Effects of Revocation on International Sites

Total Page:16

File Type:pdf, Size:1020Kb

Effects of Revocation on International Sites Appendix G - SEA of the Revocation of the South West Regional Strategy Appendix G: SOUTH WEST, European and Internationally Designated sites and key Environmental Sensitivities. Information taken from: (i) Appendix 3 “Table of Appropriate Assessment conclusions by site” South West Regional Spatial Strategy Proposed changes Habitats Regulations Assessment Final Report – July 2008; (ii) JNCC Natura 2000 Data Forms (iii) % figure in last column taken from Natural England’s designations list and condition data of sites (data for 31 March 2012). SPECIAL AREAS OF CONSERVATION (SACs) SAC Excessive Other effects Deterioration Increased Deterioration Increased Loss of % of site in recreational of increasing in air quality abstraction in water quality ‘coastal important favourable pressure and urbanisation (both local and leading to a squeeze’ supporting condition other types of (e.g. increased diffuse) decline in habitat outside 31/3/12 disturbance incidence of water levels the boundary fires and and freshwater of the numbers of inputs to European site cats predating hydrologically vulnerable sensitive chicks) European sites Avon Gorge 49% Woodlands Bath & Bradford Site within 200m 90% on Avon Bats of the A4, which may be improved. This may lead to November 2012 Appendix G 1 Appendix G - SEA of the Revocation of the South West Regional Strategy SAC Excessive Other effects Deterioration Increased Deterioration Increased Loss of % of site in recreational of increasing in air quality abstraction in water quality ‘coastal important favourable pressure and urbanisation (both local and leading to a squeeze’ supporting condition other types of (e.g. increased diffuse) decline in habitat outside 31/3/12 disturbance incidence of water levels the boundary fires and and freshwater of the numbers of inputs to European site cats predating hydrologically vulnerable sensitive chicks) European sites increased traffic, potentially adversely affecting the site. Beer Quarry & Quarrying stone. 82% Caves Blackstone 100% Point Bracket's 59% Coppice Braunton A lack of 23% Burrows grazing, and land drainage and/or abstraction has caused water tables to fall. Breney Site within 200m 3% Common and of the A30. Goss & Tregoss Nitrogen Moors deposition is already 1.4 times critical load and acid November 2012 Appendix G 2 Appendix G - SEA of the Revocation of the South West Regional Strategy SAC Excessive Other effects Deterioration Increased Deterioration Increased Loss of % of site in recreational of increasing in air quality abstraction in water quality ‘coastal important favourable pressure and urbanisation (both local and leading to a squeeze’ supporting condition other types of (e.g. increased diffuse) decline in habitat outside 31/3/12 disturbance incidence of water levels the boundary fires and and freshwater of the numbers of inputs to European site cats predating hydrologically vulnerable sensitive chicks) European sites deposition 2.5 times critical load for lowland heathland at this site. Carrine Damaging 36% Common summer fires, attributable mainly to irresponsible visitors and motorists using the road that divides the site. Dumping and tipping have also occurred on the site. Cerne & Sydling Acid deposition 73% Downs 2.6 times critical load for calcareous grassland. Part of site adjacent to rail line - November 2012 Appendix G 3 Appendix G - SEA of the Revocation of the South West Regional Strategy SAC Excessive Other effects Deterioration Increased Deterioration Increased Loss of % of site in recreational of increasing in air quality abstraction in water quality ‘coastal important favourable pressure and urbanisation (both local and leading to a squeeze’ supporting condition other types of (e.g. increased diffuse) decline in habitat outside 31/3/12 disturbance incidence of water levels the boundary fires and and freshwater of the numbers of inputs to European site cats predating hydrologically vulnerable sensitive chicks) European sites increase in frequency or expansion of facilities may adversely affect site through air pollution. Potential increased road traffic may also increase air pollution. Chesil & The Pressure from 96% Fleet tourism and recreation. Increased development in Dorchester and Weymouth expected to exacerbate effects. Physical damage or loss may occur from transport November 2012 Appendix G 4 Appendix G - SEA of the Revocation of the South West Regional Strategy SAC Excessive Other effects Deterioration Increased Deterioration Increased Loss of % of site in recreational of increasing in air quality abstraction in water quality ‘coastal important favourable pressure and urbanisation (both local and leading to a squeeze’ supporting condition other types of (e.g. increased diffuse) decline in habitat outside 31/3/12 disturbance incidence of water levels the boundary fires and and freshwater of the numbers of inputs to European site cats predating hydrologically vulnerable sensitive chicks) European sites infrastructure improvements. Weymouth Port development may lead to adverse effects. Chilmark Mineral 14% Quarries extraction could directly affect this site. Cotswold Physical Nitrogen 33% Beechwoods damage to this deposition at site may occur this site 3 times through critical load for development beech and recreation woodland. (as a result of Increased traffic increased resulting from populations). increased housing around Gloucester and Cheltenham may result in increased traffic & air pollution. November 2012 Appendix G 5 Appendix G - SEA of the Revocation of the South West Regional Strategy SAC Excessive Other effects Deterioration Increased Deterioration Increased Loss of % of site in recreational of increasing in air quality abstraction in water quality ‘coastal important favourable pressure and urbanisation (both local and leading to a squeeze’ supporting condition other types of (e.g. increased diffuse) decline in habitat outside 31/3/12 disturbance incidence of water levels the boundary fires and and freshwater of the numbers of inputs to European site cats predating hydrologically vulnerable sensitive chicks) European sites Crookhill Brick Potential 100% Pit hazards (lighting, rats) from the adjacent waste transfer station. Crowdy Marsh 0% Culm Acid deposition 70% Grasslands 2.3 times critical load for calcareous grassland. Increases in traffic from increased visitor numbers could result in further air pollution. Dartmoor Increased visitor Consented 21% numbers abstractions associated with having adverse new housing effect on and Atlantic salmon encouraging due to lowered tourism likely to river flows. November 2012 Appendix G 6 Appendix G - SEA of the Revocation of the South West Regional Strategy SAC Excessive Other effects Deterioration Increased Deterioration Increased Loss of % of site in recreational of increasing in air quality abstraction in water quality ‘coastal important favourable pressure and urbanisation (both local and leading to a squeeze’ supporting condition other types of (e.g. increased diffuse) decline in habitat outside 31/3/12 disturbance incidence of water levels the boundary fires and and freshwater of the numbers of inputs to European site cats predating hydrologically vulnerable sensitive chicks) European sites impact the site. Development proposals may lead to increased abstraction. Dawlish Warren 1% Dixton Wood 0% Dorset Heaths Mineral Acid deposition Development 15% extraction could at site 14.5 proposals may directly affect times critical lead to site. load for lowland increased Development to heathland. abstraction. facilitate Increases in maintenance traffic from and increased enhancement of visitors could Poole Port may result in further lead to adverse air pollution. effects. Dorset Heaths Existing acid Development 42% (Purbeck & deposition at proposals may Wareham) & Site 12.2 times lead to Studland Dunes the critical load increased for sand dunes. abstraction. Increases in November 2012 Appendix G 7 Appendix G - SEA of the Revocation of the South West Regional Strategy SAC Excessive Other effects Deterioration Increased Deterioration Increased Loss of % of site in recreational of increasing in air quality abstraction in water quality ‘coastal important favourable pressure and urbanisation (both local and leading to a squeeze’ supporting condition other types of (e.g. increased diffuse) decline in habitat outside 31/3/12 disturbance incidence of water levels the boundary fires and and freshwater of the numbers of inputs to European site cats predating hydrologically vulnerable sensitive chicks) European sites traffic associated with increased visitors could result in further air pollution. East Devon Wind turbines to Acid deposition 17% Pebblebed be developed in 17.1 times Heaths close proximity critical load for to site could lowland present potential heathland. for bird strike. Possibility of increased acid Recreational and nitrogen pressure. from Exeter airport. Exmoor & Development 4% Quantock proposals may Oakwoods lead to increased abstraction. Exmoor Heaths Existing acid Development 13% deposition 6 proposals may times critical lead to load for upland increased November 2012 Appendix G 8 Appendix G - SEA of the Revocation of the South West Regional Strategy SAC Excessive Other effects Deterioration Increased Deterioration Increased Loss of % of site in recreational of increasing in air quality abstraction in water quality ‘coastal important favourable pressure and urbanisation (both local and leading to a squeeze’ supporting condition other types of (e.g. increased diffuse)
Recommended publications
  • Wave Hub Appendix N to the Environmental Statement
    South West of England Regional Development Agency Wave Hub Appendix N to the Environmental Statement June 2006 Report No: 2006R001 South West Wave Hub Hayle, Cornwall Archaeological assessment Historic Environment Service (Projects) Cornwall County Council A Report for Halcrow South West Wave Hub, Hayle, Cornwall Archaeological assessment Kevin Camidge Dip Arch, MIFA Charles Johns BA, MIFA Philip Rees, FGS, C.Geol Bryn Perry Tapper, BA April 2006 Report No: 2006R001 Historic Environment Service, Environment and Heritage, Cornwall County Council Kennall Building, Old County Hall, Station Road, Truro, Cornwall, TR1 3AY tel (01872) 323603 fax (01872) 323811 E-mail [email protected] www.cornwall.gov.uk 3 Acknowledgements This study was commissioned by Halcrow and carried out by the projects team of the Historic Environment Service (formerly Cornwall Archaeological Unit), Environment and Heritage, Cornwall County Council in partnership with marine consultants Kevin Camidge and Phillip Rees. Help with the historical research was provided by the Cornish Studies Library, Redruth, Jonathan Holmes and Jeremy Rice of Penlee House Museum, Penzance; Angela Broome of the Royal Institution of Cornwall, Truro and Guy Hannaford of the United Kingdom Hydrographic Office, Taunton. The drawing of the medieval carved slate from Crane Godrevy (Fig 43) is reproduced courtesy of Charles Thomas. Within the Historic Environment Service, the Project Manager was Charles Johns, who also undertook the terrestrial assessment and walkover survey. Bryn Perry Tapper undertook the GIS mapping, computer generated models and illustrations. Marine consultants for the project were Kevin Camidge, who interpreted and reported on the marine geophysical survey results and Phillip Rees who provided valuable advice.
    [Show full text]
  • SMP2 6 Final Report
    6 ACTION PLAN 6.1 Coastal risk management activities The Action Plan for the Cornwall & Isles of Scilly Shoreline Management Plan review provides the basis for taking forward the intent of management which is discussed and developed through Chapter 4 - and summarised through the preferred policy choices set out in Chapter 5. The SMP guidance states that the purpose of the Action Plan is to summarise the actions that are required before the next review of the SMP however in reality the Action Plan is looking much further into the future in order to provide guidance on how the overall management intent for 100 years may be taken forward. For Cornwall and the Isles of Scilly SMP the Action Plan is a critical element, because there are various conditional policies for later epochs which need to be more firmly established in the future based on monitoring and investigation. The Action Plan can set the framework for an on-going shoreline management process in the coming years, with SMP3 in 5 to 10 years time as the next important milestone. This chapter therefore attempts to capture all intended actions necessary, on a policy unit by policy unit basis, to deliver the objectives at a local level. It should also help to prioritise FCRM medium and long-term planning budget lines. A number of the actions are representative of on-going commitments across the SMP area (for example to South West Regional Coastal Monitoring Programme). There are also actions that are representative of wide-scale intent of management, for example in relation to gaining a better understanding of the roles played by the various harbours and breakwaters located around the coast in terms of coast protection and sea defence.
    [Show full text]
  • Responsibilities for Flood Risk Management
    Appendix A - Responsibilities for Flood Risk Management The Department for the Environment, Food and Rural Affairs (Defra) has overall responsibility for flood risk management in England. Their aim is to reduce flood risk by: • discouraging inappropriate development in areas at risk of flooding. • encouraging adequate and cost effective flood warning systems. • encouraging adequate technically, environmentally and economically sound and sustainable flood defence measures. The Government’s Foresight Programme has recently produced a report called Future Flooding, which warns that the risk of flooding will increase between 2 and 20 times over the next 75 years. The report produced by the Office of Science and Technology has a long-term vision for the future (2030 – 2100), helping to make sure that effective strategies are developed now. Sir David King, the Chief Scientific Advisor to the Government concluded: “continuing with existing policies is not an option – in virtually every scenario considered (for climate change), the risks grow to unacceptable levels. Secondly, the risk needs to be tackled across a broad front. However, this is unlikely to be sufficient in itself. Hard choices need to be taken – we must either invest in more sustainable approaches to flood and coastal management or learn to live with increasing flooding”. In response to this, Defra is leading the development of a new strategy for flood and coastal erosion for the next 20 years. This programme, called “Making Space for Water” will help define and set the agenda for the Government’s future strategic approach to flood risk. Within this strategy there will be an overall approach to the assessing options through a strong and continuing commitment to CFMPs and SMPs within a broader planning framework which will include River Basin Management Plans prepared under the Water Framework Directive and Integrated Coastal Zone Management.
    [Show full text]
  • CARBINIDAE of CORNWALL Keith NA Alexander
    CARBINIDAE OF CORNWALL Keith NA Alexander PB 1 Family CARABIDAE Ground Beetles The RDB species are: The county list presently stands at 238 species which appear to have been reliably recorded, but this includes • Grasslands on free-draining soils, presumably maintained either by exposure or grazing: 6 which appear to be extinct in the county, at least three casual vagrants/immigrants, two introductions, Harpalus honestus – see extinct species above two synathropic (and presumed long-term introductions) and one recent colonist. That makes 229 resident • Open stony, sparsely-vegetated areas on free-draining soils presumably maintained either by exposure breeding species, of which about 63% (147) are RDB (8), Nationally Scarce (46) or rare in the county (93). or grazing: Ophonus puncticollis – see extinct species above Where a species has been accorded “Nationally Scarce” or “British Red Data Book” status this is shown • On dry sandy soils, usually on coast, presumably maintained by exposure or grazing: immediately following the scientific name. Ophonus sabulicola (Looe, VCH) The various categories are essentially as follows: • Open heath vegetation, generally maintained by grazing: Poecilus kugelanni – see BAP species above RDB - species which are only known in Britain from fewer than 16 of the 10km squares of the National Grid. • Unimproved flushed grass pastures with Devil’s-bit-scabious: • Category 1 Endangered - taxa in danger of extinction Lebia cruxminor (‘Bodmin Moor’, 1972 & Treneglos, 1844) • Category 2 Vulnerable - taxa believed
    [Show full text]
  • Dispersed Distribution
    Lundy Tintagel-Marsland-Clovelly Coast NOTES Cornwall UA/Core Strategy Area Option 2 - Dispersed Distribution 5km Buffer of Cornwall UA Special Protection Areas (SPAs) This option proposes a more dispersed pattern of growth throughout Cornwall with a much greater focus Culm Grasslands Special Areas of Conservation SACs) on small market villages, or 'clusters' of villages that are important to local areas Candidate SACs Railway Primary road Culm Grasslands Existing Ferry Ports Existing Main Airport Bude/Stratton/Poughhill Tintagel-Marsland-Clovelly Coast Culm Grasslands d x m . s n o i t Dartmoor u b South Dartmoor Woods i r Launceston t s Crowdy Marsh i D d e Dartmoor s r e p s i D - Copyright 2 n o i Contains Ordnance Survey Data © t p South Dartmoor Crown Copyright and database right 2011 O s River Camel Woods e South Dartmoor Woods t i Phoenix United Mine & Crow's Nest © Natural England material is reproduced S with the permission of Natural England 2011 d Wadebridge e t a n South Dartmoor Settlement Options Source: Cornwall Council g i Breney Common and s e Goss & Tregoss Moors Woods Dartmoor D Bodmin n a e p Liskeard o r u E Tamar Estuaries Complex Breney Common and - 5 Goss & Tregoss Moors e r u g Newquay i Saltash F \ s Penhale Dunes D St Austell Clay Pits X M \ S I Plymouth Sound & Estuaries Revision Details By Date Suffix G Polruan to Polperro c Newlyn Downs Check r A \ Drawing Status l l St Austell Blackstone Point a Godrevy Head to St Agnes w DRAFT n r o Job Title C f o Carrine Common A Prawle Point to Plymouth Sound & Eddystone
    [Show full text]
  • The Bryophytes of Cornwall and the Isles of Scilly
    THE BRYOPHYTES OF CORNWALL AND THE ISLES OF SCILLY by David T. Holyoak Contents Acknowledgements ................................................................................ 2 INTRODUCTION ................................................................................. 3 Scope and aims .......................................................................... 3 Coverage and treatment of old records ...................................... 3 Recording since 1993 ................................................................ 5 Presentation of data ................................................................... 6 NOTES ON SPECIES .......................................................................... 8 Introduction and abbreviations ................................................. 8 Hornworts (Anthocerotophyta) ................................................. 15 Liverworts (Marchantiophyta) ................................................. 17 Mosses (Bryophyta) ................................................................. 98 COASTAL INFLUENCES ON BRYOPHYTE DISTRIBUTION ..... 348 ANALYSIS OF CHANGES IN BRYOPHYTE DISTRIBUTION ..... 367 BIBLIOGRAPHY ................................................................................ 394 1 Acknowledgements Mrs Jean A. Paton MBE is thanked for use of records, gifts and checking of specimens, teaching me to identify liverworts, and expertise freely shared. Records have been used from the Biological Records Centre (Wallingford): thanks are due to Dr M.O. Hill and Dr C.D. Preston for
    [Show full text]
  • Cornwall Local Plan: Strategic Policies 2010-2030 Combined Document to Support Submission to the Secretary of State (January 2016)
    Cornwall Local Plan: Strategic Policies 2010-2030 Combined document to support submission to the Secretary of State (January 2016) 2 This is a version of the Cornwall Local Plan: Strategic Policies containing Further Significant Changes (January 2016) The original versions of the Proposed submission document (March 2014) and the Schedule of Focused Changes (September 2014). can be viewed by visiting www.cornwall.gov.uk/localplancornwall The document contains the amendments changed and consulted on during the further significant changes consultation and are expressed in the conventional form of strikethrough for deletions and underlining for additions of text. Cornwall Local Plan: Strategic Policies 2010-2030 Combined document to support submission to the Secretary of State (January 2016) Contents 72 Policy 18 Minerals – general principles 73 Policy 19 Minerals safeguarding 6 Introduction – Planning Future Cornwall 77 Policy 20 Strategic waste management principles 10 Vision and objectives 78 Policy 21 Managing the provision of waste 13 Spatial Strategy management facilities 36 General policies 79 Policy 22 Best use of land and existing buildings 106 Policy messages for places – Community Network Areas 80 Policy 22A Protection of the Countryside 206 Monitoring framework 85 Policy 23a European protected sites 218 Saved policies 88 Policy 23 Natural environment 224 Key diagram – policies map 97 Policy 24 Historic environment Schedule of policies 99 Policy 25 Green infrastructure 12 Policy 1 Presumption in favour of sustainable 101 Policy
    [Show full text]
  • Edited by IJ Bennallick & DA Pearman
    BOTANICAL CORNWALL 2010 No. 14 Edited by I.J. Bennallick & D.A. Pearman BOTANICAL CORNWALL No. 14 Edited by I.J.Bennallick & D.A.Pearman ISSN 1364 - 4335 © I.J. Bennallick & D.A. Pearman 2010 No part of this publication may be reproduced, stored in a retrieval system, or transmitted in any form or by any means, electronic, mechanical, photocopying, recording or otherwise, without prior permission of the copyright holder. Published by - the Environmental Records Centre for Cornwall & the Isles of Scilly (ERCCIS) based at the- Cornwall Wildlife Trust Five Acres, Allet, Truro, Cornwall, TR4 9DJ Tel: (01872) 273939 Fax: (01872) 225476 Website: www.erccis.co.uk and www.cornwallwildlifetrust.org.uk Cover photo: Perennial Centaury Centaurium scilloides at Gwennap Head, 2010. © I J Bennallick 2 Contents Introduction - I. J. Bennallick & D. A. Pearman 4 A new dandelion - Taraxacum ronae - and its distribution in Cornwall - L. J. Margetts 5 Recording in Cornwall 2006 to 2009 – C. N. French 9 Fitch‟s Illustrations of the British Flora – C. N. French 15 Important Plant Areas – C. N. French 17 The decline of Illecebrum verticillatum – D. A. Pearman 22 Bryological Field Meetings 2006 – 2007 – N. de Sausmarez 29 Centaurium scilloides, Juncus subnodulosus and Phegopteris connectilis rediscovered in Cornwall after many years – I. J. Bennallick 36 Plant records for Cornwall up to September 2009 – I. J. Bennallick 43 Plant records and update from the Isles of Scilly 2006 – 2009 – R. E. Parslow 93 3 Introduction We can only apologise for the very long gestation of this number. There is so much going on in the Cornwall botanical world – a New Red Data Book, an imminent Fern Atlas, plans for a new Flora and a Rare Plant Register, plus masses of fieldwork, most notably for Natural England for rare plants on SSSIs, that somehow this publication has kept on being put back as other more urgent tasks vie for precedence.
    [Show full text]
  • Cornwall Council Local Plan Strategic Policies 2010
    Planning for Cornwall Cornwall’s future Local Plan Strategic Policies 2010 - 2030 Towl leel Kernow Policis Stratejek 2010 - 2030 www.cornwall.gov.uk Cornwall is the second largest local authority in the south west, covering an area of Crime in Cornwall is 3,559 sq km generally low with a coastline of 697km and it is a safe place in which to live and work Cornwall’s environmental assets are extremely valuable and are a 76% (as at 2014) of Cornwall’s key contributor to the economy and population and quality of life (414,466 people) are of working age (2011) Over of the population of Cornwall40% live in settlements of less than 3,000 people Median gross annual pay in Cornwall is £22,068 Agriculture and fishing compared to England at £26,165 (2011) account for a larger share of employment in Cornwall (3%) than Strengthening Cornwall’s economy the regional (2%) or national (1%) is an ongoing challenge - l (2010). economic output, low wages,ow low productivity and a lack of big companies are challenges Education and Skills - Over 69,900 Six universities and children colleges and young people are educated in make up the Combined University for state funded schools and academies Cornwall which attracted over 7,700 with a further 2,525 pupils on roll higher education students in 2009/10. across independent schools in Cornwall) To support the delivery of over 38,000 jobs over the plan period the target of 422,400 sq m of employment floorspace has been provided Planning for Cornwall Cornwall’s future Local Plan Strategic Policies 2010 - 2030 Adopted November 2016 Note: This document should be read in conjunction with the Policies maps and the Community Network Area Sections.
    [Show full text]
  • Penzance Station to East Marazion
    www.gov.uk/englandcoastpath England Coast Path Stretch: Penzance to St Mawes PSM 1: Penzance Station to East Marazion Part 1.1: Introduction Start Point: Penzance Station (grid reference: SW47693050) End Point: East Marazion (grid reference: SW52853060) Re le vant M aps: PSM 1a to PSM 1d 1.1.1 This is one of a series of linked but legally separate reports published by Natural England under section 51 of the National Parks and Access to the Countryside Act 1949, which make proposals to the Secretary of State for improved public access along and to this stretch of coast between Penzance and St Mawes. 1.1.2 This report covers length PSM 1 of the stretch, which is the coast between Penzance and East Marazion. It makes free-standing statutory proposals for this part of the stretch, and seeks approval for them by the Secretary of State in their own right under section 52 of the National Parks and Access to the Countryside Act 1949. 1.1.3 The report explains how we propose to implement the England Coast Path (“the trail”) on this part of the stretch, and details the likely consequences in terms of the wider ‘Coastal Margin’ that will be created if our proposals are approved by the Secretary of State. Our report also sets out: any proposals we think are necessary for restricting or excluding coastal access rights to address particular issues, in line with the powers in the legislation; and any proposed powers for the trail to be capable of being relocated on particular sections (“roll- back”), if this proves necessary in the future because of coastal change.
    [Show full text]
  • Habitats Regulations Assessment Minerals Safeguarding DPD Evidence Report Submission June 2017
    Habitats Regulations Assessment Minerals Safeguarding DPD Evidence Report Submission June 2017 HRA Minerals Safeguarding DPD Evidence Report 1 Submission June 2017 Contents Introduction .............................................................................................. 3 Background ............................................................................................ 3 Report Format ........................................................................................ 3 Cornwall Local Plan .................................................................................. 3 Cornwall Local Plan HRA Conclusions ......................................................... 4 Habitats Regulations ................................................................................... 4 Requirements for a Habitats Regulations Assessment .................................. 4 Scope of Habitats Regulations Assessment ................................................. 5 Habitats Regulations Assessment Process ................................................... 5 HRA Stage 1: Likely significant effects .......................................................... 6 Steps in Stage 1: Screening ..................................................................... 6 European Sites........................................................................................ 6 Screening Assessment ............................................................................. 7 Step 1: Management of a European site .................................................
    [Show full text]
  • Prioritised Action Framework for England
    Doc Hab 12-04/04 Council Directive 92/43/EEC on the conservation of natural habitats and of wild fauna and flora and Directive 2009/147/EC of the European Parliament and of the Council of 30 November 2009 on the conservation of wild birds FORMAT FOR A PRIORITISED ACTION FRAMEWORK (PAF) FOR NATURA 2000 For the EU Multiannual Financing Period 2014-2020 England including marine to 12 nautical miles (2nd edition) (Version 30 March 2016) Summary of England PAF, 2nd edition This annex to the UK Prioritised Actions Framework applies to Natura 2000 sites in England, including inshore waters up to 12 nautical miles. This 2nd edition updates the first PAF (edition 2013) to incorporate the latest conservation status assessments, the outcomes of the LIFE funded IPENS project (Improvement Programme for England’s Natura 2000 Sites) and views of stakeholders and partners. Prioritised Actions Frameworks set out the priorities and funding needs for Natura 2000. The actions and cost estimates set out in this England PAF do not commit Government or any other organisation to provide additional funding for Natura 2000, although applications under e.g. LIFE and European Maritime and Fisheries Fund do require match funding. Rather the PAF provides a strategic overview to where resources are best targeted in order to improve the condition of England Natura 2000 sites and where possible deliver multiple environmental benefits. This revision will also improve the targeting of actions to better protect and enhance valuable wildlife sites and species, maximising benefits for the environment, people and the economy as part of the Government’s 25 year Environment Plan.
    [Show full text]