Gregory P. Luth, Ph.D., S.E. President & Chief Engineer
Total Page:16
File Type:pdf, Size:1020Kb
Gre Gregory P. Luth, Ph.D., S.E. President & Chief Engineer PERSONAL: Born in 1950 in St. Louis, Missouri, service-disabled Vietnam veteran TECHNICAL SPECIALTIES: Areas of expertise are conceptual design, lateral load analysis, and production of working drawings for building structures using all conventional building materials; renovation of historic structures; seismic design and retrofit of building structural systems, piping systems, and mechanical systems; integrated design/construction on large or complex design projects; and the application of emerging technologies such as BIM technology (Tekla) to the problem of integrating the interdisciplinary design tasks and incorporating facility management considerations during the conceptual design phase. Dr. Luth is a pioneer and industry leader in the development and application of the 21st century technologies and processes including HD BIM and Performance Based Design in an integrated delivery process. EDUCATION Bachelor of Science, Civil Engineering, Magna Cum Laude – University of Alaska, June 1974 Master of Science, Civil Engineering (Structures) – Stanford University, June 1975 Degree of Engineer, Civil Engineering (Structures) – Stanford University, January 1979 Doctor of Philosophy, Civil Engineering (Structures) – Stanford University, June 1991 LICENSES Licensed in all 50 states, Washington, D.C., Guam, and Puerto Rico SE in Arizona, California, Delaware, Hawaii, Idaho, Illinois, Massachusetts, Nebraska, Nevada, Oregon, Utah, Vermont, Washington, Wyoming & Guam OTHER PROFESSIONAL QUALIFICATIONS (PUBLICATIONS, ORGANIZATIONS, TRAINING, AWARDS, ETC.) Member of SEAONC, ASCE, AISC, ACI, DFI, PCI, ICC PROFESSIONAL HISTORY August, 1995 – Present Founder, President, Gregory P. Luth & Associates, Inc., Santa Clara, CA March, 2004 – Present Co-founder, Martino & Luth, Inc., Denver, CO January, 2010 – 2013 Co-founder, Exponential engineering, LLC., Charlotte, NC (Managing Member, 2010 – May, 2013, Resigned May 2, 2013) January, 1998 – April, 2003 Co-founder, President and CEO, KL&A, Inc., Loveland, CO January, 1995 – January, 1998 Co-founder, President, Krawinkler Luth & Associates, Menlo Park, CA January, 1990 – December, 1994 Founder, President, TSDC of Colorado, Littleton, CO January, 1991 – May, 1994 Managing Engineer, Failure Analysis Associates, Menlo Park, CA January, 1987 – December, 1987 Senior Vice-President, Walter P. Moore & Associates, Tampa, FL January, 1986 – December, 1986 Founder, President, KLMA, Inc., Denver, CO October, 1976 – February, 1985 Design Engineer to Vice President, Jack Gillum & Associates, St. Louis, MO Gregory P. Luth, Ph.D., S.E. Curriculum Vitae Page 1 PUBLICATIONS Tatum, C.B. and Luth, G.P. (2012) “Integrated structural and construction engineering”, ASCE Construction Research Congress, West Lafayette, IN, May 21-23, 1301-1310 Luth, Gregory P., (2011) “VDC and the Engineering Continuum’, Journal of Construction Engineering and Management 137,906 Luth, G.P. (2000), “Chronology and Context of the Hyatt Regency Collapse”, ASCE Journal of Performance of Constructed Facilities, May 2000, Vol. 14, No. 2 Fruchter, R., Schrotenboer, T., Luth, G.P., (2009) “From Building Information Model to Building Knowledge Model”, ASCE computing in Civil Engineering conference, TU Austin, June 2009, 380-389 Fruchter, R., and Luth, G., “ThinkTank a Web Based Collaboration Tool”, Proc. Of ASCE Structures Conference, Nashville, 2004 Luth, G. and Fruchter, R. “Web Based Standards”, Proc. Of ASCE Structures Conference, Nashville, 2004 Fruchter, R., Demian, P., Yin, Z., Luth, G., “Turning A/E/C Knowledge into Working Knowledge”, Proc. Of Computing in Civil Engineering Conference in conjunction with ASCE National Convention, ed. Ian Flood, Nashville, 2003 Luth, G.P., Jain, D., and Mc Donald, B., “Qualitative Formulation of Load Paths through a Functional Description of Structures”, Proceedings, Fifth International Conference on Computing in Civil and Building Engineering, Anaheim, California, 1993 Luth, G.P., Krawinkler, H., and Law, K.H., “Representation and Reasoning for Integrated Structural Design”, CIFE Technical Report #55, Center for Integrated Facility Engineering, Stanford University, June 1991 Luth, G.P., Jain, D., Krawinkler, H., and Law, K.H., “A Formal Approach to Automating Conceptual Structural Design, Part I, Methodology”, Engineering With Computers, Vol 7, No. 2, 1991, pp 79-89 Jain, D., Krawinkler, H., Luth, G.P., and Law, K.H., “A Formal Approach to Automating Conceptual Structural Design, Part II, Application to Floor Framing Generation”, Engineering With Computers, Vol 7, No. 2, 1991, pp. 91-107 Luth, G.P., Jain, D., Krawinkler, H., and Law, K.H., “A Methodology for Conceptual Structural Design”, Proceedings of Seventh Conference on Computing in Civil Engineering, ASCE, Washington, D.C. May 1991, pp. 34-43 Jain, D., Krawinkler, H., Luth, G.P., and Law, K.H., “Generation of Floor Framing Plans for Steel Office Buildings”, Proceedings of Seventh Conference on Computing in Civil Engineering, ASCE, Washington, D.C., May 1991, pp. 288- 297 Jain, D., Krawinkler, H., Luth, G.P., and Law, K.H., “A Formal Approach to Automating Conceptual Structural Design”, CIFE Technical Report #31, Center for Integrated Facility Engineering, Stanford University, August, 1990 “NPAMS2, An Example of Interactive Structural Analysis on Minicomputers”, Engineer Thesis, Stanford University, January, 1979 REPRESENTATIVE PROJECTS EOR 2017 – present Gigafactory Bldg. G, Sparks, NV (BIM, StlD, RDtl) EOR 2016 – present Splitsville, DTD, Anaheim, CA (BIM) EOR 2016 – present Folia, Cupertino High school, Cupertino, CA (BIM, StlD, RDtl) EOR 2016 Gigafactory Bldgs. D, E, D’, E’, & F, Sparks, NV (BIM, StlD, RDtl) Gregory P. Luth, Ph.D., S.E. Curriculum Vitae Page 2 EOR 2016 Saloutos House, Reno, NV (BIM) EOR 2016 Napa State Hospital Main Kitchen, Napa, CA (BIM) EOR 2015 Evergreen Pointe (Apartments over retail), not built, Bremerton, WA (BIM) EOR 2014 Forest Home-Cedar Cove Cabins, Forest Falls, CA (BIM), not built EOR 2013 Westgate Anaheim Garden Walk (timeshare over podium), Anaheim, CA, not Built (BIM) EOR 2015 Gigafactory Bldgs. A, B, C, Sparks, NV (BIM, StlD, RDtl) EOR 2015 Daytona Rising - concourse structures, Daytona, FL (BIM, LGDTL) EOR 2015 Hollywood Slots Jamul, San Diego, CA (BIM, StlD, RDtl) P.R. 2014 Disney Shanghai – Main Street (BIM support) SC 2014 VAMC San Francisco Buildings 1, 6, & 8 Retrofit, San Francisco, CA (BIM) EOR 2014 VA Seattle Mental Health Hospital Parking Garage, Seattle, WA (BIM) EOR 2013 Hollywood Slots @ Penn National Dayton Raceway, Dayton, OH (BIM) EOR 2013 Hollywood Slots @ Penn National Mahoning Valley Race Course, Mahoning Valley, OH (BIM) EOR 2013 USC School of Cinematic Arts Phases I, II, & III, Los Angeles, CA (BIM, AcDtl, RDtl) EOR 2012 Isle of Capri Casino, Cape Girardeau, MO (BIM, AcDtl, RDtl, StlD) EOR 2012 Penn National Hollywood Casino at Toledo, Ohio (BIM, RDtl) EOR 2012 California Department of Veterans Affair Homes, Residential Care Home, Fresno, CA (BIM, D/B) EOR 2011 1st Armored Division Headquarters, Ft. Bliss, TX (BIM, D/B, ACDtl) EOR 2011 Disneyland Hotel Central Service Area Renovation, Anaheim, CA (BIM) SC/EOR EOR 2011 VAMC San Francisco Parking Garage, San Francisco, CA (BIM) EOR 2011 Acton Ranger Station, Acton, CA EOR 2011 Nex Navy Lodge Addition – Naval Air Station, Coronado, CA (BIM, D/B) EOR 2010 Penn National Hollywood Casino at Joliet, Illinois (BIM) EOR 2010 U.S. Seabee Museum, Port Hueneme, CA (BIM, D/B) EOR 2010 MARSOC (7-building complex), Camp Pendleton, CA (BIM, D/B, StlD) EOR 2010 Moffett Regional Army Reserve Headquarters, Moffett, CA (BIM, D/B) EOR 2010 Temp Lodging, Camp Pendleton, CA (BIM) EOR 2009 Disney Grand Californian Hotel & Suites Expansion, Anaheim, CA EOR 2008 Hollywood Slots @ Penn National Raceway – Grandstand, Gaming, and Parking Garage, Grantville, PA EOR 2006 Charles Town Races Phase I, II, II & IV – Gaming and Parking Garage, Charles Town, WV EOR 2006 Casino Magic Interim Facility – Gaming, Bay St. Louis, MS EOR 2006 The Avenues Condo, Las Vegas, NV EOR 2006 Alta Montecito Condominium, Las Vegas, NV EOR 2004 Mt. Hermon Field House, Santa Cruz Mountains, CA EOR 2004 Middle Creek Village Affordable Housing, Vail, CO EOR 2003 Rivercamps on Crooked Creek, Bay County, FL EOR 2002 Casino Magic Bay Tower Hotel, (12-story post-tensioned hotel), Bay St. Louis, MS EOR 2001 Tabor Center Redevelopment, Denver, CO EOR 2001 Downtown Disney, Anaheim, CA EOR 2000 Disney’s Grand Californian Hotel, Anaheim, CA EOR 2000 Orchard Hotel, San Francisco, CA EOR 1998 City Center West – Office Buildings, Las Vegas, NV EOR 1996 Casino Magic Pavilion, Bossier City, LA EOR 1995 Isle of Capri Pavilion, Lake Charles, LA EOR 1994 Isle of Capri Pavilion, Biloxi, MS Gregory P. Luth, Ph.D., S.E., Curriculum Vitae Page 3 EOR 1991 Denver Tramway Building, Denver, CO EOR 1990 Nelson Residence, Telluride, CO EOR 1990 McLain Residence, Telluride, CO PM 1990 Tampa Convention Center, Tampa, FL EOR 1987 Rivercenter Mall, San Antonio, TX EOR 1985 Tabor Center – Westin Hotel, high-rise office tower & retail mall, Denver, CO EOR = Engineer of Record P.R. = Peer Reviewer SC = Sub-consultant, EOR for the sub-consulting portion BIM = Building Information Modeling D/B = Design-Build RDtl = Rebar 3D Model & Shop Drawings StlD = Steel Detailing ACDtl = Architectural cladding detail LGDtl = Lightgage detailing PE = Structural Project Engineer PM = Structural Project Manager Gregory P. Luth, Ph.D., S.E., Curriculum Vitae Page 4 .