Metropolitan Planning Organization Transportation Improvement Program 2013-2016

Metropolitan Planning Organization Transportation Improvement Program 2013-2016

NASHUA REGIONAL PLANNING COMMISSION Metropolitan Planning Organization Transportation Improvement Program 2013-2016 Surface Transportation Projects in the Nashua Metropolitan Planning Area through Amendment 2 Nashua Regional Planning Commission ADOPTED October 17, 2012 9 Executive Park Drive Suite 201 AMENDMENT #1 APPROVED March 20, 2013 Merrimack, NH 03054 (603) 424-2240 AMENDMENT #2 APPROVED June 19, 2013 www.nashuarpc.org Amended 2013 - 2016 Transportation Improvement Program Projects updated through June 19, 2013 Surface Transportation Projects in the Nashua Metropolitan Planning Area Page 1 of 8 BOSTON EXPRESS NASHUA Project Overall Reg CAA ID Project Cost Sig Status Route/Road: FE Everett Turnpike 68060 $131,000 No E-21 Scope: Manchester - Nashua (FE Everett Turnpike) Operating Subsidy Phase FY Federal $ NH DOT $ Other $ Total $ Funding Source T 2013 $ 104,000 $ 0 $ 0 $ 104,000 FTA Section 5307 Urban Transit Operating T 2014 $ 27,864 $ 0 $ 0 $ 27,864 FTA Section 5307 Urban Transit Operating Total TIP $: $ 131,864 $ 0 $ 0 $ 131,864 BROOKLINE Project Overall Reg CAA ID Project Cost Sig Status Route/Road: NH 130 20830 $466,000 No E-33 Scope: Construct sidewalks in two locations Phase FY Federal $ NH DOT $ Other $ Total $ Funding Source P 2012 $ 63,200 $ 0 $ 15,800 $ 79,000 STP - Transportation Enhancement P 2013 $ 800 $ 0 $ 200 $ 1,000 STP - Transportation Enhancement R 2012 $ 8,000 $ 0 $ 2,000 $ 10,000 STP - Transportation Enhancement R 2013 $ 16,000 $ 0 $ 4,000 $ 20,000 STP - Transportation Enhancement C 2013 $ 285,600 $ 0 $ 71,400 $ 357,000 STP - Transportation Enhancement Total TIP $: $ 302,400 $ 0 $ 75,600 $ 378,000 HUDSON Project Overall Reg CAA ID Project Cost Sig Status Route/Road: NH 111/Library Street 20245 $220,896 No N/E (2022) Scope: Upgrade three sets of traffic lights that control traffic at the convergence of three main corridors in Hudson: NH 111, NH 3A, and NH 102 Phase FY Federal $ NH DOT $ Other $ Total $ Funding Source P 2012 $ 23,117 $ 0 $ 5,779 $ 28,896 Congestion Mitigation & Air Quality Program R 2014 $ 800 $ 0 $ 200 $ 1,000 Congestion Mitigation & Air Quality Program C 2014 $ 152,800 $ 0 $ 38,200 $ 191,000 Congestion Mitigation & Air Quality Program Total TIP $: $ 153,600 $ 0 $ 38,400 $ 192,000 HUDSON Project Overall Reg CAA ID Project Cost Sig Status Route/Road: Train Depot 14408 $359,572 No E-28 Scope: Relocation and restoration of the former Hudson Center train depot. Part of the Worcester, Nashua, & Portland Railroad built in 1873. Phase FY Federal $ NH DOT $ Other $ Total $ Funding Source P 2014 $ 8,700 $ 0 $ 2,900 $ 11,600 STP - Transportation Enhancement C 2014 $ 231,800 $ 0 $ 77,300 $ 309,100 STP - Transportation Enhancement Total TIP $: $ 240,500 $ 0 $ 80,200 $ 320,700 Phase Codes: P = Preliminary Engineering; R = RIght-of-Way; C = Construction Funding: Italics: FY2012; Bold: FYs of TIP; No Emphasis: Ten Year Plan funding beyond FY2016 Amended 2013 - 2016 Transportation Improvement Program Projects updated through June 19, 2013 Surface Transportation Projects in the Nashua Metropolitan Planning Area Page 2 of 8 MILFORD Project Overall Reg CAA ID Project Cost Sig Status Route/Road: NH 101 13692B $3,514,000 No E-51 Scope: Safety improvements from Wilton Road to the NH 101/Elm Street intersection. Phase FY Federal $ NH DOT $ Other $ Total $ Funding Source C 2015 $ 1,361,000 $ 340,000 $ 0 $ 1,701,000 National Highway System C 2016 $ 1,451,000 $ 363,000 $ 0 $ 1,814,000 National Highway System Total TIP $: $ 2,812,000 $ 703,000 $ 0 $ 3,515,000 MILFORD Project Overall Reg CAA ID Project Cost Sig Status Route/Road: NH 101A/NH 13 14492 $2,643,229 No E-10 Scope: Improvements in the area known as the "Oval" to improve traffic flow based on ongoing traffic studies with the Town. Comment: Earmarked funding. Phase FY Federal $ NH DOT $ Other $ Total $ Funding Source R 2013 $ 92,880 $ 0 $ 22,704 $ 115,584 High Priority Proj Sec 1702 C 2013 $ 1,981,440 $ 0 $ 495,360 $ 2,476,800 High Priority Proj Sec 1702 Total TIP $: $ 2,074,320 $ 0 $ 518,064 $ 2,592,384 MILFORD Project Overall Reg CAA ID Project Cost Sig Status Route/Road: NH 13/Emerson Road/Armory Rd 20253 $464,000 No N/E (2022) Scope: Signal modification and additional turning lanes to address congestion and air quality related impacts Phase FY Federal $ NH DOT $ Other $ Total $ Funding Source P 2012 $ 39,629 $ 0 $ 9,907 $ 49,536 Congestion Mitigation & Air Quality Improvement P 2013 $ 8,000 $ 0 $ 2,000 $ 10,000 Congestion Mitigation & Air Quality Improvement R 2012 $ 14,861 $ 0 $ 3,715 $ 18,576 Congestion Mitigation & Air Quality Improvement R 2013 $ 800 $ 0 $ 200 $ 1,000 Congestion Mitigation & Air Quality Improvement C 2013 $ 317,030 $ 0 $ 79,258 $ 396,288 Congestion Mitigation & Air Quality Program Total TIP $: $ 325,830 $ 0 $ 81,458 $ 407,288 MILFORD Project Overall Reg CAA ID Project Cost Sig Status Route/Road: South Street 14837 $1,386,360 No E-45 Scope: South Street Improvement Project: Construct the Phase 2 portion of the downtown revitalization plan to improve overall safety, physical/ADA accessibility, functionality, design and general aesthetic of the intersection. Comment: Specific project from Statewide program, Local Administration. Phase FY Federal $ NH DOT $ Other $ Total $ Funding Source R 2012 $ 81,488 $ 0 $ 20,372 $ 101,860 High Priority Proj Sec 1702 R 2013 $ 826 $ 0 $ 206 $ 1,032 STP - Transportation Enhancement C 2013 $ 433,440 $ 0 $ 108,360 $ 541,800 High Priority Proj Sec 1702 C 2013 $ 426,010 $ 0 $ 106,502 $ 532,512 STP - Transportation Enhancement Total TIP $: $ 860,275 $ 0 $ 215,069 $ 1,075,344 Phase Codes: P = Preliminary Engineering; R = RIght-of-Way; C = Construction Funding: Italics: FY2012; Bold: FYs of TIP; No Emphasis: Ten Year Plan funding beyond FY2016 Amended 2013 - 2016 Transportation Improvement Program Projects updated through June 19, 2013 Surface Transportation Projects in the Nashua Metropolitan Planning Area Page 3 of 8 MILFORD TO NASHUA Project Overall Reg CAA ID Project Cost Sig Status Route/Road: NH 101A 10136 $3,436,227 No E-53 Scope: Intersection improvements at several locations between NH 101 and FEE Turnpike (7.5 miles) as determined by corridor study. Comment: Parent Project for PE & ROW. Specific Safety & Capacity improvements at 3 intersections as determined by corridor study, programmed as separate construction projects. Phase FY Federal $ NH DOT $ Other $ Total $ Funding Source R 2013 $ 247,000 $ 0 $ 0 $ 247,000 National Highway System S-LU Ext R 2014 $ 454,080 $ 113,520 $ 0 $ 567,600 National Highway System S-LU Ext Total TIP $: $ 701,080 $ 113,520 $ 0 $ 814,600 NASHUA Project Overall Reg CAA ID Project Cost Sig Status Route/Road: Broad Street Parkway 10040A $29,052,599 Yes N/E (2022) Scope: Broad Street Parkway (PE/ROW project only): 1.8 miles of new 2-lane road from NH 130 (Broad Street) to NH 111 (West Hollis Street). PE and ROW include appraisals, acquisitions and demolition. Comment: Original overall project for PE and ROW. Earmark funding (partial), project being re-scoped by City. Local Administration. Phase FY Federal $ NH DOT $ Other $ Total $ Funding Source P 2012 $ 600,000 $ 0 $ 150,000 $ 750,000 High Priority Proj Sec 1602 P 2012 $ 0 $ 0 $ 500,000 $ 500,000 Other Non Participating P 2012 $ 1,635,631 $ 0 $ 0 $ 1,635,631 Earmark Funds, Broad Street Parkway R 2013 $ 274,512 $ 0 $ 0 $ 274,512 Earmark Funds, Broad Street Parkway R 2014 $ 106,502 $ 0 $ 0 $ 106,502 Earmark Funds, Broad Street Parkway Total TIP $: $ 381,014 $ 0 $ 0 $ 381,014 NASHUA Project Overall Reg CAA ID Project Cost Sig Status Route/Road: Broad Street Parkway 16110 $7,183,000 Yes N/E (2022) Scope: Broad Street Parkway (Parent Construction): 1.8 miles of new 2-lane road from NH 130 (Broad Street) to NH 111 (West Hollis Street). (Parent Construction Project) Comment: Local Administration. Rescoped from Nashua 10040 Series projects. Phase FY Federal $ NH DOT $ Other $ Total $ Funding Source C 2013 $ 0 $ 0 $ 5,000,000 $ 5,000,000 City of Nashua C 2014 $ 0 $ 0 $ 2,252,546 $ 2,252,546 City of Nashua Total TIP $: $ 0 $ 0 $ 7,252,546 $ 7,252,546 NASHUA Project Overall Reg CAA ID Project Cost Sig Status Route/Road: Broad Street Parkway 10040W $103,000 Yes Scope: BUILDING DEMOLITION (Parent = Nashua 10040A) [Section 1602 - Designated Project; Demo Id NH003] Comment: Local Administration. Phase FY Federal $ NH DOT $ Other $ Total $ Funding Source R 2013 $ 147,000 $ 0 $ 0 $ 147,000 Earmark Funds, Broad Street Parkway Total TIP $: $ 147,000 $ 0 $ 0 $ 147,000 Phase Codes: P = Preliminary Engineering; R = RIght-of-Way; C = Construction Funding: Italics: FY2012; Bold: FYs of TIP; No Emphasis: Ten Year Plan funding beyond FY2016 Amended 2013 - 2016 Transportation Improvement Program Projects updated through June 19, 2013 Surface Transportation Projects in the Nashua Metropolitan Planning Area Page 4 of 8 NASHUA Project Overall Reg CAA ID Project Cost Sig Status Route/Road: Broad Street Parkway 16110B $14,700,000 Yes Scope: Construction of the north section, including replacement of Fairmont Street and Baldwin Street Bridges (Parent Project 16110*7781) Comment: Earmarked funding (partial). Responsible Agency: Municipally Managed/City of Nashua Phase FY Federal $ NH DOT $ Other $ Total $ Funding Source C 2013 $ 3,600,000 $ 0 $ 900,000 $ 4,500,000 High Priority Proj Sec 1602 C 2013 $ 0 $ 0 $ 700,000 $ 700,000 City of Nashua C 2013 $ 7,600,000 $ 0 $ 1,900,000 $ 9,500,000 STP - State Flexible In Any Area S-LU Ext Total TIP $: $ 11,200,000 $ 0 $ 3,500,000 $ 14,700,000 NASHUA Project Overall Reg CAA ID Project Cost Sig Status Route/Road: Broad Street Parkway 16110C $9,700,000 Yes Scope: Construction of the new bridge over the Nashua River (Parent Project 16110*7781) Comment: Earmarked funding (partial).

View Full Text

Details

  • File Type
    pdf
  • Upload Time
    -
  • Content Languages
    English
  • Upload User
    Anonymous/Not logged-in
  • File Pages
    36 Page
  • File Size
    -

Download

Channel Download Status
Express Download Enable

Copyright

We respect the copyrights and intellectual property rights of all users. All uploaded documents are either original works of the uploader or authorized works of the rightful owners.

  • Not to be reproduced or distributed without explicit permission.
  • Not used for commercial purposes outside of approved use cases.
  • Not used to infringe on the rights of the original creators.
  • If you believe any content infringes your copyright, please contact us immediately.

Support

For help with questions, suggestions, or problems, please contact us