Proposed Bowie City Loops crossing (T-3)

B F BHT/WB&A spur E trail and bridge crossing (T-3) North Bowie Loop Trail

Horsepen Park (Mountain Bike Skills Facility under - M-NCPPC)

A Provide lighting Upgrade bridge H County Master Plan of I Transportation Trail Add trail amenities Race Track Rd. G neighborhood connector route BHT (P-37, T-1) J C

MD 564 Race Track Rd. reconstruction (T-5) K Connect Chestnut Ave. to the WB&A @ MD 3 Mockingbird Ln. Destinations List A Old Bowie B Jericho Park D C The D WB&A Trail/ East Coast Greenway E Bowie State University/ MARC Station improvements F Merkel Farm Equestrian Center (T-6) G Tanglewood Park S High activity H Race Track LL area - address I Saddlebrook East J Yorktown Park connectivity and K Samuel Ogle Park N L access issues L Whitemarsh Park M Whitemarsh Branch Park M N Acorn Hill Park O Somerset Park Upgrade crossing P Buckingham Park Q Foxhill Park MD 197 R Belair Mansion S Bowie Marketplace/ Free State T Prince George’s U Governor Bridge P V Bowie Town Center R W Town Center Park Road improvments Upgrade X Glen Allen Park (T-7) crossing Y Allen Pond Park Z Enfield Chase Park MD 450 Q Pursue AA North Oak Court Park BB Mt. Oak Park easement for access CC Stream Valley Park Upgrade crossing - DD Mitchellville South Park under US major trail connection EE South Lake 50 FF Blacksox Park to South Bowie Melford-Kenilworth GG South Bowie Community Center Sidewalk Extension HH Capital Trails Coalition Trail (developer T-10) II South Bowie Branch Library JJ Church Road Park KK Pope’s Creek Park LL Bowie High School MM Springlake Park Governor’s US 50 Bridge Upgrade crossing U Canoe The Central Loop - Allen Pond T Launch V Park to White Marsh Park Existing Northview sidepath - to be updated Z W Core Loop Governor’s Bridge Improve crossings X Reconstruction (T-11) HH Y Governor’s Bridge Rd. Continue connector Patuxent AA River Corridor (alignment The South Bowie Loop unknown

Need sidewalks and dedicated Legend trails along Mitchellville Rd. Existing Trails (City of Bowie, 2018) Patuxent River Water Trail FF Multi-Use Trail Sidewalks (PGC, 2017) Multi-Use Trail in Park City Parks Shared Road County Parks Sidepath Proposed Trail Network GG Bike Lane Alignment Private Trails Proposed Trail Planned Trails (Prince Georges Co., 2019) Connection Opportunity Proposed Trail Route Connect to East Hard Surface Trail Existing East Linkage Coast Greenway Side Path Case # 4-04035 Coast Greenway Designated alignment Hiker-Biker alignment along Improvement Area APROVED PPS 4-04035 Mill Branch Rd. Natural Surface Trail A Destination Along Off-Road Trail Route Other Transportation and MD 214 Planned Private/Unknown Ownership Trail Pipeline Projects

Destination Trail Alignments- Existing and Planned (2018) County Master Plan of Capital Trails Coalition Trail (2018) Transportation - Planned

US 301 Shared Roadway HeritageTrail (City of Bowie, 2018) Data Sources: The City of Bowie Planning Department East Coast Greenway (2018) Prince George's County Planning Department, Maryland IMAP M-NCPPC/Prince George's County, Department of Parks and Recreation Public input from planning workshop, February 2, 2019

Source: Esri, DigitalGlobe, GeoEye, Earthstar Geographics, CNES/Airbus DS, USDA, USGS, AeroGRID, IGN, and the GIS User Community

Prince George’s Update of City of Bowie Trails Master Plan Destination/ Primary Trail to L/KLA Draft 4/25/19 Upper Marlboro Slide 8 of 9 1/10/2019 1,200 PROPOSED TRAIL NETWORK - ALT 1 E Feet