Heritage Management Plan

Total Page:16

File Type:pdf, Size:1020Kb

Heritage Management Plan Unclassified Southwest Metro – Dulwich Hill, Campsie and Punchbowl Railway Station Upgrades Heritage Management Plan Sydney Metro Integrated Management System (IMS) Applicable to: City & Southwest Document Owner: Southwest Metro System Owner: - Status: Final Version: Rev03 Date of issue: 4 March 2021 Review date: 4 March 2021 © Sydney Metro 2020 Unclassified Unclassified Sydney Metro – Integrated Management System (IMS) (Uncontrolled when printed) Table of contents 1. Introduction .............................................................................................................. 8 1.1. Context and scope of this Sub-Plan ............................................................. 8 1.2. Project Background ...................................................................................... 8 1.3. Objectives and targets ................................................................................. 9 1.4. Consultation ................................................................................................. 9 2. Legal and other requirements ............................................................................... 11 2.1. Guidelines .................................................................................................. 13 2.2. Conditions of Approval ............................................................................... 14 2.3. Roles and responsibilities .......................................................................... 19 3. Existing environment ............................................................................................. 21 3.1. Context ....................................................................................................... 21 3.2. Aboriginal heritage ..................................................................................... 21 3.3. Built heritage .............................................................................................. 23 3.4. Non-Aboriginal archaeology ....................................................................... 28 3.4.1. Compound at the former Canterbury Bowling and Community Club (SPIR Work Site W7) ......................................................................... 28 4. Construction risk assessment .............................................................................. 30 5. Management measures ......................................................................................... 33 5.1. Aboriginal archaeological management ..................................................... 33 5.1.1. Aboriginal Cultural Heritage Assessment Report ....................... 33 5.1.2. Management of S2B PAD02 ...................................................... 33 5.1.3. Human remains .......................................................................... 33 5.1.4. Unexpected finds ....................................................................... 34 5.1.5. Clearance ................................................................................... 34 5.1.6. Reporting ................................................................................... 34 5.2. Built heritage management ........................................................................ 34 5.2.1. Design Requirements ................................................................ 34 5.2.2. Conservation/Heritage Architect ................................................ 34 5.2.3. Archival Photographic Recording ............................................... 35 5.2.4. Heritage Interpretation ............................................................... 35 5.2.5. Adaptive reuse ........................................................................... 35 5.2.6. Moveable heritage ..................................................................... 35 5.2.7. Significant fabric register ............................................................ 42 5.2.8. Works methodologies ................................................................ 42 5.2.9. Heritage Engineer ...................................................................... 42 5.2.10. Skilled tradespeople ................................................................... 42 5.2.11. Exclusion zones ......................................................................... 42 5.2.12. Works on significant fabric ......................................................... 42 5.2.13. Heritage Consultant advice ........................................................ 43 5.2.14. Landscape plan .......................................................................... 43 5.3. Non-Aboriginal archaeological management ............................................. 43 © Sydney Metro 2020 Unclassified Page 2 of 83 Dulwich Hill Campsie and Punchbowl Station Upgrades HMP Rev03 210304 Unclassified Sydney Metro – Integrated Management System (IMS) (Uncontrolled when printed) 5.3.1. Archaeological Zoning ............................................................... 43 5.3.2. Archaeological Management ..................................................... 43 5.3.3. Archaeological Method Statement ............................................. 44 5.3.4. Excavation Directors .................................................................. 44 5.3.5. Unexpected finds ....................................................................... 44 5.3.6. Clearance ................................................................................... 45 5.3.7. Human Remains ........................................................................ 45 5.3.8. Storage of archaeological remains ............................................ 45 5.3.9. Analysis and reporting ............................................................... 45 5.4. Heritage awareness training and induction ................................................ 46 5.5. Ongoing notifications – unexpected finds .................................................. 47 6. Management action checklist ............................................................................... 48 7. Monitoring, auditing and reporting ...................................................................... 66 7.1. Compliance ................................................................................................ 66 7.2. Archaeological monitoring .......................................................................... 66 7.3. Archaeological reporting ............................................................................ 66 8. Review and improvement ...................................................................................... 67 8.1. Enquiries, complaints and incident management ....................................... 67 9. HMP administration ............................................................................................... 68 9.1. Hold points ................................................................................................. 68 9.2. Records ...................................................................................................... 68 Appendix A – Other Conditions of Approval, Revised Environmental Mitigation Measures and CEMF Requirements Relevant to this Plan ................................. 69 Appendix B – Registered Aboriginal Parties ..................................................................... 78 Appendix C – Consultation Register .................................................................................. 79 Appendix D – Sydney Metro Unexpected Heritage Finds Procedure ............................. 83 Figures Figure 1:S2B PAD02 (yellow) in relation to proposed Punchbowl Station ............................ 22 Figure 2 Heritage items – Dulwich Hill Station ...................................................................... 24 Figure 3 Heritage items –Compound at former Canterbury Bowling and Community Club (SPIR Work Site W7) ............................................................................................................ 25 Figure 4 Heritage items – Campsie Station .......................................................................... 26 Figure 5 Heritage items – Punchbowl Station ....................................................................... 27 Figure 6: Archaeological potential at Canterbury Compound (SPIR Work Site W7) (site outlined in yellow) ................................................................................................................. 29 Figure 7: Archaeological management at Canterbury Compound (SPIR Work Site W7) (site outlined in yellow) ................................................................................................................. 29 Tables Table 1: Impacts to heritage items (SPIR) relevant to this Project ......................................... 8 Table 2: Consultation carried out in the development of this Plan .......................................... 9 Table 3: Legislation and Planning Instruments ....................................................................... 11 Table 4: HMP Compliance Matrix ......................................................................................... 15 © Sydney Metro 2020 Unclassified Page 3 of 83 Dulwich Hill Campsie and Punchbowl Station Upgrades HMP Rev03 210304 Unclassified Sydney Metro – Integrated Management System (IMS) (Uncontrolled when printed) Table 5: Roles and responsibilities ....................................................................................... 19 Table 6: Heritage listed Items in and adjacent to the Project area
Recommended publications
  • Campsie Station Design and Precinct Plan
    METRON T2M MM_Title4 MM_Title5 Sydney Metro Southwest Metro Design Services (SMDS) METRON T2M Campsie Station Design & Precinct Plan Southwest Metro Design Services (SMDS) 18 January 2021 Document: SMCSWSWM-MTM-WCS-UD-REP-151000 A Joint Venture of Principal sub-consultant METRON is a joint venture of Arcadis and Mott MacDonald, with principal sub-consultant DesignInc METRON is a joint venture of Arcadis and Mott MacDonald, with principal sub-consultant Design Inc. Sydney Metro Southwest Metro Design Services (SMDS) Amendment Record Date Document Number/s Revision Amendment Description By 04 October 2019 SMCSWSWM-MTM-WCS-UD-REP-151000 A 70% draft Lynne Hancock with input SMCSWSWM-MTM-WHP-UD-REP-000380 A from UD and LA team Approval Record 08 May 2020 SMCSWSWM-MTM-WCS-UD-REP-151000 B (03.02) 100% Draft Ben Coulston with input from SMCSWSWM-MTM-WHP-UD-REP-000380 B UD and LA team Function Position Name Date 07 September 2020 SMCSWSWM-MTM-WCS-UD-REP-151000 C 100% Draft Ben Coulston with input from Prepared by Principal & Senior Urban Lynne Hancock & 18 January 2021 SMCSWSWM-MTM-WHP-UD-REP-000380 C UD and LA team Designer Ben Coulston 04 December 2020 SMCSWSWM-MTM-WCS-UD-REP-151000 D 100% Final Ben Coulston with input from Technical Checker Principal Urban Designer Lynne Hancock 18 January 2021 SMCSWSWM-MTM-WHP-UD-REP-000380 D UD and LA team Reviewed by T2M Urban Design Lead Mary Anne McGirr 18 January 2021 18 January 2021 SMCSWSWM-MTM-WCS-UD-REP-151000 E 100% Final Ben Coulston with input from Approved by Director Ian Armstrong 18 January 2021 SMCSWSWM-MTM-WHP-UD-REP-000380 E UD and LA team Campsie Station Design & Precinct Plan.
    [Show full text]
  • NSW HRSI NEWS August 2016
    NSW HRSI NEWSLETTER Issue 8 HRSI NSW HRSI NEWS August 2016 Mt Horeb railway station on the Cootamundra-Tumut branch line in the 1980s (Andrew Roberts collection) NSW HERITAGE RAILWAY STATION AND INFRASTRUCTURE NEWS ISSUE N.8 WELCOME to the 8th newsletter Copyright © 2014 - 2016 Newsletter index of NSWHRSI. The objective of NSWHRSI . All photos and WELCOME / MAIN NEWS 1 this newsletter is to inform, information remains property of RAILWAY GATEKEEPERS HOUSES ACROSS NSW - educate and provide insights HRSI / Phil Buckley unless stated A REVIEW 2 about the latest updates, plans to our various contributors / and heritage news relating to original photographers or COMMUNITY REUSE OF ABANDONED RAILWAY STATIONS PART 2 SOUTH / SOUTH WEST NSW 2 Heritage Railway Stations and donors. Infrastructure (HRSI) across RAIL HERITAGE WEEKEND – SYDNEY 4 NSW. The news in this letter is Credits/Contributors this issue – Greg separated into 4 core NSW Finster, Ainslie Pasql, Bruce Nelson, SOUTHERN NSW RAIL GRAIN SHEDS – FADING Peter Watters, Lindsay Richmond, STRUCTURES 7 regions – Northern, Western and Chris Stratton, Mark Zanker, Brett Southern NSW and Sydney. Leslie, Allan Hunt, Andrew Phelan, MARKING TIME NSWGR CLOCKS / BRUCE NELSON INTERVIEW 10 MAIN NEWS Gordon Ross, Adrian Compton, Gordon Issue 8 and we are focusing on Williams (Craig Short), Weston RYLSTONE BRANCH LINE SECTION REOPENS 16 heritage operations in Sydney, Langford, Nicole Hentscher, Douglas Moyle, Steve Bucton, Jim Lippitts, NORTHERN NSW 22 examining gatehouses relics, Marc Conyard, Peter Sweetten, Hayley interview a Sydney trains Hailz, Warren Banfield, Andrew WESTERN NSW 25 heritage employee, along with Roberts, Peter Burr, Philip Vergison, various news and updates which Bob Dines SOUTHERN NSW 26 include more heritage stations Northern NSW reporters – Gordon SYDNEY REGION 30 being repainted across NSW.
    [Show full text]
  • Sydney Metro City and South West - Line-Wide Works
    Acoustics Vibration Structural Dynamics SYDNEY METRO CITY AND SOUTH WEST - LINE-WIDE WORKS Construction Noise and Vibration Impact Statement Portion 4 - Bulk Power Supply Works (Southern) 2 June 2020 Systems Connect TK685-03-03F01 CNVIS C2B_P4 BPS Campsie (r6) Sydney Melbourne Brisbane Gold Coast Kuwait Singapore Renzo Tonin & Associates ABN 29 117 462 861 Level 1/418A Elizabeth St SURRY HILLS NSW 2010 | PO Box 877 STRAWBERRY HILLS NSW 2012 P (02) 8218 0500 F (02) 8218 0501 [email protected] www.renzotonin.com.au RENZO TONIN & ASSOCIATES 2 JUNE 2020 Document details Detail Reference Doc reference: TK685-03-03F01 CNVIS C2B_P4 BPS Campsie (r6) Prepared for: Systems Connect Address: Level 3, 116 Miller Street North Sydney NSW 2060 Australia Attention: Mathew Billings Document control Non-issued Issued Date Revision history Prepared Instructed Authorised revision revision 10.12.2019 First issue 0, 1 2 B. Carlyle T. Gowen T. Gowen 06.01.2020 Minor update 3 4 M. Tabacchi T. Gowen T. Gowen 11.02.2020 Address TfNSW comments - 5 T. Gowen T. Gowen M. Tabacchi 02.06.2020 Update to include additional - 6 T. Gowen T. Gowen M. Tabacchi OOHW in Area 1 Important Disclaimer: The work presented in this document was carried out in accordance with the Renzo Tonin & Associates Quality Assurance System, which is based on Australian Standard / NZS ISO 9001. This document is issued subject to review and authorisation by the Team Leader noted by the initials printed in the last column above. If no initials appear, this document shall be considered as preliminary or draft only and no reliance shall be placed upon it other than for information to be verified later.
    [Show full text]
  • Draft South District Plan
    Draft South District Plan co-creating a greater sydney November 2016 How to be involved This draft District Plan sets You can read the entire Before making a submission, out aspirations and proposals draft District Plan at please read our privacy for Greater Sydney’s South www.greater.sydney and send statement at District, which includes the feedback: www.greater.sydney/privacy local government areas of • via www.greater.sydney For more information Canterbury-Bankstown, visit www.greater.sydney Georges River and Sutherland. • by email: call us on 1800 617 681 It has been developed by the [email protected] Greater Sydney Commission. • by post: or email: Greater Sydney Commission [email protected] This draft District Plan is on Draft South District Plan formal public exhibition until PO Box 257, the end of March 2017, and will Parramatta NSW 2124 be finalised towards the end of 2017 to allow as many people as possible to provide input. This document was updated on 21 December 2016 to address typographical errors and production faults. A detailed list of the errata can be found at www.greater.sydney/content/publications Draft South District Plan Exhibition THIS SEPARATE DOCUMENT DOCUMENT Overview Draft District Maps Background Website Plan Material Dashboard Our vision — Towards our Greater Sydney 2056 Summary The requirements A compilation of Data and Reports How the A draft brochure of the legislative maps and spatial used to inform the draft District Plan is amendment to of the draft framework information used draft District Plan to be monitored update A Plan for District Plan to inform the draft Growing Sydney District Plan You can view these supporting components, as well as Our vision — Towards our Greater Sydney 2056, SOUTH DISTRICT our proposed 40-year vision for Greater Sydney, at www.greater.sydney.
    [Show full text]
  • Canterbury Bankstown Affordable Housing Strategy Background Report 7 of 93 DRAFT
    CANTERBURY BANKSTOWN Draft Affordable Housing Strategy: Background Report February 2020 Contents 1.0 Introduction ................................................................................................ 8 Background ..................................................................................................................... 8 The Canterbury Bankstown LGA ..................................................................................... 8 What is affordable housing? ......................................................................................... 10 Role of local government in affordable housing ........................................................... 11 2.0 The need for affordable housing ................................................................ 13 Housing stress ............................................................................................................... 13 Housing affordability – rental market availability ......................................................... 20 Key workers ................................................................................................................... 22 Students ........................................................................................................................ 24 Social housing ............................................................................................................... 25 People experiencing homelessness .............................................................................. 26 Rationale for
    [Show full text]
  • GIPAA D 2014 463007Final Data Sydney Rail Network Crime Incidents
    IAU 128028 - Released 30/1/2015 Total number of incidents of crime in Sydney Rail Network by by Incident Category, Incident Further Classification and Premise sub-type - 2013-2014 Event Reported Premises Sub-Type Financial Year Property Name Suburb COMPASS Category Incident Further Classification Incident Railway Station 2013-2014 Albion Park Rail Assault (Non-DV) on Public Transport Actual Bodily Harm 1 Railway 2013-2014 Albion Park Rail Drug Detection - Possess Possess Drug/Plant 1 Railway Station 2013-2014 Albion Park Rail Albion Park Rail Assault (Non-DV) on Public Transport Actual Bodily Harm 1 Railway Station 2013-2014 Albion Park Railway Station Albion Park Rail Malicious Damage on Public Transport Malicious Damage To Property 1 Railway 2013-2014 Albion Park Railway Station Albion Park Rail Stolen Vehicles Vehicle 1 Railway Station 2013-2014 Albion Park Railway Station Albion Park Rail Street Offences Offensive Language 1 Railway Station 2013-2014 Albion Park Rail Malicious Damage on Public Transport Malicious Damage To Property 1 Railway Station 2013-2014 Albion Park Rail Street Offences Other Street Offence 1 Railway Station 2013-2014 Green Square Railway Station Alexandria Steal From Person on Public Transport Steal From Person 1 Railway Station 2013-2014 Allawah Railway Station Allawah Malicious Damage on Public Transport Graffiti 1 Railway Station 2013-2014 Allawah Assault (Non-DV) on Public Transport Assault Common 1 Railway Station 2013-2014 Allawah Malicious Damage on Public Transport Graffiti 1 Railway Station 2013-2014
    [Show full text]
  • BHHH CMP Former Sugar House Canterbury Finalsep20
    BRONWYN HANNA ~,jk I Office of NSW Environment HISTORY & """""'"'"' & Heritage HER ITAGE CONSERVATION MANAGEMENT PLAN Final September 2020 Former Sugar House, Canterbury 2-4 Sugar House Road Canterbury NSW 2193 111111 J. !11111 J lJJjJ l 1 ~~~~~~!~lit I~ Anonymous, c.1842-45, “Sugar Works at Canterbury”, watercolour painting,17 x 24 cm. From unattributed sketchbook “Drawings in Sydney”, thought to be painted by Joseph Fowles or Frederick Garling. Held in the collection of the Mitchell Library. (Source: SLNSW PX/D123) PREPARED FOR: PREPARED BY: Owners Corporation, SP 70958 Bronwyn Hanna History & Heritage C/o Bright and Duggan Strata Managers PO Box 190 PO Box 281 Canterbury NSW 2193 Crows Nest NSW 1585 0403 776 133 9902 7100 [email protected] [email protected] ABN: 83 115 379 114 © Bronwyn Hanna History & Heritage (BHHH) CONTENTS Volume 1 Conservation Management Plan 1. Introduction 3 2. Description of current appearance 7 3. Brief history of the place 26 4. Assessment of heritage significance 33 5. Planning and heritage context of the place 41 6. Conservation policies 43 7. Abbreviations, permissions and references 55 Volume 2: Appendices Appendix 1. Historical timeline - illustrated Appendix 2. National Trust Register entry for Sugar House, 1979 Appendix 3. State Heritage Register (SHR) entry for Sugar House Appendix 4. Register of the National Estate entry for the Sugar House Appendix 5. Local heritage listing (Canterbury LEP) for Sugar House Appendix 6. Woodhouse & Danks architectural drawings for repairs of Sugar House stonework, 1999 Appendix 7. Lesley Muir, “A Wild & Godless Place”, excerpted chapter from MA thesis on history of Canterbury, University of Sydney, 1984 Appendix 8.
    [Show full text]
  • Urban Design Study Proposal for Evaline Campsie
    Tony Owen Partners URBAN DESIGN STUDY PROPOSAL FOR EVALINE CAMPSIE FOR FORTE SYDNEY CAMPSIE DEVELOPMENT PTY LTD SITE: 71 - 75 Evaline Street, Campsie, 2194 NSW September 2017 - Rev01 Site: 71 - 75 Evaline Street, Campsie Date issued: September 2017 Version: 01 Prepared by: DL/WT Checked by: TO Contact Details: Tony Owen Partners Level 2, 12 Queen Street, Chippendale NSW 2008 Australia T: 61 2 9698 2900 F: 61 2 9699 3018 E: [email protected] www.tonyowen.com.au Tony Owen Partners Table of Contents The Site and Context 3 Executive Summary Location Plan 4 Site Description 5 Tony Owen Partners have been engaged by Forte Sydney Campsie Development PTY Ltd to prepare a Planning Proposal and development Site Photos 6 report for the site known as 71 - 75 Evaline Street, Campsie. Survey Plan 7 Campsie is ideally-placed within the Sydenham to Bankstown Corridor to Planning Context 8 support growth in retail, commercial and residential uses. The subject site Interpretation and Development of the Strategy 9 has been identified as a site suitable for high rise residential development in the Campsie Centre. We agree that the site is strategically located in the Conceptual Approach and Methodology 10 centre to retail and commercial services and rail transport and capable of High Density Residential 11 supporting a high rise residential development. Planning Controls Based on Campsie Station Precinct Strategy 12 The positive attributes the site offers include: Proposed Building Height Diagram 13 - Its close proximity to the Campsie railway station offers genuine Proposed Massing Principle Diagram 14 advantages for people wishing to use public transport.
    [Show full text]
  • Management Plan
    Heritage Management Sub- Plan C2B Line-wide Works Contract Sydney Metro City & Southwest Project number: C600 Document number: SMCSWLWC-SYC-1NL-PM-PLN-000375 Revision date: 15/10/2020 Revision: 1 Document Approval Environment and Sustainability Project Director Manager Signature: 15/10/2020 M Billings S Hunter SMCSWLWC-SYC-1NL-PM-PLN-000375 Page 1 of 48 Details of Revision Amendments Document Control The Project Director is responsible for ensuring that this Sub-Plan is reviewed and approved. The Environment and Sustainability Manager is responsible for updating this Sub-Plan to reflect changes to Environmental legal and other requirements, as required. A controlled version of this Sub-Plan will be available electronically at all Project locations. Amendments Any revisions or amendments must be approved by the Project Manager and/or client before being distributed / implemented. Revision Details Revision Date Prepared by Details Issued for review. This version of this Sub-Plan addresses A 25/11/2019 K Truscott compliance requirements under CSSI 7400 and CSSI 8256 Planning Approvals as per the Sydney Metro Staging reports. B 17/12/2019 A Taylor Updated to address comments from Stakeholders . J Lindberg 0 13/02/2020 Updated to Address DPIE Comments – For approval (AMBS) Scheduled review 1 15/10/2020 K Truscott Updates to Section 2.2 Compliance Requirements, Section 1.2 Background, Table 7 Existing Heritage Chatswood to Sydenham, Section 6.2 Heritage Unexpected Finds Protocol SMCSWLWC-SYC-1NL-PM-PLN-000375 Page 2 of 48 Contents Contents
    [Show full text]
  • NSW HRSI NEWS August 2019
    NSWHRSI NEWSLETTER Issue 20 HRSI NSW HRSI NEWS August 2019 Mark Zanker view of Muttama railway station 1976, Tumut branch line. NSW HERITAGE RAILWAY STATION AND INFRASTRUCTURE NEWS ISSUE N.20 WELCOME to the 20th newsletter Library collection, Warren Banfield, Newsletter index of NSWHRSI. The objective of this Greg Finster collection, Trove, Kim WELCOME / MAIN NEWS 1 newsletter is to inform, educate Baillie, Bryce Hockings, Dorothy Whiterod, Mary Wood, Anne Denison, and provide insights about the INTERVIEW WITH DAVID MCGRATH 2 latest updates, plans and heritage Chris Collins, Alison Lane, John Buckland, Robert Patterson, Leon news relating to Heritage Railway Rudd, Steve Bucton, David Nelson, INVERELL BRANCH LINE REVIEW 9 Stations and Infrastructure (HRSI) John Denis, State Records NSW, Brett across NSW. The news in is Leslie, Peter Burr, Mark Zanker. TICKETS TO RIDE 29 separated into 4 core NSW regions – Northern, Western and Southern HILLSTON RAILWAY STATION 30 NSW and Sydney. STATION HERITAGE FACTS 38 MAIN NEWS NSWS NEWS 39 Phil Buckley, NSW HRSI Editor NORTHERN NSW 39 Copyright © 2014 - 2019 NSWHRSI . WESTERN NSW 54 All photos and information remains property of NSWHRSI / Phil Buckley SOUTHERN NSW 58 unless stated to our various contributors / original photographers SYDNEY REGION 63 or donors. YOUR SAY - HERITAGE PHOTOS 77 Credits/Contributors this issue – SLNSW Archives, Ian Stephens, OTHER NEWS, NEXT ISSUE AND LINKS 78 Graeme Skeet, Matthew Ramsey, Jim Leppitts, Toad Montgomery, Simon Barber, Barry Trudgett, Australian Rail Maps, Alan Holding, Nigel Judd, Garrett Ptolemy Xvi Fitzgerald, Griffith Page | 1 NSWHRSI NEWSLETTER Issue 20 INTERVIEW WITH DAVID MCGRATH I started my career with the then Public Transport Commission of N.S.W 16th July 1977 and finished 10th January 2017.
    [Show full text]
  • Contents Issues for Martin Place Building
    Contents Issues for Martin Place building............................................................................................. 1 Issues for Sydenham to Bankstown and beyond .................................................................... 2 Route issues and suggestions ................................................................................................. 3 Bibliography ......................................................................................................................... 10 Wednesday, 7 June 2017 I am a visually impaired person who has recently completed a public transport planning unit at the University of New South Wales and have obtain some ideas of location through persons orientating me in volunteering work. I thank you for the opportunity in making the below submission. I am mostly supportive of the new line between Liverpool and Chatswood via Barangaroo (even if the line between Liverpool to Sydenham is same). I still have a number of concerns and questions that have yet to be resolved satisfactory. This document updates a document sent as an attached in email to “[email protected]”, with subject “Western Sydney Rail Needs Scoping Study”, with the document titled “Response to the Discussion Paper”, sent on Monday 24 October 2016. I permit the circulation of my feedback to private bodies related to Sydney metro, Department of Infrastructure and Regional Affairs, arms of NSW government including Transport for NSW, Greater Sydney Commission and NSW Department of Planning where it falls outside your scope of research. Whilst the below are ideas, please do not completely dismiss an idea with some incompatible components as other compatible components will be relevant to your plan. Issues for Martin Place building 1. Can the construction/demolition avoid windy days to avoid contributing to dust? 2. How much of the building be made from recycled materials/demolition spoil? 3. What emergency/evacuation facilities will there be in this building? 4.
    [Show full text]
  • Sydney Metro City and South West - Line-Wide Works
    Acoustics Vibration Structural Dynamics SYDNEY METRO CITY AND SOUTH WEST - LINE-WIDE WORKS Construction Noise and Vibration Impact Statement - P4 South West Corridor Works 4 December 2020 Systems Connect TK685-03-15F01 CNVIS S2B_P4 SW Corridor (r2) Sydney Melbourne Brisbane Gold Coast Kuwait Singapore Renzo Tonin & Associates ABN 29 117 462 861 Level 1/418A Elizabeth St SURRY HILLS NSW 2010 | PO Box 877 STRAWBERRY HILLS NSW 2012 P (02) 8218 0500 F (02) 8218 0501 [email protected] www.renzotonin.com.au RENZO TONIN & ASSOCIATES 4 DECEMBER 2020 Document details Detail Reference Doc reference: TK685-03-15F01 CNVIS S2B_P4 SW Corridor (r2) Prepared for: Systems Connect Address: Level 3, 116 Miller Street North Sydney NSW 2060 Australia Attention: Mathew Billings Document control Non-issued Issued Reviewed / Date Revision history Prepared Instructed revision revision Authorised 13.11.2020 Initial report 0 1 T.Gowen - M.Tabacchi 4.12.2020 Address comments from - 2 T.Gowen - M.Tabacchi construction team and ER File Path: \\Syd-server\rtagroupsyd\AssocSydProjects\TK651-TK700\TK685 PK SMCSW Linewide Works (CPB UGL)\1 Docs\100 CONSTRUCTION\3-15 CNVIS S2B_P4 SW Corridor\TK685-03-15F01 CNVIS S2B_P4 SW Corridor (r2).docx Important Disclaimers: The work presented in this document was carried out in accordance with the Renzo Tonin & Associates Quality Assurance System, which is based on Australian/New Zealand Standard AS/NZS ISO 9001. This document is issued subject to review and authorisation by the suitably qualified and experienced person named in the last column above. If no name appears, this document shall be considered as preliminary or draft only and no reliance shall be placed upon it other than for information to be verified later.
    [Show full text]