Design Commission Meeting Agenda Monday, January 11, 2010 Public
Total Page:16
File Type:pdf, Size:1020Kb
Design Commission Meeting Agenda Monday, January 11, 2010 Public Meeting 2:20 p.m. Consent Items 23771: Installation of a prototypical newsstand, northwest corner of West 77th Street and Broadway, Manhattan. (Preliminary and Final) (CC 6, CB 7) DConA/DOT 23772: Installation of a prototypical newsstand, 130 Third Avenue, northwest corner of East 14th Street and Third Avenue, Manhattan. (Preliminary and Final) (CC 2, CB 3) DConA/DOT 23773: Installation of a prototypical newsstand, 310 East 14th Street, southeast corner of East 14th Street and Second Avenue, Manhattan. (Preliminary and Final) (CC 2, CB 3) DConA/DOT 23774: Installation of a prototypical newsstand, 89 Seventh Avenue, northeast corner of Seventh Avenue and West 15th Street, Manhattan. (Preliminary and Final) (CC 3, CB 4) DConA/DOT 23775: Construction of an addition, Rochdale Village Community Library, 169-09 137th Avenue, Queens. (Final) (CC 28, CB 12) DDC 23776: Reconstruction of the Gilboa Dam and adjacent site work, Schoharie Reservoir, adjacent to Route 990V, Gilboa, Schoharie County. (Final) DEP 23709: Construction of a siphon chlorination station and adjacent site work, Two Front Street, Staten Island. (Final) (CC 49, CB 1) EDC/DEP 23777: Construction of an on-street segment of the South Bronx Greenway, Food Center Drive, East of Halleck Street, Bronx. (Preliminary) (CC 17, CB 2) EDC/DPR/DOT 23778: Construction of a waterfront park and streetscape improvements, Phase I, Thompson Street, Wall Street and Bay Street, Stapleton, Staten Island. (Preliminary) (CC 49, CB 1) EDC/DPR WITHDRAWN 23779: Construction of the esplanade, Phase II, East River Waterfront from the Battery Maritime Building (south of Broad Street) to Wall Street, Manhattan. (Preliminary) (CC 1, CB 3) EDC/SBS Design Commission Meeting/ Monday, January 11, 2010/ Page 2 23780: Reconstruction of the Allen Street and Pike Street Malls, Phase II, Allen Street between Delancey Street and Hester Street, and Pike Street between Madison Street and South Street, Manhattan. (Final) (CC 1, CB 3) DPR/DOT 23781: Construction of a park, including the rehabilitation of and addition to the Victory Diner for use as a concession, construction of a shade structure and adjacent site work, Phase II, Midland Beach, Father Capodanno Boulevard between Slater Boulevard and Seaview Avenue, Staten Island. (Final) (CC 50, CB 2) DPR 23782: Construction of a Jaguar Exhibition, Queens Zoo, 55-51 111th Street, Queens. (Final) (CC 21, CB 4) DPR 23783: Conservation of the Maryland Monument (1895) by Stanford White, Lookout Hill, Prospect Park, Brooklyn. (Final) (CC 39, CB 6, 7, 9, 12 & 14) DPR 23784: Conservation of Eaphae-Aekyad #2 and Kryeti-Aekyad #2 by Douglas Abdell, John Jay Park, FDR Drive, East 76th Street, Cherokee Place and East 78th Street, Manhattan. (Final) (CC 5, CB 8) DPR 23785: Construction of a comfort station and adjacent site work, Rachel Carson Park, Colden Street and 45th Avenue, Kissena Corridor Park West, Queens. (Preliminary) (CC 20, CB 7) DPR 23786: Construction of a children’s garden and adjacent site work as phase I of the reconstruction of a plaza, La Guardia Place between Bleecker Street and West Third Street, Manhattan. (Preliminary) (CC 1, CB 2) DPR/DOT 23787: Rehabilitation of the Park Avenue Tunnel, Park Avenue from East 34th Street to East 39th Street, Manhattan. (Final) (CC 2, 3 & 4, CB 5 & 6) DOT 23788: Expansion of the Hospital for Special Surgery, East 70th Street, East 72nd Street, western edge of the FDR Drive and the East River, Manhattan. (Final) (CC 5, CB 8) DOT 23789: Rehabilitation of 48 East 129th Street, Manhattan. (Preliminary and Final) (CC 9, CB 11) HPD WITHDRAWN 23790: Installation of rooftop mechanical equipment, 33rd Police Precinct, 2207 Amsterdam Avenue, Manhattan. (Preliminary and Final) (CC 10, CB 12) NYPD Design Commission Meeting/ Monday, January 11, 2010/ Page 3 Public Hearing 2:25 p.m. 23791: Installation of a prototypical newsstand, southwest corner of 41st Avenue and 81st Street, Queens. (Preliminary and Final) (CC 25, CB 4) DConA/DOT 2:45 p.m. 23792: Reconstruction of Chatham Square and installation of streetscape improvements, including the construction of ramp access to One Police Plaza, as Phase II of the reconstruction of Park Row and Chatham Square, Frankfort Street to Catherine Street, Manhattan. (Final) (CC 1, CB 1 & 3) DDC/DOT/EDC/DPR Design Commission meetings are held in the conference room on the third floor of City Hall, unless otherwise indicated. Please note that all times are approximate and subject to change without notice. Members of the public who plan to attend are encouraged to arrive at least 45 minutes in advance of the estimated time; those who also plan to testify are encouraged to submit their testimony in writing at least three (3) business days in advance of the meeting date. Any person requiring reasonable accommodation in order to participate should contact the Design Commission at least three (3) business days in advance of the meeting date. Design Commission City Hall, Third Floor New York, NY 10007 Phone: (212) 788-3071 Fax: (212) 788-3086 .