<<

CITIZEN’S CHARTER FOR WATERSHED MANAGEMENT DIRECTORATE, DEPARTMENT OF WATERSHED, GOVERNMENT OF ,

Watershed Management Directorate Indira Nagar Forest Colony Dehradun Uttarakhand www.wmduk.gov.in/www.gramya.in [email protected]

Uttarakhand State is well endowed with Forest and Water resources. More than 12,000 glaciers and 8 major river catchments act as the lifeline for the entire hydrological system of Indo-Gangetic plain. The Himalayan Watersheds are under constant threat of mass wasting and erosion caused by depletion of forest cover, unscientific agronomic practices, hydrologic imbalances and natural calamities. The ever increasing population, the need to provide a better quality of life to the people and the pressure on natural resources is further compounding the problem. Considering the magnitude of the problems, the Uttarakhand Govt. has realized the significance of taking up watershed based planning. A total of about 8 watersheds, 116 sub watersheds and 1110 Micro Watersheds have been identified in the state which are being taken up for regeneration and sustainable development, in phased manner.

In the state, thrust has been given to integrated watershed development programmes. A separate Directorate- Watershed Management Directorate (WMD) has been established as a nodal agency for coordination, monitoring and implementation of integrated watershed development programmes in the state.

As a public service delivery organization which has to work closely for and with the community, WMD is working on the principles of good governance viz. transparency, accountability and responsiveness of administration. The citizen charter of WMD is an endeavor towards achieving the above enshrined principles of good governance in public service delivery. The object of this charter is to work towards efficient public service delivery.

VISION OF WMD

'To improve the productive potential of natural resources and increase incomes of rural inhabitants in degraded watersheds of the state through socially inclusive, institutionally and environmentally sustainable approaches.'

2 MISSION STATEMENT

Holistic development of the degraded and rain-fed areas of the state through integrated management of natural resources on participatory basis to achieve ecological balance, income enhancement through increased livelihood opportunities, poverty alleviation, welfare of vulnerable groups including women and landless, equity in benefit sharing and institutional strengthening through capacity building.

BUSINESS TRANSACTED BY WMD

PROJECT SURVEY AND PLANNING

 Project preparation of integrated watershed development projects following guidelines of MoA, MoRD (DLR), MoEF, Govt., of and external agencies.  Arrangements of financing from Govt. of India and other external / internal agencies for implementation of watershed projects.  Coordination with other line departments (Rural Development and Agriculture) and NGOs working on watershed development projects, evaluation and submission of project proposals to the respective Ministry and Aid agency.  Prioritization of watersheds to be taken up for treatment and project planning.

MONITORING AND EVALUATION

 Progress monitoring of all watershed development programmes / schemes being implemented by Rural Development and Agriculture Departments.  Development of MIS for quick retrieval and analysis of captured data.  Monitoring and Evaluation of externally aided projects through external, internal evaluators and participatory monitoring by the community.

3 COMMUNITY PARTICIPATION, TRAINING AND DOCUMENTATION

 Achievement of community participation through involvement of PRIs and Community Based Organizations (CBOs) for planning, implementation of integrated watershed development plans and management of assets created.  Capacity building of communities, community based organizations (CBOs) and PRI institutions through skill development, social and technical trainings, workshops and exposure visits.  Training and skill upgradation of staff.  Ensuring equity by way of effective participation of vulnerable groups including women and landless in the planning, implementation and benefit sharing in the watershed project.  Information Education and Communication (IEC) for awareness generation, transparency and impact documentation.

TECHNOLOGY DISSEMINATION

 Linkage with technical institutions and universities, technical awareness programmes for the rural community and project staff, development of technical modules for technology transfer to the end-user.  Information dissemination as regards improved technology in the fields of agro based, minor engineering, bio technology and other suitable technology.  Technology dissemination through grass root level demonstration, trainings and workshops.

PROJECT IMPLEMENTATION

 Facilitation of implementation of externally aided integrated watershed development projects through Multidisciplinary Teams (MDT) trained in participatory approaches.  WMD is presently implementing the Uttarakhand Decentralized Watershed Development Project (UDWDP) in approximately 461 Gram Panchayats in 18 Development Blocks in 11 hilly districts of Uttarakhand. A decentralized institutional setup using PRIs as the main planning and implementation agencies is a key feature. of UDWDP. Gam Panchayats are the implementing units at the village level.

4

DETAILS OF CLIENTS

Watershed Management Directorate renders services at two levels viz. Government and community. The clients at the two levels are as follows:- (i) Government level-  The state govt. through Directorate for project planning and implementation of externally aided projects.  Line Departments (Rural Development and Agriculture department) implementing Watershed Development projects. (ii) Community level-  Gram Panchayat  Revenue Village Committee  Farmers Interest Group  User Groups  Self Help Groups / Vulnerable Groups  Van Panchayat  Other community based organizations.

DETAILS OF SERVICES PROVIDED TO EACH CLIENT GROUP

Name of the client Services rendered Government level - State Government through Directorate  Arrangements of financing from Govt. of India and other external / internal agencies for implementation for watershed projects.  Prioritization of watersheds to be taken up for treatment and project planning.  Project planning and implementation of externally aided projects.

5 Name of the client Services rendered Line departments (Rural Development  Preparation of watershed development projects and Agriculture department) following guidelines of MoA, MoRD (DLR), MoEF, Govt., of India.  Evaluation and submission of project proposals submitted by Rural Development and Agriculture Department and NGOs etc. to the respective Ministry and Aid agency. Community level  Gram Panchayat  Provide technical and financial support in the preparation and implementation of Gram Panchayat Watershed Development Plan.  Capacity building support.  Support of assistant accountant.  Revenue Village Committee  Technical support in the preparation of RVC proposals for GPWDP preparation.  Capacity building support.  Technical support in the implementation of GPWDP  Farmers Interest Group  Group formation.  Technology dissemination through field demonstration, training and workshops.  Input and capacity building support.  Facilitation of market linkages.  Development of market infrastructure.  User Groups  Group Formation, input and capacity building support.  Self Help Groups / Vulnerable  Group Formation and capacity building support for Groups skill development and IGAs.  Technical support in the preparation of IGA proposal for vulnerable group fund.  Training support for skill development and IGA.

6 Name of the client Services rendered  Funding and input support for approved IGA proposal.  Van Panchayat  Technical and financial support in the implementation of plantation related activities under the project.  Other community based  Technical/ Financial and training support as and when organizations. required.

EXPECTATION FROM THE CLIENTS

Client Expectation from the clients State Government through WMD  Arrangements of financing from Govt. of India and other external / internal agencies for implementation for watershed projects. Line departments ((Rural Development  Preparation of project proposals as per requisite and Agriculture department) guidelines.  Implementation of project.

Community level

 Gram Sabha  To discuss & approve all major decisions related to GPWDP  Ensure inclusion of disadvantaged groups such as women, poor, SC/ST, transhumant  Monitor the working of RVC & GP

 Gram Panchayat  Sign all appropriate agreements with WMD for participation in the project  Assist NGOs in mobilization of village communities  Open project bank account & judiciously manage project funds  Manage project expenditure as per AWP of GPWDP  Convene Gram Sabhas  Ensure complete transparency & accountability by all GP-level institutions & individuals involved in the project  Collection of Contribution by Beneficiary

 Water and Watershed  Lead the process of planning & implementation of

7 Client Expectation from the clients Management Community GPWDP  Operation of Watershed Account.  Community procurement under GPWDP.  Procurement of various agencies as per Project Operational Manual.  Auditing of accounts.  May delegate responsibility for implementation of Village Watershed Development Plans to RVCs (this will include financial management and procurement responsibilities)  Submit timely monthly and annual financial reports to WMD  Ensure that the GP annual accounts are audited on a timely basis and submitted to the WMD

 Revenue Village Committee  Lead the process of preparing RVC Proposals  If contracted so by the GP, implement GPWDP at the village level  Ensure equity for all, especially the disadvantaged groups  Collection of beneficiary contribution

 Farmers Interest Group  Participation in demonstration activities.  Adoption of improved technology  Participation in Agribusiness activities.  User Groups  Management and maintenance of assets created.  SHGs / Vulnerable Groups  Participation in IGA activities and capacity building  Sustainable and self reliant.  Income enhancement.

 Van Panchayat  Implement all plantation related activities under the project  Coordinate with concerned Forest Department office for technical and management issues.

8 CONSULTATION WITH USERS/ STAKEHOLDERS

 Participatory monitoring and evaluation (PME) indicators have been developed and the consultation process with the stakeholders (Community) is carried out regularly.

COMPLAINT / GRIEVANCE REDRESSAL MECHANISM -

 A website for registering complaints at http://samadhan.uk.gov.in is available. Stakeholders are welcome to use this facility. They can also write through the e-mail ID: [email protected]; through postal correspondence at the following address– The Office of the Chief Project Director, Watershed Management Directorate, Indira Nagar Forest Colony, Dehradun PIN- 248 006.  Under RTI act, public information cell have been established at the following offices-

Name Designation Location Telephone /Fax/E-mail Shri Anand Vardhan Chief Project Director, Dehradun 0135-2768712/ 2762839/ WMD [email protected] Mr. D.J.K. Sharma Additional Director ,WMD Dehradun 0135-2760170/ 2764244/ & Project Director UDWDP [email protected] Phase-II Mr. W. Longwah Project Director, (Admin.), Dehradun 0135-2761002 WMD [email protected] Mr. Ashok Mishra Project Director, Garhwal Muni-ki-Reti 0135-2437010 [email protected] Mr. P.K. Singh Project Director, Kumaon 05946-283068 [email protected] UDWDP Phase-II Mr. C. B. Tripathi Deputy Project Director, Vikasnagar 01360- 253013 Dehradun Division Mob: 9412046815 [email protected] Mr. P.N. Shukla Deputy Project Director, Thatyur Tehri Division Mr. Akhilesh Tiwari Deputy Project Director, Mob- 9412056136 Pauri Division [email protected]

9 Dr. S. K. Upadhyay Deputy Project Director, Almora Division, Dr.R. K . Singh Deputy Project Director, 9412087916 Pithoragarh Division, [email protected] Mr. R. K. Singh Deputy Project Director, Bageshwar Mob: 9411103641 Bageshwar Division, [email protected] ILSP Project Mr. N. S. Burfal Deputy Project Director, Pauri Mob: 9412032410 Watershed Management, [email protected] Pauri Mr. P. K. Singh Deputy Project Director, Haldwani Ph. 05946-222498 Watershed Management, () [email protected] Nainital Mr. D. C. Arya Deputy Project Director, Champawat Mob. 9411113414 Watershed Management, [email protected] Champawat

 All Gram Pradhans have been designated as Public Information Officers under RTI act at Panchayat level in the project area.  All complaints will be acknowledged by us and final reply will be given within 30 days.

10 Main Services / Transaction (For externally aided projects- ILSP & UDWDP-II)

S.No Services/Transaction Weight Responsible Email Mobile Process Document Required Fees % Person (Phone Cate Mod Am (Designation) No.) gory e oun t 1. Arrangements of financing 9 Shri Anand wmd- 0135- Submission of As per procedures N/A N/A N/A from external agencies Vardhan Chief [email protected] 2768712, proposal by the required by State Govt, after approval from Govt. Project Director 2760170 , State Govt. to Govt. of India and of Uttarakhand and Govt. 2761002 Govt. of India. external Agency (IFAD/ of India for Fax- World Bank) implementation of 2762839 watershed projects. 2 Prioritization of 9 Sh. D.J.K. wmd- 0135- GIS based As per procedures N/A N/A N/A watersheds to be taken up Sharma, [email protected] 2768712, planning based on required by State Govt, for treatment and project Additional 2760170 , State of Govt. of India and planning. Director 2761002 Environmental external Agency (IFAD/ (Planning) Fax- degradation, World Bank) & Project 2762839 remoteness and Director lack of UDWDP Phase-II infrastructure and poverty in the micro watershed / watershed 3 Project planning and 9 Sh. Kapil Lall, wmd- 0135- Signing of project As per procedures N/A N/A N/A Implementation of Project Director [email protected] 2768712, agreement required by State Govt, Integrated Livelihood Integrated 2760170 , between state Govt. of India and support project (ILSP) with Livelihood 2761002 Govt, Govt of external Agency (IFAD) funding support from IFAD support project Fax- India and funding (ILSP) 2762839 agency, placement of officers 4 Project planning and 8 Sh. D.J.K. wmd- 0135- Signing of project As per procedures N/A N/A N/A Implementation of Sharma, Project [email protected] 2768712, agreement required by State Govt, 11 Uttarakhand Director 2760170 , between state Govt. of India and Decentralized Watershed UDWDP-II 2761002 Govt, Govt of external Agency (World Development Project Fax- India and funding Bank) (UDWDP) Phase-II 2762839 agency, placement of officers 5 Implementation of ILSP at 8 DPD Pauri, DPD wmd- Placement of N/A N/A N/A division level Champawat and [email protected] officers is in DPD Nainital process 6 Implementation of 8 DPD wmd- Placement of N/A N/A N/A UDWDP-II at Division level Vikashnagar, [email protected] officers is in DPD Thatyur, process DPD Pauri, DPD Almora, DPD Pithoragarh, DPD Bageshwar 7 Planning and 7 Concerning wmd- 0135- On N/A N/A N/A Implementation of ILSP water and [email protected] 2768712, commencement and UDWDP-II at Gram watershed 2760170 , of project at Gram Panchayat level in committee of 2761002 Panchayat level selected project divisions Gram Panchayat Fax- First year will be as PIA and Van 2762839 utilized for Panchayat, RVC, preparation of FIG, User Gram Panchayat Groups and Watershed vulnerable development groups as plans (GPWDP), participants in next 3 years for project planning implementation and works and final implementation year for withdrawal 8 Monitoring & Evaluation 8 Sh. Kapil Lall, wmd- 0135- Monitoring & N/A N/A N/A Additional [email protected] 2768712, Evaluation of

12 Director (M&E) 2760170 , project 2761002 implementation Fax- as per the 2762839 monitoring action plan involving external consultant, internal monitoring and participatory monitoring by communities. 9 Capacity Building of 8 Dr. S.K. Singh wmd- 0135- Capacity Building N/A N/A N/A Stakeholders and Project Deputy Project [email protected] 2768712, of Stakeholders staff through workshop, Director (Trg) at 2760170 , and Project staff training and exposure visit WMD level and 2761002 through concerning Fax- workshop, Deputy Project 2762839 training and Director ILSP exposure visit and UDWDP-II through reputed at Division level institutions and resource persons 10 Prompt grievance 9 Sh. W. Longwah, wmd- 0135- i. Complaint N/A N/A N/A redressal Project Director, [email protected] 2768712, Register Administration, 2760170 , ii. Providing WMD 2761002 intermediate Fax- progress made, Dr. S.K. Singh, 2762839 if required Deputy Director, iii. Informing final Admin. closure of each complaint

13 Services Standards For Externally Aided Projects- ILSP & UDWDP-II

S.No Services/Transaction Weight Success Indicators Services Unit Data Source Standards 1 Arrangements of financing from 9 Timely administrative Time as per Days WMD records external agencies after approval from approval/ clarification, release requirement Govt. of Uttarakhand and Govt. of of funds to meet the India for implementation of committed liabilities of Govt. watershed projects. of Uttarakhand for implementation of watershed projects. 2 Prioritization of watersheds to be 9 As per project requirement “ Days WMD records taken up for treatment and project and selection criteria and on planning. the basis of approved SPSS for the department 3 Project planning and Implementation 9 Signing of project agreement Date WMD records of Integrated Livelihood support and placement of officers project (ILSP) with funding support from IFAD 4 Project planning and Implementation 8 Preparation of project Date WMD records of Uttarakhand Decentralized documents, project appraisal Watershed Development Project by Govt. of India and world (UDWDP) Phase-II Bank, signing of project agreement. 5 Implementation of ILSP at division 8 Placement of officers in ILSP Date WMD records level Project division 6 Implementation of UDWDP-II at 8 Placement of officers and staff Date WMD records Division level in UDWDP-II Project division 7 Planning and Implementation of ILSP 7 Commencement of project at Date WMD records and UDWDP-II at Gram Panchayat Gram Panchayat level and level in selected project divisions signing of MoU between WMD and WWMC of the concerned Gram Panchayat for implementing the project 14

8 Monitoring & Evaluation 8 Monitoring & Evaluation of Time as per Days/Date WMD records project implementation as per requirement and RFD for ILSP the monitoring action plan and UDWDP-II involving external consultant, internal monitoring and participatory monitoring by communities. 9 Capacity Building of Stakeholders and 8 Capacity Building of 7-15 Days Days/Date Capacity Building Project staff through workshop, Stakeholders and Project staff programme training and exposure visit through workshop, training and exposure visit through reputed institutions and resource persons 10 Prompt Grievance Redressal 9 i. Complaint Register 7-15 Days Days WMD records ii. Providing intermediate progress made, if required iii. Informing final closure of each complaint

15 Main Services/Transactions for State Level Nodal Agency (SLNA) Uttarakhand

S.No Services/Transactio Weigh Responsible Email Mobile Process Document Fees . n t% Person (Phone Required (Designation No.) ) Categor Mo Amou y de nt 1 Preparation of 9 Shri Anand uttarakhandslna@g 0135- I. Identification of SPSP, MWS NA NA NA preliminary project Vardhan, mail.com 2768712, District wise level reports (PPR) CEO, SLNA 2760170 , prioritized MWS for projects according to [email protected] 2761002 Project Proposals allocated target by Sh.Kapil Lall, II. Collection of data, and GoI and as per State ACEO SLNA preparation of tables Perspective and on prescribed format Strategic Plan (SPSP) of GOI. III. Submission to GOI with presentation IV. Communication of sanctioned projects to the district V. Approval of PIAs proposed by DWDUs 2 Release of funds for 8 Sh.Kapil Lall, uttarakhandslna@g 0135- I. Transfer of funds to Sanction NA NA NA sanctioned projects ACEO SLNA mail.com 2768712, designated account at order GOI from SLNA under 2760170 , the DWDU level IWMP [email protected] 2761002 II. Issue of release order by the ACEO and Finance officer SLNA as joint signatory. With the prior approval of CEO (SLNA) III. Ensure the utilization 16 of released amount and demand of next installment to GoI from time to time according to requirement 3 Conduction of 5 Sh.Kapil Lall, uttarakhandslna@g 0135- i. Empanelment of Guidelines NA NA NA capacity building ACEO SLNA mail.com 2768712, institutions for and and trainings for all 2760170 , trainings and instructions stakeholders [email protected] 2761002 evaluation from GOI ii. Appointment of team of technical expert as per GOI instruction from time to time iii. Preparation of manuals and strategies under IWMP 4 Monitoring and 7 Sh.Kapil Lall, uttarakhandslana@ 0135- i. To Ensure Phase wise Guidelines NA NA NA Evaluation ACEO SLNA gmail.com 2768712, Evaluation of all and 2760170 , projects through instructions [email protected] 2761002 Empanelled evaluating from GOI agencies and time to time Monitoring through SLNA, Districts and Technical Experts Level. ii. Establish State Level Data Cell (SLDC) to ensure MIS under IWMP 5 Prompt Grievance 9 Sh. W. uttarakhandslana@ 0135- iv. Complaint Register Redressal Longwah, gmail.com 2768712, v. Providing Project 2760170 , intermediate progress

17 Director, [email protected] 2761002 made, if required Administratio vi. Informing final closure n, WMD of each complaint

Dr. S.K. Singh, Deputy Director, Admin

18 Services Standards For State Level Nodal Agency (SLNA) Uttarakhand

S.No. Services/Transaction Weight Success Indicators Services Unit Data Source Standards 1 Preparation of preliminary project 9 Timely administrative 120 Days SLNA records reports (PPR) according to allocated approval/ clarification, release target by GoI and as per SPSP of funds to meet the committed liabilities of Govt. of Uttarakhand for implementation of watershed projects. 2 Release of funds for sanctioned 8 As per project requirement 15 Days SLNA records projects from SLNA under IWMP and selection criteria and on the basis of approved SPSS for the department 3 Conduction of capacity building and 5 i. Empanelment of 7-15 Days Date/Days SLNA records trainings for all stakeholders institutions for trainings and evaluation ii. Appointment of team of technical expert as per GoI instruction time to time iii. Preparation of manuals and strategies under IWMP 4 Monitoring and Evaluation 7 i. To Ensure Phase wise Time as per Date SLNA records Evaluation of all projects requirement through Empanelled evaluating agencies and time to time Monitoring through SLNA, Districts and Technical Experts Level. ii. Establish State Level Data 19 Cell (SLDC) to ensure MIS under IWMP 5 Prompt Grievance Redressal 9 iv. Complaint Register 7-15 Days Days SLNA records v. Providing intermediate progress made, if required vi. Informing final closure of each complaint

20 Grievance Redress Website url to lodge http://pgpotral.gov.in/ http://samadhan.uk.gov.in/

S.No. Name of the public Grievance officer Helpline Email Mobile 1 Sh. W. Longwah, 0135-2761002 , 2768712, [email protected] Project Director, 2760170, Fax-2762839 Administration, WMD 2 Dr. S.K. Singh, 0135-2761002, 2768712, [email protected] Deputy Director, Admin 2760170 Fax-2762839

21 List of Stakeholders/Clients

S.No. Stakeholders / Clients 1 Central Govt. Departments, External Funding Agency-IFAD and World Bank 2 State Govt. through its departments- Watershed department, Agriculture Department, Forest Department and Rural Development Department, State Steering committee for projects IWMP, ILSP, UDWDP-II 3 Scientific and research organization/ Institute etc.- (viz NIH, CWCRTI, VPKS,GBPIEHD, Pant Nagar Agriculture University, USAC, Land survey Directorate 4 Local authority in the district and district level steering committee for projects 5 Kirshi Vigyan Kendra and other technical institution of other departments 6 Gram Sabha, Gram Panchayats and Water and Watershed Management Committee(WWMC) selected for projects under IWMP, ILSP, UDWDP-II 7 Revenue village committee of villages selected for projects under selected for projects under IWMP, ILSP, UDWDP-II 8 Van Panchayat selected for projects under IWMP, ILSP, UDWDP-II 9 Farmer Interest Groups and farmer federation 10 Vulnerable Groups and self help groups in projects IWMP, ILSP, UDWDP-II 11 All officers and staff of Watershed Management Directorate 12 Citizen in general

22 Responsibility Centers and Subordinate Organizations (For externally aided projects)- ILSP & UDWDP-II

S.No. Responsibility Centers and Subordinate Landline Number Email Mobile Address Organizations Number 1 Office of Chief Project Director 0135-2768712, [email protected] Watershed 2760170 , Management 2761002 Directorate, Indira Fax-2762839 Nagar Forest Colony, Dehradun 2 State Level Nodal Agency 0135-2768712, [email protected] Watershed 2760170 , Management 2761002 Directorate, Indira Fax-2762839 Nagar Forest Colony, Dehradun 3 PMU –Integrated Livelihood Support Project 0135-2768712, [email protected] Watershed (ILSP) 2760170 , Management 2761002 Directorate, Indira Fax-2762839 Nagar Forest Colony, Dehradun 4 PMU- Uttarkhand Decentralized Watershed 0135-2768712, [email protected] Watershed Development Project (UDWDP-II) 2760170 , Management 2761002 Directorate, Indira Fax-2762839 Nagar Forest Colony, Dehradun 5 Project Director Garhwal 0135-2437010 [email protected] 6 Project Director Kumaon 01368-283068 [email protected], Haldwani [email protected] 7 Deputy Project Director ILSP (Champawat) 05965-235310 [email protected] Champawat 8 Deputy Project Director ILSP (Nainital) 05946-222498 [email protected] Haldwani 9 Deputy Project Director ILSP (Pauri)) Pauri 10 Deputy Project Director UDWDP (VikasNagar) 01360- 253013 [email protected] Vikasnagar Dehradun

23 11 Deputy Project Director UDWDP (Tehri) Thatyur 12 Deputy Project Director UDWDP (Pauri) Pauri 13 Deputy Project Director UDWDP (Bageshwar) 05963-221003 [email protected] Bageshwar

14 Deputy Project Director UDWDP (Almora) Almora 15 Partner NGO UDWDP-II) Rudraprayag Rudraprayag 16 Partner NGO UDWDP-II (Uttarkashi) Uttarkashi

24 Responsibility Centers and Subordinate Organizations for SLNA

S.No. Responsibility Centers and Landline Number Email Mobile Number Address Subordinate Organizations 1 Office of Chief Executive officer 0135-2768712, [email protected] Watershed Management 2760170 , Directorate, Indira Nagar 2761002 Forest Colony, Dehradun Fax-2762839 2 State Level Nodal Agency 0135-2768712, [email protected] Watershed Management 2760170 , Directorate, Indira Nagar 2761002 Forest Colony, Dehradun Fax-2762839 3 WPMU –Watershed Project 0135-2768712, [email protected] Watershed Management Management Unit 2760170 , Directorate, Indira Nagar 2761002 Forest Colony, Dehradun Fax-2762839 4 WCDC – Watershed Cell cum 1035-2727368 [email protected] Office of Member Data center, Dehradun Secretary DWPMU Uttarakhand Dehradun 5 WCDC – Watershed Cell cum 0176-232974 [email protected] Office of Member Data center, Tehri Garhwal Secretary DWPMU Tehri Uttarakhand Garhwal 6 WCDC – Watershed Cell cum 0168-222303 [email protected] Office of Member Data center, Pauri Garhwal Secretary DWPMU Pauri Uttarakhand Garhwal 7 WCDC – Watershed Cell cum 01364-233260 [email protected] Office of Member Data center, Rudraprayag Secretary DWPMU Uttarakhand Rudraprayag 8 WCDC – Watershed Cell cum 01372-252210 [email protected] Office of Member Data center, Chamoli Secretary DWPMU Uttarakhand Chamoli 9 WCDC – Watershed Cell cum 01375-224233 [email protected] Office of Member Data center, Uttarakashi Secretary DWPMU

25 Uttarakhand Uttarakashi 10 WCDC – Watershed Cell cum 05946-222498 [email protected] Office of Member Data center, Nainital Secretary DWPMU Uttarakhand Nainital 11 WCDC – Watershed Cell cum 05944-250446 [email protected] Office of Member Data center, U.S.Nagar Secretary DWPMU Uttarakhand U.S.Nagar 12 WCDC – Watershed Cell cum 05962-230220 [email protected] Office of Member Data center,, Almora Secretary DWPMU Uttarakhand Almora 13 WCDC – Watershed Cell cum 05964-227285 [email protected] Office of Member Data center, Pithoragarh Secretary DWPMU Uttarakhand Pithoragarh 14 WCDC – Watershed Cell cum 05965-230375 [email protected] Office of Member Data center, Champawat Secretary DWPMU Uttarakhand Champawat 15 WCDC – Watershed Cell cum 05963-220249 [email protected] Office of Member Data center, Bageshwar Secretary DWPMU Uttarakhand Bageshwar 16 WCDC – Watershed Cell cum 01334-239034 [email protected] Office of Member Data center, Haridawar Secretary DWPMU Uttarakhand

26 Indicative Expectations from Services Recipients

S.No. Indicative Expectations from Service Recipients 1 State Government through WMD - Arrangements of financing from Govt. of India and other external / internal agencies for implementation for watershed projects. 2 Line departments ((Rural Development and Agriculture department) - Preparation of project proposals as per requisite guidelines. - Implementation of project. 3 Community level (Gram Sabha) - To discuss & approve all major decisions related to GPWDP - Ensure inclusion of disadvantaged groups such as women, poor, SC/ST, transhumant - Monitor the working of RVC & GP 4 Gram Panchayat - Sign all appropriate agreements with WMD for participation in the project - Assist NGOs in mobilization of village communities - Open project bank account & judiciously manage project funds - Manage project expenditure as per AWP of GPWDP - Convene Gram Sabhas - Ensure complete transparency & accountability by all GP-level institutions & individuals involved in the project - Collection of Contribution by Beneficiary 5 Water and Watershed Management Committee under ILSP & UDWDP-II and Watershed Committee under IWMP - Lead the process of planning & implementation of GPWDP - Operation of Watershed Account. - Community procurement under GPWDP. - Procurement of various agencies as per Project Operational Manual. - Auditing of accounts. - May delegate responsibility for implementation of Village Watershed Development Plans to RVCs (this will include financial management and procurement responsibilities)

27 - Submit timely monthly and annual financial reports to WMD - Ensure that the GP annual accounts are audited on a timely basis and submitted to the WMD 6 Revenue Village Committee

- Lead the process of preparing RVC Proposals - If contracted so by the GP, implement GPWDP at the village level - Ensure equity for all, especially the disadvantaged groups - Collection of beneficiary contribution

7 Farmers Interest Group

- Participation in demonstration activities. - Adoption of improved technology - Participation in Agribusiness activities. 8 User Groups - Management and maintenance of assets created. SHGs / Vulnerable Groups - Participation in IGA activities and capacity building - Sustainable and self reliant. - Income enhancement. 10 Van Panchayat

- Implement all plantation related activities under the project - Coordinate with concerned Forest Department office for technical and management issues.

28