1 APPENDIX I (See paragraph – 6) FORM 1 (I) Basic Information Sr. Item Details No. 1. Name of the project/s Environmental Clearance for the Proposed Housing Project by M/s Kalyan Developers 2. S. No. in the schedule 8 (a), Construction Project with built-up area 28,739.54 sq. m. 3. Proposed capacity / area / length Total Plot Area = 1.036 ha. (10,360.32 sq.m.) /tonnage to be handled/command Total Built-up Area = 28,739.54 sq. m. area/lease area/ number of wells Total No. of Apts. = 114 Apartments to be drilled 4. New/Expansion/Modernization New (Proposed Housing Project) 5. Existing capacity/area etc., N.A. 6. Category of Project i.e. ‘A’ or ‘B’ Category ‘B’ 7. Does it attract the general NO condition? If yes, please specify 8. Does it attract the specific NO condition? If yes, please specify 9. Location Sy. Nos. 1008/4, 1008/5, 1008/6, 1009/39, Elamkulam Village, Kochi Corporation, Kanayannur Taluk, Ernakulam District, Kerala. Plot/Survey/Khasra No. Sy. Nos. 1008/4, 1008/5, 1008/6, 1009/39 Village Elamkulam Tehsil Kanayannur District Ernakulam State Kerala 10. Nearest railway station/airport The nearest railway stations (Nettoor along with distance in Kms Railway Station) which is located at about 2.5 km. and Cochin International Airport, Nedumbassery is at about 34 km. away from the project site. 11. Nearest Town, city, District Town/City - Project site is within the Kochi Headquarters along with distance City limit. in Kms District Headquarter - Kakkanad Civil Station, Kochi – 14 km. 12 Village Panchayats, Zilla Village office address :- Parishad, Municipal Corporation, Village Office Elamkulam, Local body (complete postal Near Regional Sports Centre, Gandhinagar, addresses with telephone nos. to Kadavanthara, Kochi, Kerala-682020. be given) Ph. 0484-220 7190. Corporation Address :- Corporation of Kochi, Park Avenue, Near Boat Jetty, Ernakulam, 2 Kerala-682011. Ph. 0484-2369007. 13 Name of the applicant M/s Kalyan Developers 14 Registered Address M/s Kalyan Developers, TC 35/1403, Sreekrishna Building, West Palace Road, Thrissur, Kerala-680022. Address for correspondence : M/s Kalyan Developers, TC 35/1403, Sreekrishna Building, West Palace Road, Thrissur, Kerala-680022. Name Mr. Karthik Ramani Designation(Owner/Partner/CEO) Managing Partner Address M/s Kalyan Developers, TC 35/1403, Sreekrishna Building, West Palace Road, Thrissur, Kerala-680022. Pin Code Kerala-680022. E-Mail [email protected] & [email protected] Telephone No. 0484-2332555 Mobile No. 09946691555 Fax No. 0484-2332555 16 Details of Alternative Sites Not Applicable examined, if any. Location of Village-District-State these sites should be shown on a 1. topo sheet 2. 17 Interlinked Projects Not applicable 18 Whether separate application of Not applicable interlinked projects has been submitted? 19 If yes, date of submission Not applicable 20 If no, reason Not applicable 21 Whether the proposal involves approval/clearance under: If yes, details of the same and their status to be given. (a) The Forest (Conservation) NO Act, 1980? (b) The Wildlife (Protection) Act, NO 1972? (c) The CRZ Notification, 2011 ? Yes, The proposed development is situated is a backwater island. Hence the CRZ landward from the HTL extends only up to 50 m. (CRZ 2011 ; VIDE PARA 8 v 2. (II)). The site developments is within Municipal limits of Elamkulam Municipaltiy and is in CRZ II. CRZ II area marked by drawing 50 m. buffer zone from creek HTL as site under reference situated in island category. The water body abutting the site and the bed is CRZ IV. The CRZ status report prepared by Institute 3 of Remote Sensing, Anna University, Chennai confirming above aspect of the CRZ classification of the project site. 22 Whether there is any NO Government Order/Policy relevant/relating to the site? 23 Forest land involved (hectares) NO 24 Whether there is any litigation NO pending against the project and/or land in which the project is propose to be set up? (a) Name of the Court (b) Case No. (c) Orders/directions of the Court, if any and its relevance with the proposed project. (II) Activity 1. Construction, operation or decommissioning of the Project involving actions, which will cause physical changes in the locality (topography, land use, changes in water bodies, etc.) Sr. Information/Checklist Yes Details thereof (with approximate No. confirmation / No quantities /rates, wherever possible) with source of information data 1.1 Permanent or temporary Yes There will be permanent change in land change in land use, land cover use, land cover or topography including or topography including increase in intensity of land use. increase in intensity of land use The present project is a group housing (with respect to local land use project and is located at Elamkulam plan) Village which is falling in Corporation limits of Kochi, Ernakulam District, Kerala. During construction phase, about 125 workers (average) will be at site. During operation phase, on full occupancy of housing project, the maximum population expected is 570 persons (residents) and hence there is increase in the intensity of land use. (Source: population is calculated based on NBC) 1.2 Clearance of existing land, Yes There are some of native species of vegetation and buildings? trees and different varieties of shrubs, herbs, grass & climbers at site. For the development of the proposed project, existing trees, different varieties of shrubs, herbs, grass & climbers will be cleared. Also there is an old structure which also to be cleared from the site. 4 1.3 Creation of new land uses? Yes The new land use will be for 114 Apartments project. 1.4 Pre-construction investigations Yes Pre-construction Soil Investigation has e.g. bore houses, soil testing? been carried out for the site. As per the soil investigation report, the water table is encountered upto a depth of about 0.3 m. below the ground level. 1.5 Construction works? Yes Construction of 114 Ap artments. Internal roads for movement inside the complex will be constructed. 1.6 Demolition works? Yes For the development of the proposed project, existing structure (with single story) will be demolished from the site. 1.7 Temporary sites used for Yes Temporary sheds constructed for construction works or housing housing of construction workers (about of construction workers? 125 persons). 1.8 Above ground buildings, Yes It is proposed to construct a residential structures or earthworks building block along with supporting including linear structures, cut infrastructure facilities w ithin the site. and fill or excavations The max. no. of floor of the building is Basement + Ground + 13 floors. Excavation of earthwork for foundation of structures & basement work will be carried out. The top soil which is fertile will be kept at site for landscaping work. The excavated soil will be used for back filling work and for internal road construction purposes. 1.9 Underground works including Yes No underground works including mining mining or tunneling? / tunneling required except the work and foundation work for the structures. 1.10 Reclamation works? No Not applicable 1.11 Dredging? No No dredging work required. 1.12 Offshore structures? No No offshore structure required. 1.13 Production and manufacturing No No production / manufacturing process processes? involved. 1.14 Facilities for storage of goods Yes Separate raw material store of cement or materials? and other construction materials is made with in the project premises. Bricks and steel laid in open. 1.15 Facilities for treatment or Yes Construction phase :- disposal of solid waste or liquid Solid waste generation from the project effluents? during construction phase will be about 50 Kg/day and domestic sewage will be about 7 KL/day. The non-biodegradable waste and other packaging material will be sold to the vendors. The bio- degradable solid waste will be disposed in a bio-bin system for microbial composting and a mobile STP for the treatment o f domestic sewage from the labour colony. Operation phase :- 5 Solid waste generation will be about 228 Kg/day and which will be collected separately as Bio-degradable and Non- biodegradable waste as per the MSW Rules, 2000. The non-biodegradable and recyclable wast e would be sold to the vendors. The biodegradable waste would be sent to the bio-gas generation plant. Further, the spent oil from the D.G. sets (defined as hazardous waste) will be sold to C.P.C.B. approved recyclers. Further, the spent oil from the D.G. sets (defined as hazardous waste) will be sold to C.P.C.B. approved recyclers. Effluent :- The domestic sewage about 64 KL/day will be generated which will be treated through proposed Sewage Treatment Plant to be installed within the project premises. 1.16 Facilities for long term housing No The proposed project is housing project of operational workers? and therefore no accommodation facility is proposed for the operational workers. 1.17 New road, rail or sea traffic No Not applicable during construction or operation? 1.18 New road, rail, air waterborne No Not applicable or other transport infrastructure including new or altered routes and stations, ports, airports etc? 1.19 Closure or diversion of existing No Not applicable transport routes or infrastructure leading to changes in traffic movements? 1.20 New or diverted transmission No Not applicable lines or pipelines? 1.21 Impoundment, damming, No Not applicable culverting, realignment or other changes to the hydrology of watercourses or aquifers? 1.22 Stream crossings? No No stream crossings in the project site. 1.23 Abstraction or transfers of Yes Water from wells. It is proposed to use water form ground or surface the well water for the project. waters? 1.24 Changes in water bodies or the No There is no changes in water bodies or land surface affecting drainage the land surface affecting drainage or or run-off? run-off.