2022-2050 REGIONAL TRANSPORTATION PLAN: DRAFT REGIONAL CAPACITY PROJECTS New Project

Total Page:16

File Type:pdf, Size:1020Kb

2022-2050 REGIONAL TRANSPORTATION PLAN: DRAFT REGIONAL CAPACITY PROJECTS New Project 2022-2050 REGIONAL TRANSPORTATION PLAN: DRAFT REGIONAL CAPACITY PROJECTS New project Sponsor Project Title Financial Plan Type 2022$ Total Cost Completion Year Prioritization Score Project Type Auburn Auburn Way S (SR-164) - Hemlock to Poplar Financially Constrained $ 9,544,027 2025 52 Multimodal Auburn Auburn Way S (SR-164) 32nd Street SE to City Limit Financially Constrained $ 16,963,221 2035 40 Multimodal Auburn Auburn Way S (SR-164) Poplar to 32nd Street SE) Financially Constrained $ 18,739,138 2030 44 Multimodal Auburn M Street SE Corridor Improvements (8th St SE to Auburn Way S) Financially Constrained $ 6,847,109 2030 44 Multimodal Auburn M Street NE Widening (E Main St to 4th St NE) Financially Constrained $ 2,938,478 2024 42 Multimodal Auburn W Valley Highway Widening (W Main Street to 15th Street NW) Financially Constrained $ 4,232,804 2032 55 Multimodal Auburn E Valley Highway Widening Financially Constrained $ 1,788,424 2028 50 Multimodal Bainbridge Island Sound to Olympics Trail Segment Unprogrammed $ 20,000,000 2026 40 Bike/Ped Bainbridge Island Agate Pass Bridge Replacement Unprogrammed $ 170,702,314 2027 35 Local Roadway Bellevue Mountain to Sound Greenway Trail Financially Constrained $ 40,878,264 2040 47 Bike/Ped Bellevue West Lake Sammamish Pkwy and Path Improvements Financially Constrained $ 72,855,613 2040 44 Bike/Ped Bellevue Mountains to Sound Greenway Trail: 132nd Ave SE to 142nd Pl SE Financially Constrained $ 8,800,068 2022 0 Bike/Ped Bellevue Bel-Red Regional Connectivity - NE 6th St Extension Financially Constrained $ 100,803,623 2040 60 Local Roadway Bellevue Bellevue Way SE Southbound HOV Lane Financially Constrained $ 34,029,792 2040 48 Local Roadway Bonney Lake Fennel Creek Trail Financially Constrained $ 33,322,941 2030 24 Bike/Ped Bothell SR 522, Stage 3 Financially Constrained $ 39,638,144 2021 66 Multimodal Bothell Bothell Way NE / Bothell-Everett Hwy Improvements Financially Constrained $ 55,701,662 2030 76 Multimodal Bothell SR 522 - Stage 2b Transit Improvements Financially Constrained $ 24,586,000 2025 63 Multimodal Bothell SR 527 Southbound Widening (SR 524 to 220th Street SE) Financially Constrained $ 14,889,862 2031 59 Multimodal Bothell SR 527 (211th Street SE to north of SR 524) Financially Constrained $ 6,416,702 2031 61 Local Roadway Bremerton 6th Street or 11th Street Road Diet Financially Constrained $ 8,694,810 2025 53 Multimodal Bremerton SR 303 Two Way Left Turn Lane Replacement Financially Constrained $ 6,387,229 2030 20 Local Roadway Bremerton Warren Avenue / 11th Street Roundabout Financially Constrained $ 13,745,316 2030 19 Local Roadway Bremerton Wheaton Way Business Access and Transit (BAT) Lane Financially Constrained $ 66,427,179 2036 19 Multimodal Bremerton Warren Avenue / Callahan Drive Roundabout Financially Constrained $ 14,511,784 2038 26 Multimodal Burien 1st Avenue South, Phase 3 (SW 128th Street to SW 140th Street) Financially Constrained $ 22,715,191 2023 43 Multimodal Community Transit Swift BRT Blue Line Extension to N. 185th Street (Shoreline) Financially Constrained $ 14,874,741 2024 56 Multimodal Community Transit Swift BRT Green Line Extension to UW Bothell Campus Unprogrammed $ 9,251,024 2030 55 Transit/Ferry Community Transit Swift BRT Gold LIne - Smokey Point Corridor Unprogrammed $ 65,689,325 2027 61 Transit/Ferry Community Transit Swift BRT Silver Line - Airport Road to Cathcart Way (Everett) Unprogrammed $ 46,255,119 2033 29 Transit/Ferry Community Transit Swift BRT Orange Line - 164th Street & 196th Street Corridors Financially Constrained $ 80,323,602 2024 51 Transit/Ferry Covington SR 516 - Jenkins Creek to 185th Place SE Financially Constrained $ 20,390,673 2024 55 Multimodal Covington SR 516 - 204th Avenue SE to East City Limits Financially Constrained $ 9,556,649 2028 53 Multimodal Covington SR 516 - 192nd Avenue SE to 204th Avenue SE Financially Constrained $ 13,842,028 2026 53 Multimodal Covington SR 516 - 185th Place SE to 192nd Avenue SE Financially Constrained $ 10,069,613 2025 52 Multimodal Des Moines Kent-Des Moines Road (Segment 3) Unprogrammed $ 10,080,362 2041 52 Multimodal 1 of 11 Sponsor Project Title Financial Plan Type 2022$ Total Cost Completion Year Prioritization Score Project Type Des Moines Kent-Des Moines Road (Segment 1) Unprogrammed $ 6,720,242 2031 54 Multimodal Des Moines Kent-Des Moines Rd. Improvements (Segment 2) Unprogrammed $ 10,080,362 2027 60 Multimodal Dupont DuPont-Steilacoom Rd Financially Constrained $ 4,594,527 2021 31 Multimodal Everett SR 99/ Evergreen Way Transit HOV Treatments Unprogrammed $ 2,135,433 2030 36 Local Roadway Everett Everett Arterial Access Improvements Unprogrammed $ 44,567,173 2040 40 Local Roadway Everett Broadway Corridor Improvements Financially Constrained $ 53,025,904 2030 45 Local Roadway Everett 41st Street Rucker Avenue Freight Corridor Phase 2 Financially Constrained $ 39,670,070 2027 44 Local Roadway Federal Way 21st Ave SW Financially Constrained $ 24,236,551 2030 40 Multimodal Federal Way City Center Access Complete Project Financially Constrained $ 498,203,845 2030 67 Multimodal Federal Way City Center Access Project - Phase 1 (SB Ramp Modifications) Financially Constrained $ 86,089,624 2027 63 Multimodal Federal Way S 356th - 1st Ave S to SR 99 Unprogrammed $ 19,832,988 2025 55 Local Roadway Fife Tacoma to Puyallup Regional Trail Financially Constrained $ 9,367,150 2025 65 Bike/Ped Fife I-5 / Port of Tacoma Road Interchange Financially Constrained $ 74,792,205 2024 64 Multimodal Fife I-5 / 54th Avenue E Interchange Financially Constrained $ 72,802,617 2024 76 Multimodal Fife 70th Avenue E Railroad Crossing Financially Constrained $ 26,315,123 2025 53 Multimodal Fife 62nd Ave Pedestrian Bridge Over Interstate - 5 Unprogrammed $ 24,602,975 2025 38 Multimodal Issaquah Newport Way (Maple to Sunset) Financially Constrained $ 36,733,714 2029 32 Multimodal Issaquah 12th Ave NW/SR900/NW Sammamish Rd Widening Financially Constrained $ 6,600,000 2023 51 Multimodal Kent 212th Street BNSF Railroad Grade Separation Unprogrammed $ 35,866,090 2050 53 Local Roadway Kent S 272nd Street Multimodal Corridor Financially Constrained $ 30,658,698 2040 54 Multimodal S 224th Street Extension 84th Avenue S to 108th Avenue SE (SR Kent 515/Benson Highway) Financially Constrained $ 56,207,613 2027 52 Multimodal Kent I-5 Regional Trail Unprogrammed $ 20,439,132 2030 31 Bike/Ped Kent SR 516/SE Kent-Kangley Road Multimodal Unprogrammed $ 40,878,264 2035 50 Local Roadway Kent SR 515/108th Ave SE/104th Ave SE/Benson Highway Multimodal Corridor Unprogrammed $ 20,439,132 2040 41 Local Roadway Kent Kent-Des Moines Multimodal Transportation Hub Unprogrammed $ 45,988,047 2035 35 Multimodal Kent S 212th Street Multimodal Corridor Financially Constrained $ 40,878,264 2035 55 Multimodal Kent SR 516 (Canyon Drive/SE 256th Street) Multimodal Corridor Financially Constrained $ 20,439,132 2030 51 Multimodal Kent Central Avenue/SR 516 Multimodal Corridor Financially Constrained $ 25,548,915 2030 62 Multimodal King County Soos Creek Trail, Phases 5 & 6 Financially Constrained $ 22,283,586 2040 44 Bike/Ped King County SR 18 Trail (Auburn to Snoqualmie Trail) Financially Constrained $ 110,582,297 2050 59 Bike/Ped King County Cedar - Sammamish Trail Unprogrammed $ 24,770,435 2042 36 Bike/Ped King County Green River Trail - North Financially Constrained $ 22,283,586 2025 34 Bike/Ped King County Green River Trail - Phase 3 Financially Constrained $ 22,283,586 2035 30 Bike/Ped King County Green River Trail - Phase 4 Financially Constrained $ 22,283,586 2040 35 Bike/Ped King County Eastrail (East Side Rail Corridor Trail) Financially Constrained $ 149,652,770 2030 59 Bike/Ped King County East Lake Sammamish Trail - South Sammamish Segment B Financially Constrained $ 58,255,980 2024 38 Bike/Ped King County East Lake Sammamish Trail - North Financially Constrained $ 21,461,089 2024 61 Bike/Ped King County Foothills Trail - Central/North Unprogrammed $ 56,870,896 2045 28 Bike/Ped 2 of 11 Sponsor Project Title Financial Plan Type 2022$ Total Cost Completion Year Prioritization Score Project Type King County Foothills Trail (South) and White River Bridge Financially Constrained $ 24,234,866 2025 42 Bike/Ped King County Green River Trail Phase 5 (Upper) Unprogrammed $ 35,891,430 2045 26 Bike/Ped King County Green-to-Cedar Rivers Trail Financially Constrained $ 80,720,266 2035 31 Bike/Ped King County Landsburg-Kanaskat Trail Unprogrammed $ 36,776,513 2050 20 Bike/Ped King County Interurban Trail (South) Redevelopment Financially Constrained $ 65,717,479 2040 78 Bike/Ped King County Eastrail to Lake to Sound Trail Connector Financially Constrained $ 22,283,586 2030 51 Bike/Ped King County NE 132nd/NE 128th St Unprogrammed $ 36,483,851 2050 31 Local Roadway King County Issaquah Hobart Road Unprogrammed $ 48,031,960 2050 45 Local Roadway King County Avondale Road Unprogrammed $ 47,112,199 2050 41 Multimodal King County Novelty Hill Road Unprogrammed $ 128,766,532 2050 46 Multimodal King County Woodinville-Duvall Road Unprogrammed $ 99,027,595 2050 39 Transit/Ferry King County Metro ID# 1056: Highline College to Green River College via Kent Financially Constrained $ 223,829,188 2036 56 Multimodal King County Metro ID# 1052: Twin Lakes to Green River College via Federal Way Financially Constrained $ 84,519,097 2036 54 Multimodal King County Metro ID# 1041 - RapidRide H Line Financially Constrained $ 80,355,163 2022 59 Multimodal King County Metro ID# 1033: RapidRide I Line Financially Constrained $ 114,893,463 2023 57 Multimodal King County Metro Overlake Newcastle Renton Financially Constrained $ 107,623,003 2050 56 Multimodal King County Metro K Line Financially Constrained $ 88,770,296 2036 55 Multimodal King County Metro ID# 1009: Bothell to UW via Kenmore Financially Constrained $ 119,912,100 2050 55 Multimodal King County Metro ID# RR 1014: Loyal Heights to U District via Green Lake Financially Constrained $ 52,660,345 2050 56 Multimodal King County Metro ID# RR 1043 West Seattle - White Center - Burien Financially Constrained $ 28,879,883 2050 39 Multimodal King County Metro ID# RR 1061: Interbay - Madison Park via Capitol Hill Financially Constrained $ 61,576,757 2050 56 Multimodal King County Metro ID# RR 1064: U.
Recommended publications
  • Motion No. M2020-69 Funding Agreement for Capped Contribution for Rapidride C Line Improvements
    Motion No. M2020-69 Funding Agreement for Capped Contribution for RapidRide C Line Improvements Meeting: Date: Type of action: Staff contact: System Expansion Committee 11/12/2020 Recommend to Board Don Billen, Executive Director, Board 11/19/2020 Final action PEPD Cathal Ridge, Executive Corridor Director- Central Corridor Chris Rule, HCT Project Manager – Central Corridor Proposed action Authorizes the chief executive officer to execute an agreement with the City of Seattle and King County to reimburse the City of Seattle for $1,730,000 and King County Metro for $2,800,000 to provide a total funding contribution of $4,530,000 for bus speed and reliability improvements to the RapidRide C Line serving West Seattle to South Lake Union. Key features summary • This action authorizes Sound Transit to enter into an inter-local agreement with the City of Seattle and King County to reimburse the City and County for costs of up to $4.53 million for speed and reliability improvements to the RapidRide C Line. • The Sound Transit 3 (ST3) System Plan includes a capped capital contribution of $65 million for bus capital enhancements to design and construct transit priority improvements that improve speed and reliability for the Madison BRT project and the RapidRide C and D Lines. • In 2018 the Sound Transit Board established the RapidRide C and D Improvements project and approved an initial study of potential improvements performed by the West Seattle and Ballard Link Extensions project team. • In September the Board of Directors moved that staff bring forward an agreement for a limited near- term authorization for RapidRide C Line improvements pending a more comprehensive program realignment.
    [Show full text]
  • City Partnerships Helped Make E Line Service Better
    February 2014 Line Starting February 15, riders traveling along Aurora Avenue N between Shoreline, north Seattle and downtown Seattle will experience the benefits of RapidRide. Improving speed and reliability RapidRide includes many features that will make travel on this heavily used corridor more reliable and quick. These include roadway improvements such as transit signal priority through busy intersections and the spacing of bus stops about every half-mile. In partnership with the cities of Shoreline and Seattle, BAT (business access and transit) lanes are provided along nearly the full length of the corridor to help buses get through congestion. Funded by the 2006 Transit Now initiative that started Metro’s RapidRide also uses a fare RapidRide program, the E Line—the fifth of six RapidRide payment system that speeds lines—is ready to launch. Ridership has grown quickly on the up boarding. At stations with first four RapidRide lines, which serve busy corridors around off-board ORCA card readers, King County. The A and C lines reached their five-year rider- customers who have ORCA ship goals in only two years. Rider satisfaction is high on all cards can pay their fares before RapidRide lines. getting on the bus and may board at the back doors. Riders Frequent service makes bus riding convenient using paper bus transfers may The hallmark of RapidRide is frequent service. The E Line will also board at the back doors at operate: any RapidRide stop, while riders paying with cash or tickets will board at the front door. Fare enforcement officers will • Weekdays—every 5-12 minutes during peak hours and make sure passengers have paid fares correctly.
    [Show full text]
  • The Growing Transit Communities Strategy
    The Growing Transit Communities Strategy October 2013 Puget Sound Regional Council PSRC The Growing Transit Communities Partnership is funded by the Sustainable Communities Regional Planning Grant Program of the U.S. Department of Housing and Urban Development. Additional funding for this document provided in part by member jurisdictions, grants from the U.S. Department of Transportation, Federal Transit Administration, Federal Highway Administration and Washington State Department of Transportation. The work that provided the basis for this publication was supported by funding under an award with the U.S. Department of Housing and Urban Development. The substance and findings of the work are dedicated to the public. The author and publisher are solely responsible for the accuracy of the statements and interpretations contained in this publication. Such interpretations do not necessarily reflect the views of the Government. PSRC fully complies with Title VI of the Civil Rights Act of 1964 and related statutes and regulations in all programs and activities. For more information, or to obtain a Title VI Complaint Form, see http://www.psrc.org/about/public/titlevi or call 206-464-4819. American with Disabilities Act (ADA) Information: Individuals requiring reasonable accommodations may request written materials in alternate formats, sign language interpreters, physical accessibility accommodations, or other reasonable accommodations by contacting the ADA Coordinator, Thu Le, at 206.464.6175, with two weeks’ advance notice. Persons who are deaf or hard of hearing may contact the ADA Coordinator, Thu Le, through TTY relay 711. Servicios de Traducción Disponible 206-971-3052, Diana Martinez. Có dịch vụ thông dịch sang tiếng Việt.
    [Show full text]
  • Draft City of Shoreline
    November 26, 2012 Workshop Dinner Meeting DRAFT CITY OF SHORELINE SHORELINE CITY COUNCIL SUMMARY MINUTES OF WORKSHOP DINNER MEETING Monday, November 13, 2012 Conference Room 104 - Shoreline City Hall 5:45 p.m. 17500 Midvale Avenue N. PRESENT: Mayor McGlashan, Deputy Mayor Eggen, and Councilmembers Hall, McConnell, Roberts, Salomon, and Winstead ABSENT: none STAFF: Julie Underwood, City Manager; Debbie Tarry, Assistant City Manager; Ian Sievers, City Attorney; Kirk McKinley, Transportation Manager; Alicia McIntire, Senior Transportation Planner; Scott Passey, City Clerk GUESTS: David Hull, Supervisor of Service Planning, King County Metro; Chris O’Claire, Supervisor of Strategic Planning and Analysis, King County Metro At 5:54 p.m., the meeting was called to order by Mayor McGlashan, who presided. There were introductions around the table. David Hull, Supervisor of Service Planning, and Chris O’Claire, Supervisor of Strategic Planning and Analysis, provided a presentation on several items, including: 1. Status of RapidRide E Line implementation 2. Funding outlook 3. September service changes 4. Light rail service integration During the presentation and ensuing discussion, the following points were addressed: RapidRide as a premium Metro service, composed of A, B, and E lines RapidRide E-line implementation schedule Traffic signalization and timing questions, expectation of growth in ridership King County actions to preserve bus service, including repurposing of hours, a cut in 75,000 bus hours, union negotiations, and efficiencies 25% fare
    [Show full text]
  • Juicing the “Seattle Squeeze” Lessons Learned from Seattle’S SR-99 Closure
    Juicing the “Seattle Squeeze” Lessons Learned from Seattle’s SR-99 Closure APTA Sustainability & Multimodal Operations Planning Workshop BenjaminDepartment Smith of Transportation July 29, 2019 Presentation overview • Seattle transit overview • The “Seattle Squeeze” • SR-99 Closure • Preparation for closure • Coordination during closure • Lessons learned Department of Transportation Seattle transit overview • King County Metro • Local and commuter bus • RapidRide BRT and electric trolleybus • Water taxi • Sound Transit • Link light rail • ST Express regional bus • Sounder commuter rail • City of Seattle • Seattle Center Monorail • Seattle Streetcar Department of Transportation The “Seattle Squeeze” • One of fastest growing cities in U.S. • ~250K employment in greater downtown (HQ1) • Transit ridership investment and growth • Infrastructure and development projects Department of Transportation The “Seattle Squeeze” - Timeline • • • • D2 Roadway • SR-99 Tunnel •• CenterAlaskan City Way open Convention Center Madison East Link, closes open Connectorto buses open RapidRide Lynnwood and • • Convention • Alaskan Way • mayConnect open 2020 Northgate Link G Line Federal Way (on hold) Center Viaduct (currentlyconstruction on hold) open open Link open • • construction demolition • Alaskan Way open North Portal Alaskan Way open begins • Alaskan Way to buses* streets open to traffic • construction Seattle Arena begins renovation • DSTT buses shift complete to surface • SR-520 “Rest of the West” project begins SR-99 Closure activities Department of
    [Show full text]
  • Rapidride? D Line
    D Line WEEKDAY/Entre semana D Line WEEKDAY/Entre semana SNOW/EMERGENCY SERVICE ➜ NW 100th Pl To DOWNTOWN SEATTLE ➜ To CROWN HILL 7th Ave NW SERVICIO DE EMERGENCIA/NIEVE Downtown Downtown Seattle Uptown Ballard Crown Hill Crown Hill Ballard Uptown Seattle 3rd Ave NW During most snow conditions this route NW 100th Pl 15th Ave NW Queen Anne 3rd Ave Terrace St Prefontaine 3rd Ave Mercer St & 15th Ave NW NW 100th Pl CROWN HILL Holman Rd NW will operate via its regular route shown at & & Ave N & & & Pl S & & Queen Anne & & Mary Ave NW 7th Ave NW* NW Market St* W Mercer St* Pike St* 5th Ave* Yesler Wy* Pike St* Ave N* NW Market St* 7th Ave NW* left. In the rare event that Metro declares Stop #28680 Stop #13271 Stop #2672 Stop #431 Stop #1710 Stop #1610 Stop #578 Stop #2370 Stop #14230 Stop #28680 NW 85th St an emergency, this route will continue 4:57 5:06 5:18 5:27 5:35 4:05 4:10 4:20 4:31 4:40 5:13 5:22 5:34 5:43 5:51 4:55 5:00 5:10 5:21 5:30 NW 80th St to operate as a designated Emergency 5:25 5:34 5:46 5:55 6:03 5:20 5:25 5:35 5:46 5:55 Service Network route. During such an 5:35 5:44 5:56 6:05 6:13 5:40 5:45 5:55 6:07 6:16 15th Ave NW NW 75th St 5:43 5:52 6:04 6:14 6:22 6:00 6:05 6:15 6:27 6:36 event, it is expected to operate with the 5:51 6:00 6:13 6:23 6:31 6:10 6:15 6:25 6:37 6:46 5:59 6:09 6:22 6:32 6:40 6:20 6:25 6:35 6:47 6:56 NW 70th St same route number and follow the same 6:07 6:17 6:30 6:40 6:48 6:28 6:33 6:43 6:55 7:04 Ballard High School routing as shown in this timetable.
    [Show full text]
  • METRO CONNECTS Technical Appendices
    METRO CONNECTS Technical Appendices Table of Contents Appendix A. Service Network .................................................... A-2 Appendix B. Capital Costing Methodology ................................ B-1 Appendix C. Speed and Reliability ............................................. C-1 Appendix D. Access to Transit .................................................. D-1 Appendix E. Passenger Facilities .............................................. E-1 Appendix F. Critical Service Supports ........................................F-1 Appendix G. RapidRide Expansion Report ................................ G-1 A-1 Appendix B: METRO CONNECTS Capital Facilities – Passenger Facility Improvements Appendix A. Service Network Service Terms Glossary Alternative services: Transportation services tailored to meet specific community needs. Metro plans and provides these services with partner support throughout King County. Often, the served community lacks the infrastructure, density or land rights to support traditional, fixed-route bus service. Metro’s alternative services include: VanPool, VanShare, Community Access Transportation (CAT), Dial-a-Ride Transit (DART), Community Shuttles, Community Hub and Flexible Rideshare. (See definitions of these services below.) Bus Bulb: Bus bulbs are curb extensions that align the bus stop with the parking lane, allowing buses to stop and board passengers without ever leaving the travel lane. Bus bulbs help buses move faster and more reliably by decreasing the amount of time lost when merging in and out of traffic. Carpool: Commuters travelling similar routes can connect on the Metro Rideshare website and share rides in personal vehicles. Community Access Transportation (CAT): A program that complements paratransit (ACCESS) service by filling service gaps in partnership with nonprofit agencies, such as those serving seniors or people with disabilities. Custom Bus: A program that serves King County commuters and students who travel to locations not well served by fixed-route transit.
    [Show full text]
  • What Is Rapidride? March 20 Thru September 17, 2021
    D Line WEEKDAY/Entre semana D Line WEEKDAY/Entre semana SNOW/EMERGENCY SERVICE ➜ NW 100th Pl To DOWNTOWN SEATTLE ➜ To CROWN HILL 7th Ave NW SERVICIO DE EMERGENCIA/NIEVE Downtown Downtown Seattle Uptown Ballard Crown Hill Crown Hill Ballard Uptown Seattle 3rd Ave NW During most snow conditions this route NW 100th Pl 15th Ave NW Queen Anne 3rd Ave Terrace St Prefontaine 3rd Ave Mercer St & 15th Ave NW NW 100th Pl CROWN HILL Holman Rd NW will operate via its regular route shown at & & Ave N & & & Pl S & & Queen Anne & & Mary Ave NW 7th Ave NW* NW Market St* W Mercer St* Pike St* 5th Ave* Yesler Wy* Pike St* Ave N* NW Market St* 7th Ave NW* left. In the rare event that Metro declares Stop #28680 Stop #13271 Stop #2672 Stop #431 Stop #1710 Stop #1610 Stop #578 Stop #2370 Stop #14230 Stop #28680 NW 85th St an emergency, this route will continue 4:57 5:06 5:18 5:27 5:35 4:05 4:10 4:20 4:31 4:40 5:13 5:22 5:34 5:43 5:51 4:55 5:00 5:10 5:21 5:30 NW 80th St to operate as a designated Emergency 5:25 5:34 5:46 5:55 6:03 5:20 5:25 5:35 5:46 5:55 Service Network route. During such an 5:35 5:44 5:56 6:05 6:13 5:40 5:45 5:55 6:07 6:16 15th Ave NW NW 75th St 5:43 5:52 6:04 6:14 6:22 6:00 6:05 6:15 6:27 6:36 event, it is expected to operate with the 5:51 6:00 6:13 6:23 6:31 6:10 6:15 6:25 6:37 6:46 5:59 6:09 6:22 6:32 6:40 6:20 6:25 6:35 6:47 6:56 NW 70th St same route number and follow the same 6:07 6:17 6:30 6:40 6:48 6:28 6:33 6:43 6:55 7:04 Ballard High School routing as shown in this timetable.
    [Show full text]
  • Route 36 Speed and Reliability Corridor Total Psrc Funding Request: $2,500,000 2020 Psrc Fta Regional Grant Application Program
    ROUTE 36 SPEED AND RELIABILITY CORRIDOR TOTAL PSRC FUNDING REQUEST: $2,500,000 2020 PSRC FTA REGIONAL GRANT APPLICATION PROGRAM PROJECT DESCRIPTION This proposed project will construct and implement transit speed and reliability improvements on congested segments and bottlenecks along Metro Route 36, a trolleybus route operating between the Othello LINK Light Rail Station and Downtown Seattle via Beacon Hill. The Route 36 carries over 9,800 weekday riders and is one of Metro’s highest ridership routes. The route serves mutiple designated Regional Growth Centers, local centers, and significant numbers of transit dependent populations. WHAT ARE THE BENEFITS? » Reduce congestion and improve transit service speed and reliability. This route is one of Metro’s least reliable routes in Seattle. This project will improve the reliability of service in WHAT WILL THE FTA REGIONAL GRANT DO? these corridors and improve transit travel time. » Provides transit speed and reliability, overall improving transit service to designated The requested grant funding of $2.5 million would fund the regional and local centers. The Route 36 provide high-frequency service to the Downtown construction of transit preferential treatments on congested segments Seattle and First Hill/Capitol Hill Regional Growth Centers. Additionally, the Route 36 connects along the Route 36 corridor. to local centers, including the North Beacon Hill and Othello urban villages and Metro designated transit activity centers at the Beacon Hill and Othello Link light rail stations. Transit preferential improvements identified through Metro’s Speed and » Serves a dense, transit dependent area of Seattle experiencing high population and Reliability Program will include but are not limited: employment growth.
    [Show full text]
  • Insert Presentation Title Insert Subtitle, If Needed
    Making Communities Better Through Transit How the City of Seattle & King County Metro Delivered BRT to Amazon’s Front Door Western ITE Conference Jonathan Dong and Richard Hutchinson June 20, 2017 Presentation overview • South Lake Union • RapidRide (Bus Rapid Transit) to South Lake Union • Speed and Reliability Improvements • Results of C Line Extension • Upcoming Challenges 2 South Lake Union - in context Downtown Seattle 4 South Lake Union • 2015: ~25,000 employees, ~5M sq. ft. • By 2019, will increase to 70K, 10M sq. ft. – Equivalent to all jobs in Austin CBD 5 South Lake Union - challenges • High drive-alone rate • Limited transit infrastructure – SLU Streetcar, north-south bus • Intense construction • Known as “Mercer Mess” 6 Seattle transit • King County Metro – Bus, trolleybus, BRT • Sound Transit – Light rail, bus, commuter rail • SDOT/City of Seattle – Monorail, streetcar 7 RapidRide to SLU • Split & extend RapidRide C & D lines – Improve reliability, serve new markets – Headways of 10 minutes during peaks – C line to South Lake Union – D line to south Downtown • Proposition 1 (Nov. 2014) funds $45M/year service 8 RapidRide to SLU • Layover first, find reliable routing to reach it 9 RapidRide to SLU • Westlake Ave – Curbside transit lanes in both directions; turn restrictions – Expand existing streetcar/bus stops into RapidRide stations – Northbound queue jump around congested intersection at Mercer • Valley St – New layover by bio-med/ cancer center 10 RapidRide to SLU 11 Speed and reliability – transit lanes • Curbside lanes
    [Show full text]
  • In Transit January/February 2014 a Newsletter for King County Metro Transit Employees
    In Transit January/February 2014 A Newsletter for King County Metro Transit Employees From the General Manager’s desk Great job in 2013! I’d like to start the new year by celebrating our many accomplishments in 2013. We gave our customers and King County taxpayers high value and much-appreciated services. We enhanced customer information tools and began work on a low-income fare program; increased the cost- effectiveness and efficiency of our This mural in the 10200 block of Aurora Avenue N seems to be welcoming operations and business practices; the E Line, which begins service along the corridor on Feb. 15. launched pedestrian awareness safety initiatives; reduced on-the-job injuries; and pursued several process- improvement projects. E Line begins on Aurora Internally, we launched the he fifth RapidRide line is set to begin service between downtown Seattle management-labor Partnership to Tand the Aurora Village Transit Center on Feb. 15. Achieve Comprehensive Equity (PACE); upgraded a number of our customer As construction of passenger amenities at E Line stops and stations wound down, and operating facilities; opened a new Metro’s Marketing and Service Information group began work on customer garage at the South Kirkland Park-and- information pieces, including bus timetables and schedule information, bus Ride; and awarded a contract for new interior and exterior signs, rider education materials about RapidRide’s fare trolley buses. payment and proof of payment systems, and marketing materials to let people This list only scratches the surface, know about the new features the E Line will provide along its corridor.
    [Show full text]
  • Vashon Situation Report - 11 March 24, 2020
    Vashon Situation Report - 11 March 24, 2020 Latest updates Italics and in blue text Virus Statistics As of March 24th according to Public Health – Seattle & King County (PHSKC) no resident of Vashon Island (98070 or 98013 zip codes) has been confirmed with the COVID-19 virus. PHSKC reports as of March 24th that there are 1224 confirmed COVID-19 cases and a total of 93 reported deaths in King County. Washington State Department of Health reports that as of March 23rd, 93% of tests statewide have been negative for the virus (total of 31,712 negatives). PHSKC estimates regionally that the number of COVID cases will double every 5 to 7 days. Significant Developments Governor Inslee has issued a Stay Home, Stay Healthy order last night for all residents in non-essential activities. Essential service remain open, such as grocery stores and it is okay to go out to access these services. The Governor has designated a list of “Essential Critical Infrastructure Workers”. The full order can be found here or visit https://coronavirus.wa.gov/whats-open-and-closed WA Department of Highways announced that the West Seattle High-Rise Bridge is closed due to accelerated concrete cracking that was monitored during a regular bridge inspection. The bridge will remain closed until further notice. All vehicles will be prohibited from crossing the high-rise span of the bridge between I-5 and Fauntleroy Way SW. Buses, freight and emergency vehicles will be moved to Spokane Street Bridge, which is also called the “low bridge.” Motorists should use the First Ave or South Park bridges.
    [Show full text]