6 ACTION PLAN

6.1 Coastal risk management activities

The Action Plan for the & Shoreline Management Plan review provides the basis for taking forward the intent of management which is discussed and developed through Chapter 4 - and summarised through the preferred policy choices set out in Chapter 5. The SMP guidance states that the purpose of the Action Plan is to summarise the actions that are required before the next review of the SMP however in reality the Action Plan is looking much further into the future in order to provide guidance on how the overall management intent for 100 years may be taken forward.

For Cornwall and the Isles of Scilly SMP the Action Plan is a critical element, because there are various conditional policies for later epochs which need to be more firmly established in the future based on monitoring and investigation. The Action Plan can set the framework for an on-going shoreline management process in the coming years, with SMP3 in 5 to 10 years time as the next important milestone.

This chapter therefore attempts to capture all intended actions necessary, on a policy unit by policy unit basis, to deliver the objectives at a local level. It should also help to prioritise FCRM medium and long-term planning budget lines. A number of the actions are representative of on-going commitments across the SMP area (for example to South West Regional Coastal Monitoring Programme).

There are also actions that are representative of wide-scale intent of management, for example in relation to gaining a better understanding of the roles played by the various harbours and breakwaters located around the coast in terms of coast protection and sea defence. Additionally, gaining a better understanding of the influence of wave driven flooding and damage around the coastline at particular locations (as opposed to the derivation of flood risks from still water flooding) is identified as a key issue for this SMP coastline, and one that makes it fairly unique within and Wales.

At a local level, many of the actions relate to the monitoring of cliffs, and beaches. This provides on-going surveillance on the actual nature of morphological change at individual sites, where the preferred policies are based on the perceived pressure on the frontage due to sea level rise, increased erosion rates and so forth. Linked into this type of action, there are some discrete areas where it is felt that more intrusive studies such as geotechnical investigations would provide valuable insight into the longer-term sustainability of certain coastal settlements.

Cornwall and Isles of Scilly SMP2 1 Final Report Chapter 6 - Action Plan February 2011

The CSG have approved the Action Plan based on the Preferred Plan. The Action Plan lists the identified measures necessary to implement the intent of management identified by the Preferred Plan. It identifies partners and sources of funding as well as prioritising the actions into Low, Medium and High priorities. Through signing up to the Action Plan, each CSG partner is demonstrating a commitment of intent to undertake the actions, as priorities allow and funding permits.

A wide range of sources of funding have been considered in drawing up the Action Plan, which include Environment Agency Flood and Coastal Risk Management funding, Defra Grant in Aid funding, Plymouth Coastal Observatory, National Trust, English Heritage, and landowners such as private developers, the and Wildlife Trust. While the Action Plan does not commit these organisations to providing funding, it does document the wide range of interests that could be involved with investing in the sustainable management of the coastline. Furthermore the potential sources of funding listed in the Action Plan are not exhaustive. All funding routes should be investigated further as the Action Plan is implemented.

Table 6.1 is tabulated out into the 46 Management Areas. Within each of the 46 MAs, the required actions to implement the preferred plan are then set out on a Policy Unit basis.

Table 6.2 sets out an additional set of CFMP actions for a discrete number of Policy Units – these are derived from the relevant CFMPs (Tamar, East Cornwall and West Cornwall). Table 6.2 identifies those CFMP policies and actions at a number of locations which relate to coastal risk management activities and provides a comparison with the SMP actions identified in Table 6.1, to ensure no conflicts are present between the two plans.

Cornwall and Isles of Scilly SMP2 2 Final Report Chapter 6 - Action Plan February 2011

TABLE 6.1 COASTAL RISK MANAGEMENT ACTIONS

Rame Head to Hartland Point

SMP2 POLICY POLICY EPOCH EPOCH EPOCH ACTIONS INDICATIVE OBJECTIVES MONITORING PARTNERS PRIORITY FUNDING UNIT 1 2 3 TIMESCALE INDICATORS Wave dominated Short term Quantify wave EA, CC, PCO High FCRM flooding strategy, action, wave-set GiA including up, wave run-up monitoring and wind set-up provision. risks along the South West coast. Assess and justify wave monitoring SMP WIDE Various Various Various network. Determine wave risk assessment tool. Determine number of properties at risk. Revise Flood Map Inform LDF Identify locations Short term Secure additional A number of CC, EA, NE, EH, High Defra requiring funding to assist priority Defra, National Pathfinder community with developing an locations / Trust, Duchy, + adaptation and appropriate communities other key Various Various Various SMP WIDE consider for the adaptation strategy recommended stakeholders application of at a community / and taken Defra’s Pathfinder local level forward approach Digitise and Short term Provide long term CC, PCO, EA Medium FCRM orthorectify 1947 cliff recession data. GiA SMP WIDE Various Various Various aerial photographs held by Undertake Short term Establish sea Individual CC, EA, Harbour High FCRM assessment of defence and coast action plans or Commissioners GiA Various Various Various SMP WIDE harbour breakwater protection roles of maintenance structures. breakwaters and programmes

Cornwall and Isles of Scilly SMP2 3 Final Report Chapter 6 - Action Plan February 2011

Rame Head to Hartland Point

SMP2 POLICY POLICY EPOCH EPOCH EPOCH ACTIONS INDICATIVE OBJECTIVES MONITORING PARTNERS PRIORITY FUNDING UNIT 1 2 3 TIMESCALE INDICATORS other harbour established for structures primary sites. Assessment of all Short term Establish viability of Individual CC, Highways High CC locally important realignment or action plans SMP WIDE Various Various Various road routes at risk defence, identify for specific from erosion and/or priority routes road sections. flooding. Assessment of Short term Establish options CC, Coast Path Medium CC Coast Path and for re-routing, Team, EH Various Various Various SMP WIDE priority sections at identify priority risk. sections

Cornwall and Isles of Scilly SMP2 4 Final Report Chapter 6 - Action Plan February 2011

PDZ1 MA01 RAME HEAD TO DOWNDERRY

SMP2 POLICY POLICY UNIT EPOCH EPOCH EPOCH ACTIONS INDICATIVE OBJECTIVES MONITORING PARTNERS PRIORITY FUNDING 1 2 3 TIMESCALE INDICATORS Undefended 1.1 cliffs and NAI NAI NAI beach Monitoring of erosion rates Short term Confirm PCO Medium FCRM timescale and GiA scale of MR Managed Realignment Medium to Manage erosion Number of CC, EA, Low FCRM scheme long term risks. property in English Gia, EH Property risk zone. Heritage relocated from Annual risk zone. Maintenance Maintenance costs. MR costs reduced. 1.2 HTL MR Recording of historic harbour. Asset survey for Harbour Short term Determine Improved EA,CC, EH Low FCRM condition & understanding GiA coast protection relating to role of harbour objectives. structures. LDF to identify CCMA Short term Manage spatial CCMA CC Spatial High CC planning impacts identified in Planners, of MR Core Strategy EA

Cornwall and Isles of Scilly SMP2 5 Final Report Chapter 6 - Action Plan February 2011

PDZ1 MA02 DOWNDERRY & SEATON

SMP2 POLICY POLICY UNIT EPOCH EPOCH EPOCH ACTIONS INDICATIVE OBJECTIVES MONITORING PARTNERS PRIORITY FUNDING 1 2 3 TIMESCALE INDICATORS Monitoring of cliff erosion Short term Confirm erosion Improved PCO, CC, Low FCRM Downderry pressure. understanding EA GiA 2.1 NAI NAI NAI East Protect coast of erosion risk path Monitoring of erosion rates Short term Confirm PCO High FCRM timescale and GiA scale of MR Continued monitoring of Medium Surveillance of CC High CC local erosion in relation to term potential CC ‘Action Line’. increase in erosion rates along Downderry undefended sections. 2.2 (west) & HTL MR MR Managed Realignment Medium to Manage erosion Number of CC, EA, Low FCRM Seaton scheme long term risks. property in Gia, CC Property risk zone. relocated from Annual risk zone. Maintenance Maintenance costs. costs reduced. LDF to identify CCMA Short term Manage spatial CCMA CC Spatial High CC (including PU 2.3) planning impacts identified in Planners, of MR Core Strategy EA Road realignment scheme Short term Reduce flood Property at EA, Medium FCRM risk. risk of Cornwall GiA Reduce coastal flooding. Highways Seaton squeeze 2.3 MR NAI NAI pressure. Beach Reduce water quality impacts from tide-locking of channel LDF to identify CCMA Short term Manage spatial CCMA CC Spatial High CC (including PU 2.2) planning impacts identified in Planners, of MR Core Strategy EA

Cornwall and Isles of Scilly SMP2 6 Final Report Chapter 6 - Action Plan February 2011

PDZ1 MA02 DOWNDERRY & SEATON

SMP2 POLICY POLICY UNIT EPOCH EPOCH EPOCH ACTIONS INDICATIVE OBJECTIVES MONITORING PARTNERS PRIORITY FUNDING 1 2 3 TIMESCALE INDICATORS Beach monitoring Short term Improved PCO, CC Low FCRM understanding of GiA beach

PDZ1 MA03 SEATON TO PENCARROW HEAD

SMP2 POLICY POLICY UNIT EPOCH EPOCH EPOCH ACTIONS INDICATIVE OBJECTIVES MONITORING PARTNERS PRIORITY FUNDING 1 2 3 TIMESCALE INDICATORS Undefended Monitoring of cliff erosion Short term Confirm erosion Improved PCO, CC, Low FCRM pressure. understanding EA GiA 3.1 cliffs and NAI NAI NAI Protect coast of erosion risk beaches path Monitoring of erosion rates Short term Confirm PCO, CC Low FCRM 3.2 Millendreath NAI NAI NAI timescale and GiA scale of MR Monitoring of erosion rates Short term Confirm PCO, CC Low FCRM 3.3 Plaidy HTL NAI NAI timescale and GiA scale of MR Community adaptation Short term Improved Adaptation CC, Town High East and strategy to climate change community strategy Council, 3.4 HTL HTL HTL resilience and included in Harbour West resistance to Town Strategy Authority, flooding EA Looe Flood Defence Short term Improved flood EA, CC High FCRM Scheme risk GiA management Looe FCRM Strategy Short term Improved CC, EA, High FCRM community PCO, GiA resilience to tidal Harbour flooding and Authority

Cornwall and Isles of Scilly SMP2 7 Final Report Chapter 6 - Action Plan February 2011

PDZ1 MA03 SEATON TO PENCARROW HEAD

SMP2 POLICY POLICY UNIT EPOCH EPOCH EPOCH ACTIONS INDICATIVE OBJECTIVES MONITORING PARTNERS PRIORITY FUNDING 1 2 3 TIMESCALE INDICATORS erosion

Looe FCRM scheme Medium to Improved CC, EA, Medium FCRM long term community PCO, GiA resilience to tidal Harbour flooding and Authority erosion Asset survey for outer Short term Determine Improved EA,CC, EH Medium FCRM breakwater (Banjo Pier) condition & understanding GiA coast protection relating to / sea defence objectives. role of pier. Wave monitoring Short term Improved wave PCO, EA High FCRM climate GiA understanding and quantify risk to property Beach monitoring Short term Improved PCO, CC High FCRM understanding of GiA beach as coast protection to Looe Upper (East and West Looe 3.5 NAI NAI NAI Rivers above Trenant Point) Monitoring of erosion rates Short term Confirm PCO, CC Medium FCRM 3.6 Hannafore HTL MR NAI timescale and GiA magnitude of MR Coast Protection Scheme To be Reduced CC, PCO Low FCRM

Cornwall and Isles of Scilly SMP2 8 Final Report Chapter 6 - Action Plan February 2011

PDZ1 MA03 SEATON TO PENCARROW HEAD

SMP2 POLICY POLICY UNIT EPOCH EPOCH EPOCH ACTIONS INDICATIVE OBJECTIVES MONITORING PARTNERS PRIORITY FUNDING 1 2 3 TIMESCALE INDICATORS informed by reliance on GiA monitoring defences Managed Realignment Medium to Manage erosion Number of CC, EA Low FCRM scheme long term risks. property in Gia, CC Property risk zone. relocated from Annual risk zone. Maintenance Maintenance costs. costs reduced. 3.7 NAI NAI NAI Polperro Flood Defence Medium Maintain flood EA, CC Medium FCRM Scheme term risk GiA 3.8 Polperro HTL HTL HTL management standards

PDZ2 MA04 PENCARROW HEAD TO GRIBBIN HEAD

SMP2 POLICY POLICY UNIT EPOCH EPOCH EPOCH ACTIONS INDICATIVE OBJECTIVES MONITORING PARTNERS PRIORITY FUNDING 1 2 3 TIMESCALE INDICATORS 4.1 Undefended NAI NAI NAI cliffs 4.2 Polruan HTL HTL HTL 4.3 Fowey Flood Defence Short term Maintain flood Annual EA, CC Medium FCRM Scheme risk Maintenance GiA HTL HTL HTL management costs standards

Cornwall and Isles of Scilly SMP2 9 Final Report Chapter 6 - Action Plan February 2011

PDZ2 MA05 FOWEY ESTUARY ABOVE MIXSTOWE (INCLUDING )

SMP2 POLICY POLICY UNIT EPOCH EPOCH EPOCH ACTIONS INDICATIVE OBJECTIVES MONITORING PARTNERS PRIORITY FUNDING 1 2 3 TIMESCALE INDICATORS Undefended 5.1 intertidal NAI NAI NAI areas Community adaptation Medium Improved Adaptation CC, Parish High CC strategy to climate change term community strategy Council, resilience and included in EA resistance to Settlement 5.2 Lerryn NAI NAI NAI flooding Strategy Improved community flood Short to Improved CC, Parish High CC forecasting service medium community Council, term resilience to EA flooding Community adaptation Medium Improved Adaptation CC, Parish High CC strategy to climate change term community strategy Council, resilience and included in EA resistance to Settlement 5.3 Golant NAI NAI NAI flooding Strategy Improved community flood Short to Improved CC, Parish High CC forecasting service medium community Council, term resilience to EA flooding Flood Defence Short term Maintain flood EA, CC Medium FCRM Scheme risk GiA HTL(with HTL(with HTL(with management 5.4 Lostwithiel localised localised localised standards MR) MR) MR) Floodplain WFD Medium Improve flood WFD status EA, SWW Medium FCRM improvements term plain GiA connectivity

Cornwall and Isles of Scilly SMP2 10 Final Report Chapter 6 - Action Plan February 2011

PDZ3 MA06 GRIBBIN HEAD TO PAR DOCKS

SMP2 POLICY POLICY UNIT EPOCH EPOCH EPOCH ACTIONS INDICATIVE OBJECTIVES MONITORING PARTNERS PRIORITY FUNDING 1 2 3 TIMESCALE INDICATORS Monitoring of cliff Short term Confirm Improved PCO, CC, Low FCRM GiA Undefended erosion erosion understanding EA 6.1 NAI NAI NAI pressure. of erosion risk cliffs Protect coast path LDF to identify CCMA Short term Manage spatial CCMA CC Spatial High CC planning identified in Planners, impacts of MR Core Strategy Duchy, EA Coast Protection Short to Maintain Duchy, CC Low Duchy maintenance for HTL long term defences if MR MR (with MR (with MR (with or managed not pursued 6.2 Polkerris localised localised localised realignment scheme Condition survey for Short term Determine Improved EA, Duchy, Medium Duchy HTL) HTL) HTL) breakwater condition & understanding EH coast relating to protection objectives. /flood defence role of harbour structures. LDF to identify CCMA Short term Manage spatial CCMA CC Spatial High CC 6.3 Par Sands NAI MR MR planning identified in Planners, impacts of MR Core Strategy EA Par and Short to Manage Number of EA, CC High FCRM GiA Flood Strategy medium increasing properties at term flood risks, high risk including joint fluvial, tidal and surface water flooding. Inform LDF. Sand BAP Short term Maintain or Area of BAP CC, EA, Medium FCRM GiA Habitat Strategy enhance Habitat Site dunes. owners, Support CWT adaptation of

Cornwall and Isles of Scilly SMP2 11 Final Report Chapter 6 - Action Plan February 2011

PDZ3 MA06 GRIBBIN HEAD TO PAR DOCKS

SMP2 POLICY POLICY UNIT EPOCH EPOCH EPOCH ACTIONS INDICATIVE OBJECTIVES MONITORING PARTNERS PRIORITY FUNDING 1 2 3 TIMESCALE INDICATORS caravan park Sand Dune Short term Maintain or Area of BAP EA, CC, Medium FCRM GiA, Management Plan enhance dunes habitat Site CWT owners, CWT Sand Dune Short to Maintain or Area of BAP CC, EA, Medium FCRM GiA Management long term enhance dunes Habitat Site owners, CWT Monitoring of beach Short term Confirm Improved PCO, CC, Medium FCRM GiA and dune timescale and understanding EA magnitude of of dune MR behaviour Landfill remediation/ Short to Remove risk of CC, Town High CC, removal/ investigation medium contamination Council, FCRM GiA from historic EA, CWT landfill Sustainable Short term Eco-town Imerys, CC Medium Development redevelopment development Spatial 6.4 Par Docks MR NAI NAI that reduces Planners, reliance on EA defences

Cornwall and Isles of Scilly SMP2 12 Final Report Chapter 6 - Action Plan February 2011

PDZ3 MA07 PAR DOCKS TO BLACK HEAD

SMP2 POLICY POLICY UNIT EPOCH EPOCH EPOCH ACTIONS INDICATIVE OBJECTIVES MONITORING PARTNERS PRIORITY FUNDING 1 2 3 TIMESCALE INDICATORS Monitoring of cliff erosion Short term Confirm erosion Improved PCO, CC, Medium FCRM Undefended pressure. understanding EA GiA 7.1 NAI NAI NAI cliffs Protect coast of erosion risk path Monitoring of beach Short term Confirm Improved PCO, CC, Medium FCRM constrain on understanding EA, CEG GiA, 7.2 Carlyon Bay NAI NAI NAI major of beach (Developer) CEG development proposal Charlestown Monitoring of cliff erosion Short term Confirm erosion Improved PCO, CC, Medium FCRM pressure understanding Square Sail GiA, 7.3 (harbour & HTL/MR HTL/MR HTL/MR of erosion risk Company, Square west beach) EA Sail Co Monitoring of cliff erosion Short term Confirm erosion Improved PCO, CC, Low FCRM pressure. understanding EA GiA Protect coast of erosion risk path 7.4 Duporth NAI NAI NAI Coast path strategy Short term Establish re- Coast Path CC Medium CC routing options route for Duporth satisfactorily section of coast re-routed path. Monitoring of cliff erosion Short term Confirm erosion Improved PCO, CC, Medium FCRM pressure. understanding EA GiA, Protect coast of erosion risk path Managed Realignment Short to Reduced Maintenance CC, EA Medium FCRM Scheme medium reliance on Costs GiA, 7.5 Porthpean MR MR NAI term coast defences. Maintain amenity facilities Coast path strategy Short term Establish re- Coast path CC Medium CC routing options satisfactorily for Porthpean re-routed section of coast

Cornwall and Isles of Scilly SMP2 13 Final Report Chapter 6 - Action Plan February 2011

PDZ3 MA07 PAR DOCKS TO BLACK HEAD

SMP2 POLICY POLICY UNIT EPOCH EPOCH EPOCH ACTIONS INDICATIVE OBJECTIVES MONITORING PARTNERS PRIORITY FUNDING 1 2 3 TIMESCALE INDICATORS path.

PDZ4 MA08 BLACK HEAD TO DODMAN POINT

SMP2 POLICY POLICY UNIT EPOCH EPOCH EPOCH ACTIONS INDICATIVE OBJECTIVES MONITORING PARTNERS PRIORITY FUNDING 1 2 3 TIMESCALE INDICATORS Undefended 8.1 NAI NAI NAI cliffs FCRM Scheme Short to Improve flood EA, CC, High FCRM medium risk Parish GiA, management, Council, and community Pentewan Sands resilience Sands Holiday Holiday Park Park Community adaptation Short to Improved Adaptation CC, Parish High CC strategy to climate change medium community strategy Council, Pentewan term resilience and included in EA resistance to Settlement 8.2 Harbour & MR MR HTL flooding Strategy village Strategy to ID scheme Short/med EA/CC/PC High FDGiA

Monitoring of beach Short term Confirm Improved PCO, CC, High FCRM timescale and understanding EA GiA magnitude of of beach and MR for village. dune Improve behaviour understanding of obstruction to main river outfall

Cornwall and Isles of Scilly SMP2 14 Final Report Chapter 6 - Action Plan February 2011

PDZ4 MA08 BLACK HEAD TO DODMAN POINT

SMP2 POLICY POLICY UNIT EPOCH EPOCH EPOCH ACTIONS INDICATIVE OBJECTIVES MONITORING PARTNERS PRIORITY FUNDING 1 2 3 TIMESCALE INDICATORS Undertake sediment budget Short term Establish Improved EA, PCO Medium FCRM study. Consider sediment viability of dune understanding GiA (via supply, hydrodynamics and enhancement of processes SWRCMP aeolian transport potential. programme. and sediment budget) Examine historic mapping availability. & photography.

Sand Dune BAP Habitat Medium Enhance dunes, Area of BAP EA, CC, Medium FCRM Strategy term whilst adapting Habitat Parish GiA, caravan park Council, Pentewan Pentewan Sands Sands Holiday Holiday Park Park Sand Dune Management Short term Support Area of BAP EA, CC, Medium FCRM Plan enhancement of habitat Parish GiA, Pentewan 8.3 NAI MR NAI/HTL dunes Council, Pentewan Beach Pentewan Sands Sands Holiday Holiday Park Park Sand Dune Management Medium Enhance dunes, Area of BAP EA, CC, Medium FCRM term whilst adapting Habitat Parish GiA, caravan park Council, Pentewan Pentewan Sands Sands Holiday Holiday Park Park Monitoring of beach and Short term Confirm viability Improved PCO, CC, Medium FCRM dune formation of dune understanding EA GiA, management. of beach and Pentewan dune Sands behaviour Holiday Park Community adaptation Short to Improved Adaptation CC, Parish High CC 8.4 HTL/MR HTL/MR HTL strategy to climate change medium community strategy Council, term resilience and included in EA

Cornwall and Isles of Scilly SMP2 15 Final Report Chapter 6 - Action Plan February 2011

PDZ4 MA08 BLACK HEAD TO DODMAN POINT

SMP2 POLICY POLICY UNIT EPOCH EPOCH EPOCH ACTIONS INDICATIVE OBJECTIVES MONITORING PARTNERS PRIORITY FUNDING 1 2 3 TIMESCALE INDICATORS resistance to Settlement flooding Strategy FCRM (tidal and fluvial) Short to Improve flood EA, CC, High FCRM Scheme medium risk Town GiA, management, Council, Town and community Harbour Council, resilience Authority Harbour Authority Condition survey for Short term Determine Improved EA, CC, High FCRM harbour breakwaters condition & understanding EH GiA (particularly North Pier & coast protection relating to Victoria Pier) /flood defence objectives. role of harbour structures. Wave Study and monitoring Short term Improved wave PCO, EA, High FCRM climate CC, GiA understanding Harbour and quantify risk Authority to property LDF to identify CCMA Short term Manage spatial CCMA CC Spatial High CC planning identified in Planners, impacts of MR Core Strategy EA Managed Realignment Medium Reduce risks to At risk CC, EA, Medium FCRM Scheme term infrastructure property Residents GiA and property. relocated. Enhance UK Road BAP habitat realigned from 8.5 Portmellon HTL MR MR risk zone. Enhanced BAP habitat Beach monitoring and post Short to Confirm Improved PCO, CC, Medium FCRM storm damage surveys medium magnitude of understanding EA GiA, erosion pressure of beach behaviour and infrastructure condition 8.6 Gorran HTL HTL MR Beach monitoring and post Short to Confirm Improved PCO, CC, Medium FCRM

Cornwall and Isles of Scilly SMP2 16 Final Report Chapter 6 - Action Plan February 2011

PDZ4 MA08 BLACK HEAD TO DODMAN POINT

SMP2 POLICY POLICY UNIT EPOCH EPOCH EPOCH ACTIONS INDICATIVE OBJECTIVES MONITORING PARTNERS PRIORITY FUNDING 1 2 3 TIMESCALE INDICATORS storm damage surveys medium magnitude of understanding EA GiA, erosion pressure of beach behaviour and infrastructure condition Haven Condition survey for Short term Determine Improved EA, CC, Medium FCRM harbour breakwater and condition & understanding EH GiA walls coast protection relating to /flood defence objectives. role of harbour structures.

PDZ4 MA09 VERYAN BAY

SMP2 POLICY POLICY UNIT EPOCH EPOCH EPOCH ACTIONS INDICATIVE OBJECTIVES MONITORING PARTNERS PRIORITY FUNDING 1 2 3 TIMESCALE INDICATORS Undefended 9.1 cliffs & NAI NAI NAI coves Managed Realignment Short term Reduce reliance National Low FCRM Hemmick Scheme on defences Trust, CC, GiA, 9.2 MR NAI NAI Beach EA National Trust, CC Monitoring of beach and Short term Confirm viability Improved PCO, CC, Medium FCRM Caerhays dune formation of dune understanding EA GiA, 9.3 MR MR MR management. of beach and Caerhays Beach dune Estate behaviour

Cornwall and Isles of Scilly SMP2 17 Final Report Chapter 6 - Action Plan February 2011

PDZ4 MA09 VERYAN BAY

SMP2 POLICY POLICY UNIT EPOCH EPOCH EPOCH ACTIONS INDICATIVE OBJECTIVES MONITORING PARTNERS PRIORITY FUNDING 1 2 3 TIMESCALE INDICATORS Sand Dune Management Short term Support Area of BAP EA, CC, Medium FCRM Plan enhancement of habitat Caerhays GiA, dunes Estate Caerhays Estate Sand Dune Management Medium to Enhance dunes. Area of BAP EA, CC, Medium FCRM long term Adaptation of Habitat. Caerhays GiA, car park. Visual impact Estate Caerhays Improve of car park Estate landscape of AONB Managed Realignment Medium to Reduce reliance CC, EA Low FCRM Scheme long term on defences. GiA, CC Reduce management costs Beach and erosion Short to Confirm Improved PCO, CC, Medium FCRM Monitoring and post storm medium magnitude of understanding EA GiA damage surveys erosion pressure of beach and East cliff behaviour 9.4 NAI NAI NAI Beach and erosion Medium to Reduce reliance CC, EA Low FCRM Portholland Monitoring and post storm long term on defences. GiA, CC damage surveys Reduce management costs West 9.5 NAI NAI NAI Portholland Beach and erosion Short to Confirm Improved PCO, CC, Medium FCRM monitoring and post storm medium magnitude of understanding EA GiA, 9.6 Portloe HTL HTL HTL damage surveys erosion pressure of beach and cliff behaviour

Cornwall and Isles of Scilly SMP2 18 Final Report Chapter 6 - Action Plan February 2011

PDZ4 MA10 GERRANS BAY

SMP2 POLICY POLICY UNIT EPOCH EPOCH EPOCH ACTIONS INDICATIVE OBJECTIVES MONITORING PARTNERS PRIORITY FUNDING 1 2 3 TIMESCALE INDICATORS Undefended 10.1 cliffs & NAI NAI NAI coves Beach and erosion Short to Confirm Improved PCO, CC, Medium FCRM monitoring and post storm medium magnitude of understanding EA GiA, damage surveys erosion pressure of beach and cliff behaviour Managed Realignment Short Reduce reliance CC, EA Low FCRM Scheme on defences. GiA, CC Reduce Pendower 10.2 MR NAI NAI management East costs HRA Action During realignment at Pendower and Carne beaches (near the Nare Hotel), the existing road furniture should be removed during managed realignment, but no other work (i.e. removal of shoreline material) should occur, as the ongoing erosion of this shoreline would provide potential shore dock habitat in Epochs 2 and 3. Prevents adverse effects to the Fal and Helford SAC.

Beach and erosion Short to Confirm Improved PCO, CC, Medium FCRM Pendower monitoring and post storm medium magnitude of understanding EA GiA, 10.3 NAI NAI NAI West damage surveys erosion pressure of beach and cliff behaviour Beach and erosion Short to Confirm Improved PCO, CC, Medium FCRM monitoring and post storm medium magnitude of understanding EA GiA, 10.4 Portscatho HTL HTL HTL damage surveys erosion pressure of beach and cliff behaviour

Cornwall and Isles of Scilly SMP2 19 Final Report Chapter 6 - Action Plan February 2011

PDZ5 MA11 – MA14 FAL AND HELFORD ESTUARIES

SMP2 POLICY EPOCH EPOCH EPOCH ACTIONS INDICATIVE OBJECTIVES MONITORING PARTNERS PRIORITY FUNDING 1 2 3 TIMESCALE INDICATORS Fal and Helford Intertidal Short Improve Evidence NE, EA, High FCRM Habitat and Sedimentation understanding base available CC, PCO GiA, NE, Strategy of evolution of for strategic CC SAC features planning. over long term. Evidence Support long base for term favourable FCRM condition of strategy SAC. Determine MA11 – MA13 Various Various Various timescales for required managed realignment. Review SAC boundary to Short to All mudflats and NE, EA, High NE include all mudflat and medium saltmarsh PCO saltmarsh habitats notably included within at Mylor Creek, SAC boundary Restronguet to Devoran, Tresillian, Penryn, Porth Navas, and Gweek

PDZ5 MA11 LOWER FAL ()

SMP2 POLICY POLICY UNIT EPOCH EPOCH EPOCH ACTIONS INDICATIVE OBJECTIVES MONITORING PARTNERS PRIORITY FUNDING 1 2 3 TIMESCALE INDICATORS 11.1 Undefended NAI NAI NAI

Cornwall and Isles of Scilly SMP2 20 Final Report Chapter 6 - Action Plan February 2011

PDZ5 MA11 LOWER FAL (CARRICK ROADS)

SMP2 POLICY POLICY UNIT EPOCH EPOCH EPOCH ACTIONS INDICATIVE OBJECTIVES MONITORING PARTNERS PRIORITY FUNDING 1 2 3 TIMESCALE INDICATORS Estuary banks Community Short to Improved Adaptation CC, Parish High CC adaptation strategy to medium community strategy Council, climate change term flood resilience included in EA and resistance Settlement Strategy 11.2 HTL HTL HTL FCRM Scheme Short to Improve flood EA, CC, High FCRM medium risk Town GiA, management. Council, Town Improve Harbour Council, community Authority Harbour resilience Authority St Just-in- 11.3 HTL HTL HTL Roseland Restronguet 11.4 NAI NAI NAI Passage Community Short to Improved Adaptation CC, Parish High CC adaptation strategy to medium community strategy Council, climate change term flood resilience included in EA and resistance Settlement Strategy Flood Forecasting Short to Improved Community EA, Parish Medium FCRM Devoran & and warning medium community warning Council GiA 11.5 MR MR MR improvements flood resilience available Perranarworthal Review SAC Short to All mudflats NE, EA, Low NE boundary to include medium and saltmarsh PCO all mudflat and included within saltmarsh habitats SAC boundary from Restronguet to Devoran and Perranwell Community Short to Improved Adaptation CC, Parish High CC HTL(with adaptation strategy to medium community strategy Council, 11.6 Mylor Quay HTL localised MR climate change term flood resilience included in EA MR) and resistance Settlement Strategy

Cornwall and Isles of Scilly SMP2 21 Final Report Chapter 6 - Action Plan February 2011

PDZ5 MA11 LOWER FAL (CARRICK ROADS)

SMP2 POLICY POLICY UNIT EPOCH EPOCH EPOCH ACTIONS INDICATIVE OBJECTIVES MONITORING PARTNERS PRIORITY FUNDING 1 2 3 TIMESCALE INDICATORS Review SAC Short to All mudflats NE, EA, Low NE boundary to include medium and saltmarsh PCO all mudflat and included within saltmarsh habitats at SAC boundary Mylor Creek Community Short to Improved Adaptation CC, Parish High CC adaptation strategy to medium community strategy Council, climate change term flood resilience included in EA and resistance Settlement Strategy Flood Forecasting Short to Improved Community EA, Parish Medium FCRM and warning medium community warning Council GiA improvements flood resilience available 11.7 NAI NAI NAI Local Transport Short to Improved Number of CC, Parish Medium CC adaptation medium community incidents road Council flood resilience flooded Review SAC Short to All mudflats NE, EA, Low NE boundary to include medium and saltmarsh PCO all mudflat and included within saltmarsh habitats at SAC boundary Mylor Creek Community Short to Improved Adaptation CC, Parish High CC adaptation strategy to medium community strategy Council, climate change term flood resilience included in EA HTL(with and resistance Settlement Strategy 11.8 Flushing localised MR MR FCRM Scheme Medium to Manage flood Number of CC, EA, Low FCRM MR) long term risks to properties at Parish GiA, property. high risk of Council, Parish Reduce risk to flooding. Harbour Council, life Authority CC, Community Short to Improved Adaptation CC, Parish High CC Penryn HTL MR MR adaptation strategy to medium community strategy Council, 11.9 climate change term flood resilience included in EA and resistance Settlement Strategy

Cornwall and Isles of Scilly SMP2 22 Final Report Chapter 6 - Action Plan February 2011

PDZ5 MA11 LOWER FAL (CARRICK ROADS)

SMP2 POLICY POLICY UNIT EPOCH EPOCH EPOCH ACTIONS INDICATIVE OBJECTIVES MONITORING PARTNERS PRIORITY FUNDING 1 2 3 TIMESCALE INDICATORS FCRM Scheme Short to Improve flood EA, CC, High FCRM medium risk NE, Town GiA, management, Council, Town and community Harbour Council, resilience Authority Harbour Authority Review SAC Short to All mudflats NE, EA, Low NE boundary to include medium and saltmarsh PCO all mudflat and included within saltmarsh habitats SAC boundary notably LDF to identify CCMA Short term Manage spatial CCMA CC High CC planning identified in Spatial impacts of MR Core Strategy Planners, EA Managed Medium Reduce risks to At risk CC, EA, Medium FCRM Realignment Scheme term infrastructure property NE, GiA and property. relocated. Residents Enhance UK Road BAP habitat realigned from risk zone. Area of BAP habitat Community Short to Improved Adaptation CC, Parish High CC adaptation strategy to medium community strategy Council, climate change term flood resilience included in EA and resistance Settlement 11.10 Falmouth HTL HTL HTL Strategy Falmouth FCRM Short Managed tidal EA, CC, Medium FCRM Scheme risks to Town GiA property and Council infrastructure. Pendennis 11.11 NAI NAI NAI Point

Cornwall and Isles of Scilly SMP2 23 Final Report Chapter 6 - Action Plan February 2011

PDZ5 MA12 UPPER FAL (TURNAWARE POINT TO NORMAL TIDAL LIMIT)

SMP2 POLICY POLICY UNIT EPOCH EPOCH EPOCH ACTIONS INDICATIVE OBJECTIVES MONITORING PARTNERS PRIORITY FUNDING 1 2 3 TIMESCALE INDICATORS Undefended 12.1 Estuary NAI NAI NAI banks Monitoring of habitat Short to Improve Evidence NE, EA, High FCRM Ruan long term understanding of base available CC, PCO GiA, NE 12.2 NAI NAI NAI evolution of SAC for strategic Lanihorne features over planning long term Managed Realignment Medium Reduce risks to At risk CC, EA, Medium FCRM Scheme term infrastructure property NE, GiA and property. relocated. Residents Enhance UK Area of BAP BAP habitat habitat Review SAC boundary to Short to SAC boundary NE, EA, Low NE include all mudflat and medium revised PCO saltmarsh habitats Community adaptation Short to Improved Adaptation CC, Parish Medium CC strategy to climate change medium community flood strategy Council,

term resilience and included in EA 12.3 Tresillian HTL MR MR resistance Settlement Strategy HRA Action Managed realignment at Tresillian should provide a minimum of 1.7ha and up to 2.45ha of potential area for intertidal habitat migration, within Epoch 2

Lighterage Quay Short Ensure CC, EA, High FCRM – Improvements continued Harbour GiA 12.4 Upper HTL/MR HTL/MR HTL/MR standard of Authority Basin defence to Truro over short term Truro Strategy Medium Manage risks to CC, EA, High FCRM term infrastructure NE, GiA and property. Harbour Protect SAC Authority, City

Cornwall and Isles of Scilly SMP2 24 Final Report Chapter 6 - Action Plan February 2011

PDZ5 MA12 UPPER FAL (TURNAWARE POINT TO NORMAL TIDAL LIMIT)

SMP2 POLICY POLICY UNIT EPOCH EPOCH EPOCH ACTIONS INDICATIVE OBJECTIVES MONITORING PARTNERS PRIORITY FUNDING 1 2 3 TIMESCALE INDICATORS Council Monitoring of habitat Short to Improve Evidence NE, EA, High FCRM long term understanding of base available CC, PCO, GiA, NE evolution of SAC for strategic Harbour features over planning Authority long term Sedimentation Monitoring Short to Improve Evidence NE, EA, High FCRM medium understanding of base available CC, PCO, GiA, NE term evolution of SAC for strategic Harbour features over planning Authority long term Landfill remediation/ Short to Remove risk of CC, High CC, removal/ investigation at medium contamination Harbour FCRM Boscowen Park, Garras from historic Authority, GiA Wharf and Lighterage Quay landfills Town Council, EA, NE Managed realignment at Boscawen Park should provide a minimum of 1.5ha and up to HRA Action 4.8ha of potential area for intertidal habitat migration, within Epochs 1 and 2.

Managed realignment at Garras Wharf should provide up to 2.5ha of potential area for HRA Action intertidal habitat creation, within Epochs 1 and 2.

A detailed analysis regarding the operation of the Truro Tidal Barrier should be undertaken in Epoch 1 along with a study into the accretion of sediments within the Tidal Basin, in order to ensure that operation of the Tidal Barrier maintains an accretion level in HRA Action line with sea level rise (this could be undertaken as part of a future Strategy. All prevents adverse effects to the Fal and Helford SAC.

Short to Reduce risks to Enhanced CC, EA, Medium FCRM long term infrastructure SAC habitat NE, GiA Calenick Managed Realignment 12.5 MR MR MR and property. Residents Scheme Creek Enhance SAC habitat

Cornwall and Isles of Scilly SMP2 25 Final Report Chapter 6 - Action Plan February 2011

PDZ5 MA12 UPPER FAL (TURNAWARE POINT TO NORMAL TIDAL LIMIT)

SMP2 POLICY POLICY UNIT EPOCH EPOCH EPOCH ACTIONS INDICATIVE OBJECTIVES MONITORING PARTNERS PRIORITY FUNDING 1 2 3 TIMESCALE INDICATORS Managed realignment within Calenick Creek (including the eastern end where the unit links with the southern end of Lighterage Wharf) should provide a minimum of 4.6ha of HRA Action potential area for intertidal habitat migration, within Epochs 1 and 2.

PDZ5 MA13 PENDENNIS POINT TO ROSEMULLION HEAD

SMP2 POLICY POLICY UNIT EPOCH EPOCH EPOCH ACTIONS INDICATIVE OBJECTIVES MONITORING PARTNERS PRIORITY FUNDING 1 2 3 TIMESCALE INDICATORS Undefended 13.1 NAI NAI NAI cliff sections Castle 13.2 Beach and HTL HTL HTL Gyllyngvase Managed Realignment Medium to Reduce risks to Enhanced CC, EA, Medium FCRM Scheme long term infrastructure SAC habitat NE, GiA, 13.3 Swanpool HTL MR MR and property. NE, Enhance SAC CC habitat Managed Realignment Medium to Reduce risks to Enhanced CC, EA, Medium FCRM Scheme long term infrastructure SAC habitat NE, GiA 13.4 Maenporth HTL MR MR and property. NE, Enhance SAC CC habitat

Cornwall and Isles of Scilly SMP2 26 Final Report Chapter 6 - Action Plan February 2011

PDZ5 MA14 HELFORD ESTUARY

SMP2 POLICY POLICY UNIT EPOCH EPOCH EPOCH ACTIONS INDICATIVE OBJECTIVES MONITORING PARTNERS PRIORITY FUNDING 1 2 3 TIMESCALE INDICATORS Undefended Review SAC boundary Short to All mudflats NE, EA, Low NE Estuary to include all mudflat medium and saltmarsh PCO Banks (and and saltmarsh habitats included within 14.1 including NAI/MR NAI/MR NAI/MR notably at Gweek and SAC boundary Porth Navas undefended estuary communities) 14.2 Durgan NAI NAI NAI Helford Flood Forecasting and Short to Improved Community EA, Parish Medium FCRM GiA 14.3 NAI NAI NAI warning improvements medium community warning Council Passage flood resilience available Managed Realignment Medium to Reduce risks to Enhanced CC, EA, Medium FCRM GiA, Scheme long term infrastructure SAC habitat NE, NE, 14.4 Gweek MR MR MR and property. CC Enhance SAC habitat FCRM Scheme Medium to Reduce risks to Enhanced landowners, Low landowners, Gweek long term infrastructure SAC habitat CC, EA, FCRM GiA, 14.5 Quays (north HTL HTL HTL and property. NE, NE, & south) Enhance SAC CC habitat 14.6 Helford NAI NAI NAI 14.7 Flushing NAI NAI NAI 14.8 Gillan NAI NAI NAI

Cornwall and Isles of Scilly SMP2 27 Final Report Chapter 6 - Action Plan February 2011

PDZ6 MA15 LIZARD EAST (NARE POINT TO LIZARD POINT)

SMP2 POLICY POLICY UNIT EPOCH EPOCH EPOCH ACTIONS INDICATIVE OBJECTIVES MONITORING PARTNERS PRIORITY FUNDING 1 2 3 TIMESCALE INDICATORS Undefended 15.1 cliffs and NAI NAI NAI coves Managed Realignment Medium to Reduce risks to CC, EA, Medium FCRM GiA, Scheme long term property and CC 15.2 Porthallow HTL MR MR transport infrastructure

15.3 Porthoustock NAI NAI NAI

Managed Realignment Medium to Reduce risks to CC, EA, Medium FCRM GiA Scheme long term property. NE, NE, Retain or CC 15.4 relocate transport infrastructure Enhance SSSI exposure LDF to identify CCMA Short term Manage spatial CCMA CC Spatial High CC planning identified in Planners, impacts of MR Core Strategy EA HTL Coverack MR MR Landfill site remediation Short term Reduce risk of CC Medium CC erosion to landfill

Beach and erosion Short to Confirm Improved PCO, CC, Medium FCRM GiA, monitoring and post medium magnitude of understanding EA storm damage surveys erosion of beach and pressure cliff behaviour Geotechnical Short term Establish Evidence to CC, EA, High CC investigations of relict nature and establish NE cliff face position and position of accurate geology. underlying hard future geology. shoreline

Cornwall and Isles of Scilly SMP2 28 Final Report Chapter 6 - Action Plan February 2011

PDZ6 MA15 LIZARD EAST (NARE POINT TO LIZARD POINT)

SMP2 POLICY POLICY UNIT EPOCH EPOCH EPOCH ACTIONS INDICATIVE OBJECTIVES MONITORING PARTNERS PRIORITY FUNDING 1 2 3 TIMESCALE INDICATORS position under NAI.

Highways Scheme Medium to Reduce risks to CC, EA, Medium CC, NE long term property. NE, Retain Coverack (if transport

supported infrastructure HTL HTL HTL Enhance SSSI by CC exposure highways) Beach and erosion Short to Confirm Improved PCO, CC, Medium FCRM GiA, monitoring and post medium magnitude of understanding EA storm damage surveys erosion of beach and pressure cliff behaviour Monitoring of beach Short term Confirm Improved PCO, CC, Medium FCRM GiA, and dune formation pressure on understanding EA dune of beach and Kennack management. dune 15.5 MR MR MR Sands behaviour Sand Dune Short term Support Area of BAP EA, CC, Medium FCRM GiA, Management Plan enhancement habitat NE NE of dunes Community adaptation Short to Improved Adaptation CC, Parish Medium CC strategy to climate medium term community strategy Council, change resilience and included in EA resistance to Settlement 15.6 Cadgwith HTL HTL HTL flooding Strategy Monitor local Short/Medium Stabilize head CC/Grade Medium GRPC/CC areas of erosion material on Ruan PC on ‘The Todden’ ‘The Todden,

Cornwall and Isles of Scilly SMP2 29 Final Report Chapter 6 - Action Plan February 2011

PDZ6 MA16 LIZARD WEST (LIZARD POINT TO BAULK HEAD)

SMP2 POLICY POLICY UNIT EPOCH EPOCH EPOCH ACTIONS INDICATIVE OBJECTIVES MONITORING PARTNERS PRIORITY FUNDING 1 2 3 TIMESCALE INDICATORS Undefended 16.1 cliffs and NAI NAI NAI coves Wave Action Study Short to Assess risk to National Low FCRM medium life from wave Trust, EA GiA, Mullion run-up once National 16.2 NAI NAI NAI Harbour Trust Cove structure is lost. Support a flood response plan. Monitoring of beach and Short term Confirm Improved PCO, CC, Medium FCRM dune formation pressure on understanding EA GiA, dune of beach and management. dune behaviour Sand Dune Management Short term Support Area of BAP EA, CC, Medium FCRM Plan enhancement of habitat NE, GiA, 16.3 Cove NAI NAI NAI dunes National National Trust Trust Monitor levels of sand Short/Medium Eradicate sand Maintain CC/NT High CC/NT? extraction. extraction. bollards to stop mechanical sand extraction. Monitoring of beach and Short term Confirm Improved PCO, CC, Medium FCRM dune formation pressure on understanding EA GiA, dune of beach and Church management. dune 16.4 NAI NAI NAI behaviour Cove Sand Dune Management Short term Support Area of BAP EA, CC, Medium FCRM Plan enhancement of habitat National GiA, dunes Trust National Trust 16.5 Jangye-ryn MR MR NAI HRA Action At Jangye-ryn, realigning only those elements that are man-made would prevent the loss of

Cornwall and Isles of Scilly SMP2 30 Final Report Chapter 6 - Action Plan February 2011

PDZ6 MA16 LIZARD WEST (LIZARD POINT TO BAULK HEAD)

SMP2 POLICY POLICY UNIT EPOCH EPOCH EPOCH ACTIONS INDICATIVE OBJECTIVES MONITORING PARTNERS PRIORITY FUNDING 1 2 3 TIMESCALE INDICATORS any heathland habitat as a result of this policy. MR at Kennack would require the excavation of the historic environment features under the heathland. Excavation should be undertaken sensitively and spoil reinstated to enable continued heathland growth until such point as natural erosion results in the loss of the habitat extent. Prevents adverse effects to SAC

PDZ7 MA17 BAULK HEAD TO TREWAVAS POINT

SMP2 POLICY POLICY UNIT EPOCH EPOCH EPOCH ACTIONS INDICATIVE OBJECTIVES MONITORING PARTNERS PRIORITY FUNDING 1 2 3 TIMESCALE INDICATORS Undefended 17.1 NAI NAI NAI cliffs Gunwalloe Realignment of highway Short/med Highway Highway realigned CC, EA, Medium CC term realigned away away from erosion Highways 17.2 Fishing NAI NAI NAI from erosion risk zone. Cove risk zone. Managed Realignment Short term Improve CC, EA, Medium FCRM Strategy understanding NE, GiA of bar evolution NE, and impacts on flood risk and SSSI Loe Bar & Beach and erosion Short Confirm Improved PCO, CC, High FCRM 17.3 MR MR MR Pool monitoring and post magnitude of understanding of EA GiA, storm damage surveys erosion beach and bar pressure behaviour Beach and Bar Short to Reduce risks to PCO, CC, Medium FCRM management plan medium property. EA GiA, Enhance SSSI Managed Realignment Medium to Reduce risks to CC, EA, High FCRM

Cornwall and Isles of Scilly SMP2 31 Final Report Chapter 6 - Action Plan February 2011

PDZ7 MA17 BAULK HEAD TO TREWAVAS POINT

SMP2 POLICY POLICY UNIT EPOCH EPOCH EPOCH ACTIONS INDICATIVE OBJECTIVES MONITORING PARTNERS PRIORITY FUNDING 1 2 3 TIMESCALE INDICATORS Scheme long term property. NE, GiA Enhance SSSI NE, Condition survey for Short term Determine Improved EA, CC, Medium FCRM harbour breakwater condition & understanding of EH GiA coast protection level of /flood defence defence/protection. 17.4 HTL HTL HTL role of breakwater and the outer harbour structures.

PDZ7 MA18 TREWAVAS HEAD TO THE GREEB

SMP2 POLICY POLICY UNIT EPOCH EPOCH EPOCH ACTIONS INDICATIVE OBJECTIVES MONITORING PARTNERS PRIORITY FUNDING 1 2 3 TIMESCALE INDICATORS Undefended 18.1 NAI NAI NAI cliffs LDF to identify CCMA Short term Manage spatial CCMA CC Spatial High CC Praa Sands 18.2 MR MR NAI (includes PU18.3) planning identified in Planners, (east) impacts of MR Core Strategy EA, Parish Council Beach and dune Short to Confirm Improved PCO, CC, High FCRM Monitoring and post storm medium magnitude of understanding EA, Parish GiA, damage surveys erosion of beach and Council pressure, and dune dune behaviour management options Beach and Dune Short to Reduce risks to PCO, CC, Medium FCRM

Cornwall and Isles of Scilly SMP2 32 Final Report Chapter 6 - Action Plan February 2011

PDZ7 MA18 TREWAVAS HEAD TO THE GREEB

SMP2 POLICY POLICY UNIT EPOCH EPOCH EPOCH ACTIONS INDICATIVE OBJECTIVES MONITORING PARTNERS PRIORITY FUNDING 1 2 3 TIMESCALE INDICATORS Management Plan medium property. EA, Parish GiA, Enhance SSSI Council Managed Realignment Medium to Reduce risks to Area of BAP CC, EA, Medium FCRM Scheme/ Dune long term property. Habitat NE, Parish GiA Management Enhance BAP Council NE, habitat Undertake Sediment Short term Establish Improved EA, PCO Medium FCRM Budget Study. Consider viability of dune understanding GiA (via sediment supply, enhancement of processes SWRCMP hydrodynamics and programme. and sediment budget) aeolian transport potential availability to support adoption of managed realignment approach. LDF to identify CCMA Short term Manage spatial CCMA CC Spatial High CC (includes PU18.2) planning identified in Planners, impacts of MR Core Strategy EA, Parish Council Managed Realignment Medium to Reduce risks to Area of BAP CC, EA, Low FCRM Praa Sands Scheme long term property. Habitat NE, Parish GiA 18.3 (west ) MR MR MR Enhance BAP Council NE, Sydney Cove habitat Beach and erosion Short to Confirm Improved PCO, CC, High FCRM monitoring and post storm medium magnitude of understanding EA, Parish GiA, damage surveys erosion of beach and Council pressure defence behaviour Beach and erosion Short to Confirm Improved PCO, CC, Medium FCRM monitoring and post storm medium magnitude of understanding EA, Parish GiA, 18.4 Perranuthnoe NAI NAI NAI damage surveys erosion of beach and Council pressure dune behaviour

Cornwall and Isles of Scilly SMP2 33 Final Report Chapter 6 - Action Plan February 2011

PDZ8 MA19 – MA21 TO

SMP2 POLICY PDZ LEVEL EPOCH EPOCH EPOCH ACTIONS INDICATIVE OBJECTIVES MONITORING PARTNERS PRIORITY FUNDING ACTIONS 1 2 3 TIMESCALE INDICATORS LDF to identify Mount’s Short term Support FCRM Policy CC Spatial High CC Bay CCMA, and to favourable in Core Planners, consider Area Action condition of Strategy. Town and 19.6 Marazion Plan in next LDF SPA, and/or its Area Action Parish – to Various Various Various relocation. Plan Councils, LDF supports produced. RSPB, NE, 21.2 Newlyn sustainable Marazion EA, HA, coastal Marsh policy landowners, management in Core Network Rail Strategy. Development Short term Supports FCRM policy CC, High CC Framework incorporates delivery of incorporated. Town and findings of SMP and FCRM strategy. Marazion Parish subsequent strategy Support Marsh policy Councils, favourable incorporated. RSPB, NE, condition of EA, SPA, and/or its landowners, relocation HA, Network Sustainable Rail long-term management of flood and erosion risk to property and infrastructure Mounts Bay FCRM Short to Informs Spatial; Improved EA, CC, High FCRM GiA, Strategy medium Planning and understanding Parish and EU Development of future Town Convergence, Framework of erosion Councils, CC coastal pressures. landowners, pressure and Identify MR NE, RSPB, defence options. Network options. Baseline Rail, Identify evidence Highways preferred provided for Agency scheme to Development manage flood Framework

Cornwall and Isles of Scilly SMP2 34 Final Report Chapter 6 - Action Plan February 2011

PDZ8 MA19 – MA21 MARAZION TO NEWLYN

SMP2 POLICY PDZ LEVEL EPOCH EPOCH EPOCH ACTIONS INDICATIVE OBJECTIVES MONITORING PARTNERS PRIORITY FUNDING ACTIONS 1 2 3 TIMESCALE INDICATORS and coastal and LDF risks to property and infrastructure. Support SPA favourable condition or relocation.

Review Local Transport Short to Support Medium to CC, High CC Plan medium delivery of Long term Highways Highway FCRM policy for A30 Agency, Agency Managed at Mount’s Network Realignment Bay Rail, DfT, Scheme determined Parish and that Town addresses Councils, flood and landowners, erosion NE, RSPB pressures Review Regional Rail Short to Support Medium to Network High Network Rail Network Plan medium delivery of long term Rail, DfT, DfT FCRM policy for CC, Managed mainline Highways Realignment railway at Agency, Scheme Mount’s Bay Parish and determined Town which Councils, addresses landowners, flood and NE, RSPB erosion pressures Wave Study and Short term Improved wave PCO, EA, High FCRM GiA monitoring climate CC, Harbour understanding Authority and quantify risk to property

Cornwall and Isles of Scilly SMP2 35 Final Report Chapter 6 - Action Plan February 2011

PDZ8 MA19 – MA21 MARAZION TO NEWLYN

SMP2 POLICY PDZ LEVEL EPOCH EPOCH EPOCH ACTIONS INDICATIVE OBJECTIVES MONITORING PARTNERS PRIORITY FUNDING ACTIONS 1 2 3 TIMESCALE INDICATORS Beach and dune Short to Confirm Improved PCO, CC, High FCRM GiA, monitoring and post medium magnitude of understanding EA, Parish storm damage surveys erosion of beach and Council pressure, and defence defence behaviour condition

PDZ8 MA19 MARAZION TO LONGROCK

SMP2 POLICY POLICY UNIT EPOCH EPOCH EPOCH ACTIONS INDICATIVE OBJECTIVES MONITORING PARTNERS PRIORITY FUNDING 1 2 3 TIMESCALE INDICATORS Undefended Cliffs (including 19.1 NAI NAI NAI southern part of Mount) Marazion Study/Strategy Short EA/CC High FCRM east FCRM Schemes medium EA/CC High Gia 19.2 NAI NAI NAI (Venton FCRM Cove) Gia Condition and Short term Determine Improved EA, CC, Medium FCRM performance survey for condition & understanding of EH, NT GiA Marazion harbour breakwater coast protection level of coast 19.3 HTL HTL HTL Town /flood defence protection offered role of by structure. breakwater and

Cornwall and Isles of Scilly SMP2 36 Final Report Chapter 6 - Action Plan February 2011

PDZ8 MA19 MARAZION TO LONGROCK

SMP2 POLICY POLICY UNIT EPOCH EPOCH EPOCH ACTIONS INDICATIVE OBJECTIVES MONITORING PARTNERS PRIORITY FUNDING 1 2 3 TIMESCALE INDICATORS the outer harbour structures. St Michael’s 19.4 Mount - HTL NAI NAI (a) Causeway Condition and Short term Determine Improved NT, EA, High National performance survey for condition & understanding of CC, EH Trust St Michael’s western harbour arm coast protection level of 19.4 /flood defence defence/protection Mount – HTL HTL HTL (b) role of the provided to Harbour harbour. harbour community and condition of asset. Marazion Study/Strategy Short EA/CC High FCRM west FCRM Schemes Medium EA/CC High Gia (Chapel FCRM 19.5 HTL HTL HTL Rock to Gia Marazion Bridge) 19.6 Marazion HTL HTL HTL See PDZ8 Action Marsh Habitat Short to Identify threats NE, RSPB, High NE, Strategy (may form part medium and CC, Parish RSPB, of Mount’s Bay Strategy opportunities for Council, FCRM see PU20.1) SPA landowners, GiA management EA and adaptation FCRM Scheme Short to SPA protected Frequency of tidal NE, RSPB, High NE, medium from tidal encroachment, CC, Parish RSPB, encroachment. overtopping and Council, FCRM Support SPA saline intrusion landowners, GiA favourable through defences EA CC condition. does not increase. Beach and Dune Short to Reduce risks RSPB, NE, Medium FCRM Management Plan medium SPA PCO, CC, GiA, NE, EA, Parish RSPB

Cornwall and Isles of Scilly SMP2 37 Final Report Chapter 6 - Action Plan February 2011

PDZ8 MA19 MARAZION TO LONGROCK

SMP2 POLICY POLICY UNIT EPOCH EPOCH EPOCH ACTIONS INDICATIVE OBJECTIVES MONITORING PARTNERS PRIORITY FUNDING 1 2 3 TIMESCALE INDICATORS Council Improving the culverts, pipes and other outfall structures within Marazion Marsh and through the coastal embankment should avoid or minimise the scale of saline intrusion and tide- locking effect on water levels within the Marsh, thereby counteracting the effects of sea level rise. In order to determine the appropriate measures and works, a detailed study on current HRA Action and future water levels within the Marsh, as well as salinity levels and saline intrusion potential, will be needed to identify and design a feasible scheme. This study could be undertaken as part of an expanded Water Level Management Plan. Prevents adverse effects to Marazion March SPA

PDZ8 MA20 LONGROCK TO PENZANCE

SMP2 POLICY POLICY UNIT EPOCH EPOCH EPOCH ACTIONS INDICATIVE OBJECTIVES MONITORING PARTNERS PRIORITY FUNDING 1 2 3 TIMESCALE INDICATORS See PDZ8 Action

Mount’s Bay FCRM Medium to Sustainable EA, CC, High FCRM GiA 20.1 Longrock HTL MR MR Managed Realignment Long llong-term Town and Scheme (following management of Parish Strategy) flood and Councils, erosion risk to Network property and Rail, infrastructure Highways Support SPA Agency favourable

Cornwall and Isles of Scilly SMP2 38 Final Report Chapter 6 - Action Plan February 2011

PDZ8 MA20 LONGROCK TO PENZANCE

SMP2 POLICY POLICY UNIT EPOCH EPOCH EPOCH ACTIONS INDICATIVE OBJECTIVES MONITORING PARTNERS PRIORITY FUNDING 1 2 3 TIMESCALE INDICATORS condition. Supports UK BAP habitat

See PDZ8 Action Mount’s Bay FCRM Medium to Sustainable EA, CC, High FCRM GiA Managed Realignment Long long-term Town and Scheme (following management of Parish Strategy) flood and Councils, Eastern erosion risk to Network 20.2 HTL MR MR Green property and Rail, infrastructure Highways Support SPA Agency favourable condition. Supports UK BAP habitat 20.3 Chyandour HTL HTL HTL See PDZ8 Action

Cornwall and Isles of Scilly SMP2 39 Final Report Chapter 6 - Action Plan February 2011

PDZ8 MA21 PENZANCE AND NEWLYN (ALBERT PIER TO SANDY COVE)

SMP2 POLICY POLICY UNIT EPOCH EPOCH EPOCH ACTIONS INDICATIVE OBJECTIVES MONITORING PARTNERS PRIORITY FUNDING 1 2 3 TIMESCALE INDICATORS See PDZ8 Action Condition and Short term Determine Improved EA, CC, Medium FCRM performance survey for condition & understanding of EH GiA harbour breakwaters and coast protection level of piers. /flood defence defence/protection role of provided to Penzance breakwater and Penzance due to 21.1 Harbour & HTL HTL HTL the outer structures. Docks harbour structures. Penzance Harbour Short Managed tidal, EA, CC, Medium FCRM FCRM Scheme fluvial and Town GiA (following Strategy) erosion risks to Council, property and Harbour infrastructure. Authority See PDZ8 Action Wherry Town FCRM Short Managed tidal, EA, CC, Medium FCRM Wherry 21.2 HTL MR MR Scheme (following fluvial and Town GiA Town Strategy) erosion risks to Council property and infrastructure. Tidal Flood Protection Short to Reduce risks to CC, EA, Medium FCRM Scheme Medium property. Parish GiA, 21.3 Newlyn HTL HTL HTL Council, Harbour Harbour Authority Authority Sandy 21.4 NAI NAI NAI Cove

Cornwall and Isles of Scilly SMP2 40 Final Report Chapter 6 - Action Plan February 2011

PDZ8 MA22 MOUSEHOLE (SANDY COVE BREAKWATER TO POINT SPANIARD)

SMP2 POLICY POLICY UNIT EPOCH EPOCH EPOCH ACTIONS INDICATIVE OBJECTIVES MONITORING PARTNERS PRIORITY FUNDING 1 2 3 TIMESCALE INDICATORS 22.1 Cliff Road HTL HTL HTL Condition and Short term Determine Improved EA, CC, Medium FCRM performance survey for condition & understanding of EH GiA harbour coast level of breakwaters/piers protection defence/protection 22.2 Mousehole HTL HTL HTL /flood defence afforded to role of north Mousehole by and south harbour piers. structures.

PDZ9 MA23 POINT SPANIARD TO LANDS END

SMP2 POLICY POLICY UNIT EPOCH EPOCH EPOCH ACTIONS INDICATIVE OBJECTIVES MONITORING PARTNERS PRIORITY FUNDING 1 2 3 TIMESCALE INDICATORS Undefended 23.1 NAI NAI NAI Cliffs Condition and Short term Determine Improved EA, CC, Low FCRM GiA / performance survey condition & understanding of EH Private Lamorna for harbour coast level of funding 23.2 NAI NAI NAI breakwater protection defence/protection. contribution? Cove /flood defence role of harbour pier

Cornwall and Isles of Scilly SMP2 41 Final Report Chapter 6 - Action Plan February 2011

PDZ9 MA24 LANDS END TO CLODGY POINT

SMP2 POLICY POLICY UNIT EPOCH EPOCH EPOCH ACTIONS INDICATIVE OBJECTIVES MONITORING PARTNERS PRIORITY FUNDING 1 2 3 TIMESCALE INDICATORS Monitoring of cliff Short term Confirm erosion PCO, Low FCRM Undefended erosion at WHS risks to WHS, English GiA, EH 24.1 NAI NAI NAI Cliffs notably Crown Heritage, Engine House. EA Community adaptation Short to Improved Adaptation CC, Parish Medium CC strategy to climate medium community strategy included Council, change term resilience and in Settlement EA resistance to Strategy flooding Highway/ FCRM Medium to Maintain PCO, EA, Low CC, Scheme long term highway. CC, FCRM Support Harbour GiA community Authority resilience to flooding and Sennen erosion 24.2 HTL HTL HTL Condition and Short term Determine Improved EA, CC, Medium FCRM Cove performance survey for condition & understanding of EH GiA harbour breakwater coast protection level of /flood defence defence/protection role of afforded to breakwater. development immediately behind harbour. Wave Study and Short term Improved wave PCO, EA, High FCRM monitoring climate CC, GiA understanding Harbour and quantify Authority risk to property Monitoring of beach and Short term Confirm Improved PCO, CC, Medium FCRM Whitesand dune formation pressure on understanding of EA GiA, Bay dune beach and dune 24.3 (Sennen & NAI NAI NAI management. behaviour Gwynver Sand Dune Short term Support Area of BAP EA, CC Medium FCRM Beaches) Management Plan enhancement of habitat GiA, CC dunes

Cornwall and Isles of Scilly SMP2 42 Final Report Chapter 6 - Action Plan February 2011

PDZ10 MA25 CLODGY POINT TO PORTHMINSTER POINT

SMP2 POLICY POLICY UNIT EPOCH EPOCH EPOCH ACTIONS INDICATIVE OBJECTIVES MONITORING PARTNERS PRIORITY FUNDING 1 2 3 TIMESCALE INDICATORS Undefended 25.1 NAI NAI NAI cliffs Beach monitoring and Short to Confirm Improved PCO, CC, High FCRM post storm damage medium magnitude of understanding of EA, Town GiA, surveys erosion beach and Council pressure, and defence behaviour defence condition 25.2 Porthmeor HTL HTL HTL Community adaptation Short to Improved Adaptation CC, Town Medium CC strategy to climate medium community strategy included Council, change term resilience and in Town Strategy EA resistance to flooding Beach Management medium Manage PCO, CC, High FCRM Plan erosion risks EA, Town GiA, to defences Council Porthgwidden 25.3 HTL HTL HTL to the Pier Community adaptation Short to Improved Adaptation CC, Town Medium CC strategy to climate medium community strategy included Council, change term resilience and in Town Strategy EA resistance to flooding Condition and Short term Determine Improved EA, CC, Medium FCRM St Ives performance survey for condition & understanding of EH GiA 25.4 HTL HTL HTL harbour breakwater coast level of Harbour (Smeaton’s Pier) protection defence/protection /flood defence to St Ives frontage role of breakwater FCRM Scheme; The EA/CC High FCRM Sloop Short GiA FCRM Scheme; Wharf EA/CC High

Cornwall and Isles of Scilly SMP2 43 Final Report Chapter 6 - Action Plan February 2011

PDZ10 MA25 CLODGY POINT TO PORTHMINSTER POINT

SMP2 POLICY POLICY UNIT EPOCH EPOCH EPOCH ACTIONS INDICATIVE OBJECTIVES MONITORING PARTNERS PRIORITY FUNDING 1 2 3 TIMESCALE INDICATORS Road Short FCRM FCRM Scheme; EA/CC High GiA Pednolva (Lambeth) Short walk FDGiA

Community adaptation Short to Improved Adaptation CC, Town Medium CC Porthminster strategy to climate medium community strategy included Council, 25.5 HTL HTL HTL change term resilience and in Town Strategy EA beach resistance to flooding

PDZ10 MA26 PORTHMINSTER POINT TO ESTUARY

SMP2 POLICY POLICY UNIT EPOCH EPOCH EPOCH ACTIONS INDICATIVE OBJECTIVES MONITORING PARTNERS PRIORITY FUNDING 1 2 3 TIMESCALE INDICATORS Undefended 26.1 NAI NAI NAI cliffs Community adaptation Short to Improved Adaptation CC, Town Medium CC strategy to climate change medium community strategy Council, 26.2 Carbis Bay NAI NAI NAI term resilience and included in EA resistance to Town Strategy flooding

Cornwall and Isles of Scilly SMP2 44 Final Report Chapter 6 - Action Plan February 2011

PDZ10 MA27 HAYLE ESTUARY

SMP2 POLICY POLICY UNIT EPOCH EPOCH EPOCH ACTIONS INDICATIVE OBJECTIVES MONITORING PARTNERS PRIORITY FUNDING 1 2 3 TIMESCALE INDICATORS Beach monitoring and Short to Confirm Improved PCO, CC, Medium FCRM GiA, post storm damage medium magnitude of understanding EA, Parish surveys erosion of beach and Council pressure dune 27.1 Porth Kidney NAI NAI NAI behaviour Beach and Dune Medium Support and PCO, CC, Medium FCRM GiA, Management Plan enhance UK EA, Parish BAP habitat Council Beach monitoring and Short to Confirm Improved PCO, CC, Medium FCRM GiA, post storm damage medium magnitude of understanding EA, Parish surveys erosion of beach and Council pressure dune behaviour Beach and Dune Medium Support and Area of BAP PCO, CC, Medium FCRM GiA, Lelant Management Plan enhance UK Habitat. EA, Parish 27.2 MR MR MR BAP habitat Council Towans FCRM Managed Medium to Managed tidal, Area of BAP EA, CC, Medium FCRM GiA Realignment long term fluvial and Habitat. Parish erosion risks to Councils, property and Network infrastructure. Rail Support UK BAP habitat Lelant 27.3 HTL HTL HTL frontage FCRM Managed Short to Managed tidal, Hayle Estuary EA, CC, Medium FCRM GiA Realignment long term fluvial and Ecological Parish erosion risks to Potential. Councils, property and Area of BAP Network infrastructure. habitats. Rail, 27.4 St Erth HTL/MR HTL/MR HTL/MR Support UK Highways BAP habitat Agency, Deliver WFD SWW, Heavily RSPB, Modified Water landowners

Cornwall and Isles of Scilly SMP2 45 Final Report Chapter 6 - Action Plan February 2011

PDZ10 MA27 HAYLE ESTUARY

SMP2 POLICY POLICY UNIT EPOCH EPOCH EPOCH ACTIONS INDICATIVE OBJECTIVES MONITORING PARTNERS PRIORITY FUNDING 1 2 3 TIMESCALE INDICATORS Body mitigation measure. FCRM Managed Medium to Managed tidal, Hayle Estuary EA, CC, Medium FCRM GiA Realignment long term fluvial and Ecological Parish CC erosion risks to Potential. Councils, property and Area of BAP English Griggs Quay infrastructure. habitat. Heritage, 27.5 HTL MR HTL/MR / Causeway Deliver WFD Highways Heavily Agency, Modified Water Network Body mitigation Rail, RSPB measure. FCRM Scheme Medium to Managed tidal, Hayle Estuary Harbour Medium Landowner, long term fluvial and achieves Authority, FCRM GiA, erosion risks to good landowner, English Harbour, property and ecological EA, CC, Heritage, infrastructure. potential. Town NE 27.6 East Quay & HTL HTL HTL Maintain SSSI Support UK Councils, South Quay in favourable BAP targets. English condition. No loss of Heritage, Maintain or intertidal NE enhance WHS. mudflats. FCRM Scheme Medium to Managed tidal, Hayle Estuary EA, CC, Medium FCRM GiA, long term fluvial and achieves Town Landowner, erosion risks to good Councils, NE, English property and ecological Harbour Heritage Copperhouse infrastructure. potential. Authority, 27.7 HTL HTL HTL Pool Maintain SSSI Support UK landowner, in favourable BAP targets. NE condition. No loss of Maintain or intertidal enhance WHS. mudflats LDF to identify CCMA Short term Manage spatial CCMA CC Spatial High CC Harvey’s (includes PU28.2, 28.3 planning identified in Planners, 27.8 MR MR MR and PU28.4) impacts of MR Core Strategy NE, EA, Towans and dune Town management Council

Cornwall and Isles of Scilly SMP2 46 Final Report Chapter 6 - Action Plan February 2011

PDZ10 MA27 HAYLE ESTUARY

SMP2 POLICY POLICY UNIT EPOCH EPOCH EPOCH ACTIONS INDICATIVE OBJECTIVES MONITORING PARTNERS PRIORITY FUNDING 1 2 3 TIMESCALE INDICATORS Beach and dune Short to Confirm Improved PCO, NE, High FCRM GiA, monitoring and post medium magnitude of understanding CC, EA, NE storm damage surveys erosion of beach and Town pressure, and dune Council, dune behaviour landowners management options Beach and Dune Short to Reduce risks to Area of BAP PCO, NE, Medium FCRM GiA, Management Plan medium property. Habitat CC, EA, NE Enhance SSSI Town Council, landowners Managed Realignment Short to Reduce risks to Area of BAP NE, CC, Medium FCRM GiA Scheme/ Dune long term property. Habitat EA, NE, NE, Management Enhance BAP Town habitat Council, landowners

PDZ10 MA28 BLACK CLIFF TO POINT

SMP2 POLICY POLICY UNIT EPOCH EPOCH EPOCH ACTIONS INDICATIVE OBJECTIVES MONITORING PARTNERS PRIORITY FUNDING 1 2 3 TIMESCALE INDICATORS Beach and dune monitoring Short to Confirm Improved PCO, NE, High FCRM and post storm damage medium magnitude of understanding CC, EA, GiA, NE 28.1 Black Cliff NAI NAI NAI surveys erosion pressure of beach and Town dune Council behaviour Mexico LDF to identify CCMA Short term Manage spatial CCMA CC Spatial High CC 28.2 MR MR MR (includes PU27.7, 28.3 and planning identified in Planners, Towans to PU28.4) impacts of MR Core Strategy NE, EA,

Cornwall and Isles of Scilly SMP2 47 Final Report Chapter 6 - Action Plan February 2011

PDZ10 MA28 BLACK CLIFF TO GODREVY POINT

SMP2 POLICY POLICY UNIT EPOCH EPOCH EPOCH ACTIONS INDICATIVE OBJECTIVES MONITORING PARTNERS PRIORITY FUNDING 1 2 3 TIMESCALE INDICATORS and dune Town management Council, CWT, landowners Beach and dune monitoring Short to Confirm Improved PCO, NE, High FCRM and post storm damage medium magnitude of understanding CC, EA, GiA surveys erosion of beach and Town pressure, and dune Council, dune behaviour CWT, management landowners Gwithian options Beach and Dune Short to Reduce risks to Area of BAP PCO, NE, Medium FCRM Towans Management Plan medium property. Habitat CC, EA, GiA, NE Enhance SSSI Town Council, CWT, landowners Managed Realignment Short to Reduce risks to Area of BAP NE, CC, Medium FCRM Scheme/ Dune long term property. Habitat EA, NE, GiA Management Enhance BAP Town NE, habitat Council, CWT, landowners LDF to identify CCMA Short term Manage spatial CCMA CC Spatial High CC Gwithian (includes PU27.7, 28.2 and planning identified in Planners, 28.3 Beach & MR MR MR PU28.4) impacts of MR Core Strategy NE, EA, and dune Town management Council Beach and dune monitoring Short to Confirm Improved PCO, NE, High FCRM and post storm damage medium magnitude of understanding CC, EA, GiA, NE surveys erosion of beach and Town pressure, and dune Council, dune behaviour CWT management options Beach and Dune Short to Reduce risks to Area of BAP PCO, NE, Medium FCRM Management Plan medium property. Habitat CC, EA, GiA, NE

Cornwall and Isles of Scilly SMP2 48 Final Report Chapter 6 - Action Plan February 2011

PDZ10 MA28 BLACK CLIFF TO GODREVY POINT

SMP2 POLICY POLICY UNIT EPOCH EPOCH EPOCH ACTIONS INDICATIVE OBJECTIVES MONITORING PARTNERS PRIORITY FUNDING 1 2 3 TIMESCALE INDICATORS Enhance SSSI CWT, Town Council Managed Realignment Short to Reduce risks to Area of BAP NE, CC, Medium FCRM Scheme/ Dune long term property. Habitat EA, NE, GiA Management Enhance BAP CWT, NE, habitat Town Council LDF to identify CCMA Short term Manage spatial CCMA CC Spatial High CC (includes PU27.7, 28.2 and planning identified in Planners, PU28.3) impacts of MR Core Strategy NE, EA, Town Council, National Trust Geotechnical Study of cliff Short term Confirm Improved Town High NT, CC failure & associated risk mechanisms of understanding Council, assessment failure and of cliff National principle driver behaviour Trust, of failure risk Godrevy Godrevy Farm 28.4 NAI NAI NAI cliffs Beach and dune monitoring Short to Confirm Improved PCO, NE, High FCRM and post storm damage medium magnitude of understanding CC, EA, GiA, NE surveys erosion of beach and Town pressure, and dune Council dune behaviour management options Beach and Dune Short to Reduce risks to Area of BAP PCO, NE, Medium FCRM Management Plan medium property. Habitat CC, EA, GiA, NE Enhance SSSI Town Council, National Trust

Cornwall and Isles of Scilly SMP2 49 Final Report Chapter 6 - Action Plan February 2011

PDZ11 MA29 GODREVY POINT TO ST AGNES HEAD

SMP2 POLICY POLICY UNIT EPOCH EPOCH EPOCH ACTIONS INDICATIVE OBJECTIVES MONITORING PARTNERS PRIORITY FUNDING 1 2 3 TIMESCALE INDICATORS Undefended cliffs (including 29.1 NAI NAI NAI cove at Chapel Porth) LDF to identify CCMA Short term Manage spatial CCMA identified CC Spatial High CC (includes PU29.3) planning in Core Strategy Planners, 29.2 HTL MR MR impacts of MR EA, Town Beach and dune Council, management English Heritage Beach monitoring and Short to Confirm Improved PCO, CC, High FCRM post storm damage medium magnitude of understanding of EA, Town GiA surveys erosion beach and dune Council, pressure, and behaviour English dune Heritage management options FCRM Scheme Medium to Reduce risks to Number of CC, EA, Medium FCRM long term property. properties at high Town GiA, CC, risk reduced Council, EH English Heritage Condition and Short term Determine Improved EA, CC, High FCRM performance survey for condition & understanding of EH, GiA harbour breakwater coast protection level of Harbour /flood defence defence/protection Authority role of afforded to the breakwater and inner harbour area the outer and eastern harbour Portreath structures. frontage.

Cornwall and Isles of Scilly SMP2 50 Final Report Chapter 6 - Action Plan February 2011

PDZ11 MA29 GODREVY POINT TO ST AGNES HEAD

SMP2 POLICY POLICY UNIT EPOCH EPOCH EPOCH ACTIONS INDICATIVE OBJECTIVES MONITORING PARTNERS PRIORITY FUNDING 1 2 3 TIMESCALE INDICATORS Wave Study and Short term Improved wave PCO, EA, High FCRM monitoring (includes climate CC, GiA PU29.3) understanding Harbour and quantify Authority risk to property LDF to identify CCMA Short term Manage spatial CCMA identified CC Spatial High CC (includes PU29.2) planning in Core Strategy Planners, impacts of MR EA, Town and dune Council, management English Heritage Condition and Short term Determine Improved EA, CC, High FCRM performance survey for condition & understanding of EH, GiA harbour breakwater coast protection level of Harbour /flood defence defence/protection Authority role of afforded to the breakwater and inner harbour area the outer and eastern harbour Portreath structures. frontage. Portreath 29.3 HTL HTL/MR HTL/MR Beach monitoring and Short to Confirm Improved PCO, CC, High FCRM Harbour post storm damage medium magnitude of understanding of EA, Town GiA surveys erosion beach and dune Council, pressure, and behaviour English dune Heritage management options FCRM Scheme Medium to Reduce risks to Number of CC, EA, Medium FCRM long term property. properties at high Town GiA, CC, risk reduced Council, EH English Heritage Wave Study and Short term Improved wave PCO, EA, High FCRM monitoring (includes climate CC, GiA PU29.2) understanding Harbour and quantify Authority risk to property

Cornwall and Isles of Scilly SMP2 51 Final Report Chapter 6 - Action Plan February 2011

PDZ11 MA29 GODREVY POINT TO ST AGNES HEAD

SMP2 POLICY POLICY UNIT EPOCH EPOCH EPOCH ACTIONS INDICATIVE OBJECTIVES MONITORING PARTNERS PRIORITY FUNDING 1 2 3 TIMESCALE INDICATORS LDF to identify CCMA Short term Manage spatial CCMA identified CC Spatial High CC planning in Core Strategy Planners, impacts of EA, Parish MR/NAI and Council dune management Beach and dune Short to Confirm Improved PCO, CC, High FCRM monitoring and post medium magnitude of understanding of EA, Parish GiA, NE storm damage surveys erosion beach and dune Council pressure, and behaviour 29.4 Porthtowan MR MR MR dune management options Beach and Dune Short to Reduce risks to Area of BAP PCO, CC, Medium FCRM Management Plan medium property. Habitat EA, Parish GiA, NE Enhance SSSI Council Dune Management Short to Reduce risks to Area of BAP NE, CC, Medium FCRM long term property. Habitat EA, Parish GiA Enhance BAP Council NE, habitat

PDZ11 MA30 ST AGNES HEAD TO PENTIRE POINT WEST

SMP2 POLICY POLICY UNIT EPOCH EPOCH EPOCH ACTIONS INDICATIVE OBJECTIVES MONITORING PARTNERS PRIORITY FUNDING 1 2 3 TIMESCALE INDICATORS Undefended 30.1 NAI NAI NAI cliffs Trevaunance NAI NAI Community adaptation Short to Improved Adaptation CC, Town Medium CC 30.2 NAI/MR strategy to climate change medium community strategy Council, Cove (with (with term resilience and included in EA

Cornwall and Isles of Scilly SMP2 52 Final Report Chapter 6 - Action Plan February 2011

PDZ11 MA30 ST AGNES HEAD TO PENTIRE POINT WEST

SMP2 POLICY POLICY UNIT EPOCH EPOCH EPOCH ACTIONS INDICATIVE OBJECTIVES MONITORING PARTNERS PRIORITY FUNDING 1 2 3 TIMESCALE INDICATORS resistance to Settlement flooding Strategy localised localised Wave Study and Short term Improved wave PCO, EA, Medium FCRM HTL) HTL) monitoring climate CC GiA understanding and quantify risk to property Community adaptation Short to Improved Adaptation CC, Town High CC strategy to climate change medium community strategy Council, term resilience and included in EA resistance to Town flooding Strategy Strategic Flood Risk Short term Reduce risks to Wave induced CC, EA, High CC Assessment to consider life and flooding PCO wave induced flooding property. included in SFRA Beach monitoring and Short term Confirm Improved PCO, CC, High FCRM post storm damage magnitude of understanding EA, Town GiA surveys erosion of beach and Council pressure, and wave climate flood risks behaviour 30.3 HTL MR MR Wave Study and Short term Improved wave Still water PCO, EA, High FCRM monitoring climate flooding CC GiA understanding replaced in and quantify risk Flood Map to property Inform Spatial Planning of flood risks FCRM Bolingey fluvial Short term Reduce risks to Combined CC, EA, Medium FCRM Scheme life and fluvial, tidal Town GiA, CC property. and wave Council induced flooding considered FCRM Managed Medium to Reduce risks to Number of CC, EA, High FCRM

Cornwall and Isles of Scilly SMP2 53 Final Report Chapter 6 - Action Plan February 2011

PDZ11 MA30 ST AGNES HEAD TO PENTIRE POINT WEST

SMP2 POLICY POLICY UNIT EPOCH EPOCH EPOCH ACTIONS INDICATIVE OBJECTIVES MONITORING PARTNERS PRIORITY FUNDING 1 2 3 TIMESCALE INDICATORS realignment Scheme long term life and properties at Town GiA, CC property. high risk Council reduced Beach and dune Short to Confirm Improved PCO, CC, Medium FCRM monitoring and post storm medium magnitude of understanding NE, EA, GiA, NE damage surveys erosion of beach Town pressure, and behaviour Council beach management Perran options 30.4 MR MR MR Beach Beach and Dune Short to Reduce risks to Area of BAP PCO, CC, Medium FCRM Management Plan medium property. Habitat NE, EA, GiA, NE Ensure SSSI SSSI Town remains in condition Council favourable condition

Beach and dune Short to Confirm Improved PCO, CC, Medium FCRM monitoring and post storm medium magnitude of understanding NE, EA, GiA, NE damage surveys erosion of beach and Town and pressure, and dune Parish dune behaviour Council management options Beach and Dune Short to Reduce risks to No loss of PCO, CC, Medium FCRM Penhale and Management Plan medium property. BAP Habitat NE, EA, GiA, NE 30.5 MR MR MR Holywell Bay Enhance SSSI Town and Parish Councils Dune management Short to Ensure SSSI Area of BAP NE, CC, Medium FCRM long term remains in Habitat. EA, Town GiA favourable SSSI and Parish NE, condition. condition Council Enhance BAP habitat

Cornwall and Isles of Scilly SMP2 54 Final Report Chapter 6 - Action Plan February 2011

PDZ12 MA31 FISTRAL AND CRANTOCK

SMP2 POLICY POLICY UNIT EPOCH EPOCH EPOCH ACTIONS INDICATIVE OBJECTIVES MONITORING PARTNERS PRIORITY FUNDING 1 2 3 TIMESCALE INDICATORS Undefende 31.1 NAI NAI NAI d cliffs Beach and dune Short to Confirm Improved PCO, CC, Medium FCRM monitoring and post storm medium magnitude of understanding EA, Parish GiA damage surveys erosion of beach and Council Crantock pressure dune 31.2 NAI NAI NAI Beach behaviour Beach and Dune Short to Reduce risks to Area of BAP PCO, CC, Medium FCRM Management Plan medium property. Habitat EA, Parish GiA Enhance SSSI Council The 31.3 NAI NAI NAI Gannel Beach and dune Short to Confirm Improved PCO, CC, Medium FCRM Pentire / monitoring and post storm medium magnitude of understanding EA, Town GiA 31.4 south HTL NAI NAI damage surveys erosion of beach and Council Fistral pressure defence behaviour LDF to identify CCMA (to Short term Manage spatial CCMA CC Spatial High CC include PU31.6) planning identified in Planners, impacts of Core Strategy EA, Town MR/NAI and Council, dune Golf management Course owners Central Beach and dune Short to Confirm Improved PCO, CC, High FCRM Monitoring and post storm medium magnitude of understanding EA, Town GiA Fistral & 31.5 MR MR MR damage surveys erosion of beach and Council Dunes pressure, and dune dune behaviour management options Beach and Dune Short to Reduce risks to Area of BAP PCO, CC, Medium FCRM Management Plan medium property. Habitat EA, Town GiA Council Dune Management Short to Reduce risks to No loss of CC, EA, Medium FCRM

Cornwall and Isles of Scilly SMP2 55 Final Report Chapter 6 - Action Plan February 2011

PDZ12 MA31 FISTRAL AND CRANTOCK

SMP2 POLICY POLICY UNIT EPOCH EPOCH EPOCH ACTIONS INDICATIVE OBJECTIVES MONITORING PARTNERS PRIORITY FUNDING 1 2 3 TIMESCALE INDICATORS long term property. BAP Habitat Town GiA Enhance BAP Council habitat LDF to identify CCMA (to Short term Manage spatial CCMA CC Spatial High CC include PU31.5) planning identified in Planners, impacts of Core Strategy EA, Town MR/NAI and Council, dune Landowner management Beach and dune Short to Confirm Improved PCO, CC, High FCRM monitoring and post storm medium magnitude of understanding EA, Town GiA damage surveys erosion of beach and Council pressure, and dune North dune behaviour 31.6 Fistral HTL HTL/MR MR management options Beach Management Plan Short to Reduce risks to Area of BAP PCO, CC, Medium FCRM medium property. Habitat EA, Town GiA Council FCRM Managed Medium to Reduce risks to Area of BAP CC, EA, Medium FCRM Realignment Scheme long term property. Habitat Town GiA, Enhance BAP Council, landowner habitat. landowner CC Maintain amenity infrastructure

Cornwall and Isles of Scilly SMP2 56 Final Report Chapter 6 - Action Plan February 2011

PDZ12 MA32 BAY

SMP2 POLICY POLICY UNIT EPOCH EPOCH EPOCH ACTIONS INDICATIVE OBJECTIVES MONITORING PARTNERS PRIORITY FUNDING 1 2 3 TIMESCALE INDICATORS Undefended 32.1 NAI NAI NAI cliffs Community adaptation Short to Improved Adaptation CC, Town High CC strategy to climate change medium community strategy Council, resilience and included in EA resistance to Town Strategy flooding Beach and dune monitoring Short to Confirm Improved PCO, CC, High FCRM and post storm damage medium magnitude of understanding EA, Town GiA surveys erosion of beach Council pressure behaviour Beach Management Plan Short to Reduce risks to PCO, CC, Medium FCRM medium property. EA, Town GiA Newquay Council 32.2 HTL HTL HTL Harbour Condition and performance short Maintain Improved EA/CC High FDGiA study for north pier defence to understanding harbour & town of pier role in coast protection Repair scheme Short Maintain EA/CC High FDGiA defence to harbour & town Strategic Flood Risk Short term Reduce risks to Wave induced CC, EA, High CC Assessment to consider life and property flooding PCO wave induced flooding included in SFRA Community adaptation Short to Improved Adaptation CC, Town High CC strategy to climate change medium community strategy Council, term resilience and included in EA Towan resistance to Town Strategy 32.3 HTL HTL/NAI NAI flooding Beach Strategic Flood Risk Short term Reduce risks to Wave induced CC, EA, High CC Assessment to consider life and property flooding PCO wave induced flooding included in SFRA

Cornwall and Isles of Scilly SMP2 57 Final Report Chapter 6 - Action Plan February 2011

PDZ12 MA32 NEWQUAY BAY

SMP2 POLICY POLICY UNIT EPOCH EPOCH EPOCH ACTIONS INDICATIVE OBJECTIVES MONITORING PARTNERS PRIORITY FUNDING 1 2 3 TIMESCALE INDICATORS Community adaptation Short to Improved Adaptation CC, Town High CC strategy to climate change medium community strategy Council, term resilience and included in EA Great resistance to Town Strategy 32.4 Western NAI NAI NAI flooding Beach Strategic Flood Risk Short term Reduce risks to Wave induced CC, EA, High CC Assessment to consider life and property flooding PCO wave induced flooding included in SFRA Community adaptation Short to Improved Adaptation CC, Town High CC strategy to climate change medium community strategy Council, term resilience and included in EA Tolcarne resistance to Town Strategy 32.5 HTL HTL/NAI NAI flooding Beach Strategic Flood Risk Short term Reduce risks to Wave induced CC, EA, High CC Assessment to consider life and property flooding PCO wave induced flooding included in SFRA Community adaptation Short to Improved Adaptation CC, Town High CC strategy to climate change medium community strategy Council, term resilience and included in EA resistance to Town Strategy 32.6 Lusty Glaze NAI NAI NAI flooding Strategic Flood Risk Short term Reduce risks to Wave induced CC, EA, High CC Assessment to consider life and property flooding PCO wave induced flooding included in SFRA Community adaptation Short to Improved Adaptation CC, Town High CC strategy to climate change medium community strategy Council, 32.7 Porth HTL MR NAI term resilience and included in EA resistance to Town Strategy flooding Beach and dune monitoring Short to Confirm Improved PCO, CC, High FCRM and post storm damage medium magnitude of understanding EA, Town GiA surveys erosion of beach Council pressure behaviour

Cornwall and Isles of Scilly SMP2 58 Final Report Chapter 6 - Action Plan February 2011

PDZ12 MA32 NEWQUAY BAY

SMP2 POLICY POLICY UNIT EPOCH EPOCH EPOCH ACTIONS INDICATIVE OBJECTIVES MONITORING PARTNERS PRIORITY FUNDING 1 2 3 TIMESCALE INDICATORS Beach Management Plan Short to Reduce risks to PCO, CC, Medium FCRM medium property and EA, Town GiA infrastructure Council Strategic Flood Risk Short term Reduce risks to Wave induced CC, EA, High CC Assessment to consider life and property flooding PCO wave induced flooding included in SFRA Potential realignment of Short/med Investigate Highway CC, EA, Medium CC highway term potential realigned Highways options. away from Combine with erosion and overall flood risk adaptation zone. strategy.

PDZ13 MA33 TO

SMP2 POLICY POLICY UNIT EPOCH EPOCH EPOCH ACTIONS INDICATIVE OBJECTIVES MONITORING PARTNERS PRIORITY FUNDING 1 2 3 TIMESCALE INDICATORS Undefended 33.1 NAI NAI NAI cliffs Watergate 33.2 NAI NAI NAI Bay Wave Study and Short term Improved wave PCO, EA, Medium FCRM GiA Mawgan monitoring climate CC 33.3 Porth – MR MR NAI understanding and quantify road section risk to property and

Cornwall and Isles of Scilly SMP2 59 Final Report Chapter 6 - Action Plan February 2011

PDZ13 MA33 TREVELGUE HEAD TO TREVOSE HEAD

SMP2 POLICY POLICY UNIT EPOCH EPOCH EPOCH ACTIONS INDICATIVE OBJECTIVES MONITORING PARTNERS PRIORITY FUNDING 1 2 3 TIMESCALE INDICATORS infrastructure Community adaptation Short to Improved Adaptation CC, Parish High CC strategy to climate medium community strategy Council, EA change term resilience and included in resistance to Settlement flooding Strategy Beach and dune Short to Confirm Improved PCO, CC, High FCRM GiA monitoring and post medium magnitude of understanding EA, Town storm damage surveys erosion of beach and Council pressure dune behaviour LDF to identify CCMA Short term Manage spatial CCMA CC Spatial High CC planning identified in Planners, impacts of MR Core Strategy EA, Parish and dune Council, management landowner Beach and dune Short to Confirm Improved PCO, CC, High FCRM GiA monitoring and post medium magnitude of understanding EA, Town storm damage surveys erosion of beach and Council pressure, and dune dune behaviour management options Beach Management Short to Reduce risks to Area of BAP PCO, CC, Medium FCRM GiA Plan (with 33.4) medium property. Habitat EA, Town Council Wave Study and Short term Improved wave PCO, EA, Medium FCRM GiA monitoring climate CC understanding and quantify risk to property and infrastructure FCRM Managed Medium to Reduce risks to Area of BAP CC, EA, Medium FCRM GiA, Realignment Scheme long term property. Habitat Parish CC Enhance BAP Council, habitat. landowner

Cornwall and Isles of Scilly SMP2 60 Final Report Chapter 6 - Action Plan February 2011

PDZ13 MA33 TREVELGUE HEAD TO TREVOSE HEAD

SMP2 POLICY POLICY UNIT EPOCH EPOCH EPOCH ACTIONS INDICATIVE OBJECTIVES MONITORING PARTNERS PRIORITY FUNDING 1 2 3 TIMESCALE INDICATORS Maintain amenity infrastructure Beach and dune Short to Confirm Improved PCO, CC, High FCRM GiA monitoring and post medium magnitude of understanding EA, Parish storm damage surveys erosion of beach and Council Mawgan pressure, and dune dune behaviour 33.4 Porth - NAI NAI NAI management dunes options Beach and Dune Short to Reduce risks to Area of BAP PCO, CC, Medium FCRM GiA Management Plan (with medium property. Habitat EA, Parish PU33.3) Council Porthcothan 33.5 NAI NAI NAI cliff Beach and Dune Short to Maintain and Area of BAP PCO, CC, Low FCRM GiA, Management Plan medium enhance BAP Habitat EA, Parish CC, Porthcothan habitat Council, Porthcothan 33.6 NAI/HTL NAI/HTL NAI/HTL beach Porthcothan Sand Dune Sand Dune Trust Trust Beach and Dune Short to Maintain and Area of BAP PCO, CC, Low FCRM GiA, Management Plan medium enhance BAP Habitat EA, Parish CC, 33.7 Treyarnon NAI NAI NAI habitat Council, landowners landowners Beach and Dune Short to Maintain and Area of BAP PCO, CC, Medium FCRM GiA, Constantine Management Plan medium enhance BAP Habitat EA, Parish CC, 33.8 NAI NAI NAI Bay habitat Council, landowners landowners

Cornwall and Isles of Scilly SMP2 61 Final Report Chapter 6 - Action Plan February 2011

PDZ13 MA34 TREVOSE HEAD TO

SMP2 POLICY POLICY UNIT EPOCH EPOCH EPOCH ACTIONS INDICATIVE OBJECTIVES MONITORING PARTNERS PRIORITY FUNDING 1 2 3 TIMESCALE INDICATORS Undefended 34.1 NAI NAI NAI cliffs Community adaptation Short to Improved Adaptation CC, Parish High CC strategy to climate medium community strategy Council, change resilience and included in EA, resistance to Settlement landowners flooding Strategy Beach and dune Short to Confirm Improved PCO, CC, High FCRM GiA monitoring and post medium magnitude of understanding EA, Town storm damage surveys erosion of beach and Council pressure, and dune dune behaviour management options Beach and Dune Short to Reduce risks to Area of BAP PCO, CC, Medium FCRM GiA Management Plan medium property. Habitat EA, Town Restore and Council, Harlyn enhance Sand landowners 34.2 HTL MR MR Dune. Beach Enhance AONB landscape value FCRM Managed Medium to Reduce risks to Area of BAP CC, EA, Medium FCRM GiA, Realignment Scheme long term property. Habitat Parish CC, Enhance BAP Number of Council, landowners habitat. properties at landowners Enhance AONB risk. landscape Level of risk value to infrastructure Potential realignment of Medium to Investigate Highway CC, EA, Medium CC highway long term potential realigned Highways options. away from Combine with erosion and overall flood risk

Cornwall and Isles of Scilly SMP2 62 Final Report Chapter 6 - Action Plan February 2011

PDZ13 MA34 TREVOSE HEAD TO STEPPER POINT

SMP2 POLICY POLICY UNIT EPOCH EPOCH EPOCH ACTIONS INDICATIVE OBJECTIVES MONITORING PARTNERS PRIORITY FUNDING 1 2 3 TIMESCALE INDICATORS adaptation zone. strategy. Coast path strategy Short term Establish re- Coast path CC Medium CC Trevone routing options route 34.3 NAI NAI NAI for Trevone Bay satisfactorily cliffs section of coast re-routed path. Community adaptation Short to Improved Adaptation CC, Parish High CC strategy to climate medium community strategy Council, change term resilience and included in EA, resistance to Settlement landowners flooding Strategy Beach and dune Short to Confirm Improved PCO, CC, High FCRM GiA monitoring and post medium magnitude of understanding EA, Town storm damage surveys erosion of beach and Council pressure, and dune Trevone 34.4 MR MR NAI dune behaviour beach management options FCRM Managed Medium to Reduce risks to Area of BAP CC, EA, Medium FCRM GiA, Realignment Scheme long term property. Habitat Parish CC, Enhance BAP Number of Council, landowners habitat. properties at landowners Enhance AONB risk. landscape Level of risk value to infrastructure

Cornwall and Isles of Scilly SMP2 63 Final Report Chapter 6 - Action Plan February 2011

PDZ14 MA35 CAMEL ESTUARY

SMP2 POLICY POLICY UNIT EPOCH EPOCH EPOCH ACTIONS INDICATIVE OBJECTIVES MONITORING PARTNERS PRIORITY FUNDING 1 2 3 TIMESCALE INDICATORS Undefended cliffs and 35.1 NAI NAI NAI estuary banks FCRM Scheme Short to Reduce risks to Area of BAP CC, EA, Medium FCRM long term property and Habitat Town GiA, infrastructure Number of Council, CC, properties at Harbour Harbour risk. Authority, Authority Level of risk landowners 35.2 HTL HTL HTL to Harbour infrastructure Community adaptation Short to Improved Adaptation CC, Town Low CC strategy to climate medium community strategy Council, EA change term resilience and included in resistance to Settlement flooding Strategy Padstow 35.3 south NAI NAI NAI (Dinas) Central 35.4 Camel left NAI NAI NAI bank Community adaptation Short to Improved Adaptation CC, Town High CC strategy to climate medium community strategy Council, EA change term resilience and included in resistance to Town 35.5 HTL HTL HTL flooding Strategy FCRM Scheme Short to Maintain Number of CC, EA, Medium FCRM long term defences properties at Town GiA, high risk Council, CC, landowners Egloshayle FCRM Managed Short to Manage risks to Number of CC, EA, Medium FCRM 35.6 HTL MR MR left bank Realignment Scheme long term property and properties at Town GiA,

Cornwall and Isles of Scilly SMP2 64 Final Report Chapter 6 - Action Plan February 2011

PDZ14 MA35 CAMEL ESTUARY

SMP2 POLICY POLICY UNIT EPOCH EPOCH EPOCH ACTIONS INDICATIVE OBJECTIVES MONITORING PARTNERS PRIORITY FUNDING 1 2 3 TIMESCALE INDICATORS infrastructure. high risk. Council, CC, Enhance UK Area of flood landowners BAP habitats plain grazing marsh. During preparation and design of MR implementation, appropriate detailed geomorphological study and modelling must be undertaken to ensure that there is no net change (or design out any change) in river flows, with a particular focus on preventing HRA Action net change in substrates. Appropriate design would avoid any potential adverse impact on the supporting habitat, and its characteristics, for bullhead, otter, and Atlantic salmon. Prevents adverse effects to the SAC FCRM Scheme Medium to Manage risks to Number of CC, EA, Medium FCRM long term property and properties at Town GiA, Egloshayle infrastructure. high risk. Council, CC, 35.7 HTL HTL HTL Right Bank Enhance UK Area of flood landowners BAP habitats plain grazing marsh. During preparation and design of MR implementation, appropriate detailed geomorphological study and modelling must be undertaken to ensure that there is no net change (or design out any change) in river flows, with a particular focus on preventing HRA Action net change in substrates. Appropriate design would avoid any potential adverse impact MR MR on the supporting habitat, and its characteristics, for bullhead, otter, and Atlantic salmon. (with (with Prevents adverse effects to the River Camel SAC 35.8 Sladesbridge HTL localised localised FCRM Managed Short to Manage risks to Number of CC, EA, Medium FCRM HTL) HTL) Realignment Scheme long term property and properties at Town GiA, infrastructure. high risk. Council, CC, Enhance UK Area of flood landowners BAP habitats plain grazing marsh. During preparation and design of MR implementation, appropriate detailed geomorphological study and modelling must be undertaken to ensure that there is no net change (or design out any change) in river flows, with a particular focus on preventing 35.9 Amble HTL MR MR HRA Action net change in substrates. Appropriate design would avoid any potential adverse impact on the supporting habitat, and its characteristics, for bullhead, otter, and Atlantic salmon. Prevents adverse effects to the River Camel SAC Amble Marsh Water Short term Enhance Area of flood CC, EA, High FCRM Level Management freshwater BAP plain grazing NE, Parish GiA, Scheme habitats. marsh. Council, CC, NE

Cornwall and Isles of Scilly SMP2 65 Final Report Chapter 6 - Action Plan February 2011

PDZ14 MA35 CAMEL ESTUARY

SMP2 POLICY POLICY UNIT EPOCH EPOCH EPOCH ACTIONS INDICATIVE OBJECTIVES MONITORING PARTNERS PRIORITY FUNDING 1 2 3 TIMESCALE INDICATORS SSSI to SSSI landowners favourable condition condition Amble Marsh Water Medium to Create Area of flood CC, EA, High FCRM Level Management long term saltwater UK plain grazing NE, Parish GiA, Scheme BAP habitat. marsh. Council, CC, NE Enhance UK SSSI landowners BAP habitats condition Support SSSI Area of favourable coastal flood condition plain grazing marsh. Area of coastal saltmarsh. FCRM Managed Medium to Manage risks to Number of CC, EA, Medium FCRM Realignment Scheme long term property and properties at NE, Parish GiA, infrastructure. high risk. Council, NE, Enhance UK Area of landowners BAP habitats floodplain grazing marsh. SSSI condition Area of coastal floodplain grazing marsh. Area of coastal saltmarsh.

35.10 Porthilly NAI NAI NAI Cove 35.11 Rock HTL MR MR

Cornwall and Isles of Scilly SMP2 66 Final Report Chapter 6 - Action Plan February 2011

PDZ14 MA35 CAMEL ESTUARY

SMP2 POLICY POLICY UNIT EPOCH EPOCH EPOCH ACTIONS INDICATIVE OBJECTIVES MONITORING PARTNERS PRIORITY FUNDING 1 2 3 TIMESCALE INDICATORS Beach and dune Short to Confirm Improved PCO, CC, High FCRM monitoring and post medium magnitude of understanding EA, Parish GiA storm damage surveys erosion of beach and Council pressure, and dune Rock Dunes dune behaviour 35.12 and Daymer NAI NAI NAI management Bay options Beach and Dune Short to Maintain and Area of BAP PCO, CC, Medium FCRM Management Plan medium enhance sand Habitat EA, Parish GiA dunes. Council, landowners

PDZ14 MA36 TREBETHERICK POINT TO PENTIRE POINT

SMP2 POLICY POLICY UNIT EPOCH EPOCH EPOCH ACTIONS INDICATIVE OBJECTIVES MONITORING PARTNERS PRIORITY FUNDING 1 2 3 TIMESCALE INDICATORS Undefended 36.1 NAI NAI NAI cliffs LDF to identify CCMA Short term Manage spatial CCMA CC Spatial High CC 36.2 Polzeath HTL MR MR planning identified in Planners, impacts of MR Core Strategy EA, Parish Council Beach and erosion Short to Confirm Improved PCO, CC, High FCRM monitoring and post storm medium magnitude of understanding EA, Parish GiA, damage surveys erosion of beach and Council pressure defence behaviour Wave Study and monitoring Short term Improved wave PCO, EA, Medium FCRM climate CC GiA understanding

Cornwall and Isles of Scilly SMP2 67 Final Report Chapter 6 - Action Plan February 2011

PDZ14 MA36 TREBETHERICK POINT TO PENTIRE POINT

SMP2 POLICY POLICY UNIT EPOCH EPOCH EPOCH ACTIONS INDICATIVE OBJECTIVES MONITORING PARTNERS PRIORITY FUNDING 1 2 3 TIMESCALE INDICATORS and quantify risk to property and infrastructure Managed Realignment Medium to Reduce risks to Number of CC, EA, High FCRM Scheme long term life, property properties at Parish GiA and high risk Council, CC infrastructure. landowners

New 36.3 NAI NAI NAI Polzeath Pentireglaze 36.4 NAI NAI NAI Haven

PDZ15 MA37 PENTIRE POINT TO BOSCASTLE

SMP2 POLICY POLICY UNIT EPOCH EPOCH EPOCH ACTIONS INDICATIVE OBJECTIVES MONITORING PARTNERS PRIORITY FUNDING 1 2 3 TIMESCALE INDICATORS Undefended 37.1 NAI NAI NAI Cliffs FCRM Scheme Short to Reduce risks Number of Landowner, Low Landowner, medium to life, property properties at high EA, CC CC, 37.2 Portquin MR MR NAI term and risk. FCRM GiA infrastructure. FCRM Scheme Short to Reduce risks Number of Landowners, Low Landowners, long term to life, property properties at high EA, CC FCRM GiA and risk. 37.3 Port Issac HTL HTL HTL infrastructure Condition and Short term Determine Improved EA, CC, EH, High FCRM GiA performance survey condition & understanding of Harbour

Cornwall and Isles of Scilly SMP2 68 Final Report Chapter 6 - Action Plan February 2011

PDZ15 MA37 PENTIRE POINT TO BOSCASTLE

SMP2 POLICY POLICY UNIT EPOCH EPOCH EPOCH ACTIONS INDICATIVE OBJECTIVES MONITORING PARTNERS PRIORITY FUNDING 1 2 3 TIMESCALE INDICATORS for east and west coast level of Authority breakwaters protection defence/protection /flood defence afforded to the role of Port Issac breakwaters. frontage. FCRM Scheme Short to Reduce risks Number of National Low Landowners, Port medium to life, property properties at high Trust, EA, FCRM GiA 37.4 MR MR NAI Gaverne term and risk. CC infrastructure

37.5 NAI NAI NAI

FCRM Scheme Medium to Reduce risks Number of National Low National long term to life and properties at high Trust, EA, Trust, property. risk. CC FCRM GiA

Condition and Short term Determine Improved EA, CC, EH, High FCRM GiA 37.6 Boscastle HTL HTL HTL performance survey condition & understanding of Harbour for east and west coast level of Authority breakwaters protection defence/protection /flood defence afforded to the role of Port Issac breakwaters. frontage.

Cornwall and Isles of Scilly SMP2 69 Final Report Chapter 6 - Action Plan February 2011

PDZ15 MA38 BOSCASTLE TO WANSON MOUTH

SMP2 POLICY POLICY UNIT EPOCH EPOCH EPOCH ACTIONS INDICATIVE OBJECTIVES MONITORING PARTNERS PRIORITY FUNDING 1 2 3 TIMESCALE INDICATORS Undefended 38.1 NAI NAI NAI cliffs FCRM Scheme Medium to Reduce risks to Number of CC, EA, Medium CC, Crackington long term life, property and properties at Parish FCRM 38.2 HTL MR MR Haven infrastructure. high risk. Council, GiA landowners

PDZ16 MA39 WANSON MOUTH TO HIGHER LONGBEAK

SMP2 POLICY POLICY UNIT EPOCH EPOCH EPOCH ACTIONS INDICATIVE OBJECTIVES MONITORING PARTNERS PRIORITY FUNDING 1 2 3 TIMESCALE INDICATORS Undefended 39.1 NAI NAI NAI cliffs Community adaptation Short to Improved Adaptation CC, Parish High CC Black Rock strategy to climate change medium community strategy Council, EA 39.2 / south MR MR NAI term resilience and included in Widemouth resistance to Settlement flooding Strategy Beach and erosion Short to Confirm Improved PCO, CC, High FCRM monitoring and post storm medium magnitude of understanding EA, Parish GiA, damage surveys erosion of beach and Council pressure defence behaviour Wave Study and Short term Improved wave PCO, EA, Medium FCRM monitoring (with PU39.3) climate CC GiA understanding and quantify risk to property and infrastructure

Cornwall and Isles of Scilly SMP2 70 Final Report Chapter 6 - Action Plan February 2011

PDZ16 MA39 WANSON MOUTH TO HIGHER LONGBEAK

SMP2 POLICY POLICY UNIT EPOCH EPOCH EPOCH ACTIONS INDICATIVE OBJECTIVES MONITORING PARTNERS PRIORITY FUNDING 1 2 3 TIMESCALE INDICATORS Beach and Dune Short to Maintain and Area of BAP PCO, CC, Medium FCRM Management Plan medium enhance sand Habitat EA, Parish GiA dunes Council, landowners Managed Realignment Medium to Reduce risks to Number of CC, EA, Medium FCRM Scheme long term life, property properties at Parish GiA and high risk. Council, CC infrastructure. Area of BAP landowners Maintain and Habitat enhance sand dunes. Community adaptation Short to Improved Adaptation CC, Parish High CC strategy to climate change medium community strategy Council, EA term resilience and included in resistance to Settlement flooding Strategy Beach and erosion Short to Confirm Improved PCO, CC, High FCRM monitoring and post storm medium magnitude of understanding EA, Parish GiA, damage surveys erosion of beach and Council pressure defence behaviour Wave Study and Short term Improved wave PCO, EA, Medium FCRM monitoring (with PU39.2) climate CC GiA North 39.3 MR MR NAI understanding Widemouth and quantify risk to property and infrastructure Beach and Dune Short to Maintain and Area of BAP PCO, CC, Medium FCRM Management Plan medium enhance sand Habitat EA, Parish GiA dunes. Council, landowners Managed Realignment Medium to Reduce risks to Number of CC, EA, Medium FCRM Scheme long term life, property properties at Parish GiA and high risk. Council, CC infrastructure. Area of BAP landowners Maintain and Habitat enhance sand

Cornwall and Isles of Scilly SMP2 71 Final Report Chapter 6 - Action Plan February 2011

PDZ16 MA39 WANSON MOUTH TO HIGHER LONGBEAK

SMP2 POLICY POLICY UNIT EPOCH EPOCH EPOCH ACTIONS INDICATIVE OBJECTIVES MONITORING PARTNERS PRIORITY FUNDING 1 2 3 TIMESCALE INDICATORS dunes.

PDZ16 MA40 HIGHER LONGBERAK TO LOWER SHARPNOSE POINT

SMP2 POLICY POLICY UNIT EPOCH EPOCH EPOCH ACTIONS INDICATIVE OBJECTIVES MONITORING PARTNERS PRIORITY FUNDING 1 2 3 TIMESCALE INDICATORS Undefended Monitoring of Short to Assess impacts Understanding National Medium Landowner cliffs impacts of car medium on landscape & of impacts, Trust (including parking at term AONB assessment of Northcott Sandymouth and alternatives 40.1 NAI NAI NAI Duckpool Mouth, Sandymouth and Duckpool) Weir refurbishment Short term Maintain Number of PCO, CC, High FCRM Bude Haven 40.2 HTL HTL HTL Scheme defence properties at EA, Town GiA, & Canal area standard high risk Council

Bude Flood defence Short term Maintain Number of PCO, CC, High FCRM refurbishment defence properties at EA, Town GiA, standard high risk Council

Community adaptation Short to Improved Adaptation CC, Town High CC strategy to climate medium community strategy Council, change term resilience and included in EA resistance to Settlement flooding Strategy Beach and erosion Short to Confirm Improved PCO, CC, High FCRM monitoring and post medium magnitude of understanding EA, Town GiA, storm damage surveys erosion of beach and Council

Cornwall and Isles of Scilly SMP2 72 Final Report Chapter 6 - Action Plan February 2011

PDZ16 MA40 HIGHER LONGBERAK TO LOWER SHARPNOSE POINT

SMP2 POLICY POLICY UNIT EPOCH EPOCH EPOCH ACTIONS INDICATIVE OBJECTIVES MONITORING PARTNERS PRIORITY FUNDING 1 2 3 TIMESCALE INDICATORS pressure defence behaviour Beach and Dune Short to Maintain and Area of BAP PCO, CC, Medium FCRM GiA Management Plan medium enhance sand Habitat EA, Town dunes. Council Wave Study and Short term Improved wave PCO, EA, Medium FCRM GiA monitoring (with PU40.3 climate CC and PU40.4) understanding and quantify risk to property and infrastructure FCRM Scheme Medium to Reduce risks to Number of CC, EA, High FCRM GiA long term life, property properties at Town CC and high risk. Council, infrastructure. Area of BAP landowners Maintain and Habitat enhance sand dunes. Community adaptation Short to Improved Adaptation CC, Town High CC Summerleaze strategy to climate medium community strategy Council, 40.3 MR MR NAI change term resilience and included in EA beach resistance to Settlement flooding Strategy Beach and erosion Short to Confirm Improved PCO, CC, High FCRM monitoring and post medium magnitude of understanding EA, Town GiA, storm damage surveys erosion of beach and Council pressure defence behaviour Beach and Dune Short to Maintain and Area of BAP PCO, CC, Medium FCRM GiA Management Plan medium enhance sand Habitat EA, Town dunes. Council Wave Study and Short term Improved wave PCO, EA, Medium FCRM GiA monitoring (with PU40.2 climate CC and PU40.4) understanding and quantify risk to property

Cornwall and Isles of Scilly SMP2 73 Final Report Chapter 6 - Action Plan February 2011

PDZ16 MA40 HIGHER LONGBERAK TO LOWER SHARPNOSE POINT

SMP2 POLICY POLICY UNIT EPOCH EPOCH EPOCH ACTIONS INDICATIVE OBJECTIVES MONITORING PARTNERS PRIORITY FUNDING 1 2 3 TIMESCALE INDICATORS and infrastructure

FCRM Managed Medium to Reduce risks to Number of CC, EA, High FCRM GiA Realignment Scheme long term life, property properties at Town CC and high risk. Council, infrastructure. Area of BAP landowners Maintain and Habitat enhance sand dunes. Community adaptation Short to Improved Adaptation CC, Town High CC strategy to climate medium community strategy Council, change term resilience and included in EA resistance to Settlement flooding Strategy Beach and erosion Short to Confirm Improved PCO, CC, High FCRM monitoring and post medium magnitude of understanding EA, Town GiA, storm damage surveys erosion of beach and Council pressure defence behaviour Beach Management Short to Maintain PCO, CC, Low FCRM GiA Crooklets Plan medium amenity beach EA, Town 40.4 MR MR NAI Council beach Wave Study and Short term Improved wave PCO, EA, Low FCRM GiA monitoring (with PU40.2 climate CC and PU40.4) understanding and quantify risk to property and infrastructure FCRM Managed Medium to Reduce risks to Number of CC, EA, Low FCRM GiA Realignment Scheme long term life, property properties at Town CC and high risk Council, infrastructure landowners

Cornwall and Isles of Scilly SMP2 74 Final Report Chapter 6 - Action Plan February 2011

PDZ17 MA41 LOWER SHARPNOSE POINT TO HARTLAND POINT

SMP2 POLICY POLICY UNIT EPOCH EPOCH EPOCH ACTIONS INDICATIVE OBJECTIVES MONITORING PARTNERS PRIORITY FUNDING 1 2 3 TIMESCALE INDICATORS

Undefended 41.1 NAI NAI NAI cliffs Hartland 41.2 NAI NAI NAI Quay

Cornwall and Isles of Scilly SMP2 75 Final Report Chapter 6 - Action Plan February 2011

PDZ18 MA42 – MA46 ISLES OF SCILLY

SMP2 POLICY POLICY UNIT EPOCH EPOCH EPOCH ACTIONS INDICATIVE OBJECTIVES MONITORING PARTNERS PRIORITY FUNDING 1 2 3 TIMESCALE INDICATORS Wave Study and Short term. Improved wave PCO, EA, High FCRM monitoring (notably Wave buoys climate Council for GiA on St Mary’s for deployed understanding IoS IoS Porthcressa, Porth during next and quantify Hellick, Porthmellon 5 year risk to property Various Various Various and Harbour frontage, phase of and on St Agnes for Big Strategic infrastructure Pool defences, and Monitoring on Tresco for Island Programme. Hotel). LDF to identify CCMA Short term. Manage spatial CCMA IoS Spatial High IoS for St Marys This planning identified in Planners, planning impacts of MR Core Strategy EA should and sea level Policy for Various Various Various commence rise community by 2015 in adaptation PDZ 18 line with the included in strategy Core Strategy (see below). Isles of Scilly FCRM Short to Inform Spatial Baseline EA, Council High FCRM Strategy medium Planning of evidence for IoS, GiA, coastal provided for landowners, IoS Initial pressure and LDF. Duchy, NE, strategy is defence Scale of MR English urgently options. understood. Heritage required Identify Impacts on Various Various Various and should preferred infrastructure be scheme to understood. completed manage flood Impacts on in next 5-10 and coastal Ground water years. risks to understood. property and infrastructure.

Cornwall and Isles of Scilly SMP2 76 Final Report Chapter 6 - Action Plan February 2011

PDZ18 MA42 ST MARY’S

SMP2 POLICY POLICY UNIT EPOCH EPOCH EPOCH ACTIONS INDICATIVE OBJECTIVES MONITORING PARTNERS PRIORITY FUNDING 1 2 3 TIMESCALE INDICATORS The Mermaid 42.1 HTL HTL HTL Wall 42.2 The Quay HTL HTL HTL Isles of Scilly FCRM Short to Quantify Evidence PCO, IoS, High FCRM Strategy – see PDZ medium magnitude of base EA, Duchy GiA 18 Initial required available for strategy is managed LDF. urgently realignment. Evidence required Support base for and should resilience of Sewerage The Quay to be critical Infrastructure 42.3 HTL HTL MR completed infrastructure. improvements Custom House in next 5-10 Inform spatial years. planning. FCRM Scheme Medium to Mange risks to Number of PCO, IoS, High FCRM long term life, property properties at EA, Duchy, GiA and risk. landowners infrastructure. Critical infrastructure at risk. Isles of Scilly FCRM Short to Quantify Evidence PCO, IoS, High FCRM Strategy – see PDZ medium magnitude of base EA, Duchy GiA 18 required available for Initial managed LDF. strategy is realignment. Evidence urgently Support base for Custom House required resilience of Sewerage 42.4 HTL HTL MR and should critical Infrastructure to Carn Thomas be infrastructure. improvements completed Inform spatial in next 5-10 planning. years. FCRM Scheme Medium to Mange risks to Number of PCO, IoS, High FCRM long term life, property properties at EA, Duchy, GiA and risk. landowners

Cornwall and Isles of Scilly SMP2 77 Final Report Chapter 6 - Action Plan February 2011

PDZ18 MA42 ST MARY’S

SMP2 POLICY POLICY UNIT EPOCH EPOCH EPOCH ACTIONS INDICATIVE OBJECTIVES MONITORING PARTNERS PRIORITY FUNDING 1 2 3 TIMESCALE INDICATORS infrastructure. Critical Manage risks infrastructure to Lower at risk. Moors water supply and SSSI. Where feasible, maintain sand dune Beach and erosion Short to Confirm Improved PCO, IoS, High FCRM monitoring and post medium magnitude of understanding EA GiA, 42.5 Porth Mellon HTL MR MR storm damage erosion of beach and surveys pressure defence behaviour Beach and Dune Short to Maintain and Area of BAP PCO, IoS, High FCRM Management Plan medium enhance sand Habitat EA, Duchy GiA dunes. Isles of Scilly FCRM Short to Quantify Evidence PCO, IoS, High FCRM Strategy – see PDZ medium magnitude of base EA, Duchy GiA 18 required available for Initial managed LDF. strategy is realignment. Evidence urgently Support base for required resilience of Waste and should critical Infrastructure be infrastructure. improvement completed Maintain sand plans. in next 5-10 dune. Evidence years. Inform spatial base for water planning of resource implications for strategy. road and industrial estate. FCRM Managed Medium to Manage risks Number of PCO, IoS, High FCRM Realignment long term to life, property properties at EA, Duchy GiA

Cornwall and Isles of Scilly SMP2 78 Final Report Chapter 6 - Action Plan February 2011

PDZ18 MA42 ST MARY’S

SMP2 POLICY POLICY UNIT EPOCH EPOCH EPOCH ACTIONS INDICATIVE OBJECTIVES MONITORING PARTNERS PRIORITY FUNDING 1 2 3 TIMESCALE INDICATORS Scheme and risk. infrastructure. Critical Manage risks infrastructure to Lower at risk. Moors water Area of BAP supply and habitat. SSSI. Condition of Where SSSI. feasible, maintain sand dune Potential Short/med Investigate Highway IoS C, EA, Medium IoS realignment of term potential realigned Duchy Council highway options. away from Combine with erosion and overall flood risk adaptation zone. strategy. 42.6 Thomas Porth NAI NAI NAI 42.7 Porth Loo NAI MR MR Taylor's Island 42.8 NAI NAI NAI to Innisidgen Innisidgen to 42.9 NAI NAI NAI Point Beach and erosion Short to Confirm Improved PCO, IoS, High FCRM monitoring and post medium magnitude of understanding EA GiA, 42.10 Porth Hellick HTL MR NAI storm damage erosion of beach and surveys pressure defence behaviour Beach Management Short to Maintain Condition of PCO, IoS, High FCRM Plan medium beach as part beach EA, Duchy GiA of defence Isles of Scilly FCRM Short to Quantify Evidence PCO, IoS, High FCRM Strategy – see PDZ Medium magnitude of base EA, Duchy GiA 18 required available for

Cornwall and Isles of Scilly SMP2 79 Final Report Chapter 6 - Action Plan February 2011

PDZ18 MA42 ST MARY’S

SMP2 POLICY POLICY UNIT EPOCH EPOCH EPOCH ACTIONS INDICATIVE OBJECTIVES MONITORING PARTNERS PRIORITY FUNDING 1 2 3 TIMESCALE INDICATORS Initial Managed LDF. strategy is realignment. Evidence urgently Support base for water required resilience of resource and should water strategy be resource. completed in next 5-10 years.

FCRM Scheme Medium to Manage risks Number of PCO, IoS, High FCRM long term to life, property properties at EA, Duchy GiA and risk. infrastructure. Critical Manage risks infrastructure to water supply at risk. 42.11 Salakee Down NAI NAI NAI 42.12 Porth Minnick HTL MR MR 42.13 Tolman Point NAI NAI NAI Tolman Point to 42.14 NAI NAI NAI Old Town Slip Beach and erosion Short to Confirm Improved PCO, IoS, High FCRM Old Town Slip monitoring and post medium magnitude of understanding EA GiA, 42.15 HTL MR MR storm damage erosion of beach and to Old Church surveys pressure defence behaviour Beach Management Short to Maintain PCO, IoS, High FCRM Plan medium beach as part EA, Duchy GiA of defence Isles of Scilly FCRM Short to Quantify Evidence PCO, IoS, High FCRM Strategy – see PDZ medium magnitude of base EA, Duchy GiA 18 required available for Initial managed LDF. strategy is realignment. Evidence urgently Support base for water required resilience of resource

Cornwall and Isles of Scilly SMP2 80 Final Report Chapter 6 - Action Plan February 2011

PDZ18 MA42 ST MARY’S

SMP2 POLICY POLICY UNIT EPOCH EPOCH EPOCH ACTIONS INDICATIVE OBJECTIVES MONITORING PARTNERS PRIORITY FUNDING 1 2 3 TIMESCALE INDICATORS and should critical strategy be infrastructure. completed Inform spatial in next 5-10 planning of years. implications for road and water resources. FCRM Managed Medium to Mange risks to Number of PCO, IoS, High FCRM Realignment long term life, property properties at EA, Duchy GiA Scheme and risk. infrastructure. Critical Manage risks infrastructure to Lower at risk. Moors water Area of BAP supply and habitat. SSSI. Condition of SSSI. Old Church to 42.16 NAI NAI NAI Carn Leh Beach and erosion Short to Confirm Improved PCO, IoS, High FCRM Carn Leh to monitoring and post medium magnitude of understanding EA GiA, 42.17 NAI NAI NAI storm damage erosion of beach and Playground surveys pressure defence behaviour Beach and erosion Short to Confirm Improved PCO, IoS, High FCRM Playground to monitoring and post medium magnitude of understanding EA GiA, 42.18 Slipway HTL NAI NAI storm damage erosion of beach and (Porthcressa) surveys pressure defence behaviour Isles of Scilly FCRM Short to Quantify Evidence PCO, IoS, High FCRM Strategy – see PDZ medium magnitude of base EA, Duchy GiA HTL 18 required available for Slipway to Little (with 42.19 HTL MR Initial managed LDF. Carn localised strategy is realignment. Evidence MR) urgently Support base for required resilience of Porthcressa and should critical Vision.

Cornwall and Isles of Scilly SMP2 81 Final Report Chapter 6 - Action Plan February 2011

PDZ18 MA42 ST MARY’S

SMP2 POLICY POLICY UNIT EPOCH EPOCH EPOCH ACTIONS INDICATIVE OBJECTIVES MONITORING PARTNERS PRIORITY FUNDING 1 2 3 TIMESCALE INDICATORS be infrastructure. completed Inform spatial in next 5-10 planning. years. FCRM Scheme Medium to Manage risks Number of PCO, IoS, High FCRM long term to life, property properties at EA, Duchy, GiA and risk. infrastructure. Critical infrastructure at risk. Isles of Scilly FCRM Short to Quantify Evidence PCO, IoS, High FCRM Strategy – see PDZ medium magnitude of base EA, Duchy GiA 18 required available for Initial managed LDF. strategy is realignment. Evidence urgently Support base for required resilience of Porthcressa HTL and should critical Vision. Little Carn to (with be infrastructure. Evidence 42.20 HTL MR completed Inform spatial base for Sally Port localised in next 5-10 planning. sewerage MR) years. improvement plans FCRM Scheme Medium to Manage risks Number of PCO, IoS, High FCRM long term to life, property properties at EA, Duchy, GiA and risk. infrastructure. Critical infrastructure at risk. Beach and erosion Short to Confirm Improved PCO, IoS, High FCRM Sally Port to the monitoring and post medium magnitude of understanding EA, English GiA, EH 42.21 Quay NAI NAI NAI storm damage erosion of beach and Heritage (The Garrison) surveys pressure defence behaviour

Cornwall and Isles of Scilly SMP2 82 Final Report Chapter 6 - Action Plan February 2011

PDZ18 MA43 ST MARTINS

SMP2 POLICY POLICY UNIT EPOCH EPOCH EPOCH ACTIONS INDICATIVE OBJECTIVES MONITORING PARTNERS PRIORITY FUNDING 1 2 3 TIMESCALE INDICATORS Tean 43.1 NAI NAI NAI Sound St Martins 43.2 NAI NAI NAI Bay Beach and erosion Short to Confirm Improved PCO, IoS, Low FCRM monitoring and post storm medium magnitude of understanding EA GiA, St Martin's damage surveys erosion of beach and 43.3 NAI NAI NAI Flats pressure general frontage behaviour Beach and erosion Short to Confirm Improved PCO, IoS, Low FCRM monitoring and post storm medium magnitude of understanding EA GiA, Middle damage surveys erosion of beach and 43.4 NAI NAI NAI Town pressure general frontage behaviour

Cornwall and Isles of Scilly SMP2 83 Final Report Chapter 6 - Action Plan February 2011

PDZ18 MA44 TRESCO

SMP2 POLICY POLICY UNIT EPOCH EPOCH EPOCH ACTIONS INDICATIVE OBJECTIVES MONITORING PARTNERS PRIORITY FUNDING 1 2 3 TIMESCALE INDICATORS Beach and erosion Short to Confirm Improved PCO, IoS, Medium FCRM monitoring and post storm medium magnitude of understanding EA GiA, New damage surveys erosion of beach and 44.1 HTL HTL HTL Grimsby pressure general frontage behaviour Castle 44.2 NAI NAI NAI Down Land 44.3 Island Hotel HTL HTL MR owner Old 44.4 NAI NAI NAI Grimsby 44.5 Rushy Point NAI NAI NAI Beach and erosion Short to Confirm Improved PCO, IoS, Medium FCRM South monitoring and post storm medium magnitude of understanding EA GiA, damage surveys erosion of beach and Beach / 44.6 NAI NAI NAI pressure general Pentle Bay frontage behaviour Beach and erosion Short to Confirm Improved PCO, IoS, Medium FCRM monitoring and post storm medium magnitude of understanding EA GiA, Appletree damage surveys erosion of beach and 44.7 NAI NAI NAI Bay pressure general frontage behaviour Beach and erosion Short to Confirm Improved PCO, IoS, Medium FCRM monitoring and post storm medium magnitude of understanding EA GiA, Tresco damage surveys erosion of beach and 44.8 NAI NAI NAI Flats pressure general frontage behaviour

Cornwall and Isles of Scilly SMP2 84 Final Report Chapter 6 - Action Plan February 2011

PDZ18 MA45

SMP2 POLICY POLICY UNIT EPOCH EPOCH EPOCH ACTIONS INDICATIVE OBJECTIVES MONITORING PARTNERS PRIORITY FUNDING 1 2 3 TIMESCALE INDICATORS Beach and erosion Short to Confirm Improved PCO, IoS, Medium FCRM NAI NAI monitoring and post medium magnitude of understanding EA GiA, Great Porth (with (with storm damage erosion of beach and 45.1 HTL north localised localised surveys pressure general HTL) HTL) frontage behaviour Beach and erosion Short to Confirm Improved PCO, IoS, Medium FCRM monitoring and post medium magnitude of understanding EA GiA, storm damage erosion of beach and 45.2 Stinking Porth NAI NAI NAI surveys pressure general frontage behaviour 45.3 Gweal Hill NAI NAI NAI Beach and erosion Short to Confirm Improved PCO, IoS, Medium FCRM monitoring and post medium magnitude of understanding EA GiA, storm damage erosion of beach and surveys pressure general frontage behaviour Isles of Scilly FCRM Short to Quantify Evidence PCO, IoS, High FCRM Strategy – see PDZ medium magnitude of base EA, Duchy GiA Great 45.4 HTL NAI NAI 18 required available for Popplestones Initial managed LDF. strategy is realignment. Evidence urgently Support base for water required resilience of resource and should water strategy be resource. completed in next 5-10 years. Little 45.5 NAI NAI NAI Popplestones Popplestone 45.6 NAI NAI NAI Brow

Cornwall and Isles of Scilly SMP2 85 Final Report Chapter 6 - Action Plan February 2011

PDZ18 MA45 BRYHER

SMP2 POLICY POLICY UNIT EPOCH EPOCH EPOCH ACTIONS INDICATIVE OBJECTIVES MONITORING PARTNERS PRIORITY FUNDING 1 2 3 TIMESCALE INDICATORS Popplestone 45.7 Brow to NAI NAI NAI Hangman Island 45.8 Kitchen Porth NAI NAI NAI Post Office to 45.9 NAI NAI NAI the Bar The Bar to the 45.10 NAI NAI NAI Quay 45.11 Southward NAI NAI NAI Beach and erosion Short to Confirm Improved PCO, IoS, Medium FCRM monitoring and post medium magnitude of understanding EA GiA, The Brow to storm damage erosion of beach and 45.12 NAI NAI NAI Works Point surveys pressure general frontage behaviour Beach and erosion Short to Confirm Improved PCO, IoS, Medium FCRM monitoring and post medium magnitude of understanding EA GiA, Works Point to storm damage erosion of beach and 45.13 NAI NAI NAI Great Carn surveys pressure general frontage behaviour

Cornwall and Isles of Scilly SMP2 86 Final Report Chapter 6 - Action Plan February 2011

PDZ18 MA46 ST AGNES &

SMP2 POLICY POLICY UNIT EPO EPOCH 2 EPOCH 3 ACTIONS INDICATIVE OBJECTIVES MONITORING PARTNERS PRIORITY FUNDING CH 1 TIMESCALE INDICATORS 46.1 Tol Tuppens to Kittern Rock NAI NAI NAI (Gugh) 46.2 Kittern Rock to The Hoe NAI NAI NAI (Gugh) 46.3 The Hoe to the NAI NAI NAI Bar (Gugh) 46.4 The Bar NAI NAI NAI

46.5 The Bar to Tol NAI NAI NAI Tuppens 46.6 Kallimay Point NAI NAI NAI to the Jetty 46.7 The Jetty to the NAI NAI NAI Bar 46.8 The Bar to NAI NAI NAI Tean Plat Point 46.9 Tean Plat Point NAI NAI NAI to Long Point 46.10 Long Point to NAI NAI NAI Pereglis slips Isles of Scilly Short to Quantify Evidence PCO, IoS, High FCRM FCRM Strategy – medium magnitude of base EA, Duchy GiA see PDZ 18 required available for Pereglis Slips Initial managed LDF. 46.11 to Ginamoney HTL HTL HTL strategy is realignment. Evidence Carn urgently Support base for required resilience of water and should water resource. resource be strategy

Cornwall and Isles of Scilly SMP2 87 Final Report Chapter 6 - Action Plan February 2011

PDZ18 MA46 ST AGNES & GUGH

SMP2 POLICY POLICY UNIT EPO EPOCH 2 EPOCH 3 ACTIONS INDICATIVE OBJECTIVES MONITORING PARTNERS PRIORITY FUNDING CH 1 TIMESCALE INDICATORS completed in next 5-10 years.

Where works are to be undertaken along existing defence line at Big Pool within the Isles of Scilly, the surface materials should be similar to the existing materials in order HRA Action to avoid any loss of intertidal rocky habitats, and should be designed so as to maintain any bird roosting features. Prevents adverse effects to the Isles of Scilly SPA and Ramsar site Isles of Scilly Short to Quantify Evidence PCO, IoS, High FCRM FCRM Strategy – medium magnitude of base EA, Duchy GiA see PDZ 18 required available for Initial managed LDF. strategy is realignment. Evidence urgently Support base for required resilience of water Ginamoney and should water resource. resource be strategy Carn to 46.12 HTL HTL HTL completed Browarth Point in next 5-10 years.

Where works are to be undertaken along existing defence line at Big Pool within the Isles of Scilly, the surface materials should be similar to the existing materials in order HRA Action to avoid any loss of intertidal rocky habitats, and should be designed so as to maintain any bird roosting features. Prevents adverse effects to the Isles of Scilly SPA and Ramsar site 46.13 Browarth Point NAI NAI NAI 46.14 Browarth Point NAI (with NAI (with to Kallimay NAI localised localised Point HTL) HTL)

Cornwall and Isles of Scilly SMP2 88 Final Report Chapter 6 - Action Plan February 2011

CFMP policy in relation to SMP2 policy

Table 6.2 presents a comparison between the SMP2 Preferred Plan and the CFMP policy where a specific action to implement the CFMP Policy option is published in the CFMPs for Tamar Catchment, East and West Cornwall and North Devon. This comparison shows that there are no conflicts between the CFMP implementation actions and SMP2 preferred plan, with many actions from the CFMP able to be fed into the SMP Action Plan in order to compliment and support the flood and coastal risk management actions at these locations.

TABLE 6.2 CFMP ACTIONS & POLICY IN RELATION TO SMP2 LOCATIONS

SMP2 Preferred Plan CFMP CFMP proposed action to implement the SMP2 Action Plan Policy policy Inclusions Action P5 Investigate measures for reducing flood risk at Road realignment Seaton 2.3 MR MR MR Looe, Fowey, Polperro and Seaton, from tidal scheme Beach and surface water flooding. P5 Investigate measures for reducing flood risk at Tidal FCRM strategy Looe, from tidal and surface water flooding. and scheme, with We would expect planning policy to address community adaptation East and climate change adaptation due to sea level rise, to climate change. 3.4 HTL HTL HTL West Looe especially at Looe Wave monitoring. Investigate the possibility of installing a tide gauge at either Fowey or Looe for flood warning Investigate measures for reducing flood risk at Polperro flood defence 3.8 Polperro HTL HTL HTL P5 Polperro from tidal and surface water flooding. scheme Investigate measures for reducing flood risk at Fowey Flood Defence Fowey from tidal and surface water flooding. Scheme We would expect planning policy to address climate change adaptation due to sea level rise, 4.3 Fowey HTL HTL HTL P5 especially at Fowey. Investigate the possibility of installing a tide gauge at either Fowey or Looe for flood warning 5.4 Lostwithiel HTL/MR HTL/MR HTL/MR P4 Review options to reduce flood risk at Lostwithiel Flood

Cornwall and Isles of Scilly SMP2 89 Final Report Chapter 6 - Action Plan February 2011

SMP2 Preferred Plan CFMP CFMP proposed action to implement the SMP2 Action Plan Policy policy Inclusions Action Lostwithiel, including improving lead time for Defence Scheme flood warning and improving the standard of Flood plain WFD protection of current defences. Undertake work improvements to reduce risk if justified. We would expect planning policy to address climate change adaptation due to sea level rise, especially at Lostwithiel.

Flood Hazard Mapping of Par, St Blazey to Par and St Blazey improve emergency response information. Flood Strategy to Undertake a flood risk management strategy at manage increasing 6.3 Par Sands NAI MR MR P5 Par and St Blazey to investigate opportunities flood risks, including to improve existing flood alleviation schemes. joint fluvial, tidal and Surface Water Management Plans (SWMP) surface water flooding produced for Par and St Blazey. Surface Water Management Plans (SWMP) FCRM (tidal and produced for Mevagissey. fluvial) Scheme Wave Study and monitoring. Community adaptation 8.4 Mevagissey HTL/MR HTL/MR HTL P5 strategy to climate change. Condition survey for harbour breakwaters (particularly North Pier & Victoria Pier) Investigate the scope for wetland creation on Managed Realignment the Tresillian River upstream of Ladock and Scheme Tresillian. Review SAC boundary HTL/ HTL/ to include all mudflat 12.3 Tresillian HTL P6 MR MR and saltmarsh habitats Community adaptation strategy to climate change

Cornwall and Isles of Scilly SMP2 90 Final Report Chapter 6 - Action Plan February 2011

SMP2 Preferred Plan CFMP CFMP proposed action to implement the SMP2 Action Plan Policy policy Inclusions Action Review Truro flood alleviation scheme and Lighterage Quay implement measures required to sustain the Improvements. current scale of flood risk into the future. Truro Strategy Create community-based warnings for areas at monitoring of habitat Truro – 12.4 HTL/MR HTL/MR HTL/MR P5 risk of tidal flooding. sedimentation Upper Basin Undertake a flood risk management strategy to monitoring investigate key opportunities for managed realignment in the Fal estuary and potential impacts on flood risk and habitat creation. Investigate the creation of wetland areas at Marazion Marsh Marazion Marsh to enhance this SSSI/SPA site Habitat Strategy Marazion 19.6 HTL HTL HTL P5 and reduce flood risk in the Green Lane area. FCRM Scheme Marsh Beach and Dune Management Plan Undertake Surface Water Management Plans Community adaptation for St Ives and Hayle. Within this, strategy to climate investigate retrofitting Sustainable Drainage change. Systems and using pumping stations to deal Condition and with tide-locking issues. Include proposals for performance survey implementation at St Ives and Hayle. for harbour breakwater St Ives (Smeaton’s Pier) 25.4 HTL HTL HTL P4 Harbour FCRM Scheme;The Sloop, FCRM Scheme; Wharf Road FCRM Scheme; Pednolva(Lambeth) walk

Review flood alleviation scheme to FCRM Managed sustain current standard of service. Realignment Undertake a flood risk management strategy for 27.3 St Erth HTL/MR HTL/MR HTL/MR P4 the Hayle River to consider how provision of upstream storage, wetland creation and setting back of defences could sustain flood risk.

Cornwall and Isles of Scilly SMP2 91 Final Report Chapter 6 - Action Plan February 2011

SMP2 Preferred Plan CFMP CFMP proposed action to implement the SMP2 Action Plan Policy policy Inclusions Action Undertake Surface Water Management Plan for FCRM Scheme, Hayle. Within this investigate retrofitting FCRM Managed 27.4- Sustainable Drainage Systems and using Realignment Hayle area Combination of HTL and MR P4 27.6 pumping stations to deal with tide-locking issues. Include proposals for implementation at Hayle. Undertake feasibility studies at Portreath for LDF to identify CCMA options to reduce flood risk. Implement (includes PU29.2), recommendations. Condition and Create specific flood warning service on the performance survey Stream/Portreath Stream for Portreath. for harbour Portreath Create a Major Incident Plan (MIP) for breakwater, Beach 29.3 HTL HTL/MR HTL/MR P5 Harbour Portreath monitoring and post storm damage surveys, FCRM Scheme, Wave Study and monitoring (includes PU29.2) Review flood warning criteria for MIP at Community adaptation Perranporth. strategy to climate change, Strategic Flood Risk Assessment to consider wave induced flooding, Beach 30.3 Perranporth HTL MR MR P5 monitoring and post storm damage surveys, Wave Study and monitoring, FCRM Bolingey Fluvial Scheme, FCRM Managed realignment Scheme. 33.3 Mawgan MR MR NAI P3 Continue to maintain existing defences at LDF to identify CCMA,

Cornwall and Isles of Scilly SMP2 92 Final Report Chapter 6 - Action Plan February 2011

SMP2 Preferred Plan CFMP CFMP proposed action to implement the SMP2 Action Plan Policy policy Inclusions Action Porth – Mawgan Porth Beach and dune road section monitoring and post storm damage surveys, Beach Management Plan (with 33.4), Wave Study and monitoring, FCRM Managed Realignment Scheme Undertake and implement Surface Water FCRM Scheme, Management Plans for Padstow. Community adaptation Padstow strategy to climate 35.2 HTL HTL HTL P5 Harbour change

Ensure PPS25 implemented for development Community adaptation and in particular at Wadebridge. strategy to climate Undertake and implement Surface Water change FCRM 35.5 Wadebridge HTL HTL HTL P5 Management Plans for Wadebridge. Scheme Investigate the current management of flood risk at Wadebridge. Investigate the current management of flood FCRM Managed 35.8 Sladesbridge HTL MR MR P5 risk on the rivers Allen and Camel at Realignment Scheme Sladesbridge. Sustain the current flood risk at Boscastle into FCRM Scheme the future Condition and 37.6 Boscastle HTL HTL HTL P4 performance survey for east and west breakwaters Review existing flood risk in Bude and Bude Weir undertake work to reduce risk if justified. refurbishment scheme, Bude Haven 40.2 HTL HTL HTL P5 Review current facility for recording tide levels Bude Flood defence & Canal area at Bude and improve if required. refurbishment, Create community-based warnings for areas at Community adaptation

Cornwall and Isles of Scilly SMP2 93 Final Report Chapter 6 - Action Plan February 2011

SMP2 Preferred Plan CFMP CFMP proposed action to implement the SMP2 Action Plan Policy policy Inclusions Action risk of tidal flooding. strategy to climate Review and improve flood warnings on the change, Beach and Neet and Strat if feasible. erosion monitoring and post storm damage surveys, Beach and Dune Management Plan, Wave Study and monitoring (with PU40.3 and PU40.4), FCRM Scheme

Cornwall and Isles of Scilly SMP2 94 Final Report Chapter 6 - Action Plan February 2011