Service for the Future

Safe Disposal and Landfilling

www.fcc-group.eu Management Cycle DevelopmentSafe Landfi of a Modernlls as Wastea base Management for a Modern System System

EU Regulation 2008/98/EG Implementation of a Modern Waste obliges states to Steps in FCC Environment CEE Waste Management System Management System Waste management centres are a basis for a comprehensive waste management system. Its building-up is a step-by-step procedure and Household depending on local requirements and feasibility. We are ambitious to protect environment from the very beginning. ENERGY R DF Prevention Minimization Reuse Industry ( re st : Constructing a safe landfi ll according S fu EC s ENERGY T O e 1 to EU – Standards S N d O D e P A ri We design, construct and operate safe landfi lls. M R v Y e O d II. Collection Essential environmental safety is secured through C R f A u a multi-barrier-concept: W e l) nd M 2 step • Detection of a suitable location A

T

E • Installation of a bottom sealing

R

I • Strict controls of incoming waste A

L • Experienced operation III. Implementation • Carrying out re-cultivation and aftercare BIO WASTE GLASS PAPER PLASTIC METAL of Separate Collection nd: Start of and 3rd step 2 environmental awareness raising campaigns Servicing population and institutions are carried Composting Sorting IV. Composting, Sorting out with proper equipment for all kinds of waste. and of Waste Our environmental awareness raising campaigns are focused on children primarily. th

Recycling 4 step rd : Implementation of separate collection 3 Separate collection is implemented in order Incinera- Mechanical treatment to improve waste management and its further tor Environmental Awareness of Population V. Treatment of Waste processing. Biological (MBA, ) th treatment 4 : Sorting, recycling and composting S of waste L th A L 5 step G First treatment measures are sorting and , IA Energy Recovery A R S E H T recycling as well as composting of waste. A M ED th : Treatment of waste (mechanical- IZ IL 5 AB biological treatment, incineration,…) ST I. Safe according Implementation of further treatment, such as to EU - Standards mechanical-biological, incineration and RDF- production depends on needs and requirements st Safe 1 step based on countries' legislation and feasibility. We are Disposal experienced with all kinds of treatment processes.

» The Modern Waste a controlled waste disposal waste management centres Landfi lls constructed by FCC Environment CEE have implemented technologies that help to create a better Safe Management System starts can be guaranteed. comply with the highest safety environment and also turn our waste into new energy and new resources. and ends with safe, sanitary Any time waste needs standards and have each Safe landfi lls can work as energy generators: landfi lls. It means that in spite a technically sophisticated been certifi ed in accordance landfi lls of the prevention of waste, and absolutely safe fi nal with ISO. • High-quality fuels production: used for the district heating: 8,000 t/year in conjunction with careful storage solution that permits We can offer every service • Gases originating from the landfi ll are transformed into electricity (eco-power): Saving collection, separation and re- continuous monitoring to be connected with the process approx. 88,000 MWh/year use, some types of waste that carried out. Such facilities of safe and sustainable By applying other technologies following products can be generated at the landfi ll sites: resources, cannot be re-used or recycled require drainage systems landfi lling, from establishing will at any time remain. for collecting and treating the project, construction of the • Mechanical-biological treatment: Leachate water (contaminated water) is made into clean water generating A sanitary landfi ll is always leachates, as well as landfi ll and its operation, to the a quality close to drinking water (20,000 m3/year). the fi rst step in waste systems for the collection and subsequent recultivation. • Composting: Biogenic waste is processed in composting plants. These fertilizers and substrates can » power management where utilization of landfi ll gas. Our be returned to circulation by being used in agriculture.

2 3 1st step: Constructing and operation of safe landfi lls according to EU – Standards

Water Collection System 1a 1b Landfi ll Body and 4 Landfi ll Halbenrain (AT) Tainach (AT) Re-cultivated landfi ll body 1a

1b

During the operation of a landfi ll, A landfi ll is structured into different sectors 3 rainwater can infi ltrate the landfi ll body with a separate discharge of rain and leachate and solve pollutants out of waste. waters. After several years of operation, the This water is called leachate. fi rst sector is recultivated, while the active area To optimize the amount of leachate, is still available for disposing of incoming waste. 7 the landfi ll sectors are “open” as short 4 as possible. After closing a landfi ll sector, water cannot enter into the Weighbridge 2 8 landfi ll body. Landfi ll Arad (RO) Surface water coming from pathways and unused landfi ll sections is collected in separate surface water reservoir. 5

Degassing System 5 6 Landfi ll Hódmezővásárhely (HU) 2

Every single truck passes the weighbridge where the amount of waste to be disposed is measured. Data is processed 1 further to bookkeeping and technical » Elements Landfi ll body department. a Active area of a Safe b Re-cultivated area Cleaning Pit 8 Landfi ll 2 Weighbridge Landfi ll gas arises from degradation of organic waste components. Landfi ll Hódmezővásárhely (HU) 3 Fence Within 15 to 20 years 100 to 200 m³ 4 System for collection of leachate water, leachate landfi ll gas is arising from 1 ton of water basin & basin for surface water household waste. 5 Treatment of landfi ll gas begins with Degassing system and gas station collection of gas through gas wells. 6 Administration building In a fi rst phase gas is burned before 7 facilities and storage area volume is suffi cient for producing electricity. 8 Cleaning pits for trucks Cleaning pits are an important installation to keep trucks proper.

4 5 Our landfi lls group-wide Austria Hungary 1. FCC Waste Management 10. FCC Landfi ll Bláto 19. FCC Waste Management Centre Tainach in aftercare Centre Gyál landfi ll, splitting plant, ground landfi ll for municipal waste, 11. sorting, transfer station FCC Waste Management gas fl are station, ground and a collection yard Centre Lišov sorting, alternative fuel landfi ll for municipal waste, production and a composting 2. FCC Waste Management sorting line, transfer station plant Centre Halbenrain and a collection yard landfi ll, mechanical-biological 20. FCC Waste Management treatment facility, transfer 12. FCC Landfi ll Vyskytná Centre Hódmezövásárhely station, power generation, in aftercare landfi ll for municipal waste, laboratory 13. FCC Landfi ll Borek u Dačic gas fl are station, ground landfi ll for other waste, sorting and a composting 3. FCC Landfi ll Lichtenwörth plant in aftercare including rubble and earth, Poland composting plant, transfer station and collection yards Romania Czech Republic 14. FCC Waste Management 21. FCC Waste Management 4. FCC Waste Management Centre Úholičky Centre Arad Centre Praha-Ďáblice landfi ll for municipal waste, landfi ll, ground sorting landfi ll for municipal sorting plant with alternative 23. and a composting plant 14. waste (closed), ground fuel production, composting 15. 9. 4. 22. sorting, transfer station plant, collection yards, gas 5. fl are station Poland 12. Czech 6. 24. 5. FCC Waste Management Republic 15. 22. 11. 10.13. Centre Tisová FCC Landfi ll Uhy FCC Landfi ll Radomsko 8 7. landfi ll for municipal landfi ll, transfer station, gas installation for disposal of Slovakia and other waste, composting fl are station industrial & liquid and plants, waste, including hazardous 16. 18. gas fl are station, collection waste Austria 3. 17. yard Slovakia 1. 23. FCC Landfi ll Sadów 16. 6. FCC Waste Management FCC Waste Management (Lubliniec region) Centre Zohor 19. Centre Řepiště in aftercare 2. landfi ll for landfi ll for municipal waste fi rst FCC landfi ll in Poland Hungary and hazardous waste, 7. FCC Landfi ll Žabčice, sorting plant, ground sorting, 24. FCC Landfi ll Biała 20. RO landfi ll No. I (aftercare), biodegradation area landfi ll for hazardous waste 21. landfi ll No. II (active) and a solidifi cation plant landfi ll for municipal waste, 25. Romania composting plant, gas fl are 17. FCC Landfi ll Dolný Bar Serbia station landfi ll for municipal waste, sorting line, ground sorting 25. FCC Landfi ll Lapovo 8. FCC Landfi ll Únanov landfi ll for non-hazardous landfi ll, composting plant 18. FCC Waste Management waste Centre Trnava 26. 26. 9. FCC Waste Management landfi ll for municipal waste, FCC Waste Management Centre Lodin sorting line, ground sorting, Centre Kikinda Serbia landfi ll for , vcomposting plant landfi ll, ground sorting protected store of hazardous and a collection yard and a collection yard waste, sorting line, transfer station, composting and solidifi cation plants

6 Legend: Local headquarter Capital city 7 Our services We are reliable We are a leading private waste management company acting in Central Europe and SEE-countries. Long-time experience, modern equipment and facilities completed with state of the art technology make us a reliable partner for you.

Safe and sustainable solutions In everything we do in CEE, we adhere to EU regulations as a minimum. In most of our projects, we surpass even the strictest regulations by a signifi cant margin. We aim to lower the impact that waste has on the environment and ensure that the future generations fi nd the environment in better shape than we have.

We are your partner Since 1990 a great number of municipalities have chosen FCC Environment CEE, as their competent partner – in some cases in joint ventures – entrusting us with the management of waste disposal in accordance with EU-Standards. With our know-how waste management has been privatised successfully.

We are investor and operator We invest in integrated waste management solutions considering local requirements and needs. Investing is a continuous process over years along with improving of the respective waste management system in your country. business municipal environmental waste solutions & citizen services services & supports

» FCC Environment CEE is part of the Spanish FCC Group (www.fcc.es) and employs more than 4,000 people in 7 CEE countries.

FCC Group acts in 30 countries with 58,000 employees and having more than one hundred years of experience.

Service for the Future FCC Environment CEE GmbH A-2325 Himberg, Hans-Hruschka-Gasse 9 Tel. +43 2235855-0, Fax +43 2235855-2028 Email [email protected], www.fcc-group.eu

Issued: 09/2020