Scenic Byways Program $ - $ - $ - $ - $ 500,000 $ - $ - $ - $ - $ 500,000 Rail-Hwy: Haz Elim-Protective Devices $ 550,000 $ - $ - $ 550,000 $ 790,000 $ 567,600 $ - $ - $ 567,600 $ 140,000 Recreational Trails $ 1,267,944 $ - $ - $ 1,267,944 $ 1,241,000 $ 1,308,518 $ - $ - $ 1,308,518 $ 1,241,000 Safe Routes to School $ - $ - $ - $ - $ 832,000 $ - $ - $ - $ - $ 1,323,000 STP-Areas Less Than 200K $ 7,014,540 $ - $ 455,000 $ 7,469,540 $ 5,336,529 $ 7,239,005 $ - $ 451,500 $ 7,690,505 $ 14,032,092 STP-Areas Over 200K $ 4,907,765 $ - $ 4,907,765 $ 5,064,813 $ - $ 155,017 $ 5,219,830 $ 775,084 STP-DBE $ - $ - $ - $ - $ 90,000 $ - $ - $ - $ - $ 90,000 STP-Enhancement $ - $ - $ 505,732 $ 505,732 $ 4,369,076 $ - $ - $ 1,283,113 $ 1,283,113 $ 6,768,860 STP-Flexible $ 16,993,253 $ - $ 1,911,000 $ 18,904,253 $ 47,423,122 $ 17,537,037 $ - $ 630,552 $ 18,167,589 $ 37,160,146 STP-Hazard Elimination $ - $ - $ 105,000 $ 105,000 $ 2,560,000 $ - $ - $ - $ - $ 2,035,000 STP-Non Urban Areas Under 5K $ 8,777,826 $ - $ - $ 8,777,826 $ 1,931,124 $ 9,058,716 $ - $ - $ 9,058,716 $ 3,061,669 STP-Safety $ - $ - $ - $ - $ 495,000 $ - $ - $ - Tiger Grant $ 1,024,200 $ - $ 682,800 $ 1,707,000 $ 1,707,000 $ 3,413,650 $ - $ 2,275,766 $ 5,689,416 $ 5,689,416 Transportation Assistance $ - $ - $ - $ - $ 30,000 $ - $ - $ - $ - $ 30,000 STP-Off System Bridge $ 3,672,842 $ - $ 3,672,842 $ 3,790,373 $ - $ 3,790,373 Transportation & Community & System Preservation $ 300,000 $ - $ 75,000 $ 375,000 $ 375,000 $ - $ - $ - Transportation Alternatives $ 3,769,144 $ - $ - $ 3,769,144 $ 3,889,757 $ - $ - $ 3,889,757 Earmarks $ 6,834,784 $ - $ 754,488 $ 7,589,273 $ 7,589,273 $ 5,334,297 $ - $ 121,601 $ 5,455,898 $ 5,455,898 FHWA FEDERAL-AID TOTAL $ 171,011,960 $ - $ 6,728,888 $ 177,740,848 $ 175,580,170 $ 175,558,320 $ - $ 9,411,496 $ 184,969,816 $ 182,923,422

6/6/2013 NH STIP 2013-2016 Financial Constraint Documentation FISCAL CONSTRAINT - ANTICIPATED REVENUES WITH MATCH VERSUS PROGRAMMED FUNDING FOR PROJECTS WITHIN THE STIP Dollars in Millions

2013 2014 Improvement Program Improvement Program

Federal State Local/Other Total Total Federal State Local/Other Total Total Resources Resources Resources Resources Programmed Resources Resources Resources Resources Programmed

Available Available Available Available Programmed Available Available Available Available Programmed

FTA - Federal-aid w/ Match FTA 5307 Capital and Operating Program $ 3,896,180 $ - $ 3,316,268 $ 7,212,448 $ 10,943,618 $ 4,020,858 $ - $ 3,215,083 $ 7,235,940 $ 10,000,175 FTA 5310 Capital Program $ 1,002,588 $ - $ 186,200 $ 1,188,788 $ 931,000 $ 1,034,671 $ - $ 186,200 $ 1,220,871 $ 931,000 FTA 5311 Capital & Operating Program $ 3,900,762 $ - $ 2,800,000 $ 6,700,762 $ 7,000,000 $ 4,025,586 $ - $ 2,800,000 $ 6,825,586 $ 7,000,000 FTA 5316 JARC $ - $ - $ 350,000 $ 350,000 $ 700,000 $ - $ - $ 350,000 $ 350,000 $ 700,000 FTA 5317 New Freedom Program $ - $ - $ 348,438 $ 348,438 $ 722,188 $ - $ - $ 348,708 $ 348,708 $ 723,538 FTA 5339 Bus and Facility Program $ 1,764,854 $ - $ 438,069 $ 2,202,923 $ 2,190,346 $ 1,821,329 $ - $ 454,578 $ 2,275,907 $ 2,272,891

FTA FEDERAL-AID TOTAL $ 10,564,384 $ - $ 7,438,974 $ 18,003,358 $ 22,487,151 $ 10,902,444 $ - $ 7,354,568 $ 18,257,013 $ 21,627,604

FHWA/FTA FEDERAL-AID TOTAL $ 181,576,344 $ - $ 14,167,863 $ 195,744,207 $ 198,067,322 $ 186,460,764 $ - $ 16,766,065 $ 203,226,829 $ 204,551,026

Innovative Financing GARVEE Bond Funds $ - $ 57,172,615 $ - $ 57,172,615 $ 57,172,615 $ - $ 41,529,459 $ - $ 41,529,459 $ 41,529,459 Toll Credit $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - Other $ - $ - $ - $ - $ - $ - $ - $ - $ - $ -

Total Innovative Financing $ - $ 57,172,615 $ - $ 57,172,615 $ 57,172,615 $ - $ 41,529,459 $ - $ 41,529,459 $ 41,529,459

State Fund Sources (State Funded Projects Only) State Funds - No Federal-Aid Match $ - $ 170,600,000 $ - $ 170,600,000 $ 85,060,000 $ - $ 100,440,000 $ - $ 100,440,000 $ 46,730,000

Total State Fund Sources $ - $ 170,600,000 $ - $ 170,600,000 $ 85,060,000 $ - $ 100,440,000 $ - $ 100,440,000 $ 46,730,000

Other Fund Sources Non-Particpating Funds (other states, municipalities, private sources) $ - $ - $ 34,789,900 $ 34,789,900 $ 34,789,900 $ - $ - $ 2,614,274 $ 2,614,274 $ 2,614,274

Total Other Fund Sources $ - $ - $ 34,789,900 $ 34,789,900 $ 34,789,900 $ - $ - $ 2,614,274 $ 2,614,274 $ 2,614,274

TOTAL ALL PROGRAMS $ 181,576,344 $ 227,772,615 $ 48,957,763 $ 458,306,722 $ 375,089,837 $ 186,460,764 $ 141,969,459 $ 19,380,339 $ 347,810,562 $ 295,424,759

6/6/2013 NH STIP 2013-2016: Financial Constraint Documentation

FISCAL CONSTRAINT - ANTICIPATED REVENUES WITH MATCH VERSUS PROGRAMMED FUNDING FOR PROJECTS WITHIN THE STIP Dollars in Millions

2015 2016 Improvement Program Improvement Program

Federal State Local/Other Total Total Federal State Local/Other Total Total Resources Resources Resources Resources Programmed Resources Resources Resources Resources Programmed

Available Available Available Available Programmed Available Available Available Available Programmed

FHWA - Federal-aid w/ Match Bridge Off System $ - $ - $ 1,200,000 $ 1,200,000 $ 10,769,707 $ - $ - $ 1,240,000 $ 1,240,000 $ 7,467,262 Bridge On/Off System $ - $ - $ 1,794,493 $ 1,794,493 $ 44,918,546 $ - $ - $ - $ - $ 59,879,580 Congestion Mitigation and Air Quality Program $ 11,002,187 $ - $ 428,000 $ 11,430,187 $ 5,688,695 $ 11,354,257 $ - $ - $ 11,354,257 $ 2,450,000 Emergency Relief $ - $ - $ - $ - $ - $ - Equity Bonus (Flexible) $ 356,803 $ - $ 356,803 $ 368,221 $ - $ 368,221 Forest Highways $ 905,270 $ - $ - $ 905,270 $ 850,000 $ 934,239 $ - $ - $ 934,239 $ 850,000 Highway Safety Improvement Program (HSIP) $ 9,824,981 $ - $ - $ 9,824,981 $ 3,150,000 $ 10,139,380 $ - $ - $ 10,139,380 $ 3,150,000 Homeland Security Grant $ - $ - $ - $ - $ - $ - Interstate Maintenance $ - $ - $ 11,715 $ - $ 25,298,838 $ - $ - $ - $ - $ 20,414,318 National Highway (NHPP) $ 100,052,658 $ - $ - $ 100,052,658 $ 22,286,669 $ 103,254,343 $ - $ - $ 103,254,343 $ 19,245,214 National Historic Covered Bridge Preservation (NHCBP) $ - $ - $ - $ - $ 1,917,000 $ - $ - $ - National Scenic Byways Program $ - $ - $ - $ - $ 500,000 $ - $ - $ - $ - $ 500,000 Rail-Hwy: Haz Elim-Protective Devices $ 585,763 $ - $ - $ 585,763 $ 440,000 $ 604,508 $ - $ - $ 604,508 $ 440,000 Recreational Trails $ 1,350,391 $ - $ - $ 1,350,391 $ 1,241,000 $ 1,393,603 $ - $ - $ 1,393,603 $ 1,241,000 Safe Routes to School $ - $ - $ - $ - $ 1,170,000 $ - $ - $ - $ - $ 1,170,000 STP-Areas Less Than 200K $ 7,470,653 $ - $ - $ 7,470,653 $ 6,184,670 $ 7,709,714 $ - $ - $ 7,709,714 $ 3,765,994 STP-Areas Over 200K $ 5,226,888 $ - $ 52,512 $ 5,279,400 $ 262,561 $ 5,394,148 $ - $ 549,550 $ 5,943,698 $ 2,747,750 STP-DBE $ - $ - $ - $ - $ 90,000 $ - $ - $ - $ - $ 90,000 STP-Enhancement $ - $ - $ - $ - $ - $ - STP-Flexible $ 18,098,222 $ - $ - $ 18,098,222 $ 35,502,025 $ 18,677,365 $ - $ - $ 18,677,365 $ 27,642,589 STP-Hazard Elimination $ - $ - $ 149,100 $ 149,100 $ 2,780,500 $ - $ - $ - $ - $ 2,035,000 STP-Non Urban Areas Under 5K $ 9,348,595 $ - $ - $ 9,348,595 $ 9,291,060 $ 9,647,750 $ - $ - $ 9,647,750 $ 7,672,817 STP-Safety $ - $ - $ - $ - $ - $ - Tiger Grant $ 402,570 $ - $ 268,380 $ 670,950 $ 670,950 $ - $ - $ - Transportation Assistance $ - $ - $ - $ - $ 30,000 $ - $ - $ - $ - $ 30,000 STP-Off System Bridge $ 3,911,665 $ - $ 3,911,665 $ 4,036,838 $ - $ - $ 4,036,838 $ 3,627,030 Transportation & Community & System Preservation $ - $ - $ - $ - $ - $ - Transportation Alternatives $ 4,014,229 $ - $ - $ 4,014,229 $ 4,142,684 $ - $ - $ 4,142,684 Earmarks $ 6,164,279 $ - $ 769,923 $ 6,934,202 $ 6,164,279 $ 2,108,075 $ - $ - $ 2,108,075 $ 2,108,075 FHWA FEDERAL-AID TOTAL $ 178,715,155 $ - $ 4,674,123 $ 183,377,563 $ 179,206,499 $ 179,765,127 $ - $ 1,789,550 $ 181,554,677 $ 166,526,629

6/6/2013 NH STIP 2013-2016: Financial Constraint Documentation

FISCAL CONSTRAINT - ANTICIPATED REVENUES WITH MATCH VERSUS PROGRAMMED FUNDING FOR PROJECTS WITHIN THE STIP Dollars in Millions

2015 2016 Improvement Program Improvement Program

Federal State Local/Other Total Total Federal State Local/Other Total Total Resources Resources Resources Resources Programmed Resources Resources Resources Resources Programmed

Available Available Available Available Programmed Available Available Available Available Programmed

FTA - Federal-aid w/ Match FTA 5307 Capital and Operating Program $ 4,149,525 $ - $ 3,382,881 $ 7,532,406 $ 10,500,254 $ 4,282,310 $ - $ 3,539,766 $ 7,822,076 $ 10,948,169 FTA 5310 Capital Program $ 1,067,780 $ - $ 186,200 $ 1,253,980 $ 931,000 $ 1,101,949 $ - $ 186,200 $ 1,288,149 $ 931,000 FTA 5311 Capital & Operating Program $ 4,154,405 $ - $ 2,800,000 $ 6,954,405 $ 7,000,000 $ 4,287,346 $ - $ 2,800,000 $ 7,087,346 $ 7,000,000 FTA 5316 JARC $ - $ - $ 350,000 $ 350,000 $ 700,000 $ - $ - $ 350,000 $ 350,000 $ 700,000 FTA 5317 New Freedom Program $ - $ - $ 340,000 $ 340,000 $ 680,000 $ - $ - $ 340,000 $ 340,000 $ 680,000 FTA 5339 Bus and Facility Program $ 1,879,612 $ - $ 469,114 $ 2,348,726 $ 2,345,570 $ 1,939,759 $ - $ 485,461 $ 2,425,220 $ 2,427,305

FTA FEDERAL-AID TOTAL $ 11,251,323 $ - $ 7,528,195 $ 18,779,518 $ 22,156,824 $ 11,611,365 $ - $ 7,701,427 $ 19,312,792 $ 22,686,474

FHWA/FTA FEDERAL-AID TOTAL $ 189,966,477 $ - $ 12,202,319 $ 202,157,081 $ 201,363,324 $ 191,376,491 $ - $ 9,490,977 $ 200,867,468 $ 189,213,103

Innovative Financing GARVEE Bonds $ - $ 37,951,182 $ - $ 37,951,182 $ 37,951,182 $ - $ 4,459,713 $ - $ 4,459,713 $ 4,459,713 Toll Credit $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - Other $ - $ - $ - $ - $ - $ - $ - $ - $ - $ -

Total Innovative Financing $ - $ 37,951,182 $ - $ 37,951,182 $ 37,951,182 $ - $ 4,459,713 $ - $ 4,459,713 $ 4,459,713

State Fund Sources (State Funded Projects Only) State Funds - No Federal-Aid Match $ - $ 108,410,000 $ - $ 108,410,000 $ 56,780,000 $ - $ 66,930,000 $ - $ 66,930,000 $ 40,420,000

Total State Fund Sources $ - $ 108,410,000 $ - $ 108,410,000 $ 56,780,000 $ - $ 66,930,000 $ - $ 66,930,000 $ 40,420,000

Other Fund Sources Non-Particpating Funds (other states, municipalities, private sources) $ - $ - $ 12,553,589 $ 12,553,589 $ 12,553,589 $ - $ - $ 26,658,671 $ 26,658,671 $ 26,658,671

Total Other Fund Sources $ - $ - $ 12,553,589 $ 12,553,589 $ 12,553,589 $ - $ - $ 26,658,671 $ 26,658,671 $ 26,658,671

TOTAL ALL PROGRAMS $ 189,966,477 $ 146,361,182 $ 24,755,908 $ 361,071,852 $ 308,648,095 $ 191,376,491 $ 71,389,713 $ 36,149,648 $ 298,915,852 $ 260,751,487

2013 2014 2015 2016 State Total State Total Total State Total State Resources Resources Programmed Resources Programmed Programmed Resources Programmed Available Programmed Available Programmed Available Programmed Available Programmed

Statewide Operations & Maintenance $ 123,578,823 $ 123,578,823 $ 122,386,958 $ 122,386,958 $ 126,303,341 $ 126,303,341 $ 130,345,048 $ 130,345,048

6/6/2013 2013-2016 STIP: Programmed Dollars versus Available Resources

FHWA Programs Innovative Finance State & Other Resources $250,000,000 FHWA Resources Total Program

$200,000,000

$150,000,000

$100,000,000

$50,000,000

$- 2013 2014 2015 2016

FTA Programs State & Other Resources FTA Resources $25,000,000 Total Program

$20,000,000

$15,000,000

$10,000,000

$5,000,000

$- 2013 2014 2015 2016 Boston-Manchester-Portsmouth (Southeast), New Hampshire; 8-Hour Ozone Area

Summary of Conformity Tests August 27, 2012

Table S-1: Volatile Organic Compounds (VOCs)

Analysis Year MPO 2022 2032 2040 Nashua Regional Planning Commission 4,436 3,905 4,011 Rockingham & Strafford Planning Commissions 8,114 7,021 7,233 Southern NH Planning Commission 5,184 4,615 4,734 Total (lbs/Day) 17,734 15,541 15,978 Total* (Ton/Day) 8.9 7.8 8.0

Budget** (Ton/Day) 8.9 8.9 8.9

Pollutant - VOCs - Ozone Precursor

9.0 8.9 8.8 8.6 VOC Emissions

8.4 Budget - VOC 8.2 8.0 8.9

Tons/Day 7.8 7.6 8.0 7.8 7.4 7.2

Analysis Year

* Conversion Factor for Pounds to Tons = 0.005 ** MVEB found adequate: Federal Register, Vol. 77, No. 93 - May 14, 2012

Prepared by: New Hampshire Department of Transportation Data provided by: - Nashua Regional Planning Commission - Rockingham Planning Commission - Southern NH Planning Commission - Strafford Regional Planning Commission - New Hampshire Department of Environmental Services Boston-Manchester-Portsmouth (Southeast), New Hampshire; 8-Hour Ozone Area

Summary of Conformity Tests August 27, 2012

Table S-2: Nitrogen Oxides (NOx)

Analysis Year MPO 2022 2032 2040 Nashua Regional Planning Commission 5,147 4,449 4,452 Rockingham & Strafford Planning Commissions 12,064 10,253 10,396 Southern NH Planning Commission 5,687 5,232 5,286 Total (lbs/Day) 22,898 19,934 20,134 Total* (Ton/Day) 11.4 10.0 10.1

Budget** (Ton/Day) 11.8 11.8 11.8

Pollutant - NOx - Ozone Precursor

12.0 11.8 11.5 NOx Emissions

11.0 Budget - NOx 10.5 11.4

Tons/Day 10.0

9.5 10.0 10.1

9.0

Analysis Year

* Conversion Factor for Pounds to Tons = 0.005 ** MVEB found adequate: Federal Register, Vol. 77, No. 93 - May 14, 2012

Prepared by: New Hampshire Department of Transportation Data provided by: - Nashua Regional Planning Commission - Rockingham Planning Commission - Southern NH Planning Commission - Strafford Regional Planning Commission - New Hampshire Department of Environmental Services Manchester and Nashua, New Hampshire; Carbon Monoxide Maintenance Areas

Summary of Conformity Tests August 28, 2012

Table S-3: Carbon Monoxide (CO) City of Manchester, NH

CO CO CO Budget** Year (kg/day) (Ton/day*) (Ton/day) 2022 22,937 25.28 55.83 PASS 2032 25,245 27.83 55.83 PASS 2040 26,944 29.70 55.83 PASS

Table S-4: Carbon Monoxide (CO) City of Nashua, NH

CO CO CO Budget*** Year (lb/day) (Ton/day**) (Ton/day) 2022 32,993 16.50 60.13 PASS 2032 36,054 18.03 60.13 PASS 2040 38,347 19.17 60.13 PASS

* Conversion Factor for Kilograms (kg) to Tons = 0.00110231 ** Conversion Factor for Pounds (lb) to Tons = 0.005 *** Carbon Monoxide Emissions Budget from Maintenance Plans

Prepared by: New Hampshire Department of Transportation Data provided by: - Nashua Regional Planning Commission - Southern NH Planning Commission - New Hampshire Department of Environmental Services